Loading...
HomeMy WebLinkAboutContract 42236-A1 CITY SECRETARY A� AMENDMENT No.1 CONTRACT NO. TO CITY SECRETARY CONTRACT No. 42236 WHEREAS, the City of Fort Worth (CITY) and DeOtte, Inc, (ENGINEER) made and entered into City Secretary Contract No. 42236, (the CONTRACT) which was authorized by M&C C-25111 on the 23rd day of August, 2011 in the amount of $ 424, 713; and WHEREAS, the CONTRACT involves engineering services for the following project: Lower Como Erosion Control Improvements; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated November 2, 2017, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $26, 910. (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $451, 623. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD City of Fort Worth CITY SECRETARY Professional Services Agreement Amendment Template FT-WORTH,TX CFW Official Release 9/19/2017 Page 1 of 3 EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER DeOtte, Inc. Jesus Chapa Richard W DeOtte, P.E. , CFM AssistantCity Manager President r DATE: /(//' 3a —1 ? DATE: — Zo APPROVAL RECOMMENDED: Gir 4)�'z Doug PF Wiersig, P .D. , P.E. Director, T&PW Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and ' istration of this contract, including ensuring all pe rmance an po ting requirements. teven E. Euban s, P.E. , PMP, CFM Sr. Professional Engineer APPROVED AS TO FORM AND LEGALITY: M&C: �14° Date: Douglas W. Black Assistant City Attorney ATTEST: �Q� Foily OFFICIAL RECORD ary Ka ser " '* CITY SECRETARY city secretary `' FT.WORTH,TX City of Fort Worth Professional Services Agreement Amendment Template CFW Official Release 9/19/2017 Page 2 of 3 FUNDING BREAKDOWN SHEET City Secretary No. 42236 Amendment No. 1 Department Fund-Account-Center Amount TPW 59651-0200431-5330500-C01605-CO2830 $26, 910 Total : $26, 910 City of Fort Worth Professional Services Agreement Amendment Template CFW Official Release 9/19/2017 Page 3 of 3 MD E O TT E, INC. CIVIL ENGINEERING November 2, 2017 Mr. Steve Eubanks, P.E., Project Manager City of Fort Worth,Transportation&Public Works Department 1000 Throckmorton Fort Worth,Texas 76102-6311 Re: Amendment No. 1 City Project No. 01605; Design of Lower Como Erosion Control Improvements DOI No. 2010106-00 City Project No. 01605 Dear Mr. Eubanks, This memorandum is in reference to a contract between DeOtte, Inc. and the City of Fort Worth(the City)dated August 23, 2011 herein referred to as the"Contract." Our services during construction of this project exceeded the allotted time for those due to the sensitive nature of the construction. The previous memorandum of understanding from November 2015 had reduced the scope and fee for work under the contract but a portion of the additional construction phase work was allowed to be covered by those previous savings.As of the September 29 billing for the original contract,there is$1,500 remaining to be billed. Additional design services have been requested for new construction in the same creek beyond the limits of the original construction. This work will be completed under the original City construction contract as a change order. Amendment No. 1 is offered to cover the scope and fee of additional design work for this additional construction. Also, the remainder of the additional construction phase related assistance beyond the original contract is included in this amendment as well. The attached Level of Effort Spreadsheet includes the work for both the additional construction phase related work as well as the additional design work requested by the City. We anticipate that the amendment amount will be sufficient to complete all work in both the original design contract and the additional work needed in the creek. Original Contract Amount $424,713.00 Contract Amendment No. 1 26,910.00 Revised Contract Total 451,623.00 We sincerely appreciate the opportunity to work with you on this project. Should have any questions,please contact me at 817-253-5727. Respectfully, DeOtte, Inc. � Richard W. DeOtte, P.E. CFM President PHONE(817)337.8899 420 JOHNSON ROAD;SUITE 303,KELLER,TEXAS 76248 Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for Lower Como Erosion City Project No.01605 Labor It oursi Ex ansa Task Na. Task Description Project Sr.EngJPM EIT Civil Tech Env. rein Total Labor Subconsultant Trevel or Total Expense Task Sub Total Diroctor Planner Cost Other Reproduction Cost ate $200 100 $1100 $TO $1100 $00 MWBE Non-MWBE Ex nae. 1.0 Pro'ect Management 0 0 0 0 0 0 SO $0 $0 $0 s0 $0 so 1.1 M—gmg the Team $0 $0 $0 1.1 Direct D—gin Activities $0 $0 $0 1.1. Internal Team Meetin s $0 $0 $0 1.1. QAIQC $0 $0 $0 1.2 Communications and Reporting $0 $0 $0 1.2. Pm—Design Coordination Maetin $D $D $0 (monthly,bi-monthly,monthly)Project 1.2. Update Meetin s $0 1 $0 $0 1.2. Desi n Submittal Review Meelm s 1 $0 $0 $0 1.2. Prepare Baseline Schedule $0 $0 $0 Prepare Monthly Progress Reports with 1.2. Shcedde $0 $0 $D 1 2. Prepare Monthly MWBE Reports $0 $0 $0 1.2. Coordination and M mL Surve $0 $0 $0 1.2. Coordination and M mL Geotechnical $0 - $D $0 1.2. Coordination and M mt. Environment $0 $D $0 1.2 Coordination and M mt. FEMA $0 $0 $0 1.2. Invoicin $0 $0 $0 City of Fon Wirth.Texas Attachment B-Level 0 Effort Supp[emant PMO Official Release Date.5.19.2010 1 0(7 Level of Effort Spreadsheet TASKMOUR BREAKDOWN Design Services for Lower Como Erosion City Project No.01605 Labor ihours Ezp.nse Task No. Task Description ProJec[ Sr.En 7PM EIT Civil Tech Env' Atlmin Total Labor Subconsultant Travel or Total Expense Task Sub Total Director g' Planner Cost Other Reproduction Cost a[e $200 $160 $100 $70 $100 $60 MWBE I Non-MWBE Ex ensos 2.0 Conceptual Design 30-Percent 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 2.1 Data Collection $0 1 $0 $0 2.1. From Fort Worth $0 $0 $0 2.1. From Franchise Utilities $0 $0 $0 Drainage Computations and Drainage Area 2.2 Ma $0 $0 $0 2.2.1 Review EAsting Hydrology $0 $0 $0 Prepare and Analyze Models far Concept 2.1. Alternatives $0 $0 $0 23 Survey fivii Gorrondona $0 $0 $0 Design Surve $0 $0 $0 61 Level"B" $0 $0 $0 2.3 Geotechnical MAYBE.Addula) $0 $0 $0 2.4 Conceptual Design(2 C les) $0 $0 $0 2.4. Horizontal Alignment Stud/Exhibit $0 $0 $0 2.4. Phasing Plan $0 $0 $0 2.4. Design Concept Narrative $0 $0 $0 2 4.1 Quantity Takeoff $0 $0 $0 2.4. Easement IDIExhiba $0 $0 $0 24. Internal QAiQC $0 $0 $0 2.4. Assemble Design Package $0 $0 $0 2.5 Project Decision Lo $0 $0 $0 2.6 Construction Estimate $0 $0 $0 City of Fort Worth,Texas Attachment B-Level of Effort Supplement PMO ficial Release Date,5,19 2010 2 of7 Level of Effort Spreadsheet TASKMOUR BREAKDOWN Design Services for Lower Como Erosion City Project No.01605 Labor Ihours E as Task No. Task Description Project Sr.En /PM EIT Civil Tech Env. Atlmin Total Labor Subconsultant Travel ar Total Expense Task Sub Total Director 0' Planner Coat Other Reproduction Cost ate $200 $160 $100 $70 $100 $60 MWBE I Non-MWBE Ex enses 3.0 Preliminary Design 60 Percent 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 3.1 Survey Import and process $0 $0 $0 3.2 Preliminary Design Drawings 60% $0 $0 $0 3.2. Cover SheetlSheet Index $0 $0 $0 3.2. General Notes $0 $0 $0 3.2. D.—s Area M and Calcs 2 ,¢A $0 $0 3.2.j Surve/D,mens,onalMor.Control Plan $0 $0 $0 32. Overall Sheet Layout Plan $0 $0 $0 3.2. Plan and Profile 4 1"=20' $0 $0 $0 Cross Sections(60 xsecs@1OfSheet 32. 1"=10')=8 $0 $0 $0 3.2. Tree Mitigation Plan $0 $0 $0 32. Nationwide Permit Mitigation Drawing $0 $0 $o 32. Construction Details 2 $0 $0 $0 3.2. Erosion Control Sheets 1) $0 $0 $0 3.2 1 Detail Sheets-Erosion Control l $0 $0 $0 3.2. Detail Sheets-Traffic Control 2 $0 1 1 $0 $0 3.3 Specifications 2 Sets $() $0 $0 3.3. Front End Specifications $0 $0 $0 33. Bid Proosal $0 $0 $0 3.3.! Technical Specifications $0 $0 $0 3.4 Opinion of Probable Constuotion Costs $0 $0 $0 3.4. Quantity Takeoffs $0 $0 $0 3.4. P-in Evaluation $0 $0 $0 34. OPCC Spreadsheet Props at,., $0 $0 $0 3.5 Internal OA/OC $0 $0 $0 3.6 Constructebilit Review 3-F0 goes $0 0 $0 3.6. Meetin $0 i $0 $0 3 6. Meetin Report/Minutes/Pro.Lou $0. $0 $0 3.7 Ulllit Clearance 10-Full Size $0 $0 $0 3.4. Coordination with Public/Private Utilities $0 $0 $0 City of Fort Worth,Texas Attachment B-Level of Effort Supplement PMO Official Release Data:5.19.2010 3&7 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Lower Como Erosion City Project No.01605 Labor hours Ex ens. Task No. Task 0—ript on Project Is,En IPM EIT Civil Tech Env' Admin Total Labor Subconsultant Trarel or Total Expense Task Sub Total Director 9' Planner Cost Other Reproduction Cost Rate 5200 5160 $100 570 $100 $50 MWBE Non-MW BE Ex enses 4.0 Final Design 0 25 54 0 0 0 $10400 $0 $0 $0 $0 ;0 $10400 Final Design Drawings(90%)(2-half 1-Full 4.1 Size 24 60 $9840 $C $9,640 4.1. Cover SheauSheet Index $0 $0 $0 4'. General Wtes _ $0 $0 $0 4.1. Drainage Area Map and Calcs 2 $0 $0 $0 4.1, Surve/DimensionalMor.Control Plan $0 $0 $0 4.1. Overall Sheet Layout Plan $0 s0 $0 4.1. Plan and Profile(4)1"-20') $0 $0 $0 Cross Sections(80 xsecs@10/Shea) 4.1. Tree Ma anon Plan $0 $0 $0 4.1_ Nationwide Penult Mlle ation Drawin $0 $0 $0 4.1. Construction Details 2) $0 $0 $0 4.1. Erosion Control Sheets 1 $0 $D $0 4.1. Detail Shoats-Erosion Control 1) $0 $0 $0 41 1 Detail Sheets-Traffic Control 2 $0 $0 $0 4.2 Specifications(2 Sots) 1 $0 $0 $0 4.2. Front End Specifications 1 $0 $0 $0 42. Bid Proposal $0 1 $0 $0 42. Technicals ecifications $0 $0 $0 4.3 Opinion of Probable Constucton Costs 1 4 $560 $0 $560 4.3. Q—tity Takeoffs $0 $0 $0 4.3. Pricing Evaluation _ _ $0 $0 $0 4.3. OPCC Spreadsheet Preps— $0 _ $0 $0 4.4 Internal DA/QC $0 $0 0 4.5 100%Plan Submittal 1-U1,M lar Cover $0 $0 $0' 46 S ecifications 1 Set $0 $0 $0 46.0 Incur rate Final Cit Comments $0 $0 $0 4.6. Prepare Final Documents $0 $0 $D 4.6. Publish Final Document-PDF&DWF $0 $0 $0 $0 $0 $D Cityof Port Worth,Texas Attachment B-Level of Effort Supplar ant PMO OffCel Release Date 5.19.2010 4 of Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for Lower Como Erosion City Project No.01606 Labor hours Ex erase Task Description Project Env. Total Labor Travel or Total Expense Task Na. Director $r.Eng./PM EIT Civil Tech planner Admin Cost Subcons01tan1 Other Reproduction Cost Task Sub Total ate $200 $160 $100 $70 5100 560 MWBE I Nan-MWBE Ex enses 5.0 Bid Phase 0 2 6 0 0 0 $920 $0 $0 $0 $150 $150 $1,070 5.1 Bid Support $0 $0 5.1. Upload Documents to Bdu Saw 1 $100 $0 $100 5.1. Deliver Bid Plans to Cit 2-half;10-Full) 1 slop $1..50 $150 $250 5.1_ Deliver Bid Specs to Cil 10sets $D $D $0 5.1. Maintain Plan Holders List $D $0 $0 Receive and Respond to 0ueslionsMH s 5.1. 4 2 4 $72 $720'. 5.1.1 Attend Bid Opening $0 $0 5.1. Tabulate Bids and Recommend Award $0 $0 Issue Conformed Contract Documents 5.1. M lays for Reco,d Storage! $0 $0 $0 $0 $0 $0 6.0 Construction Phase Services 0 84 20 0 0 0 $15440 $0 $0 $0 $0 $0 $15440 6.1 Construction Su ort $0 $0 $0 6.1. Attend Preconstrur ion Conference 4 $640 $0 $640 6,2 Attend Public M,-ting 1 $0 $0 $0 6.2. Prepare Exhibit $0 $0 $0 62Attend Meeting $0 $0 $0 6.3 Site Visits 3 12111 4 $2.320 _ $0 $2,320 6.4 Submittal Review 1 $0 $0 $0 Request for IMormalionlChange Order 6.5 Review/Sho Drawin Review 68 16 $12480 $0 $12,480 6.6 Final Walk Th—h and Punch List $0 $0 $0 $0 $0 $0 City of Fort Worth,Texas Attachment B-Level of Effort Supplement PMO Official Release Date.5.19.2010 5 of Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for Lower Como Erosion City Project No.01606 Labor(hours Ez enae Task No. Task Description Project Sr.Eng./PM EIT Civil Tech Env. Admin Total Labor Subconsultant Travel or Total Expense Task Sub Total Director Planner Cost Other Reproduction Cost Rate 00 $160 $100 $70 $100 100 MWBE Non-MWSE Expensea 7.0 ROWIEasementServices 0 0 0 0 0 0 $0 $0 $0 $0 $0 to I. 7.1 Ri hl f-Way Research SutrConsultanf $0 $0 $0 ROW/Easement Preparation(Sub- 72 nsultant)Easements(27 90ENaach $D $0 $D 7 3 Temporary ora Right of Entry Submittal $0 $0 $D 74 Easement i Documents 2 Sets $0 $0 $0 7.4. Define Easements for Surveyor $0 1 1 $0 $0 7 4. Review Easement Documents $0 $0 $0 7.4. Coordination with Real Property $0 $0 $0 $01 $0 $0 0.0 Survey 0 0 0 0 0 0 $01 $o so $0 $0 $0 $0 8.1 Desi n 5urve $0 $o $0 8.2 Temporary Right of Enty Submittal _ $0 $0 $0 8.3 Construction Surve $0 $0 $0 City of Fort Wodh,Texas Attachment 8-Level of Effod Supparnant PMO Othoal Rebase Date,5.19.2010 60(7 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Lower Como Erosion City Project No.M05 Labor Ihours E.rose Task No, Task Description Project Sr.Eng.IPM EIT Civil Tech Env. Admin Total Labor gubconsultant Travel gr Total Expense Task$u4 Total Director Planner Coat Other Reproduction cost ate $200 $160 $100 $70 $100 $60 MWBE Non-MWBE Ex enses 9.0 Pamittln 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 9.1 SWPPP $0 $0 $0 9.2 Environmem.al Services(USACOE 404 $0 $0 $0 9.3.1 Floodplain Services+FEMA Fees,$11K $0 $0 $0 9.3.2 FEMA CLOMR Fee$4,400'110%=$4.840 $0 $0 $0 9.3.2 FEMALOMRFee $5.600'110%=$6,160 $0 $0 $0 9.4 TxDOT $0 $0 $0 9.5 Railroad $0 $0 $0 9.6 Urban ForestryPermit $0 $D $D 9.7 TDLR $0 $0 $0 9.8 City o ort art $0 10.0 Specialmeetings $0 s0 $0 T.talal 01 1111 Sol 01 0 0 26,760 $of SOL- 5150 150 $26,910 Project Surrunary Total Hours 201 Total Labor $26,760 Total Expense, $150 MWBE Subconsultant $0 Non-MWBE Subconsultant $0 10% Sub Markup $0 MWBE P,Ir,,,hon 0OD0% Total Project Cost $26,910 City cf Fort Worth,Teres Attachment R-Level of Effort Supplement PMO Official Release Date.5,19 2010 7of7