Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 48509-FP4
Department od TP &W Const.Services CPNiI Date Project Manager t "1 ZT WO RT H O Risk Management Ca adv 11�'1:,11 1 CITY SECRETARY , D.O.E. Brotherton IZ ✓ GOATi RACT tela. CFA Morales/Scanned I Z b- 1 *1441 Gutzler/ScannedI-2A 4:7 The Proceeding people have been Contacted concerning the request for final payment&have ATION AND PUBLIC WORKS released this project for such payment. IF PROJECT COMPLETION 9 (0 0) Developer Projects) Clearance Conducted By I�/iaM*!6 City Project JV'o: 100445 Regarding contract 100445 for SENDERA RANCH EAST PHASE 13A as required by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon th sistant Director of the Transportation&Public Works Department has accepted the project I DEC 21 2017 Original Contract Price: $743,453.25 Amount of Approved Change Orders. Ne Revised Contract Amount: Total Cost Work Completed: $743,453.25 Recomme r Acceptance Date Asst. Dire r, TPW - e esign an uc io �trC -�evr Accepted Date Asst. Director, WATER DEPARTMENT Asst. City Manager Date Comments: ,. IT MAIIeM O"IC AL RI'ICCRQ CITY CRETAICY DEC k2 2011 IST.WOM,TX Rev.9/22/101twt R IECEIVE DEC 21 2017 s 9 U bbl L) -- City Project Numbers 100445 joy 1. DOE Number 0445 Contract Name SENDERA RANCH EAST PHASE 13A Estimate Number I Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 10/6/2017 Project Funding Project Manager NA City Secretary Contract Number Inspectors LAYER / MATTEGAT Contract Date Contractor C.W.YOUNG CONSTRUCTION Contract Time 150 CD 210 S.SIXTH STREET Days Charged to Date 239 CD MANSFIELD, TX 76063 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $743,453.25 Less % Retained $0.00 Net Earned $743,453.25 Earned This Period $743,453.25 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $743,45325 Friday,October 6,2017 Page 5 of 5 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name SENDERA RANCH EAST PHASE 13A Contract Limits Project Type WATER&SEWER City Project Numbers 100445 DOE Number 0445 Estimate Number 1 Payment Number I For Period Ending 10/6/2017 CD City Secretary Contract Number Contract Time 150D Contract Date Days Charged to Date 239 Project Manager NA Contract is 100.00 Complete Contractor C.W.YOUNG CONSTRUCTION 210 S.SIXTH STREET MANSFIELD, TX 76063 Inspectors LAYER / MATTEGAT Friday,October 6,2017 Page 1 of 5 City Project Numbers 100445 DOE Number 0445 Contract Name SENDERA RANCH EAST PHASE 13A Estimate Number I Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 10/6/2017 Project Funding WATER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 TRENCH SAFETY FOR WATER 3078 LF $0.30 $923.40 3078 $923.40 2 DUCTILE IRON WAER FITTINGS W/RESTRAINT 1.55 TN $5,930.13 $9,191.70 1.55 $9,191.70 3 8"WATER PIPE 2376 LF $25.20 $59,875.20 2376 $59,875.20 4 8"DIP WATER 77 LF $74.00 $5,698.00 77 $5,698.00 5 12"WATER PIPE 599 LF $34.48 $20,653.52 599 $20,653.52 6 12"DIP WATER 26 LF $114.00 $2,964.00 26 $2,964.00 7 FIRE HYDRANT 3 EA $3,600.00 $10,800.00 3 $10,800.00 8 CONNECT TO EXISTING 4"-12"WATER MAIN 3 EA $500.00 $1,500.00 3 $1,500.00 9 1"WATER SERVICE 78 EA $711.24 $55,476.72 78 $55,476.72 10 8"GATE VALVE 7 EA $1,134.08 $7,938.56 7 $7,938.56 11 12"GATE VALVE 1 EA $2,040.50 $2,040.50 1 $2,040.50 12 REMOVE AND RELOCATE FIRE HYDRANT 1 EA $2,500.00 $2,500.00 1 $2,500.00 13 REMOVE AND RELOCATE 8"GATE VALVE 1 EA $1,500.00 $1,500.00 1 $1,500.00 Sub-Total of Previous Unit $181,061.60 $181,061.60 SEWER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 POST CCTV INSPECTION 2902 LF $1.25 $3,627.50 2902 $3,627.50 2 MANHOLE VACUUM TESTING 14 EA $100.00 $1,400.00 14 $1,400.00 3 TRENCH SAFETY 2902 LF $0.50 $1,451.00 2902 $1,451.00 4 TRENCH WATER STOPS 5 EA $350.00 $1,750.00 5 $1,750.00 5 4"SEWER SERVICE 79 EA $627.59 $49,579.61 79 $49,579.61 6 8"SEWER PIPE 2902 LF $48.38 $140,398.76 2902 $140,398.76 7 8"SEWER PIPE CSS BACKFILL 172 LF $45.00 $7,740.00 172 $7,740.00 8 4'MANHOLE 14 EA $3,377.30 $47,282.20 14 $47,282.20 9 4'EXTRA DEPTH MANHOLE 8.21 VF $25.00 $205.25 8.21 $205.25 Sub-Total of Previous Unit $253,434.32 $253,434.32 Friday,October 6,2017 Page 2 of 5 City Project Numbers 100445 DOE Number 0445 Contract Name SENDERA RANCH EAST PHASE 13A Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 10/6/2017 Project Funding MASTER SEWER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. —– Quanity Total Quanity Total 1 POST CCTV INSPECTION 2830 LF $1.25 $3,537.50 2830 $3,537.50 2 MANHOLE VACUUM TESTING 17 EA $100.00 $1,700.00 17 $1,700.00 3 TRENCH SAFETY 2830 LF $0.50 $1,415.00 2830 $1,415.00 4 TRENCH WATER STOPS 9 EA $350.00 $3,150.00 9 $3,150.00 5 CONCRETE ENCASEMENT FOR UTILITY PIPES 26.1 CY $45.00 $1,174.50 26.1 $1,174.50 6 4"SEWER SERVICE 32 EA $627.59 $20,082.88 32 $20,082.88 7 8"SEWER PIPE 230 LF $48.38 $11,127.40 230 $11,127.40 8 15"SEWER PIPE 2600 LF $76.52 $198,952.00 2600 $198,952.00 9 4'MANHOLE 16 EA $3,377.30 $54,036.80 16 $54,036.80 10 4'EXTRA DEPTH MANHOLE 32.09 VF $25.00 $802.25 32.09 $802.25 11 5'MANHOLE OVER EXISTING SEWER LINES I EA $6,635.00 $6,635.00 1 $6,635.00 12 SANITARY SEWER MANHOLE VENT 2 EA $850.00 $1,700.00 2 $1,700.00 13 WATER TIGHT HINGED MANHOLE FRAME, 6 EA $774.00 $4,644.00 6 $4,644.00 COVER AND GRADE RINGS Sub-Total of Previous Unit $308,957.33 $308,957.33 Friday,October 6,2017 Page 3 of 5 City Project Numbers 100445 DOE Number 0445 Contract Name SENDERA RANCH EAST PHASE 13A Estimate Number 1 Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 10/6/2017 Project Funding Contrac!information Summary Original Contract Amount $743,453.25 Chante ®refers Total Contract Price $743,453.25 L (7 Total Cost of Work Completed $743,453.25 Con r ctor Less %Retained $0.00 ,r ,� Net Earned $743,453.25 U u L `1 Date 11-17-17/, ;;;, Inspection Supervisor Earned This Period $743,453.25 Retainage This Period $0.00 4al-' /`a �• Date 02l'Ln (in Proj tManages Less Liquidated Damages j� Days @ /Day $0.00 Date VQ,�, LessPavement Deficiency $0.00 Asst.D t r/T/ f�Ct� PW- e 'gons c i i Vel .. j Less Penalty $0.00 (� Date (2 Z / CL01 Less Previous Payment $0.00 Director/Contracting Department Plus Material on Hand Less 15% $0.00 Balance Due This Payment $743,453.25 Friday,October 6,2017 Page 4 of 5 FORTWORTH rev 03,05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Sendera Ranch East Phase 13A PROJECT NO.: 100445 CONTRACTOR: CW Young DOE NO.; PERIOD FROM:-02/13/17 TO: 10/1017 FINAL INSPECTION DATE: ]0-Oct-17 WORK ORDER EFFECTIVE-1/10/2017 CONTRACT TIME: 180 O WE CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL & HOLIDAYS & TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS PERIOD 0 0 0 0 0 0 PREVIOUS 0 0 0 0 239 239 PERIOD TOTALS 0 0 0 TO DATE jO j239 j239 *REMARKS: 1 2 7 -------- r � CONTIACTOR DATE INS / DATE ENGINEERING DEPART"Z'N� v The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817) 392-7941 •Fat: (817) 392-7845 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Sendera Ranch East Phase 13A PROJECT NUMBER: 100445 DOE NUMBER: N/A WATER PIPE LAID SIZE TYPE OF PIPE LF 8" PVC 2,376 12" PVC 599 8" Dip Water 77 12" Dip Water 26 FIRE HYDRANTS: 4 VALVES(16" OR LARGER) 0 PIPE ABANDONED SIZE TYPE OF PIPE LF N/A DENSITIES: Yes NEW SERVICES: 1" Copper 1,843 LF 1.5" Copper 35 LF SEWER PIPE LAID SIZE TYPE OF PIPE LF 8" PVC 3,132 15" PVC 2,600 PIPE ABANDONED SIZE TYPE OF PIPE LF N/A DENSITIES: Yes NEW SERVICES: 4" PVC 1,855 LF TRANSPORTATION AND PUBLIC WORKS ? The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845 FORTWORTHREV:8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR n CONTRACTOR&PROJECT DATA Name of Contractor Project Name C.W.Young Sendera Ranch East Phase 13A Inspector City Project Number William Mattegat 100445 Construction Components Project Manager 0 water[] Waste Water❑ Storm Drainage❑ Pavement Khal Jaafari Initial Contract Amount Project Difficulty $743,453.25 Q Simple Routine 0 Complex Final Contract Amount Date $`7 3 9-Oct-17 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 2 8 4 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 2 20 10 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 2 20 10 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 N 12 After Hours Response 5 N 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 354 BONUS POINTS(25 Maximum)(B) III)CONTRACTOR'S RATING TOTAL SCORE(TS) 354 Maximum Score(MS)=448 or sum of applicable element score maximums which= 408 Rating([TS/MS] x 100%) 354 / 408 = 87% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature Con ctor Signature v //Inspector's Supervisor Signature / az CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 8851 Camp Bowie West Blvd. •Fort Worth,TX 76116• (817)392-8306 wi FO RT I �0 RT H REV:02'22'°' TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY n PROJECT INFORMATION Date: �9-Oct-17 Name of Contractor Project Name C.W.Young Sendera Ranch East Phase 13A DOE Inspector Project Manager William Mattegat Khal Jaafari DOE Number�� ProjectD vuln Tvpe of Contract CPN N99§-1-5 100,4+} Q Simple * Routine Q Complex Q water waste water Storm Drainage0 Pavement Initial Contract Amount Final Contract Amount $743,453.25 $743,453.25 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 3 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities Applicability of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager c 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Payments 5/ 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817) 392-7845 AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Joe Winchester, Operations Manager Of C. W. Young Construction, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Sendera Ranch East Phase 13A- City rojectfNoo.. 100445 BYW ' Jo Winchester- Operations Manager Subscribed and sworn before me n thi date 21 of November, 2017. Notary Public County, State �OW EVERETT W STEWART 1H My Commission Expires March 12,2019 BOND NUMBER 022056262 OWNER CONSENT OF SURETY ARCHITECT TO FINAL PAYMENT CONTRACTOR ❑ Conforms with the American Institute of SURETY Architects,AIA Document G707 OTHER TO OWNER: Lennar Homes of Texas ARCHITECT'S PROJECT NO.: (Name and address) 1707 Marketplace Blvd. Suite 100 Irving,Texas 75063 CONTRACT FOR: Sendera Ranch East Phase 13A,Water, Sewer&Storm Improvements PROJECT: Sendera Ranch East Phase 13A CONTRACT DATED: (Name and address) In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (Insert name and address of Surety) Liberty Mutual Insurance Company 175 Berkeley Street SURETY, Boston,MA 02116 on bond of (Insert name and address of Conn•actoi) C.W.Young Construction,LP 210 S.6th Ave. Mansfield,Texas 76063 ,CONTRACTOR, hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (Insert name and address of Oumet) Lennar Homes of Texas 1707 Marketplace Blvd.,Suite 100 Irving,Texas 75063 OWNER, as set forth in said Surety's bond. IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: October 3,2017 (Insert in uniting the month followed by the numeric date and year.) Liberty Mutual Insurance Company (Surety) r-Wllj� Atte ( ah thori ed representative) Sonia Lara,Attorney-in-Fact (Printed name and title) Liberty a .© SURETY TEXAS TEXAS IMPORTANT NOTICE AVISO IMPORTANTE To obtain information or make a complaint: Para obtener informacion o para someter una queja: You may call toll-free for information or to Usted puede llamar al numero de telefono gratis make a complaint at para informacion o para someter una queja al 1-877-751-2640 1-877-751-2640 You may also write to: Usted tambien puede escribir a: 2200 Renaissance Blvd., Ste. 400 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 King of Prussia, PA 19406-2755 You may contact the Texas Department of Puede comunicarse con el Departamento de Insurance to obtain information on companies, Seguros de Texas para obtener informacion coverages, rights or complaints at acerca de companias, coberturas, derechos o 1-800-252-3439 quejas al 1-800-252-3439 You may write the Texas Department of Insurance Puede escribir al Departamento de Seguros Consumer Protection(111-1 A) de Texas Consumer Protection(111-1 A) P. O. Box 149091 P. O. Box 149091 Austin, TX 78714-9091 Austin, TX 78714-9091 FAX: (512) 490-1007 FAX#(512)490-1007 Web: htM://www.tdi.texas.gov Web:b—ttp://www.tdi.texas.gov E-mail: ConsumerProtection@,tdi.texas.gov gov E-mail: ConsumerProtection@tdi.texas.gov gov PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS O RECLAMOS: Should you have a dispute concerning your Si tiena una disputa concerniente a su prima o a premium or about a claim you should first un reclamo, debe comunicarse con el agente o contact the agent or call 1-800-843-6446. primero. Si no se resuelve la disputa, puede If the dispute is not resolved, you may contact the entonces comunicarse con el departamento (TDI) Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR UNA ESTE AVISO A SU POLIZA: POLICY: This notice is for information only and does not Este aviso es solo para proposito de informacion become a part or condition of the attached y no se convierte en parte o condicion del document. documento adjunto. NP 70 68 09 01 LMS-15292 10/15 THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named'herein,and they have no authority to bind the Company except in the manner and to the extent herein stated. Liberty Mutual Insurance Company Certificate No.7713994 The Ohio Casualty Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS:That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire,that Liberty Mutual Insurance Company is a corporation duly organized under laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State oflndiana=(herein collectively called the Companies"),pursuant to and.by authority herein,set-forth,does hereby name,constitute and appoint, Aaron?:.DeRoss Alisha:Weis Andrew P.Clark dill Bailin er BrtantA Smith B .ant Ahmed Candace Re molds Colin E.Coni •C stat A.Gutierrez- David W.Morgan;Diana Perez,Hilaria Tjerma;Kevin Claborn LaC'asha Grimes Mark Rozewicz NTelissa AII&6 Paul W Bower;Rachel D-uncap Richard S Maxey,Sherlssa Stoker Sonia Lara,Teresa Ske.rtchly,Todd Tschantz,.Tomi J..Pope Zia:Reeves all of the city of Dallas state of TX: each ind,Viduallyifthere be more than one named,its true and lawfuhattorrtey In factto make,execute,seal;acknowledge and deliver,for and on its behalf as surety and as.its act and deed,any and all undertakings,bonds recognizances and othersurety obligations iixpnrsuance of these presents.and shall be as-binding upon the Companies as if they trove been dulysigned bytfie president and attested bythe secretary of the Companies in theirown,pioperpersons. IN WITNESS WHEREOF;"this Power of A_ttorneq has been subscnbed by an authorized officer ar official of the Companies end the corporate seals of the Companies have been affixed thereto this 5th day of April _ �SY INSU " �J��oavoGt F�!� - tiJt"caco2lT�'�� �P oavory�•Gi., -. _; _;.. The Ohio.Casualty Insurance Company_ rn o '1919 0 791, o N 7997 3 Liberty Mutual Insurance Company m West American Insurance-Company - rA 1AN1 '��' j =ynrut�r MeinNn < q7 O �_:.STATE OF PENNSYLVANIA ss David-M.Care ,-Assistant Secretary COUNTY OF MONTGOMERY: O On this 5th da of April 2017 —-O L Y- before me personally appeared David M.Carey,who acknowledged himself toi be the AssistantSecretary of Liberty Mutual Insurance v�•.. v d -Company,The Ohio-Casualty Company,and West American Insurance Company,and that he, as such;being authorized so to do, execute the foregoing instrument for the purposes 0 _therein contained.b signing on behalf of the co orations b himself as duly authorized officer. W O ff _ Y.9 9 m- Y Y d >_AN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at King of Prussia,Pennsylvania,on the day and year first above-written. `O=Q it3 _ �. yp PAST COMMONWEALTH OF PENNSYLVANIA j// �•N- - �moo: Notarial Seal to d - of Teresa Pastella;Notary Public By: - O Ct 0:C = Upper Mission Twp:,Montgomery County Teresa Pastella;.Notary Public C 3 j� `Q�,� My Commission Expires March 28;2021 r OO �Tq� - Member,Pennsylvania Association of Notaries O C IL GSC C-4: This Power of Attorney is-made and executed-pursuant to and by authority of the following By-laws and Authorizations of The Ohio_Casualty Insurance Company, Liberty.Mutual fA p Insurance Company;and WestAmerican Insurance Company which resolutions are.now in full force and effect reading as follows: w L ARTICLE IV–OFFICERS–Section 12.Power of Attorney.Any officer or other official of the Corporation authorized for that-purpose in writing by the Chairman or the President,and subject O = C 40 to such lirnitatiori as the Chairman or the President may prescribe,shall-appoint such attorneys-in-fact,as may be necessary to act in behalf of the Corporation to make;execute,seal, > O:_ acknowledge and deliver as surety any and all undertakings;bonds,recognizances and othersuretyobligations;Such attomeys-in-fact,subject to the limitations set forth in their respective :5 E :powers of attorney,shall have.full power-to bind the Corporation by their signature and execution-of any such instruments and to attach thereto the seal of the Corporation. When so O M executed,such instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or atomey-in-fact under. >'O C. the provisions of this article maybe revoked at any time by the Board,the Chairman,the President or by the officer or officers-granting such power or authority. ell ARTICLE XIII–Execution of Contracts–SECTION 5:Surety Bonds and Undertakings.Any officer of the Company authorized for that purpose in writing by the chairman or the president, y 00 > L and subject to such limitations as the chairman or the resident may prescribe,shall a omt such attome s In fact,as ma bernecessaryto actin behalf of the Company to make,execute,_ , M L, _ P Y P PP y= y 0 0-seal,acknowledge and deliver as surety any andallundertakings;bonds;recognizances and other surety obligations. Such attorneys-in-fact subject to_the limitations-set forth in their_ o? L U respective,powers of.attomey,shall have full power to bind the Companyby their signature and execution of an such Instruments and to attach thereto the seal of the Company.When so: 00 Y executed such-instruments shall be as#imd`mg as if signed by hepresldent and a#tesfed bythe secretary: O 'Certificate ofDesignation President of the-Company acting pursuantto th'e Bylaws offihe Company,authorizes Davld'M Carey,Rssistant`Secretary to appoint such attorneys-in ~r fact as may be necessary to act on behalfof the Company to rYlake execute,seal,acknowledge and deliver as::"surety any and all undertakings'bonds,recognizances and other surety obligations:: Authorisation–By unanimous consent of- Company s Board of Directors,the Company consents#hat facsimile or mechanically reproducedslgnature of any assistant secreta of the -Company..wherever cerin a on a certified eo ofa secretary PP 9 P py ny:power of attorney issued by the Cgnlpatly in connection with surety bonds,shall be valld:and binding upon the Company with the same force and effect as though manually atFced- I, Renee C: Llewellyn; the undersigned, Assistant Secretary,_The Ohla Casualty.Insurance Cprnpany, Liberty Mutual Insurance Companq and 'est American Insurance Company do hereby certify that the original power of attorney of which the foregoing Is a:furl true ate Correct copy of the Power of Attorney execuked by said Companies, is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF,I have hereunto set myhandand affixed-the seals of said Companies i day oftBy: 20 SSV INS Nsbq N1tlSU:�. �yJ�CJ�21T9 J�JF.�FFOY,T /C n �cpN 0211���� 0 1919 o r F 1912 3 r 1991 0 Renee C.Llewe i ,Assistant Secretary.. - 194 of 300