Loading...
HomeMy WebLinkAboutContract 47349-CO6 CITY SECRETARY FORT WORTH. City of Fort Worth CONTRACTNO. ,q+rVn Change Order Request Breakdown ProjectNamel N. Beach Street from Fossil Creek to NE Loop 820 City Sec# 47349 Client Project#(s)l 02238 �F Q Change Order Submittal# © Date 11/2/2017 Dept. TIPW Water Sewer Contract Time Totals CD Original Contract Amount $5,675,296.15 $897335.52 $82,214.26 $5,846,845.93 541 Extras to Date $176,598.79 50.00 $0.00 $176,598.79 14 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $5,851,894.94 $89,335.52 $82,214,26 S6,023,444.72 555 Amount of Proposed Change Order $15,280.00 $0.00 $0.00 $15,280.00 C Revised Contract Amount $5,867,174.94 $89,335.52 $82,214.26 $6,038,724.72 555 Original Funds Available for Change Orders $488,154.00 $6,250.00 $5,750.00 $500,154.00 Remaining Funds Available for this CO $311,555.21 $6,250.00 $5,750M $323,555.21 Additional Funding(if necessary) I l CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.28% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2591.) $7,308,557.41 'IW' JUSTIFICATION(REASONS)FOR CHANGE ORDER11 11 1 Traffic Management requested this change order to revise the 44 streetlight luminaires from High Pressure Sodium to LED to meet the new design standards adopted after bids were accepted for this project.2 streetlight foundations and poles(T-08 and T-08A on Sheet No. 141, Station 119+05)were added on each side of North Beach Street in the east and west parkways at the median opening was constructed at QuikTrip under Change Order#4. Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. JAIyV4409 Michael Weiss,P.E. OFFICIAL RECORD Senior Professional Engineer CITY SECRETARY FT.WORTH,TX Fas1WoRTx City of Fort Worth Change Order Additions Project Name N.Beach Street from Fossil Creek to NE Loop 820 City sec# 47349 Client Project# 02238 Change Order Submittal# © Date fi 11712017 ADDITIONS i;L nit, Unit Costotal i r';;r,y ilium Assmbly TY 18,1 BA,19.an Rdi y Alum Foundation TY 3,5.6.and 8 T PW 2.0 ew AT V L 7 LED luminaires T PVJ 4 . TrPW X31,560.00 Water $0.00 Sewer $C.00 Sub Total Additions Change Order Additions Page 1 of 1 FORTWOR'm City of Fort Worth ,-I-- Change Order Deletions Project Name N.Beach Street from Fossil Creek to NE Loop 820 City Sec# 47349 Client Project# 02238 Change Order Submittal# Date ti 1l2120i 7 DELETIONS DESCRIPTIONnit Unit Cas! Total Ligming r ix ure TIPW 4410 F-A $310.00 T/PWX*28000WaterSewer �ub I otal Delebons Change Order Deletions Page 1 of 1 CFVR Change Order Approval 5t-COApp 11 Page I of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 7 fortworth ovInfrastructure Projects 02238 - N. Beach Street from NE Loop 820 to Fossil Creek/Contractor/Change Orders Chan e Order Breakdown template cos, additional light poles and LED fixtures - 11.2.2017.xlsm Attachments{Q) No Attachments r7ave been added to this form. httpsJ/projectpoint.buzzsaw.com/ bz_web/Fonns/FomiPrint.aspx?Siteld=51500&ProcessId=4941&Active... 11/21/2017 CFW Change Order Approval St-COApp 1 I Page 2 of 3 FORT WORTH."Y of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: Change Order No.: __t-�_DApp11 Date Started:, 017-11-16 City Sec. No.: 17349 Date Due:12017-12-02 Project Name: ';N. Beach Street from NE Loop 820 to Fossil Creek 72238 DOE Numbers: Project Numbers: Project ;N;iden North Beach street to a 6 lane di ided arterial street Description: with concrete paving, storm drain, streetlights, traffic signals, sidewalks, and shared use 'oath. Project Manager: Michael Weiss City Inspector:LTom Miller Contractor: JLB Contracting, LLC COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: L$j5,280.00 34014 0200431 5740010 CO2238 C r Total Cost: 1.5c280.00,. Total Requested Days: Approval Status: https://projeetpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?Siteld=51500&ProcessId=4941&Active... 11/21/2017 CFW Change Order Approval St-CQAppl l Page 3 of 3 Approved: Yes Comments: User: Aaron Perez Date: 2017-11-16 1:54 PM Approved: Yes Comments: User: Michael Weiss Date: 2017-11-16 3:09 PM Approved: Yes Comments: User. JoAnne Kamman Date: 2017-11-16 3:31 PM Approved: Yes Comments: User: Kim Arnold Date: 2017-11-20 9:20 AM Approved: Yes Comments: User: Doug Wiersig Ap 0 D S TO FORM AND LEGALITY. Date: 2017-11-20 11:45 PM Approved: Yes .CItymoRNEY DLL Comments: User: Jay Chapa Date: 2017-11-21 9:16 AM Action Required: .�7 7 C� https://projeetpoint.bu7. aw.com/_bz—web/Forms/FonnPrint.aspx?Siteld=51500&Processld=4941&Active... 11/21/2017 LEGEND M. -MF canm A Ax- F NOTES ---- ------------------------------- -T 0 0 -.M.-T + + w ��1�a.—w- - (m[x°Fn) - y W ru¢W ar..vs¢roar%�iwc w wse�c m .'3 -M.1AM=T-1 T U.M%TV".41-T tL. T --------- - CITY OF FORT WORTH,TEXAS TRANSPORTATION 8 PUBLIC WORM NORTH BEACH STREET P-- wouxr-.=E HE LOOP 810 TO FOSSIL CRM BOULEVARD P.— 1Vpl=----vp LIGHTING AND FIBER INTERCONNECT A SHEET 8 OF 12 I STA 10-00 TO STA W-00 All—M OR P' DE- LT -1. 1 A 41 8 Al ZC-17D'