Loading...
HomeMy WebLinkAboutContract 48850-FP2 Department of TP &W Const. Services CPN# Dat Project ManagerCITYSECRARY f Risk Management Cana rORTH® CONTRACT t D.O.E. Brotherton tro CFA Morales (Scanned j_ "Ir Gutzler/Scanned -7. -1-1 77 The Proceeding people have been Contacted CION AND PUBLIC WORKSII J concerning the request for final payment& have PROJECT COMPLETION �� t r Ut released this project for such payment. :veloper Projects) Clearance Conducted By PALM6491 City Project Ns: 100513 -- Regarding contract 100513 for EDGEWOOD PHASE 3 as required by the WATER DEPARTMENT as approved by City Council on N/A thro .�L&;C N_/A the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of rarisport 2a orks Department has accepted die project as complete. di� QrrC 05 2017 Original Contract Price: $245,100.00 Amount of Approved Change Orders: 2V2 (. Revised Contract Amount: ti Total Cost Work Completed: $245,100.00 Recomme e or Acceptance Date Asst. Direc PW - I ur �esig,n n & ?\/ A e--12-) 17-6- /7 Accepted Date Asst. Director, WATER DEPARTMENT ol, Asst. City Manager Date omments: M.A.MJE;L) ®>FFICIAL RECORD DEC 14 2017 CITY SECRETARY FTS WORTH TX Rev.9/22/16 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name EDGEWOOD PHASE 3 Contract Limits Project Type STORM DRAIN&PAVING City Project Numbers 100513 DOE Number 0513 Estimate Number 1 Payment Number 1 For Period Ending 11/30/2017 CD City Secretary Contract Number Contract Time 86D Contract Date Days Charged to Date 208 Project Manager NA Contract is 100.00 Complete Contractor CONATSER CONSTRUCTION T%LP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors LAYER / SMITH a Thursday,November 30,2017 Page 1 of 5 City Project Numbers 100513 DOE Number 0513 Contract Name EDGEWOOD PHASE 3 Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 11/30/2017 Project Funding STORM DRAIN Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 10'CURB INLET 4 EA $2,500.00 $10,000.00 4 $10,000.00 2 21"RCP 78 LF $53.00 $4,134.00 78 $4,134.00 3 24"RCP 31 LF $56.00 $1,736.00 31 $1,736.00 4 27"RCP 518 LF $62.00 $32,116.00 518 $32,116.00 5 30"RCP 32 LF $72.00 $2,304.00 32 $2,304.00 6 48"RCP 241 LF $130.00 $31,330.00 241 $31,330.00 7 CONCRETE COLLAR I EA $500.00 $500.00 1 $500.00 8 T STORM JUNCTION BOX I EA $4,000.00 $4,000.00 1 $4,000.00 9 6'STORM JUNCTION BOX 1 EA $6,000.00 $6,000.00 1 $6,000.00 10 48"SLOPED END HEADWALL 1 EA $4,500.00 $4,500.00 1 $4,500.00 11 REMOVE EX.27"RCP SLOPED END 1 EA $750.00 $750.00 1 $750.00 HEADWALL 12 TRENCH SAFETY 900 LF $1.00 $900.00 900 $900.00 Sub-Total of Previous Unit $98,270.00 $98,270.00 PAVING ItemDescription of Items Unit Unit Cost Estimated Estimated Completed Completed No. Quanity Total Quanity Total 1 6"CONCRETE PAVEMENT 6160 SY $35.75 $220,220.00 6160 $220,220.00 2 6"LIME TREATMENT 6560 SY $3.00 $19,680.00 6560 $19,680.00 3 HYDRATED LIME 98 TN $175.00 $17,150.00 98 $17,150.00 4 BARRIER FREE RAMP 4 EA $1,200.00 $4,800.00 4 $4,800.00 5 BARRIER FREE RAMP 2 EA $1,200.00 $2,400.00 2 $2,400.00 6 4"CONCRETE SIDEWALK 420 SF $5.00 $2,100.00 420 $2,100.00 7 CONNECT TO EXISTING CONCRETE HEADER 2 EA $20.00 $40.00 2 $40.00 8 INSTALL ALUM SIGN GROUND MOUNT 8 EA $500.00 $4,000.00 8 $4,000.00 9 INSTALL STOP SIGN 2 EA $650.00 $1,300.00 2 $1,300.00 10 INSTALL STREET NAME BLADES 8 EA $450.00 $3,600.00 8 $3,600.00 11 INSTALL W1-1 &W13-1P SIGNAGE 4 EA $450.00 $1,800.00 4 $1,800.00 12 REMOVE&DISPOSE OF END-OF-ROAD 3 EA $250.00 $750.00 3 $750.00 BARRICADE 13 PERFORMANCE BONDS I LS $4,310.00 $4,310.00 1 $4,310.00 Thursday,November 30,2017 Page 2 of 5 City Project Numbers 100513 DOE Number 0513 Contract Name EDGEWOOD PHASE 3 Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 11/30/2017 Project Funding Sub-Total of Previous Unit $282,150.00 $282,150.00 ST LIGHT Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 IOOW HPS PC LIGHTING FIXTURE TYPE 11 10 EA $4,485.00 $44,850.00 10 $44,850.00 W/3313 ARM 2 GROUND BOX TYPE B 21 EA $533.00 $11,193.00 21 $11,193.00 3 2"CONDT PVC SCH 40 317 LF $12.00 $3,804.00 317 $3,804.00 4 NO 10 INSULATED ELEC CONDR ALUM#6 951 LF $3.00 $2,853.00 951 $2,853.00 XHHW Sub-Total of Previous Unit $62,700.00 $62,700.00 Thursday,November 30,2017 Page 3 of 5 City Project Numbers 100513 DOE Number 0513 Contract Name EDGEWOOD PHASE 3 Estimate Number I Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 11/30/2017 Project Funding Contract Information Summary Original Contract Amount $443,120.00 ChanIze Orders Total Contract Price $443,120.00 Date r�" ^I ? Total Cost of Work Completed $443,120.00 outr for Less %Retained $0.00 Date /,L' Net Earned $443,120.00 , 1-7 Earned This Period $443,120.00 Insoeion Supervisor Retainage This Period $0.00 Date Less Liquidated Damages 'Alof t Manager i '7 Days @ /Day $0.00 Date �7 �� Y I LessPavement Deficiency $0.00 As recto PW-h uc re esign an onsr i �`f jt �-Q _ Less Penalty $0.00 Date Less Previous Payment $0.00 Dirccto Contracting Depa nt / Plus Material on Hand Less 15% $0.00 Balance Due This Payment $443,120.00 Thursday,November 30,2017 Page 4 of 5 I City Project Numbers 100513 DOE Number 0513 Contract Name EDGEWOOD PHASE 3 Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 11/30/2017 Project Funding Project Manager NA City Secretary Contract Number Inspectors LAYER / SMITH Contract Date Contractor CONATSER CONSTRUCTION T%LP Contract Time 85 CD 5327 WICHITA ST Days Charged to Date 208 CD FORT WORTH, TX 76119 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $443,120.00 Less %Retained $0.00 Net Earned $443,120.00 Earned This Period $443,120.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $443,120.00 Thursday,November 30,2017 Page 5 of 5 i i rev 03/05/07 FORT W0,RTH t TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO. 1 NAME OF PROJECT: Edgewood Phase 3 PROJECT NO.: 100513 CONTRACTOR: Conatser Construction DOE NO. N/A PERIOD FROM 05/08/17 TO: 12/01/17 FINAL INSPECTION DATE: 1-Dec-17 WORK ORDER EFFECTIVE 5/8/2017 CONTRACT TIME 85 0 WD o CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS CHARGED CHARGED MONTH CREDITED MONTH DURING CREDITED I DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS 0 0 0 0 208 208 PERIOD PREVIOUS 0 0 0 0 0 0 PERIOD TOTALS 0 0 0 0 208 208 TO DATE *REMARKS f i CONTRACTOR DATE IN PECTOR AT 0_ ENGINEERING DEPART\,LENT y/EA The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 0 (817)392-7941 •Fax:(817)392-7845 0 RT 0 RT REV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 11/8/2017 Nance of Contractor Project Nanne Conatser Construction Edgewood Phase 3 DOE Inspector Project Manager Kedric Smith Gopal Sahu DOE Number Project Difficulty Ty—pe of Contract 100513 Simple o Routine O Complex ❑ Water ❑ Waste Water o Storm Drainage o Pavement Initial Contract Amount I Final Contract Amount $443,120.00 $443,120.00 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector y 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities N 3 Applicability of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs �{" 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager �fq 1 Change Order Processing Time 3 Communication 5/ 2 Timliness of Contractor Payments 14 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS Signature Contractor A. Signature DOE Inspector Signature DOE Inspector's Supervisor �•- INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort K7orth• 1000 Throckmorton Street•Fort North,TX 76012-6311 `� (817)392-7941 •Fax: (817)392-7845 TWOREV:8120/16 FORTRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA None of Contractor Project Nanre Conatser Construction TX,LP Edgewood Phase 3 Inspector City Projecl Number Kedric Smith 100513 Construction Components Project Manager ❑ Water ❑ Waste Water o storm Drainage o Pavement Gopal Sahu Initial Contract Amount Project Difficnlr), $443,120.00 D Simple o Routine O Complex Final Contract Amount Date $443,120.00 11/8/2017 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(X) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 448 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 448 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums W 448 Rating(ITS/MS] * 100%) 448 / 448 = 100% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AR'ARDED) ? Inspector Signature Co actor Signature Ci Inspector's Supervisor Signature 'L_. CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 8851 Camp BoNvie V\est Blvd. •Fort Worth,TZ 76116 • (817)392-8306 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc., general partner of Conatser Construction TX, LP, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: EDGEWOOD PHSE 3 WATER, SANITARY SEWER, STORM DRAINAGE AND PAVING IMPROVEMENTS DOE#: N/A CFA PRJ#: N/A CITY PROJCT #: 100513 CITY OF FORT WORTH STATE OF TEXAS CONATSER CONSTTRRUCTION TX,LP rock Huggins Subscribed and sworn to before me this 21 st day of Novemb 7. BERTH A GIANULIS xas Notary Public in Tarrant County Texas State of Te I S Notary Public, My Commission Expires +` September 18, 2019 CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ CONTRACTOR ❑ TO FINAL PAYMENT SURETY ❑ Conforms with the American Institute of OTHER Architects,AIA Document 6707 Bond No.0204572 PROJECT: (name, address)Edgewood Phase 3 Fort Worth,TX TO (Owner) ARCHITECT'S PROJECT NO: City Project No. 100513 FBLOOMFIELD HOMES, L,P.AND CITY OF FORT WORTH CONTRACT FOR: 1050 E. Highway 114,Suite 210 3 Water, Sanitary Sewer,Storm Drain,and Paving for Edgewood Phase Southlake Tx 76092 —J CONTRACT DATE: CONTRACTOR: CONATSER CONSTRUCTION TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of (here insert name and address of Contractor) CONATSER CONSTRUCTION TX, L.P. 5327 Wichita St. Fort Worth TX 76119-6035 CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Owner) BLOOMFIELD HOMES, L.P. AND CITY OF FORT WORTH 1050 E. Highway 114, Suite 210 Southlake TX 76092 , OWNER, as set forth in the said Surety Company's bond. IN WITNESS, WHEREOF, the Surety Company has hereunto set its hand this 15th day of November, 2017 BERKLEY INSURANCE COMPANY Surety Company Attest: _ � i (Seal): Signature of Authorized Representative Robbi Morales Attorney-in-Fact Title NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE No. BI-7280g POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON,DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware,having its principal office in Greenwich, CT,has made,constituted and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell, Vena DeLene b •E Marshall, Sophinie Hunter; Robbi Morales, Kelly A. Westbrook, or Tina MCE{van of Aon Risk Services Southwest, Inc. of Dallas, TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings,with the exception of Financial Guaranty Insurance,providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00), to the same extent as if such bonds s' had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. a� This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware, Z > without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010: a" c ' RESOLVED, that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant oSecretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such ;= attorney-in-fact and revoke any power of attorney previously granted;and further u RESOLVED,that such power of attorney limits the acts of those named therein to the bonds,undertakings,recognizances,or EZ other suretyship obligations specifically named therein,and they have no authority to bind the Company except in the manner a and to the extent therein stated;and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and pfurther a•SRESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any C�3 power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or 3 other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as Y -S though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any 0 person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have :� ceased to be such at the time when such instruments shall be issued. o IN WITNESS WHEREOF, the Comp ny has caused these presents to be signed and attested by its appropriate officers and its °o x corporate seal hereunto affixed thisday of 2016. Attest: Berkley Insurance Company E- G Seal B Q ( ) o y Ira S.Lederman Je after Executive Vice President&Secretary S nior V President „ WARNING:THIS POWER INVALID IF NOT PRINTED ON BLUE uBERKLEY"SECURITY PAPER .o E STATE OF CONNECTICUT) N ) ss: COUNTY OF FAIRFIELD ) Sworn to before me, a Notary Public in the State of Connecticut, this� day o , 2016, by Ira S. Lederman and Jeffrey M. Hafter who are sworn to me to be the Executive Vice President and Secretary, and e Senior Vice President, r. respectively, of Berkley Insurance Company.MARIA C.RUNDBAICEN Q ❑ NOTARY PUBLIC g MY COMMISSION EXPIRES Notary Public, State of Connecticut v APRIL 30,2019 CERTIFICATE ul I, the undersigned, Assistant Secretary of BERKLEY INSURANCE COMPANY, DO HEREBY CERTIFY that the foregoing is a true, correct 3 and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded and that the authority of the " Attorney-in-Fact set forth therein,who executed the bond or undertaking to which this Power of Attorney is attached, is in full force and effect as of this date. Given under my hand and seal of the Company,thisl5th day of November (Seal) Vincent P.—Forte