Loading...
HomeMy WebLinkAboutContract 46322-A3 AMENDMENT No.3 CITY SECRETARY RECEIVED CONTRACT NO. DEC 2 6 2017 TO CITY SECRETARY CONTRACT No. 46322 Cil`(OF FORT WORTH CITYSEO{ REAS, the City of Fort Worth (CITY) and Pacheco Koch Consulting Engineers, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 46322, (the CONTRACT) which was authorized by M&C C-27094 on the 2nd day of December, 2014 in the amount of $414, 500. 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 which was authorized by the City Council on the 29th day of March, 2016 (M&C C-27651) in the amount of $277, 000. 00; WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 2 which was authorized by the City Council on the 4th day of April, 2017 in the amount of $48, 590. 00; WHEREAS, the CONTRACT involves engineering services for the following project: Blue Mound Road from Willow Springs Road to US Highway 81/287; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to a.nclude an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated December 14, 2017 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $50, 000. 00. (See Attached Funding Breakdown Sheet, Page -4-) . 2 . Article II of the CONTRACT is amended to provide for an increase in City of Fort Worth Professional Services Agreement Amendment Template OFFICIAL.RECORD PMO Official Release 8/1/2012 Page 1 of 4 CITY SICIW'ARY the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $740, 490. 00. City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 4 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Pacheco Koch Consulting Engineers, Inc. Jay Chapa Mark A_ acheco, P.E. , R.P.L.S. Assistant City Manager President DATE: � .d /., 0 DATE: 12/14/2017 APPROV RECOMMENDED: W. 1AJ Douglas Z. Wiersig, P.E. Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: / Date: Douglas W. Black Senior Assistant City Attorney ATTEST: �'c VVQR Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring 0' and administration of this contract, yam'. including ensuring all performance and reporting requirements ary J. y e Mitch Aiton, P.E. City Se etary Senior Professional En ineer Profs Fort worth OFFICIAL RIC®RD Professional Services Agreement Amendment Template PMO Official Release$/1/2012 CITY iICIiTArtY Page 2 of 3 FT.WORTH,''I'X FUNDING BREAKDOWN SHEET City Secretary No. 46322-A3 Amendment No. 3 Department Fund - Dept. - Account - Project - Activity - Year - ReferenceAmount TPW 34014 - 0200431 - 5330` Total: $50 ,000.0( City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 4 of 4 J4 Pacheco Koch December 14,2017 Mr. Mitch Aiton, P.E. City of Fort Worth, Transportation and Public Works 200 Texas Street,2nd Floor Fort Worth,Texas 76102 Re: Blue Mound Road; City Project#:02161 Contract Amendment 3 for Additional Services Dear Mr. Aiton: Pacheco Koch Consulting Engineers, Inc. is pleased to offer additional Professional Engineering Services for this project. These additional services are required due to needing a final design of Willow Springs Road from Blue Mound Road to Eagle Parkway for the full width of the roadway. The previous design included a design for half of the road. This amendment is for an 75% design where another amendment is planned to be executed to finish the final design. This Engineering Services Contract Amendment includes a detailed scope of additional services attached to this letter. Pacheco Koch Consulting Engineers, Inc. proposes to provide the attached scope of additional services for the lump sum total of$50,000.00. All the additional services proposed will be performed in accordance with the original contract dated December 2,2014. This Amendment,consisting of one page, and the attached Additional Scope of Services represent the entire amendment to the original agreement between the City of Fort Worth and Pacheco Koch Consulting Engineers, Inc. If the terms of this Amendment are acceptable, please indicate by acknowledging acceptance of the terms of this document. Summary of Contract Fee for Blue Mound Road Original Contract Amount $414,500.00 Amendment No. 1 $277,000.00 Amendment No.2 $48,590.00 Amendment No.3 $50.000.00 Revised Contract Amount $790,490.00 If you should have any questions,please do not hesitate to call at 817-412-7155. Sincerely, Christopher J. Cha,P.E. Pacheco Koch • _ F: 817.412.7156 pkce.com CERTIFICATE OF INTERESTED PARTIES FORM 1295 10f1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-294202 Pacheco Koch Consulting Engineers,Inc. Fort Worth,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for w rch the form is 12/14/2017 being filed. City of Fort Worth,Texas Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. Contract No.46322 Contract amendment associated with civil engineering,land surveying and landscape architecture services for Blue Mound Road from Willow Springs Road to US Highway 811287. 4 Nature of interest Name of Interested Parry City,State,Country(place of business) (check applicable) Controlling I Intermediary Koch,James A. Dallas,TX United States X Pacheco,Mark A. Dallas,TX United States x 5 Check only it there is NO Interested Party. 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. KRYSSA-MARIE RODRIGUEZ Nolory Public,State Ot lex0s My Commission Expires October 19, 2019 Signature of authoriz agent of contracting business entity AFFIX NOTARY STAMP f SEAL ABOVE Sworn to and subscribed before me,by the said Mark A. Pacheco, P.E., R.P.L.S. ,this the 14th day of December 24_tZ_,to certify which,witness my hand and seal of office. 4I/WIZ K sta-Marie Rodriguez Notary Pjjblic. State of Tpxas of officer a ministering ath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state,tx.us Version V1.0.3337 PROHIBITION ON CONTRACTS WITH COMPANIES BOYCOTTING ISRAEL Contractor acknowledges that in accordance with Chapter 2270 of the Texas Government Code, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not boycott Israel, and(2) will not boycott Israel during the term of the contract. Signature ark A.Pacheco,P.E.,R.P.L.& President Title 12/18/2017 Date ATTACHMENT "A" DESIGN SERVICES Scope for Engineering Design and Survey Phase Services BLUE MOUND ROAD AND WILLOW SPRINGS ROAD City Project No.02161 The scope set forth herein defines the contemplated work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE The objective of this Task Order Agreement is to proceed to 75%design of Willow Springs Road from Blue Mound Road to Eagle Parkway. Previously,only half of Willow Springs Road was designed to be constructed This Task Order is to provide a 75%design for the hill section of Willow Springs from Blue Mound Road to Eagle Boulevard. Additionally,construction staking survey services is included for the City crews constructing Blue Mound Road around US 287. WORK TO BE PERFORMED ENGINEER hereby agrees to provide services on a Task Order basis as may be directed by the CITY. All work under this agreement will be performed on a Task Order basis. The CITY will request services for each Task Order individually and independently. The ENGINEER shall prepare scope, fee and schedule to perform the services requested by each Task Order within 10 working days of the CITY'S request. Each Task Order shall include a detailed scope of services as Attachment"A". This scope of services will outline tasks required to complete the Task Order. The scope shall include a detailed description of each task,outline any assumptions and list the required deliverables. Each Task Order shall include Attachment"B",detailing the compensation for the Task Order. Compensation will be based upon hours and labor costs agreed upon by the CITY and the ENGINEER for each Task Order. Compensation will be based on the Schedule of Rates in Attachment"B"of this agreement. The fee will include an estimate of reimbursable and sub- consultant cost for each Task Order. Compensation for each Task Order shall be based upon the agreed upon not-to-exceed fee and paid via invoiced amount. If the Task Order requires a schedule it shall be attached as Attachment"D". Cdy of Fort ftnh,Texas Attachffw4 A PMO Release Date 0723-2012 Pwge 1 41 ATTACHMENT B COMPENSATION Design Services for BLUE -MOUND RO_A-D A_ND NVTLLOW SPRINGS ROAD City Project No. 02161 I. Compensation a. The ENGINEER shall be compensated for personnel time, non-labor expenses, and subcontract expenses in performing services for Task Orders up to $50,000.00 unless amended. CITY and ENGINEER will agree upon compensation for each Task Order prior to starting work. Each Task Order shall be Lump Sum. i. Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Category Rate for the ENGINEER's team member performing the work and includes all direct salaries, overhead,. and profit. Labor Category Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. LABOR CATEGORY RATE ($/HOUR) Project Manager/Principal $215 Senior Engineer $180 Project Engineer $140 RLA $140 EIT $95 GIS/CADD $80 Survey PM $190 Field Crew—Two Person $135 Survey Technician $75 -Survey Manager/Coordinator $120 Administrative $70 Il. Non-Labor Expenses. Non-labor expenses shall be reimbursed as Direct Expenses at invoice or intemal office cost. Direct Ex ep nses (Non-labor) include, but are not limited to, mileage, travel and lodging, expenses, mail, supplies, printing and reproduction services, other direct expenses associated with deliverer of the work, plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. Ill. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of ten percent(100). City of Fon Wath,Texas Attadwneat 8 FMO OfFKW Release Date_8.09.2012 Page 1 of 4 B-1 ATTACHMENT B COMPENSATION IV. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER'S excess costs expended prior to such increase will be allowable to the same extent as is such costs had been incurred after the approved increase. The Engineer shall be paid monthly payments as described in Section II — Method of Payment. If. Method of Payment a. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. b. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1_ d. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports a. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. City of Fort Wlorth,Texas Attachment B PMO Official Release Date:8.092012 Page 2 of 4 B-2 ATTACHMENT B COMPENSATION IV. A Summary of Task Order Fees shall accompany each Task Order, Summary of Total Pro'ect Fees Firm Primary Responsibility Fee Amount % Prime Consultant Pacheco Koch Engineering (75% Design) $38,000 76% Consulting Engineers, Survey Services Inc. Proposed MBE/SBE Sub-Consultants Civil Associates, Inc. Illumination Design $12,000 24% Non-MBE/SBE Consultants TOTAL $50,000 100% Additional Task Orders Project Number& Name Total Fee MBE/SBE Fee MBE/SBE 02161 —Willow Springs Road—Task $45,000 $12,000 26.7% No. 4 — Final Design 75% 02161 — Blue Mound Road—Task No. 8 1 $5,000 1 $0 1 0% City MBE/SBE Goal = 20% Consultant Committed Goal =20°x® City of Fart Worth,Texas Attadwnei t B PW Qffidal Release Date:8.09.2012 Page 3 of 4 B-3 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across desired work types and work phases. City of Fort Worth,Texas Attachment B PMO Official Release Date_8.092012 Page 4 of 4 B-4 Professional Services Payment Request Project Manager: Mach Ntw.PF Summary LOCK Project: Amendment 4-Willow Springs Road-75%Design J UNLOCK City Project S: 102161 City Sec Number 146322 conswtanunsuuctions: Fill in green cells including invoice Number.Fran and To Dales and the included worksheets. Company Name: Pacttem Koch Cor—ingErgrneers.Inc. When you Invoke is complete,save and close,start Buusaw and Add your invoice to the Consultant folder vdthm Project's folder. Consultant's PM: shad D.O'Neil,PE email: booed Vendor Invoice* Office Addres 6100 Wesfem Place,Suite 1001,Fon Worth.T—76107 Payment Request 9: Telephone: (817)412-7155 From Date: Fax: 1(811)4t2-1 545 To Date: Invoice Date: 1 Agement Amendment Amount to Completed percent ($)Invoiud Current Remaining Sheet FAC and Work T Description Amount Amount Date Amount Completed Previously Invoice Balance Work Type Wdow Springs-75%Design $SODOG.001 550,000 0C 450000.00 Work Type 2 Wwk T re J Wo k Type 4 Work Type 5 WorX Type 6 Totals This Payment Request 450,000Do $60.00000 wow Overall Percentage Complete: Professional Services Payment Request Prolect IMnper: Mitch A—,PE Project: Amendment 4-Willow Springs Road-75%De,, City Project A`-: 02161 Work Type Desc: Willow Springs-75%Design consunmrt kr.truntiws: F/AIC: City Set:Number: 46312 Fie in peen uses-Wirhp Percent Complete and ehvc4ced M-wmly Q— ,has*Order: when your invoice m wmPlele,cave erM cl e,stmt 13—ane Add your--,10 tna c-""told.,Wiewh Pro Ift foldm. Company Nark: PaN=Koch c—ftig Er r—s,kx Consultant's PM: ensu D.orae..PE email: eoredilpkce.wm Vendor Invoice 1!: Office Address 6100 Wee Mace,Solt.1001,Fod W ,Tenex 76107 Payment Request p: Telephone: (817)411-7155 From Date: Fu: (817)411-7156 To Date: Invoice Date: Pay Items Agreement Agreement Amendment Amendment Amountio Completed Percent IEI Invoiced Current Remalmng De5cr1 ton Amount Number Amount Date Amount Completed Prevousl Invoice Balance F 5a. 5 b t': Totals This Unit. - -- - Overall Percentage Complete Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Blue Mound Road and Willow Springs Road City Project No.02161 Labor hours Expense Task No. Task Description Project Senior Project EIT CADD Atlmin Total Labor Subconsultant Total Expense Task Sub Total Manager Engineer Engineer Cos[ Travel Reproduction Cos[ Rate $215 $180 $140 $95 $80 $70 MWBE Non-MWBE 4.0 Task No.4-Final Design 11 10 134 0 118 0 $32,365 $12,000 $0 $0 $35 $12,035 $44,400 4.1 Final Draft(75%)Construction Plans and Specifications $0 $0 $0 Front End,Erosion Control,Survey Control,and Construdion 4AA Details 3 6 40 $4,685 $35 $35 $4,720 4.1.2 Drainage Area Map and Storm Drain P&P 1 30 30 $6,815 $0 $6,815 4.1.3 Pavement P&P and Cross Section 1 22 20 $4,89 $0 $4,895 4.1.4 Permanent Pavement Markings 1 16 20 $4,05 M035 $49,,400 055 4.1.5 Traffic Control Plan 1 20 $3,015 ,015 4.2 75%Plans and Specifications 2 20 8 $3,870 870 4.4 Illumination Design 0 $12000 000 4.5 QAQC 10 $1,800 800 4.6 Construction Estimate 2 20 $3,230 ,230 8.0 Task No.8-Surve 0 0 0 0 0 0 $5000 $0 $0 0 0008.1 Construction Stakin $5,000 ,000Totals 11 10 134118 0 $37,365 $12,000 $0 s0 $3400 Project Summa Total Hours 273 Total Labor $37,365 Total Exp- $12,03 MBE/SBE Subconsultant $12 000 Non-MBE/SBE Subconsultant $0 5% Sub Marku $600.00 MBE/SBE Participation, 24.0% Total Pro50, Project Cost 000.00 City of Fort Worth,Texas Attachment B-Level of Effort Supplement PMO Official Release Date:8.09.2012 1 oft ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for BLUE TNIOtiND ROAD AND WILLOW SPRINGS ROAD Amendment for 75% Design of Willow Springs Road (Blue Nfound Road to Eagle Park-way) City Project No. 02161 None. Cdy of Fort Wath,Texas Attachment C PMO Reiease Date:05.19.2010 Page I of 1 Consulting Contract Schedule Specifications i'()R,r WORT H City of Fort Worth Capital Improvement Program Attachment D - Project Schedule This PROTECT Tguires a Tier 3 schedule as defined Iferein and in the City's Schedule Guidance Document. Dl. CONSULTING SERVICES SCHEDULE DEVELOPMENT: The CONSULTANT shall prepare schedules for consulting services that meet the requirements described in this specification, showing by Critical Path Method (CPM) the planned sequence and timing of the Work associated with the Agreement. All submittals shall be submitted in PDF format, and schedule files shall also be submitted in native file format (Le. file formats associated with the scheduling software). The approved scheduling software systems for creating the schedule files are: - Primavera(Version 6.1 or later or approved by CrM - Primavera Contractor(Version 6.1 or later or approved by CITY) - Microsoft Project(Version 2003/2007 or later or approved by CITY)(PHASING OUT) D2 BASELINE CONSULTING SERVICES SCHEDULE: Following notice-to-proceed, the CONSULTANT shall develop, submit and review the draft detailed baseline consulting services schedule with the CITY to demonstrate the CONSUL.TANT's understanding of the Agreement requirements and approach for performing the work The CONSULTANT will prepare the final detailed baseline consulting services schedule based on CITY comments,if any,and submit to the CITY no later than the submittal of the first project invoice. The following guidelines shall be adhered to in preparing the baseline schedule, and as described m further detail in the CITY's Schedule Guidance Document. a. The scope shall be subdivided by work breakdown structure (WBS)representing the tasks,subtasks,and activities associated with delivering the work b. The schedule shall accurately describe the major work activities,key milestones,and dependencies/relationships as appropriate to the work c. The schedule should include appropriate meetings, review periods, critical decision points,including third party utility dependencies and reviewing agencies. D3. PROGRESS CONSULTING SERVICES SCHEDULE: The CONSULTANT shall prepare and submit monthly to the CITY for approval the updated schedule in accordance with Dl and D2 and the CITY's Schedule Guidance Document inclusive. As the Work progresses, the CONSULTANT shall enter into the schedule and record actual progress as described in the CII'Y's Schedule Guidance Document. The updated schedule submittal shall also include a concise schedule narrative that highlights the following,if appropriate and applicable: • Changes in the critical path, • Expected schedule changes, • Potential delays, • Opportunities to expedite the schedule, • Coordination issues the CITY should be aware of or can assist with, City of Fort W oM.Texas Attadanert D PMO Release Dale:02.15M 1 Page i of 2 • Other schedule-related issues that the CONSULTANT wishes to communicate to the CITY. D4. PERFORMANCE AND CONSULTING SERVICES SCHEDULE: If the work accomplished falls behind that scheduled due to factors within the CONSULTANT"s control, the CONSULTANT shall take such action as necessary to improve the progress of the Work. In addition, the CITY may require the CONSULTANT to submit a revised schedule demonstrating the proposed plan to make up the delay in schedule progress and to ensure completion of the Work within the allotted Agreement time. D5. SCHEDULE TIERS SPECIAL INSTRUCTIONS: The requirements for the schedule are determined based on the nature and needs of the project. The schedule tier for this project is stated at the top of this document. CONSULTANT shall submit each schedule relying on the CTTY's current Schedule Guidance Document. D6. SCHEDULE SUBMITTAL AND PAYMENT: As stated in III.A.(1). of the Agreement, CONSULTANT shall provide the information required by Attachment D. CONSULTANT's monthly invoices will not be accepted and processed for payment without monthly schedule updates that are submitted in the time and manner required by Attachment D and the CTTY's current Schedule Guidance Document. City of Fort Worth,Texas Attachment D PMO Release Date 02 152011 Page 2 of 2 Attachment E : Project Location Maps P„ achecoll-Koch Cky of Fort Worth . Willow Springs Road 6100 WES IERN PLACE, SWE 1001 From Slue MoundRoad to Eagle Boulevard FORT VIADR771, 7X 76107 PHONE(817)412-7155 i o CL w U a 3 m 4 ui 9 " M6 a,- r ti E � N V NOTE S DATUM BACKGROUND IMAGE FROM NAD 1983 TEXAS STATE PLANE BING AERIALS NORTH CENTRAL ZONE FIPS 4202 Q 1.0100 2,000 L,u,rcce& sh,HERE Feef!§G"fAfbrnsp. rmc,=ro rtierP Corp.,N RCAtd, V N ouem ber 6.20 15