HomeMy WebLinkAboutContract 48148-CO2 FORT WORTH® City of Fort Worth CITY SECRETARY Change Order Request Breakdown CONTRACTNO. C, Project Namel FW South Pavement Replacement(FY 15-CD9) City Sec;; 1 48148 Client Project#(s)l 2375 Contractorl McClendon Construction Co. PM Mary Hanna i Inspectorl Gary Deyon Change Order Submittal# 0 Date 9/11/2017 Dept. Stormwater& Water Sewer Contract Time TPW Totals CD Original Contract Amount $1,814,899.49 $1,182,564.06 $82,200.00 $3,079,663.55 280 Extras to Date $11,250.00 $10;550.00 $23.540.00 $45,340.00 Credits to Date Pending Change Orders(in M&C Process) Contr<',c:Cost, Date $1,826,149.49 $1,193,114,06 $105.740,00 $3,125.003.55 301 Go ADD& DE'_Ta^s' Enter CO Backup $0.00 $0.00 $98391.65 $98,391.65 115 Revised Contract Amount $1,826,149.49 $1,193,114,06 5204.13'.55 $3,223,395.20 416 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 $0.00 $0.00 Additional Funding(if necessary) $98,391,65 $98,391.65 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 4.67% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $3,849,579.44 JUSTIEICATION{#SAS ,IlO C 0 The reason for this change order is to add new sewer fine,manholes,and sewer service on Galveston Ave.that was not part of the original contract and will service future development. Once concrete work was complete on Galveston Ave.it was discovered that a sewer line outside the scope of work in the contract was never installed. To install the line at this time it is necessary to delay milling and asphalt overlay, remobilize utility crews to complete the added work,repair concrete curbs and ramps disturbed by added utility work,reschedule milling and asphalt overlay,and final cleanup which is the reason for the additional time. 1 3 4 515- c_ lot f� OFFICIAL RECORD CITY SECRETARY ':T WORTH,TX Fo T� Wow City of Fort Worth T Change Order Additions Project Name FW South Pavement Replacement(FY 15-CD 9) mm T mm W City Sec# 48148 Client Project# 2375 Contactorl McClendon Constriction Co. PM Mary Hanna Inspector Gary Deyon Change Order Submittal# 0 Date 9I11I2017 ADDITIONS HEM DESCRIPTiON City Unit U 122L Total Unit 11 6anitary Sewer 21 8"PV ewer Pipe 10'-12'deep Sewer 267.00000000 LF 5:. 22 Pre- TVlnspection Sewer DO LF 23 Inscpetion Post Construction CCTV Sewer 267.00 00000 LF 24 Trench Safety System>5'Depth Sewer 2 LF 1: 25 Manhole 4'Diameter to 6'Depth Sewer 2.00 Ea5,55..1 u. 26 Manhole 4'Dia Added Depth Sewer VF 27 Manhole Vacuum Test ewer Ea 5 28 ollar-Manhole(5x5) ewer 2. Ea 5 G.;. 29 Remove 'Dia Sewer Manhole Sewer 1Z000000 Ea001 30 angary Sewer Grouting Sewer 0.5 -CyTEN—< - 1 ide Asphalt Pavemetn Repair,Residential Sewer 267.00000000 LF 32 Extra Width Nnnt Repair Residential Sewer 40.00000000 Y 33 Connect to Manhole Sewer T.0 0 Ea $2,400 C: 34 Construction Staking Sewer 1.0000060 L -f77.7 5Te-mobilization Sewer 1.00000000 Ea 7, 36 4^Sewer Service Tap,Service Line&Cleanout ewer 1.660066615 Ea o S. 37 5'Wide Asphalt Pavemetn Repair,Residential Sewer 22.00000000 LS WO ­ 38 Extra Width Pvmt Repair Residential Sewer 3.00000000 SY $70 7 Sm-wal;cd`. V $98,391 00.6Ci50� yc?i.3 Change Order Additions Page 1 of 1 Fo_RT WoerH City of Fort worth Change Order Deletions Project Name I FW South Pavement Re acement FY 15-CD9 City Sec# 48148 ClientProject# 1 2375 Co*actDrl McClendon Construction Co. PM1 Mary Hanna Inspector Gary Deyon Change Order Submittal# Date 9111/2017 DELETIONS ITEM DESMUM77--- DEPT City Unit Unit Cost Total Stonnwater8 TPW $0.00 Water $0.00 S. _ $0.00 -- Change Order Deletions Page 1 of 1 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO Lions Gate Logistics Haul Off Trucking $1,000.00 Total $1,000.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 CFW Change Order Approval Wa-COApp02 Page 2 of 3 FORT WORTHo, City of Fort Worth --- Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 2 Change Order No.: Wa-COApp02 Date Started: 2017-11-06 City Sec. No.: 48148 Date Due: 2017-12-26 Project Name: 02375 - FY15 - CD 9 Street Repair and Reconstruction Program 02375 & c02445 DOE Numbers: Project Numbers: Project This is Round 1 of CD9 Street Repair and Reconstruction Description: Program (c02375) Project Manager: Mary Hanna City Inspector: Gary Deyon Contractor: McClendon Construction Company, Inc. COUNCIL ACTION (If Required): M&C Log Name: 60SFWPNSMDCO2-MCLENDON M&C Number: c-28466 M&C Date: 2017-11-07 COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: Sewer $ 98,391.65 56011-0700430-5740010-CO2445-C 115 Total Cost: $ 98,391.65 Total Requested Days: 115 Approval Status: https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&ProcessI... 11/9/2017 CFW Change Order Approval Wa-COApp02 Page 3 of 3 Approved: Yes Comments: User: Justin Blair Date: 2017-11-06 8:31 AM Approved: Yes Comments: User: Mary Hanna Date: 2017-11-06 8:49 AM Approved: Yes Comments: User: John Kasavich Date: 2017-11-08 1:17 PM Approved: Yes Comments: User: Chris Harder Date: 2017-11-08 1:35 PM mm. Approved: Yes Comments: User: Jay Chapa Date: 2017-11-08 2:53 PM Action Required: C. APPROVED AS TO FORM AND LEGALITY. A . sled CITY ATTORNEYD*4(SW. 81aGc. 1\4g 'y J. pii, ec t wan XAS. OFFICIAL RECORip i CITY SECRETARY FT. WORTH, TX https://projectpoint.buzzsaw.com/ bz web/Forms/FomiPrint.aspx?SiteId=51500&ProcessI... 11/9/2017 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Mary HamULIA Sr.Professional Engineer,TPW ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature o� OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 11/7/2017 DATE: Tuesday,November 7,2017 REFERENCE NO.: **C-28466 LOG NAME: 60SFWPNSMDCO2-MCCLENDON SUBJECT: Authorize Execution of Change Order No.2 in the Amount$98,391.65 and the Addition of 115 days to City Secretary Contract No.48148 with McClendon Construction Company,Inc., for a Revised Contract Amount of$3,223,395.20 for Round 1 of the Council District 9 Street Repair and Reconstruction Program and the Near Southside Medical District Water and Sanitary Sewer Main Improvements Project(COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council authorize execution of Change Order No.2 in the amount$98,391.65 and the addition of 115 days to City Secretary Contract No.48148 with McClendon Construction Company,Inc.,for a revised contract amount of$3,223,395.20 for Round 1 of the Council District 9 Street Repair and Reconstruction Program and the Near Southside Medical District Water and Sanitary Sewer Main Improvements Project. DISCUSSION: On August 23,2016,Mayor and Council Communication(M&C C-27883)the City Council authorized a contract with McClendon Construction,Company,Inc., in amount of$3,079,663.55 for Round 1 of the Council District 9 Street Repair and Reconstruction Program and the Near Southside Medical District Water and Sanitary Sewer Main Improvements Project. The contract was subsequently revised by Change Order No. 1 in the amount of$45,340.00 administratively authorized July 25,2017. Change Order No.2 will provide for additional sanitary sewer installation on Galveston Avenue(W. Lueda Street to W. Terrell Avenue)to serve proposed development on the street.In addition to the Change Order amount, $10,000.00 is required for project management and inspection. Construction is estimated to be complete by November 2018. M/WBE OFFICE&ndash;A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Department and approved by the M/WBE Office,in accordance with M/WBE or BDE ordinance,because the purchase of goods or services from source(s)where subcontracting or supplier opportunities are negligible. This project is located in COUNCIL DISTRICT 9. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations,funds will be available in the current capital budget,as appropriated,of the Water and Sewer Bond Fund 2016,the Water and Sewer Bond 2017A Fund,the Water Capital Project Fund, and the Sewer Legacy Capital Project Fund. The Water and Wastewater Capital Improvement Plan includes an appropriation of$250,000.00 for programmable Wastewater Collectors Rehabilitation Related Projects-P00003. After the funding of this M&C,the amount of$114,608.00 of the original appropriation will be available to fund future individual projects. Funding for Round 1 of the Council District 9 Street Repair and Reconstruction Program and the Near Southside Medical District Water and Sanitary Sewer Main Improvements Project as depicted below: FUND Existing Additional Project Appropriations Appropriations Total* 2016 Water and Sewer $147,600.00 $0.00 $147,600.00 Bend Fund 5'6005, 201 x1 ♦♦alll and Sewer $1,399,392.00 $0.00 $1,399,392.00 Bond Fund 56011 Water Capital $337,835.00 $0.00 $337,835.00 Fuud 59601 Sc\ cr Capital Fund-Legacy $183,955.00 $0.00 $183,955.00 59607 Project Total 1 $2,068,782.00 $0.00 1$2,068,782.00 *Rounded for presentation purposes. FUND IDENTIFIERS(FIDs): ig Department Account Project Program Activity Budget Reference# Amount Fund ID ID year (Chartfield 2) EH--M Department Project Program Activity Budget Reference# Amount Fund ID Account ID year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Kara Shuror (8819) Additional Information Contact: John Kasavich (8480) ATTACHMENTS 1 60SFWPNSMDCO2-McCLENDON FID Table.docx (cFw Intemai) 2. 60SFWPNSMDCO2-MCCLENDON Map Ol.pdf (Public) 60SFWPNSMDCO2-MCCLENDON Waiver.pdf (CFW Intemal) 4, Form 1295 Certificate 100275176 CO 2.12df (Public) 5. McClendon SAM.pdf (CFW Internal) a CERTIFICATE OF INTERESTED PARTIES FORM '.2gJ 1of1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Comolete Nos.1,2,3.5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-263059 McClendon Construction Company,Inc Burleson,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 09/20/201.7 being filed. City of Fort Worth Date Acknowledged: �— 3 Provide the identification number used by the governmental entity or state agency to track or identity the contract,and provide a description of the services,goods,or other property to be provided under the contract. City Proj#02445&02375 City Proj#02445&02375 Paving and Utility Construction Change Order#2 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling I Intermediary McClendon,Dan Burleson,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm.under penalty of perjury,that the above disclosure is true and correct. l d Signature of authorized agent of contracting business entity AFF-IX NOTARY STAMP f SEAL ABOVE Sworn to and subscribed before me,by the said this the day of 20—(7 to certify which,witness my hand and seal of off? MARY1 PORTER ``- My WHY ID#185864 tg OF?t'' E*w September 17,2020 42 Q Signat officer administering oath Printed nhme of officer adrrtinis...... oath le of officer administeriAd oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.3337