Loading...
HomeMy WebLinkAboutContract 49840 w Developer and Project Information Cover Sheet: Developer Company Name: Pine Meadows Development Company,LLC ....................._.............................................................._............................................................................_................_............._..................................._................_..................................................._..............._........................._..._.............................._................_..........................................._.__..._.._._._._._.....-- Address, State,Zip Code: 5137 Davis Blvd. Fort Worth,TX 76180 Phone&Email: 817-281-3509, Authorized Signatory,Title: Terry Sandlin , General Partner Project Name: Pine Meadows Phase 2 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights ........................................_._.._...........-.............................._..............._.........................................................._.._...................._.._... ..........................................:.............................._............................................................._................................._..._......_................._.....----.......... ; Project Location: North of Thompson Rd, South of N.Tarrant Pkwy,East of Old Denton Plat Case Number: .. FP-16-124 Plat Name: Pine Meadows Phase II ....... --.._......._.......__............_..._...................................._._......................._.........._.r.._............................ -.......................................;_................._...._............._........._..........._..............._........._.........................._............... ................ — ._... Mapsco: TAR-035H Council District: 1 4 CFA Number: CFA-2017-109 City Project Number: 100824 i To be completed by staff Received by: Date: City of Fort Worth,Texas Standard Community Facilities Agreement-Pine Meadows Phase 2 CFA Official Release Date: 02.20.2017 Page 1 of 11 ' Sb, c� EEGEI�IED r OCT 2 2017 a 6s CRY OF FORTWOR� �: cQ CIV SECRETARY � 9SSTANDARD COMMUNITY FACILITIES AGREEMENT� SZtiW THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. q �`� WHEREAS, Pine Meadows Development Company, LLC, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Pine Meadows Phase 2 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Pine Meadows Phase 2 CFA Official Release Date:02.20.2017 OFFICIAL RECORD Page 2 of 11 CITY SECRETARY FT.WORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ®, Sewer(A-1) ®, Paving(B) ®, Storm Drain (B-1) ®, Street Lights & Signs (C) N. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section 11,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section 11, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Pine Meadows Phase 2 CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. 1. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Pine Meadows Phase 2 CFA Official Release Date:02.20.2017 Page 4of11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers,agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims,suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Pine Meadows Phase 2 CFA Official Release Date:02.20.2017 Page 5of11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Pine Meadows Phase 2 CFA Official Release Date:02.20.2017 Page 6of11 14 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth.Texas Standard Community Facilities Agreement-Pine Meadows Phase 2 CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Pine Meadows Phase 2 CFA No.: CFA-2017-106 City Project No.: An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 129,537.50 2.Sewer Construction $ 166,392.50 Water and Sewer Construction Total $ 295,930.00 B. TPW Construction 1.Street $ 413,225.48 2.Storm Drain $ 189,076.50 3.Street Lights Installed by Developer $ 34,292.50 4. Signals $ - TPW Construction Cost Total $ 636,594.48 Total Construction Cost(excluding the fees): $ 932,524.48 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 5,918.60 D. Water/Sewer Material Testing Fee(2%) $ 5,918.60 Sub-Total for Water Construction Fees $ 11,837.20 E. TPW Inspection Fee(4%) $ 24,092.08 F. TPW Material Testing(2%) $ 12,046.04 G. Street Light Inspsection Cost $ 1,371.70 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 37,509.82 Total Construction Fees: $ 49,347.02 Choice Financial Guarantee Options,choose one Amount 'Marr one` Bond=100% $ 932,524.48 Completion Agreement=100%/Holds Plat $ 932,524.48 x Cash Escrow Water/Sanitary Sewer=125% $ 369,912.50 Cash Escrow Paving/Storm Drain=125% $ 795,743.10 Letter of Credit=125%w/2yr expiration period $ 1,165,655.60 City of Fort Worth,Texas Standard Community Facilities Agreement-Pine Meadows Phase 2 CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER ! Pine Meadows Development Company,LLC /aI �— Jesus J. Chapa Assistant Ci y Ma ge Date: Name: erry ndl' mop- Recommended by: Title: its 'VrV0,W Date: l b/11111-2 Wendy Chi-Babulal, EMBA, P.E. ATTEST: (Only if required by Developer) Development Engineering Manager Water Department D"'.1,�— l,i, (,j Signature Douglas A. Wiersig, P.E. Name: Director Transportation & Public Works Department Contract Compliance Manager: Approved as to Form &Legality: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting Richar A_. McCracken requirements. Assistant City Attorney M&C No. IvltA Date: Name: Janie Morales Form 1295: N l — Title: Development Manager ATTEST: FORT �O Mary J. Ka er City Secretary TEXPS City of Fort Worth,Texas Standard Community Facilities Agreement-Pine Meadows Phase 2 OFFICIAL RECORD CFA Official Release Date:02.20.2017 Page 9 of 11 CITY SECRETARY FT�FORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvements ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Pine Meadows Phase 2 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. None City of Fort Worth,Texas Standard Community Facilities Agreement-Pine Meadows Phase 2 CFA Official Release Date: 02.20.2017 Page 11 of 11 N . TARRANT PKWY PINE MEADOWS II Cf] w FOSSIL TREE LANE 0 0 0 y 3: w O > Q -H-550M 0 w co w PINE o Ex MEADOWS II y w HOLLY BROOK LANE Z a THOMPSON RD VICINITY MAP N.T.S. MAPSCO NO. TAR-035H r COUNCIL DISTRICT 4 NOTE: ALL SEWER LINES ARE 8" IN DIAMETER UNLESS SHOWN OTHERWISE. — i a I LAPEN LBR�IDK IANEr LI PROP.8"SS Y Ts �' a Is 16 n' 18 r9 TB ' Tf ]1' TJ z+ T5 'm at Ou IBLCCK� F� I TI OI 19 I1 If 10 9 , B ) B S I ] ' 1 f a I RGREEN � � I 'p1E � r� —19 PROP 8"SS dbrB O !aE>FNnavvraval 1) i fI 15 1B IT IB 19 TB TI TT' T9 TI T5 1D i)� —„ BLOCK e .I1 Y it to 9 'BL©CK ' I i7 i i i 8 � ' 6 i 5 �i � i J i 2 i 1 I I I "I ' 'FOS ILT EE LANE I i 'I v_t" - -----------_______________________________________�I i�_______ iJ t. ______________ EXIST,B"SS ---------r---- _______ 1J Mil 1 ------_ -------- �� 11 ' 15 r 16 17 ' 18 19 20 21 '22 2J 24 25 26 L C - I 4 I ' BLOCK � r ' B I LEGEND PROP.8" SANITARY SEWER 0 — PROP.MANHOLE 7�T ---------- EXIST.SANITARY SEWER 1� ----(D----- EXIST.MANHOLE SCALE:1" 200' LIMITS OF PROJECT - ENIGEERING-SURVEYORS.PLMNERa PINE MEADOWS PHASE 11 OWNER eooa 117)33aN TERRACE c2TLE ILLE.Tx7eoaa PINE MEADOWS DEVELOPER COMPANY,LLC (e1T lase-aaoa SANITARY SEWER 5137 DAVIS BLVD. CONEULTANTE,L.L.¢ ".tall lase-ooea FORT WORTH,TX 76180 TBPE FIRM .20 EXHIBIT 'A-1' TEL-(817)281-3509 00 42 43 DAP-BID PROPOSAL Page I of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of No. Description Section No. Measure Bid Quantity Unit Price Bid Value UNIT I:WATER IMPROVEMENTS 1 3305.0109 Trench Safety 33 0S 10 LF 2,135 $0.10 $ 213.50 2 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 1.0 $4,300.00 $ 4,300.00 3 3311.0261 8"PVC Water Pipe 3311 12 LF 2,135 $22.40 $ 47,824.00 4 3312.0001 Fire Hydrant 33 12 40 EA 3 $2,700.00 $ 8,100.00 5 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 3 $800.00 $ 2,400.00 6 3312.2003 1"Water Service 33 12 10 EA 82 $750.00 $ 61,500.00 8 13312.3003 8"Gate Valve 33 12 20 EA 4 $1,300.00 $ 5,200.00 TOTAL UNIT I:WATER IMPROVEMENTS $129,537.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Pine Meadows-Phase Two Form Version April 2,2014 City Project 4100824 NOTE: ALL WATER LINES ARE 8" IN DIAMETER UNLESS SHOWN OTHERWISE. JA--------- — — — — — 971 ,, , 9519, ,mer°c — — --- ---_--- ____ ri ---ASPEN�R901F Lw.T_—_—_—___—_—_—_ _ —2S Y J 21 ab gu _I I .1__I f�l I IBCK T=—�_L -2, I �N" ' I2 I, r0 9 B , . B ' 5 ' I 9 ' 1 I J x w 9 re� '--_—___—EYER6REEN-i1{B6E-Hp�yB_—_—_—___—.—_--{ re O i) /OEIFNnONPoN01 16 Y71 JB ' /9 ' X1 2/ V 19 17 BLCICK re -------,II'' 2 i^ 16 Iii /J 12 8 J B 5 I J 1 i I i - f5io v � � � �exls'r.a..W,L -------- ----- --- --------------- i� 11 ii _ __________________i-0SSlkiRfE-kANE----------__---- pro � --- ---T---T---T---I--- ------- i IS 16 17 18 : 1.9 :20 :21 :22 21 21 75 26 film------ ISI F-- --- ---�---1 BLACK; 4 I i � � -- -- _ i- i- f-- t---i---� LEGEND --------------- EXIST.WATER LINE - PROP.8" WATER LINE 1�T -------*------ EXIST.GATE VALVE PROP.GATE VALVE 1V ------¢------- EXIST.FIRE HYDRANT PROP.FIRE HYDRANT LIMITS OF PROJECT SCALE:1'' 200' - NOw lIVRVEYOWw PLWWEFS PINE MEADOWS PHASE 11 OWNER 00 E c0LEWILL 5x75034WATER PINE MEADOWS DEVELOPER COMPANY,LLC lelass-0000 5137 DAVIS BLVD.AN l60 4 COIIBULTAMT8,L.L.C. """I'll 1001-0015 FORT WORTH,TX 76180 TBPE FIRM .ZO EXHIBIT 'A' TEL.(817)281-3509 00 42 43 DAP-BID PROPOSAL Page 2 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of No. Description Section No. Measure Bid Quantity Unit Price Bid Value UNIT II:SANITARY SEWER IMPROVEMENTS 1 3301.0002 Post-CCN Inspection 3301 31 LF 2,625 $1.50 $ 3,937.50 2 3301.0101 Manhole Vacuum Testing 3301 30 EA 10 $110.00 $ 1,100.00 3 3305.0109 Trench Safety 33 05 10 LF 2,625 $1.00 $ 2,625.00 4 3305.0202 Imported Embed/CSS 33 05 10 LF 140 $24.00 $ 3,360.00 5 3331.4115 8"Sewer Pipe 3331 20 LF 2,625 $28.00 $ 73,500.00 6 3331 3101 4"Sewer Service 3331 50 EA 81 $630.00 $ 51,030.00 7 3339 1001 4'Manhole 33 39 10 EA 10 $2,500.00 $ 25,000.00 33 39 20 8 3305 0112 Concrete Collar 33 05 17 EA 1 $ 300.00 $ 300.0 9 3339.1003 4'Extra Depth Manhole 3339 10,33 VF 14 $110.00 $ 1,540.00 3920 10 19999.0001 8"Steel Casing for Sewer Service 9999 99 LF 80 $25.00 $ 2,000.00 11 3305.0116 Concrete Encasement for Utility Pipes 33 05 10 1 LF 40 $50.00 $ 2,000.00 TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $166,392.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Pine Meadows-Phase Two Forth Version April 2,2014 City Project 0100824 B I I I j I .1__I I_ ]¢] BL CK I 1 B S4 J ' 1 ,. _- p 9 4Ry s �'• V ` NC`BttICiE: �. ,s .� -B� (OEIFN NsIJNO/ !� -j � I m� 2f ' 22 T9 ' 2! ' - ,> I BLOCK B 11 77 �i i i H i l i 6 i 5 ! 3 T ! 13 BLOCK; 5 v li o- --------------- -- --- --- - - - iJ » i i„ FOSSIL TREE IANE I___T___T___T___r___r___r___r___r__-i � 1------ lI 15 i 16 17 1 18 19 20 21 i 77 :2j :24 75 76 ------_� BLOCK: 4 ---i--- 'r---17-- il----I-- F- 1- �- -1- 1---1- 1---i LEGEND PROP.29'B-B ROADWAY N 50'ROW LIMITS OF PROJECT SCALE:1" 200' - ENIOEERINO r BURVEVOR!.PLANNERS PINE MEADOWS PHASE 11 OWNER 60D0 TNOAVBON TERRACE PAVING IMPROVEMENTS W LEVVILLE.TXT6034 PINE MEADOWS DEVELOPER COMPANY,LLC I" 3"W000 5137 DAVIS BLVD. CONSULTANTS.L.L.C. RA%r(Il )p8E-Yi66 FORT WORTH,TX 76180 u -PE FIRM 20 EXHIBIT 'B' TEL.(617)281-3509 00 42 43 DAP-BID PROPOSAL Page 4 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of No. Description Section No. Measure Bid Quantity Unit Price Bid Value UNIT IV: PAVING IMPROVEMENTS 1 3211.0400 Hydrated Lime 32 1129 TON 157 $155.00 $ 24,303.23 2 3211.0501 6"Lime Treatment 32 1129 SY 8,035 $2.85 $ 22,899.75 3 3211.0502 8"Lime Treatment 32 1129 SY 2,015 $2.85 $ 5,742.75 3 3213.0101 6"Conc Pvmt 32 1313 SY 7,060 $37.60 $ 265,456.00 4 3213.0102 T'Conc Pvmt 32 1313 SY 1,775 $39.45 $ 70,023.75 5 3213.0302 5"Conc Sidewalk 32 1320 SF 70 $10.00 $ 700.00 6 3213.0501 Barrier Free Ramp,Type R-1 32 1320 EA 4 $2,000.00 $ 8,000.00 7 3213.0504 Barrier Free Ramp,Type M-2 32 1320 EA 4 $2,000.00 $ 8,000.00 8 3213.0507 Barrier Free Ramp,Type P-2 32 1320 EA 4 $1,650.00 $ 6,600.00 9 9999.0002 Install Type III Barricade 00 00 00 EA 1 $1,500.00 $ 1500.00 TOTAL UNIT IV: PAVING IMPROVEMENTS $413,225.48 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Pine Meadows-Phase Two Form Version April 2,2014 City Project#100824 ' J OV IS 7 ' � r r - L -� ! -Lt�` �- L L_� is_L__L L_ X ROP. P 21"SO X D rT I ASPEN BROKE 7-7-- J 3 u�l r 13 ZJ 2 I /I a 0 '2 f-I I -F-- -*-Kll �1 10 0 _ a PROP. E IST. --9 w EVERGREEN RIDGE ROAD PROP.24"SDlp-ppyPo,�,ol !i Vr p —r r p rT ill r /S f6 I) is 1s p ' Zf Z2' IJ X 15 X r i —' BLf�CK� I f6 1J /7 B 7 6 5 i 1 J 2 1 15 'Y is � u la 19 IBL©CK' S—L ' �1Ii Pi-------- -—--------------------------------- ------ -- --------------------------------- ------- ----------- m r II 15 z+ BLOCK4__ I _ / I 'I LEGEND PROP.STORM DRAIN LINE —C PROP.HEADWALL T PROP.INLET -------------- EX.STORM DRAIN ■ PROP.MANHOLE SCALE:1" 200' LIMITS OF PROJECT ENIOEERINQ�Bl#i VETOFB w PLANM¢113 PINE MEADOWS PHASE II OWNER All00THOWSM °°°°EYVILL TX760 STORM DRAIN LLEwaLE.Tx7eosa PINE MEADOWS DEVELOPER COMPANY,LLC uv 133E-MO 11 5137 DAVIS BLVD. CO NSULTANTS,L.L.C. FM-($71333-99- EXHIBIT /B-1, FORT WORTH,TX 76180 �p nPE FIRM.20 TEL.(81 7) 281-3509 00 42 43 DAP-BID PROPOSAL Page 3 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of No. Description Section No. Measure Bid Quantity Unit Price Bid Value UNIT III: DRAINAGE IMPROVEMENTS 1 3305.0109 Trench Safety 33 05 10 LF 1,351 $0.50 $ 675.50 2 3341.1201 5x3 Box Culvert 3341 10 LF 91 $267.00 $ 24,297.00 3 3341.1102 4x3 Box Culvert 3341 10 LF 304 $214.00 $ 65,056.00 4 3341.0302 30"RCP,Class III 3341 10 LF 40 $87.00 $ 3,480.00 5 3341.0205 24"RCP Class Ill 3341 10 LF 916 $68.00 $ 62,288.00 6 3349.0001 4'Storm Junction Box 33 49 10 EA 1 $3,900.00 $ 3,900.00 7 3349.5001 10'Curb Inlet 33 49 20 EA 6 $3,500.00 $ 21,000.00 8 3349.0104 4'Stacked Manhole 33 49 10 EA 2 $1,300.00 $ 2,600.00 9 3349.7001 4'Drop Inlet 33 49 20 EA 1 $4,500.00 $ 4,500.00 10 0241.0800 Remove Rip Rap 0241 13 SY 128 $10.00 $ 1,280.00 TOTAL UNIT III: DRAINAGE IMPROVEMENTS $189,076.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Pine Meadows-Phase Two Forrn Version April 2,2014 City Project 9100824 1 I /7" y_= 4— — — — — — ----- T7 i7B 7B Tl L i i "LB ocC1 ! L i ' u� T9 , I( fl IIS 15 !B 1) 1B 1B ra 1J a 19 ' V X :TB G _I I_ I _ I _I I 1 . o 0 ' o 1 L r J ' u r� I IBL�C'CK —� I I $ -21 I I f3 1T If , lO 9 B ) 6 5 4 9 1 1 Q , X yf f9 7 ___ e. �f9 /GIElFNIICNP0N0/ 11 — ,Bir �I EVE GRE N IDG RO D � ( IS IB 171 16 IB : TB 2f , 1P T9 i 14 ffi TB 1!� i7 BLOCK re 4 ! ! 7 1 _ ---__ s BLKI - --- ' ! r, ---- -5 - i --+I-- � iiIIIr -------- ---------- - 5_ -- -------`------ __ ___ ___ __ FOL TTEE ANEI 1B 19 71 7J 71 75 76 -------- L--- ---I :22 Ib 17 i 12 BL©CK; 4 -- 'I ---+---+-- LEGEND PROP.SINGLE STREET LIGHT EXIST.SINGLE STREET LIGHT LIMITS OF PROJECT SCALE:1" - 200' AENIOEERINO 3UPVEYORe.,PLANMERe PINE MEADOWS PHASE 11 OWNER 600°111p3P60MTfl""� STREET LIGHTS I COLIEWILLE TX7e°81 PINE MEADOWS DEVELOPER COMPANY,LLC t 171335-ee00 5137 DAVIS BLVD. CONSULTANTS,L.L.C. FAxwlev 1335-eee5 EXHIBIT ,�' FORT WORTH,TX 76180 At TBPE FIRM •20 TEL.(817)281-3509 00 42 43 DAP-BID PROPOSAL Page 5 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of No. Description Section No. Measure Bid Quantity Unit Price Bid Value UNIT V:STREET LIGHTING IMPROVEMENTS 1 2605.3015 2"CONDT PVC SCH 80(T) 26 05 33 LF 595 $9.00 $ 5,355.00 2 3441.3301 Rdwy Illum Foundation TY 1,2,and 4 34 41 20 EA 9 $950.00 $ 8,550.00 3 3441.3351 Furnish/Install Rdway Illum TY 11 Pole 34 41 20 EA 9 $1,250.00 $ 11,250.00 4 3441.1646 Furnish/Install Type 33B Arm 34 41 20 EA 9 $500.00 $ 4,500.00 5 3441.3401 6-6-6 Triplex Alum Elec Conductor 34 4120 LF 595 $2.50 $ 1,487.50 6 9999.0003 Furnish/Install LED Lighting Fixture(50 watt 34 41 20 EA 9 $350.00 $ 3,150.00 ATBO Cobra Head) TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $34,292.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Pine Meadows-Phase Two Form Version April 2,2014 City Project 9100824 17 16 B OC 7 ASPEN BROOK LANE 13 ' ? 14 13 >6 11' iB ' 099 ' 10 : 109 11 19 14 5 TB ---51 2? 14L l� BL CK 1B 093 12 fl 10 9 e J B ' 54 9 EVERGREEN RIDGE ROAD r4 13 ,B 1711 ' m ' zr zz' zs za ' zs as 17 BLgCK T W ## 16 15 L 17 8 7 , 6 5 4 J 2 I 13 U Is l ' a to 9 :BLOCK! 5 i ----4- �._____�� ---------________'__--"--------- ----------- -----' ii------- /4 FOSSIL TREE LANE -----------------------------� ----- 1 tJ II II � i I II II ' I ' I � � � �28 i 11 �22 �1J i 14 i 25 � 26 ' I ii 14 IS 16 17 18 l9 ' ----F--F------ ---1—LbCKI4---i---t 12 I I I ;BLOCK; ' I I � � I LEGEND PROP.STREET SIGN /STOP SIGN 7� a EXIST.STREET SIGN l� LIMITS OF PROJECT SCALE1" = 200' ERIRO,SURVEYORS.PLWHERB PINE MEADOWS PHASE 11 OWNER ASK 5850 n4OWEYVILL. TERRAC0LLEYVa S r MRRA PINE MEADOWS DEVELOPER COMPANY,LLC Ie1rIsaS-0909509STREET SIGNS 5137 DAVIS BLVD. FAAu(5101585-090955 FORT WORTH,TX 76180 -PE FIRM •45 EXHIBIT 'C-l' (/'��./ 1 1` TEL.(817)281-3509 00 42 43 DAP-BID PROPOSAL Page 6 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of No. Description Section No. Measure Bid Quantity Unit Price Bid Value UNIT VI:STREET NAME SIGN IMPROVEMENTS 1 19999.0004 Street Name Blade 1 99 99 99 1 EA 1 8 $500.00 Is 4,000.00 2 9999.0005 Stop Sign 99 99 99 EA 4 $100.00 $ 400.00 3 19999.0006 Street Name Post 99 99 99 EA 1 4 $250.00 Is 1,000.00 TOTAL UNIT VI: STREET NAME SIGN IMPROVEMENTS $5,400.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Pine Meadows-Phase Two Forth Version April 2,2014 City Project#100824