HomeMy WebLinkAboutContract 49940 Received Date
Received Time
Developer and Project Information Cover Sheet:
Governmental Entity/ISD Name: Eagle Mountain Saginaw I.S.D.
Address, State,Zip Code: 1200 Old Decatur Rd,Fort Worth,TX 76179
Phone& Email: 817-232-0880,cwelch(&ems-isd.net
Authorized Signatory,Title: Steven G.Newcom,Board President
Project Name and Brief Eagle Mountain Saginaw Middle School No.6
Description:
Project Location:
Plat Case Number: FS-17-112 Plat Name: Eagle Mountain—Saginaw I.S.D.Middle School
No. 6
Mapsco: 47F Council District: 2 City Project Number: 101182
CFA Number: 2017-132 DOE Number: None
To be completed b staff:
Received by: Date: l
89 011 ,
a
N
[OFFICIAL RECORD
City of Fort Worth,Texas CITU''SECRETARY
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:09.22.2016 ¢ M P,
RT sTX
Page 1 of 11
GOVERNMENTAL ENTITY/ISD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.— � qo—
WHEREAS, the undersigned Governmental Entity ("Developer") desires to make
certain specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Eagle Mountain Saginaw Middle
School No. 6 ("Project")within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement("CFA"or"Agreement") in connection with the Improvements and the Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved
by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this
Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause all contractors
hired by Developer to comply with the Policy in connection with the work performed by said
contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the
Policy or by providing written certification from the Developer's Chief Financial Officer(or equivalent
position regardless of title)that the Developer(governmental entity)has appropriated sufficient funds to
pay its contractor for all work to be performed under this Agreement. Developer recognizes that there
shall be no reduction in the any financial security held by the City until the Project has been
City of Fort Worth,Texas OFFICIAL RECORD
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:09.22.2016 CITY SECRETARY
Page 2 of I 1
FT.WORTH,TX
completed and the City has officially accepted the Improvements. Developer further
acknowledges that the said acceptance process requires the Developer's contractor(s) to
submit an affidavit of bills paid signed by its contractor and consent of surety signed by its
surety to ensure the contractor has paid any sub-contractors and suppliers in full.
Additionally, the contractor must also provide in writing that the contractor has been paid in
full by Developer for all the services provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein: Water
(A) ®, Sewer(A-1) ®, Paving(B) 0, Storm Drain(B-1) ❑, Street Lights & Signs (C).
E. If there is City financial participation in the Project, the Developer shall award all contracts for
the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy,
subject to any limitations in Texas Local Government Code Chapter 212, Subchapter, or under
statutes governing Developer's award of public works contracts. The contracts for the
construction of the public infrastructure shall be administered in conformance with paragraph 8,
Section 11, of the Policy.
F. For all Improvements included in this Agreement for which the Developer awards construction
contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the department
having jurisdiction over the infrastructure to be constructed, said contractor to meet City's
requirements for being prequalified, insured, licensed and bonded to do work in public
streets and/or to perform water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in the
names of the City and the Developer for one hundred percent (100%) of the contract
price of the Improvements, and a maintenance bond in the name of the City for one
hundred percent (100%) of the contract price of the Improvements valid for a period of
two (2)years from the date of final acceptance insuring the maintenance and repair of the
constructed infrastructure during the term of the maintenance bond. All bonds to be
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:09.22.2016
Page 3 of 11
furnished before work is commenced and to meet the requirements of Chapter 2253,
Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work contemplated herein
to provide insurance equal to or in excess of the amounts required by the City's standard
specifications and contract documents for developer-awarded infrastructure construction
contracts. The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance (ACORD or
other state-approved form) supplied by the contractor's insurance provider and bound in
the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces, to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector
is present and gives his consent to proceed, and to make such laboratory tests of materials
being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to the City
in order to schedule a Pre-Construction Meeting. The submittal should occur no less than
10 working days prior to the desired date of the meeting.No construction will commence
without a City-issued Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains constructed
under this Agreement until said sewer and water mains and service lines have been
completed to the satisfaction of the Water Department.
G. Developer shall provide, at its expense, all engineering drawings and documents necessary to
construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements contemplated herein.
1. City shall not be responsible for any costs that may be incurred by Developer in the relocation of
any utilities that are or may be in conflict with any of the community facilities to be installed
hereunder.
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:09.22.2016
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for
any inadequacies in the preliminary plans, specifications and cost estimates supplied by the
Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby, fully
indemnify, hold harmless and defend the City, its officers, agents and employees from all
suits, actions or claims of any character, whether real or asserted, brought for or on
account of any injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design, performance or
completion of any work to be performed by said Developer, his contractors,
subcontractors, officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused, in whole or in
part, by the alleged negligence of the City of Fort Worth, its ofricers, servants, or
employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless the
City, its officers, agents and employees from and against any and all claims, suits or causes
of action of any nature whatsoever, whether real or asserted, brought for or on account of
any injuries or damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated herein, whether or
not such injuries, death or damages are caused, in whole or in part, by the alleged
negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer
will require its contractors to indemnify, and hold harmless the City for any losses,
damages, costs or expenses suffered by the City or caused as a result of said contractor's
failure to complete the work and construct the improvements in a good and workmanlike
manner, free from defects, in conformance with the Policy, and in accordance with all plans
and specifications.
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:09.22.2016
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements, Developer
will assign to the City a non-exclusive right to enforce the contracts entered into by the
Developer with its contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with any contractor
shall include provisions granting to the City the right to enforce such contracts as an express
intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material testing
fees equal to two percent (2%) for a total of 4% of the developer's share of the total
construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent
(4%) and material testing fees equal to two percent (2%) for a total of 6% of the
developer's share of the total construction cost as stated in the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the
streetlights, inspection fees equal to four percent (4%) of the developer's share of the
streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided, however, if
construction of the Improvements has started within the two year period, the developer
may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations under the
Policy, this Agreement, its financial guarantee, its agreement with its contractor or
other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to
cause the completion of the construction of the Improvements if at the end of two (2)
years from the date of this Agreement(and any extension period)the Improvements have
not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of
same before the expiration of two (2) years if the Developer breaches this Agreement,
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:09.22.2016
Page 6 of 11
becomes insolvent or fails to pay costs of construction and the financial guarantee is not a
Completion Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of supplies and/or
construction, the contractors and/or suppliers may put a lien upon the property which is
the subject of the Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code, the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not boycott
Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel"
and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas
Government Code. By signing this contract, Developer certifies that Developer's signature
provides written verification to the City that Developer: (1) does not boycott Israel,and(2) will
not boycott Israel during the term of the contract.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:09.22.2016
Page 7 of 11
Cost Summary Sheet
Project Name: Eagle Mountain Saginaw Middle School No. 6
CFA No.: 2017-132 DOE No.: None
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1, Water Construction $ 79,086.00
2.Sewer Construction $ 51,919.00
Water and Sewer Construction Total $ 131,005.00
B. TPW Construction
1.Street $ -
2.Storm Drain $ -
3.Street Lights Installed by Developer $ -
TPW Construction Cost Total $ -
Total Construction Cost(excluding the fees): $ 131,005.00
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 2,620.10
D. Water/Sewer Material Testing Fee(2%) $ 2,620.10
Sub-Total for Water Construction Fees $ 5,240.20
E. TPW Inspection Fee(4%) $ -
F. TPW Material Testing(2%) $
G. Street Light Inspsection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ -
Total Construction Fees: $ 5,240.20
Choice
Financial Guarantee Options, choose one Amount Mark one'
Bond=100% $ 131 005.00
Completion Agreement=100%/Holds Plat $ 131.005.00
Cash Escrow Water/Sanitary Sewer=125% $ 163.756.25
Cash Escrow Paving/Storm Drain=125% $
Letter of Credit=125%w/2yr expiration period $ 163 756.25
Statement of Appropriated Funding For Governmental Entit 1JSDs ONLr x
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:09.22.2016
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER:
Eagle Mountain— Saginaw I.S.D.
Jesus J. ChaP a
Assistant City Manager Name: Steven G.Newcom
Title: Board President
Date: � l _ Z
Date: i1 �13�Zo1�
Recommended by:
Contract Compliance Manager:
By signing, I acknowledge that I am the
Evelyn berts/Jennifer Ezernack person responsible for the monitoring and
Project Assistant administration of this contract, including
Planning and Development ensuring all performance and reporting
requirements.
rn 5-L.
nie Morales
Approved as to Form & Legality: Title: Development Manager
Richard A. McCracken
Assistant City Attorney
ATTEST: GST y O�
M&C No. rJ'/4—
Date: :O
Mary J. Kayser/Ronald Gonzales
ity Secretary /Assistant City Sec
City of Fort Worth,Texas OFFICIAL RECORD
Governmental Entity/ISD Community Facilities Agreement CITY SECRETARY
CFA Official Release Date:09.22.2016
Page 9 of 11 FT.WORTH,TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A:Water Improvements
® Water Cost Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Cost Estimate
❑ Exhibit B: Paving Improvements
Paving Cost Estimate
❑ Exhibit B-1: Storm Drain Improvements
❑ Storm Drain Cost Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:09.22.2016
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Governmental Entity/ISD Community Facilities Agreement
City Project No. 101182
None
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:09.22.2016
Page 11 of 11
— mow /
,N� r
annWELL+MA INE C-- ROAD NRD n
SITE 3T""F
E��11f�p a
I 0
J \ r
?�
PPOJE'- LOCATION
µiH
karine
Creek
Lake
82
i
C.F.A.EXHIBIT FOR...
EMS MIDDLE SCHOOL 6
Vicinity Map
Water Project No. 56008-0600430-101182-001580
Sewer Project No. 56008-0700430-101182-001380
SHEET No. 1 of 1
League Hall &Perkins City of Fort Worth,Texas vroy<+
stale dale
horix tnp533J N.RW—id.give,SW.100 Im provemanfs for EM817038
sheet
F. W.rh,T....76137 EMS ISD, Middle School 6
N A Od 2017 817.336.5"3 ph"7.336 W8
T.P.Ryi..P .Ne.1230 VICINITY MAP t
03
11
LEGEND
——— EXIST. WA IFR
PROP. WATER
PROP, F.H. ASSEM8L Y
1-8"GATE VAL VE
1-12"GATE VALVE 1-4"GATE VALE PROP, GATE VALVE
12' WATER UN 12"WATER UN
8"WATER UNE 6
-o
4"WATER LINE
y �
1� G
• fir- I
r'
,7 30C
C.F.A.EXHIBIT FOR
EMS ISD, Middle School
Water
Exhibit "A"
Water Project No. 56008-0600430-101182-001580
Sewer Project No. 56008-0700430-101182-001380
SHEET No. 1 of 1
�ro�• dale teague nail &perkins cr,Y ar FaM worn,Texas EMS 17038
herl: 5]37 N.Rl—ld"D&.,Sala 100 Implaaemen,s far
r=aoo^
tnp
Penwa ph 91.7eu7 EMS 1563 Middle School 6 heel
Od 2017 e17.33a.5W. , n 7613713 e. r 502
•N TBPE Rp1,1,fl"Ne.x-330
EXHIBIT A 03
LEGEND
------ EXIST. SS
PROP. SS
• EXIST SSMH
• PROP. SSMH
e
�� \\ 8•SS UNE
-o
z
C.F.A.EXHIBIT FOR...
EMS ISD, Middle School
SANITARY SEWER
Exhibit "B"
Water Project No. 56008-0600430-101182-001580
Sewer Project No. 56008-0700430-101182-001380
SHEET No. 1 of 1
..al. am• teague nail&perkins City of F611 Wodh,Te-
5237N'
exas EMS17038
h.ria 5237 N.Nlv.r.Id.D&.,EvR.100 Impravem.nls far
1'=300' Od 2017 4& t�� E.rlw.nh,T.:•.]els] EMS ISD, Middle School 6 sheet
!1].336.5]]3 Ph!.].]36.]!13`. 0f
v.d TBPERphl,pi—o.FfaO EXHIBIT B
N/A wvws•pl.ss.m �3
004100-1
BID FORM
Page 1 of3
SECTION 00 4100
BID FORM
This proposal must not be removed from this book of Contract Documents.
TO: Eagle Mountain-Saginaw I.S.D.
1200 Old Decatur Road
Fort Worth,TX 76179
PROPOSAL FOR Water and Sewer Improvements to serve
Eagle Mountain-Saginaw Middle School No. 6
City Project No. 101182.
Water Project No. 56008-0600430-101182-W1580
Sewer Project No.56008-0700430-101182-001380,
X No.X-24710
Includes the furnishing of all materials, except materials specified to be furnished by the City,
equipment and labor for the installation of all facilities and all necessary appurtenances and
incidental work to provide a complete and serviceable project designated as:
WATER AND SANITARY SEWER IMPROVEMENTS TO SERVE
EAGLE MOUNTAIN-SAGINAW MIDDLE SCHOOL No. 6
Construction staking for this project shall be performed by the Contractor.
The Bidder acknowledges that all work types must be performed only by prequalified contractors
and subcontractors.
Pursuant to the foregoing 'Imritation to Bidders', the undersigned Bidder, having thoroughly
examined the Contract Documents, including plans, the site of the project and understanding the
amount of work to be done, and the prevailing conditions, hereby proposes to do all the work,
fim ish all labor, equipment and material except as specified to be famished by the City,which is
necessary to frilly complete the work as provided in the Plans and Contract Documents and
subject to the inspection and approval of the City of Fort Worth, Texas; and binds himself upon
acceptance of this Proposal to execute a contract and furnish an approved Performance Bond,
Payment Bond, Maintenances Bond, and such other bonds, if any, as may be required by the
Contract Documents for the performing and completing of the said work. Contractor proposes to
do the work within the time stated and for the sum listed in the Proposal Form, Section 00 42 43.
EMSMIDDLE SCHOOL No.6
CINPROJECTNO.10I182
004100-2
HID FORM
Page 2 of3
After acceptance of this Proposal, the undersigned will execute the formal contract and will
deliver approved bonds as required by the Contract Documents, for the faithful performance of
the Contract.
The Bidder agrees to begin construction within 10 calendar days after issue of the work order,
and to complete the contract within calendar days after beginning construction as set forth
in the written work order to be furnished by the Owner.
I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the
provisions and requirements of which have been taken into consideration on preparation of the
foregoing bid:
Addendum No. 1 (Initials) Addendum No.3 (Initials)
Addendum No. 2(Initials) Addendum No.4(Initials)
EATSAM)MESCHOOL No.6
MYPROJECTNO.101182
004100-3
BID FORM
Page 3 of3
Respectfully submitted,
— Z�
By(Signature
?Z)4
By(Please Print or Type)
5014-r 015WEE F- p' iDQV -
Title �^
Contractor
15-12- CrVW' 1-- DW,, 5M 30V
tfcKj t -n -16-oby
Buskers Address
6fmShy- foot NfA-
'T
Tckphone Number FAX Num
Indicate whether—Individual
Partnership
Corporation
ATTEST:
S cretary
x�= ROXANW AXASYVONM
May 14 1014
EMS AODDLE SCHOOL Na.b
CMPROJECTNO.101182
00 42 43
DAP-BID PROPOSAL
Page 1 of 3
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
_J
Description Unit Price Bid Value
No. Section No. Aeasure (�uantlt}
UNIT 1:WATER IMPROVEMENTS
-01 3311_0461 12"PVC Water Pipe 33 1112 C. $39.00 S25.350,00
1-02 3311.0261 8"PVC Water Pipe 33 11 12 LF 75 $27.00 $2.C25.00
1-03 3311.0061 4"PVC Water Pipe 3311 12 LF 75 $22.00 $1.550.60
1-04 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 2 $4,169.00 $8.338.00
1-05 3312.3105 12"Gate Valve 33 12 20 EA 3 $2,223.00 Sr,,:;69.00
1-06 3312.3003 8"Gate Valve33 12 20 EA $1,307.00 $1,37.00
I-07 3312.3002 6"Gate Valve 33 12 20 EA 2 $1,004.00
_._ . _ -_._-_---
I-08 3312.3001-4'Gate Valve_... - _ 33 12 20 EA $916.00 $916.66
1-09 3312.0001 Fire Hydrant 331240 EA 2 $3,364.00 $6.728.00
1-10 3312.0117 Connection to Existing 4"-12"Water Main 33 12 2. __. _ _
_ 1-11 3305.0109 Trench Safe 33 05 10 LF 800 $2.00 51,600.00
_. ..._ _.... N!..,.. .. _._..__..
I-12 3312.2802 4'Water Meter and Vault 33 12 11 EA $13,920.00 $13,920.00
_"-12"Pressure Plug 02 41 14 EA S 45.00 $545.00
1-14 9999.0000 1"Comb Air Release Valve and Vault 0000 00 EA SS.I"i1.00 $5,061.00
TOTAL UNIT I:WATER IMPROVEMENT $79,086.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 00 42 43 A Ulility_Bid Proposal DAPexeculed.xis
004243
DAP-BID PROPOSAL
Page 2 of 3
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project It— Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Descnph°I Section No. Measure Quantity Unit Price Bid Value
UNIT II: SANITARY SEWER IMPROVEMENTS
33 11 10,
II-01 3331.4115 8"Sewer Pipe 3331 12, LF 625 $40.00 $25,000.00
33 31 20
3311 10,
II-02 3331.4116 8"Sewer Pipe,CSS Backfill 3331 12, LF 80 $115.00 $9,200.00
33 31 20
II-03 3339.1001 4'Manhole 33 39 10, EA 2 $4,293.00 $8,586.00
33 39 20
......._.. – .._—_...._.__...-- .__._._ _ 333920 _. _....-.._. ...........
11-04 3339.1003 4'Extra Depth Manhole VF 32 $165.00 $5,280.00
II-05 3301.0101 M. -Y3 h<iIc Vc rCUum Testing 3301 30 EA 2 $125.00 $250.00
II-06 3301 I-Ispection 3301 31 LF 705 $1.00 $705.00
II-07 330`0100 100 Trench Safety 33 05 10 LF 705 $2.00 $1.410.00
11-08 3305.:1112 Concrete Collars 33 05 10 EA 2 $744.00 $1,488.00
TOTAL UNIT 11:SANTTART SEWER IMPROVEMENT $51,919.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Vmim April 2,2014 00 42 43 A_Utility_Bid Proposal_DAP- ecutedxls
00 42 43
DAP-BID PROPOSAL
Page 3 43
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
Bid Summary
UNIT I.WATER IMPROVEMENTS $79,086.00
UNIT If:SANITARY SEWER IMPROVEMENTS $51,919.00
Total Construction Bid $131,005.00
Contractor agrees to complete WORK for FINAL ACCEPTANCE within &600alendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version Apri12,2014 00 42 43 A UtilityBid Proposal DAP<eemed.xls