Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 49911
Developer and Project Information Cover Sheet: Developer Company Name: M&W Real Estate Development,LLC ....... ..... ......... ..... . .... .......................... Address, State,Zip Code 175 E Continental Blvd, Southlake,TX, 76092 Phone&Email: 817-968-1430,mikemfloors@aol.com Authorized Signatory,Title: Mike Masters,Owner Project Name: Alta Vista Business Park Brief Description: Water, Sewer,Paving, Storm Drain Project Location: 10375 Alta Vista Rd. Plat Case Number: FS-16-120 Plat Name: Hinton Heiights Addition Mapsco: 22P Council District: 7 CFA Number: 2017-130 City Project Number: 01058 To be completed by staff.- Received taffReceived by: Date: It)/:31 r7 � N 56 7 89 r ^ r � C�EC�9 Zp11 City of Fort Worth,Texas Standard Community Facilities Agreement-Alta Vista Business Park CFA Official Release Date: 02.20.2017 Pagel of 11 68 L 99 CITY SECRETARY � ,/�j CONTRACT NO. �. `J� STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, M & W Real Estate Development, LLC , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements")related to a project generally described as Alta Vista Business Park ("Project") within the City or the extraterritorial jurisdiction of Fort Worth,Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. D 9 a p further acknowledges that said acceptance process requires the Developer's c ac> (s)�� . City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Alta Vista Business Park: CFA Official Release Date: 02.20.2017 CITY SECRETARY Page 2 of 11 O� CQ �'T.WORTH,TX CV ��0� 6 R L 9 5 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) lel, Sewer(A-1) ®, Paving (B) ®, Storm Drain(B-1) ®, Street Lights & Signs (C) ❑. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Alta Vista Business Park CFA Official Release Date: 02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. 1. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Alta Vista Business Park CFA Official Release Date:02.20.2017 Page 4 of 11 J Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Alta Vista Business Park CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent(2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Alta Vista Business Park CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2)will not boycott Israel during the term of the contract. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Alta Vista Business Park CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Alta Vista Business Park CFA No.: 2017-130 City Project No.: An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1, Water Construction $ 102,202.00 2.Sewer Construction $ 85,132.62 Water and Sewer Construction Total $ 187,334.62 B. TPW Construction 1 Street $ 43,846.46 2.Storm Drain $ 45,328.92 3,Street Lights Installed by Developer $ - 4. Signals $ - TPW Construction Cost Total $ 89,175.38 Total Construction Cost(excluding the fees): $ 276,610.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 3,746.69 D. Water/Sewer Material Testing Fee(2%) $ 3,746.69 Sub-Total for Water Construction Fees $ 7,493.38 E. TPW Inspection Fee(4%) $ 3,567.02 F TPW Material Testing(2%) $ 1.783.51 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 5,350.53 Total Construction Fees: $ 12,843.91 Choice Financial Guarantee Options,choose one Amount Mark one Bond= 100% $ 276,510.00 Completion Agreement=100%4/Holds Plat $ 276,510.00 Cash Escrow Water/Sanitary Sewer=125% $ 234,168.28 Cash Escrow Paving/Storm Drain=125% $ 111,469.23 Letter of Credit=125%w/2yr expiration period $ 345,637.50 x City of Fort Worth,Texas Standard Community Facilities Agreement-Alta Vista Business Park CFA Official Release Date: 02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER ManaW Real Estate. Vae(oprneAt► U-L Jesus J. Chapa Assistant City Manager Date: / Z�7 �2 -7 Name: Mike Masters Recommended by: Title: Owner Date: Wendy C abulal. EMBA, P.E. ATTEST: (Only if required by Developer) Development Engineering Manager Water Department L�/c ti. L-) Signature DouglaOW. Wiersig, P.E. Name: Director Transportation& Public Works Department Contract Compliance Manager: Approved as to Form &Legality: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting Richard A. McCracken requirements. Assistant City Atto M&C No. Date: Form 1295: �'✓ � ame: Janie Morales .tle: Development Manager ATTEST: ,OF SORT Mary J. Kays& "F City Secretary j�-XAS City of Fort Worth,Texas Standard Community Facilities Agreement-Alta Vista Business Park CFA Official Release Date:02.20.2017 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvements ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Alta Vista Business Park CFA Official Release Date: 02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101058 None City of Fort Worth,Texas Standard Community Facilities Agreement-Alta Vista Business Park CFA Official Release Date:02.20.2017 Page 11 of 11 Keller Hicks Rd 71mbermon 91va AA61 ffii Keller Hicks Rd Kelte, C, Lexington Place Texas Health Golden Trianqtp Golden TriaoT�I�v Dnuh,, Harris Methodist... PROJECT w' LOCATION X 54 W Wall Rice Keffe �R qvw pTxav,L-Rwy H kem,�Qq -""v Mirage Dt Alliance Town Center Mtn N.T.S. MAPSCO NO. 22-P COUNCIL DISTRICT 7 SEPTEMBER 2017 DMOTHOMAJOhL%41% ALTA VISTA STA BUSINESS PARK VICINITY MAP 3973 W V1 CKERY BLVD.,SUITE T03 PHONE-(817)732-9839 FORTWOR7H,TX 75107 FA'- (8.71732-9841 REGISTRATION NO.F-W1 MUT NO.- 678-001 LLOW DRIVE EXISTING PUBLIC 6' WATER UNE r X-20162 �° AL n _ 1r em..d m MPS..a yw. OM,M NbTLL�� I POINT OF S o BEGINNING 0 mmrww b q.1� I (cw 7L - ___ "'•ro t 189g_——3 � 0 Cm.A.Sia NDSB P.R.T.0 UNE .T. taste n. I ° ;' PROPOSED 12' DIA co 12 Z D.et9 PUBLIC WATER y; rn.tr _ tLl' —_ .- — Alta Wta B.M—Pak.LLC DR PROPOSED PROPOSED� PUBLIC WATER LIE a FIRE OSEDANT� I I DZDTDNoeea PROPOSED 12' DIA. O.R.T.QT. p FIREHYDRANT FIRE HYDRANT s_ � auBN�r'� "EXISTING PUBLIC I 711294 o L �\ I 21' WATER LINE - * _.j 1.614— ` I X-09015 wDG DSD6�259 �® 0 �' 1 -� NOM PAF 1 I ',, I i D.R.T.C.T. i 30" CITY OF MILLER ® .. i:.® I WATER LINE. PLANS �•MICHAEL A. THOMAS 0 ® I BY FREESE AND NICHOLS q'°•°°° Aiz JOB/15147 rou93640 NI� � _qh_Sury ey P.R.LC.t. ®�9�rc°�fCENSE�•°°gym® Abstract #747 " S�FONAL,��G�y SCALE 1"_]i)i FEET x/1/17 SDD 200 �JTHOIIVIIAS ALTA VISTA BUSINESS PARK EXHIBIT A R B.kc.S'uITE'C� WATER IMPROVEMENTS T.•:'.7 .=-sari �C, i^ EXISTING 8" DIA. PUBLIC SANITARY SEWER LINE DOEJ4041 �• I O U Yiflical Drt,.GT. PaNr OF M I BEGINNING I O PROPOSED 8" PUBLIC �-20 — — f �20f SANITARY SEWER LINE sa " ----- ------ -- ` _ �(1 con.ti S.d.vase P.R.MT. PROPOSED 8" PUBLIC LOT a.. SANITARY SEWER UNE PROPOSED 8" PUBLIC ° IDG SANITARY SEWER — _ !—, --. LINE STUBOUT mle C'J Tv v Alta Yet.&.hw Pah,LLC Y r — CC#D207090EEG �n 7Y `' D.R.LGT. YlD2t J ' -- � •I--�— I TOd�17FIf IJt CeY — � _ I�� ` DLIDIIIOR iM.Llf 'X4S27F I.614 �LDT 3RIM PROPOSED 8" PUBLIC t11 SANITARY SEWER UNE STUBOUT VP vwta // CC/D D.R.LC.T. •MICHAEL A. THOMAS•j 93640 ENSO'S � l 9/1/1 SEPTEMBER 2017 WOTHOMAS �L,TA VISTA BUSINESS PARK EXHIBIT Al - PHONE-181,1, F^R'WORTiN NO. FAX !6171;67MD REGISTRATION NO.F-9435 MJT N0.- 678-0Oi 1J 1 -1- 0 III I r A TRUNCATED DOME L 2z TRUNCATED DOME _— UMIAK 1_7 TRUNCATED DOME Li RaW D ALTA VISIA ROAD w. -_%LTAVISTA;� FURNISH AND INSTALL 717 LF OF CONCRETE RIP—RAP ill; _ is IJIT _I L TRUNCATED DOME o- CD PELY c a ?o PAVING LEGEND 5" THICK, 4000 PSI PORTLAND CEMENT CONCRETE SIDEWALKS W/ 14 BARS AT 18- O.C.E.W. 6" THICK, 4000 PSI PORTLAND CEMENT CONCRETE WITH MONOLITHIC CURB AND GUTTER - ---------------- W/ #4 BARS AT 18- O.C.E.W. •MICHAEL A. THOMAS. 93640 9.5- THICK, 3600 PSI PORTLAND CEMENT CONCRETE WITH MONOLITHIC CURB AND GUTTER SCALE 1" 100' W/ #4 BARS AT 18" O.C.E.W. FEET I loo 2oc SEE PAVING DETAILS FOR TYPICAL PAVING SECTIONS SEPTEMBER 2017 0MJTHom._. ff ALTA VISTA BUSINESS PARK., . ..... EXHIBIT B PAVING IMPROVEMENTS q m o rn w 1/2-IRF I oo ALS FF=75b.04 BUILDING 1 i I 4 13200 SF .._ — 07 PROPOSED -- —_ ——--— ---®—r--- --- I PUBLIC �- -$ -- —� ��——— — 2e RCP 5/8-IRF' +0owat se�v e� +00——� 2+0o ement VARIABLE WIDTH PA zz0 ---------- - ------- ---- to ———_ 114 Alta Vista I PRIVATE I DETENTION I PROPOSED DROP INLET POND B I X1/2"IRF z STORM WATER I o '' PROPOSED o_ 1 DETENTION FACILITY PUBLIC LOT 3R1 70,294 0. cn 514 aerss 1c) NG 18' CMP 0 E --I ;MICHAEL�A. THOMAS t..........................�j 93640 I I .:'fiN.. SCALE 1"-50' 9/1/17 -T o u so ,FR 2017 T H 0 M fivaS AT TA �'T � , .... . . w-"4erell -- - EXHIBIT B1 3�73- REGI' - - 00 42 43 DAP-BID PROPOSAL Page 1 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidli l keen Specificaa,, Unitof Bid Unit Price Bid Value Section N Measure Quantity UNIT 1:WATER IMPROVEMENTS 1 0241.1012 Remove 6"Water Lne .G2 4' "4 LF 340 g ti0 92 $ 3,712.80 2 3110.0103 12"-18"Tree Remova 3' 1 .1)"1 EA I S O G[i $ 700.00 3 _ 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 EA 2 S 850 CO $ 1,700.00 4 3305.0109 Trench Safety 33 05 ^0 LF -- 88-' $ 1 co $ 887.00 5 3305.0110 Utility Marxers 33 05 26 LS 1 $ 000.00 $ 1,000.00 -- -_ ? 6 3311.0001 Ductile Iran Water Fittings w!Restraint 33 11 11 TON 0.75 $ '•4 3 3 $._ 5,605.00 7 3311.0261 8" PVC Water Pipe 3311 12ALF 8 S 35.00 $ 280.00 8 3311.0441 12"Water Pipe 33 11 10. 33 11;_F 862 S 52.00 $ 44.824.00 9 3312.0001 Fire Hydrant 33 12 40 EA 2 $ 3.645.00 $ 7,290.00 10 3312.0107 Connection to Existing 20"Water Main 33 1225 -A 1 S 1,525.00 $ 1,625.00 11 _ 3312.0117 Connection toExistin 4'-12"-Water Main 33 12 25 '-A 2 5 1,135.00 $ 2,27u.7C 12 3312.2003 1"Water Service 33 12 10 EA 2 $ 602.00 $ 1.204.0C 13 3312.2203 2"Water Service 33 12 10 EA 3 $ 975.00 $ 2.925 --10 - --- 14 3312.3003 8"Gate Valve 33 12 20 ;EA 1 $ 1,115.0( 3 15 3312.3005 12"Gate Valve 33 12 20 EA 7 $ 2 050 00 $ 14.350 00 1 $ 3 50. OC � 3,5� 16 3312.4205 20"x 12"Tapping Sleeve&Valve 33 12 25 EA L'7 -- 17 9999.0001 Temporary Water Lane and Services 9999 0001 iLS 1 S 7n "IC $ 1,50 ,0 18 _ 9999 0002 Automatic Flushing Device Eclipse 9700i 9999.0002 tEA " $ 7.-7 14,20 $ 7 714 20 TOTAL UNIT I:WATER IMPROVEMENTS $102,202.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Water,Sewer,Paving Drainage for Alta Vista Business Park Form Version September 1,2015 City Project No.101058 00 42 43 DAP-BID PROPOSAL Page 2 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Informatiol Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section N Messure Quantity Unit Price Bid Value UNIT II: SANITARY SEWER IMPROVEMENTS 19 3301.0002 Post-CCTV Inspection 33 01 31 1.F 1247 5C $ 1,870.50 _ _ -- 20 3301.0101 Manhole Vacuum Testing 33 01 30 EA 7 S 0' F; $ 750.12 21 3305.0109 Trench Safety 33 05 10 [_F 12471 S 00 $ 1,24700 22 3305.0115 Vacuum Excavation 33 05 31' JEA 2 S 750 0C $ 1,500.00 23 3305.1103 20"Casing By Other Than Open Cut 33 05 22 LF 32 S 11:)0C $ 3.520.00 24 3331.3101 4"Sewer Service 3? 31 50 EA 3 S 2,156 33 $ 6,468.99 25 3331.3201 6"Sewer Se,,.<e 34 ,?1 S^ EA 1 a 1,72,OC $ 1,720.00 26 3331.330' 8"Sewer Service 33 31 C1) EA 1 S 450 OC $ 450.00 1 3 3 31ILF F 1055, S ..l '. 27 333' 4115 8"Sewer PiCP - 31-< 1 1" �:"' '� s� ,!4 $ 39,077.20 28 333' 4116 8"Sewn r Pipe,CSS Backfill 33 1 H'.33 31I L F 481 $ 38 310 $ 1,824.00 29 X339 001 4'%ar,t1rle 3� 39 l , 33 3 EA 7i $ 3.2 ,7., „r $ 22,400.00 30 P339 '003 4' Extra Depth Manhole 133 39 10, 33 3 VF 23 $ 159 00 J $ 3,887.00 TOTAL UNIT II:SANITARY SEWER 164fIPFfOVEMIENTS $84.71'4,$1 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Water,Sewer,Paving Drainage for Alta Vista Business Park Form Version September 1,2015 City Project No.101058 00 42 43 DAP-BID PROPOSAL Page 3 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section Na Measure QuanR' Unit Price Bid Value UNIT III: PAVING IMPROVEMENTS - - --- 31 0241 1000 Remove Conn Pvmt 0241 15 IS W 9cc $ 2,3e4 c y ?F 5 � 32 0241.1100 Remove Asphalt Pvmt 0241 15 Sy 73 S r 92 $ 359.1, 33 3110.0101 Site Clearing 31 1000 S 1 S 0 0t $ 600.01 34 3125.0101 SWPPP a 1 acre 31 25 00 Is 1 $ 200.00 $ 2C 00 35 3211.0400 Hydrated Lime 32 11 29 74 S r,2 00 $ 1,19s 80 36 3211.0502 8"Lime Treatment 32 11 zv Sy $ 400 $ 1.404 CO 37 3213.01016"Thick Conc Pvmt 32 1313 Sy 31? 5 45 00 $ 14 355 CO 38 32 13 11 5 9 7 — r _ 32 � .N J S 5 25_ -9 555 53 _ 3213.0700,1c n',Sealant LF 32 13 3 1_S � $ �50 $ 39 3213.0302 ��~Sidewalk „� 5F � :�� $ .555 GO 13.0104 Conc Pvmt 40 — � � S <75 00 $ 275 CJ 41 3291 Tcpsoil - -- 3291 19 CY 415. $ 3 00 $ 1,248 CO 42 3292 0400 Seeding Hydr©mulch 32 92 1" SY" r50' $ 0 68 $ 850.00 43 9999.013 .amona rlaie Grossing Flume 9999.0004 EA S 95:,OO $ 950.00 44 9999.004 'Wide Concrete Curbed Flue 9999 0Go5 LF 5 S 870 00 $ 4,350.D0 45 19999.0005 Erosicr Ccrtrol `.'999 0004 LS 1 S 1 50 O0 $ 1 500.00 TOTAL UNIT III: PAVING IMPROVEMENTS $43,046-46 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Water,Sewer,Paving Drainage for Alta Vista Business Park Form Version September 1,2015 City Project No.101058 00 42 43 DAP-BID PROPOSAL Page 4 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application ltem Informati< Bidder's Proposal Bidlisth,Cm it ofBid No. Ze tsure Quantity Unit Price Bid Value —._. - _ UNIT IV. DRAINAGE IMPROVEMENTS 46 0241.3011 Remove 15"Storm Line 102 4' 14 LF 31 $ 25.00 $ 775.00 47 0241.4401 Remove Headwall/SET 0541 14 EA 2 $ 531.46 $ 1,062.92 48 3137.0101 Concrete Riprap (31 3700 SY 717 $ 40.00 $ 28 680 00 49 3305.0109 Trench Safety 133 0-5-10 LF 149 $ 1.00 $ 14900 50 3341.0103 18"RCP,Class III 1 33 41 10 LF 47 $ 35.00 $ 1 64E 00 51 3341.0206 24"RCP,Class IV 33 4' 10 LF 102 $ 60.00 $ 6 120 00 52 3349.4103 18"SET, 1 pipe " 49 4:1 EA 1 $ -95j 00 $ 1.9`C.GG 53 3349.4105 24"SET, 1 pipe 131,49 41 CA 1 $ 1,697 00 $ 1,697 00 54 3349.9001 2'Grate Inlet 33 49 20 EA 1 $ BciG ao $ 800.00 55 19999.0006 3x3 Drop Inlet with Concrete Apron___ 59 r9.C', 7 FA 1 $ 2,450 30, $ 2,450.00 TOTAL UNIT IV: DRAINAGE WROVEMENTS $45,32892, CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROTECTS Water,Sewer,Paving Drainage for Alta Vista Business Park Form Version September 1,2015 City Project No.101058 00 42 43 DAP-BID PROPOSAL Page 5 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal iii+llos:ltc°1 Description Specification Unit of Bid Unit Price Bid Value Section No. Measure Quantity Bid Summary UNIT I:WATER IMPROVEMENTS $102.20200 UNIT II:SANITARY SEWER IMPROVEMENTS $84.714.81 UNIT III: PAVING IMPROVEMENTS $43,846.46 UNIT IV:DRAINAGE IMPROVEMENTS $45,323 92 Total Construction Biel $276,092.19 Contractor agrees to complete WORK for FINAL ACCEPTANCE within ISO calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Water,Sewer,Paving Drainage for Alta Vista Business Park Form Version September 1,2015 City Project No.101058