Loading...
HomeMy WebLinkAboutContract 49941 Developer and Project Information Cover Sheet: Developer Company Name: Moriah Properties,LTD Address, State,Zip Code: 303 W.Wall St., Ste.2400,Midland TX,79701 Phone&Email: 432-682-2510,cary@moriahgrop.net Authorized Signatory,Title: Cary D. Brown,Partner Project Name: Moriah at Timberland Phase 1 Brief Description: Water, Sewer Project Location: NEC North Freeway&Golden Triangle Boulevard Plat Case Number: FS-15-270 Plat Name: Moriah at Timberland Addition Mapsco: 2 1 L Council District: 2 CFA Number: 2017-076 City Project Number: 100618 To be completed b taff Received by: Date: ot y61 g 910 11124'!s co �� CR'I�SECR�aR� ,4 OL 6 $ L�Gi OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement-Moriah at Timberland Phase 1 FT.WORTH,TX CFA Official Release Date: 02.20.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Moriah Properties, LTD , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto("Improvements")related to a project generally described as Moriah at Timberland Phase 1 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer' City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Moriah at Timberland Phase 1 CITY SECRETARY CFA Official Release Date: 02.20.2017 Page 2 of 11 FT.WORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ®, Sewer(A-1) ® Paving (B) C[, Storm Drain(B-1) ©, Street Lights & Signs (C) C . E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 1 CFA Official Release Date: 02.20.2017 Page 3 of 11 iii. To require the contractor(s)it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 1 CFA Official Release Date: 02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 1 CFA Official Release Date: 02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent(2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 1 CFA Official Release Date:02.20.2017 Page 6 of 11 Cost Summary Sheet Project Name: Moriah at Timberland Phase 1 CFA No.: 2017-076 City Project No.: 100618 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 211,005.00 2.Sewer Construction $ 48,160.50 Water and Sewer Construction Total $ 259,165.50 B. TPW Construction 1.Street $ - 2.Storm Drain $ - 3.Street Lights Installed by Developer $ - 4. Signals $ - TPW Construction Cost Total $ - Total Construction Cost(excluding the fees): $ 259,165.50 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 5,183.31 D. Water/Sewer Material Testing Fee(2%) $ 5,183.31 Sub-Total for Water Construction Fees $ 10,366.62 E. TPW Inspection Fee(4%) $ - F. TPW Material Testing(2%) $ - G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ Sub-Total for TPW Construction Fees $ - Total Construction Fees: $ 10,366.62 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 255.165.50 Completion Agreement= 10C k,i Holds Plat $ 259,165.50 Cash Escrow V`J'ater.!Sanita Sewer=125% $ 323,956.88 Gash Escrow Paving/Storm Drain=125% $ Letter of Credit=126%w/2yr expiration period 1 $ 323.956.88 1 x City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 1 CFA Official Release Date: 02.20.2017 Page 8 of 11 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER 1z 1 A 1.4 ?moi c iZ52Tt651 LT, Jesus J. Chapa Assistant City Manager Date: - Name: Cary . Brown Recommended by: Title: Partner Q P� Date: LIL Wendy Ch -Babulal,EMBA, P.E. ATTEST: (Only if required by Developer) Development Engineering Manager Water Department Signature Douglas W. Wiersig. P.E. Name: Director Transportation& Public Works Department Contract Compliance Manager: Approved as to Form & Legality: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting Richard A. McCracken requirements. Assistant City Att�o�ruey M&C No. -- AI A- AQ C4" 1,0011�C,4WIIIY) Date: Form 1295: Name: Janie Morales - Title: Development Manager ATTEST: Mary J. Kayser City Secretary , '` y City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Moriah at Timberland Phase 1 CITY SECRETARY CFA Official Release Date: 02.20.2017 FT WORTH TX Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvements ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ❑ Sewer Cost Estimate ❑ Exhibit B: Paving Improvements ❑ Paving Cost Estimate ❑ Exhibit B-l: Storm Drain Improvements ❑ Storm Drain Cost Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 1 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"I" Changes to Standard Agreement Community Facilities Agreement City Project No. 100618 None City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 1 CFA Official Release Date: 02.20.2017 Page 11 of 11 Enn BLUE MOUND z o o cn Of Lu Cif KELLER-HICKS TIMBERLAND INTERSTATE 35W z 0 z ~ z m SITEOf o o = o GOLDEN TRIANGLE GOLDEN TRIANGLE MORIAH AT TIMBERLAND ADDITION - PHASE 1 INFRASTRUCTURE VICINITY MAP Graham Associates,lnc. CONSULTING ENGINEERS & PLANNERS 1300 SUMMIT AVENUE,SUITE 419 FORT WORTH,TEXAS 76102 (817)640-8535 TBPE FIRM:F-1191lTBPLS FIRM:101538-00 DRAWN BY: JKP DATE: 5/2212017 PROJECT NO.: 2658-1004 SHEET 1 OF 1 J lu RRM f. /j cowl a Iwo Aooww I� U. 16" WATER LINE X-21681Lor ra a ono mum r. , I �w �� EX. 16" WATER UNE ADMIX l X-21681 OP05ED 16 WATER Lmom Ar 7WORM Amon, OPOSED 8" WATER LI - E SION FOR FUT� � CON CTION ,-« NMIXADMIX �_ -3 - GOLDEN TRIANGLE BOULEVARD MORIAH AT TIMBERLAND ADDITION - PHASE I INFRASTRUCTURE UNIT A - WATER IMPROVEMENTS Graham Associates,I nc. GRAPHIC SCALE 1 "=200' CONSULTING ENGINEERS & PLANNERS - 1300 SUMMIT AVENUE,SUITE 419 FORT WORTH,TEXAS 76102 (817)640-8535 200 0 200 400 TBPE FIRM:F-1191lTBPLS FIRM: 101538-00 DRAWN BY: JKP DATE: 5/22/2017 PROJECT NO.: 2658-1004 SHEET I OF 7nn I lI / tR R I=,, YOIMN a INKLW ADMO I J Lar IK Em 1. Il C LM rat ( I I PROPOSED 8" WDW A7 SANITARY SEWER �.� OSED. 4QLES-_ EXISTING SS MANHOLE Qp �- W PROPOSED 8" STUBOUT P I ,m eR-r,RM,, FOR FUTURE CONNECTION I. mom ,i PROPOSED 8`- IiARY SE'rrLor M E: ---- _ — uM�ad� OWN neeuwo I LM IOR-D1 T&OULW:Amu ADDrM EXISTING 8" SANITARY SEWER —21681 . -ss -- _ s ss GOLDEN TRIANGLE BOULEVARD MORIAH AT TIMBERLAND ADDITION - PHASE 1 INFRASTRUCTURE UNIT Al - WASTEWATER IMPROVEMENTS Graham Associates, Inc. GRAPHIC SCALE 1 "=200' CONSULTING ENGINEERS & PLANNERS 1300 SUMMIT AVENUE,SUITE 419 FORT WORTH,TEXAS 76102 (817)640-8535 200 0 200 400 TBPE FIRM:F-1191/TBPLS FIRM:101538-00 DRAWN BY: JKP DATE: 5122/2017 PROJECT NO.: 2658-1004 SHEET 1 OF 1 CFA PROJECT QUANTITY MATRIX Prepared for:Moriah Real Estate Company,LLC Water and Sewer to Serve Moriah at Timberland Phase 1 May 22,2017 PART 1-WATER DEPARTMENT CONSTRUCTION ITEMS CPA UNIT A-WATER IMPROVEMENTS is 211,005.00 CFA UNIT Al -SANITARY SEWER IMPROVEMENTS is 48,160.50 SUBTOTAL PART I-WATER DEPARTMENT CONSTRUCTION ITEMS $ 259,165.50 CONSTRUCTION TOTAL $ 259,165.50 MAT PO.1 DAP- am PROPOSAL Papp 1 of I CFA PROJECT QUANTITY MATRIX Prepared far.Moriah Real Estate Company,LLC Water and Sewer to Serve Moriah at Timberland Phase 1 May 22,2017 QUANTITY BY SHEET CONTRACTOR Bid List Description N. Unit o1 6 7 8 9 81d Unit Price Bid Value Item No. Measure Quwlity UNIT A:WATER IMPROVEMENTS 1 0241.1016 Remove 16"Water Line C2 41_14 LF 397 262 659 $41.00 $27,:719.00 2 3305.0109 Trench Safety 5 lo--- LF 450 425 210 10851 $0.10- 11,19 50 3 0241.1406 Abandon 16"Water Valve 0241 14 EA 1 1 $450.00 $450.00 4 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON 1.7 1.5 0.7 391 $7,200.00 $28.090.00 5 3311.0241 8"Water Pipe _33.11 10,33 11 12 LF 107 57 t64� $3850 56,314.00 6 33110441 12"Water Pipe _ 331110.331112 LF 75 75 >5r3.50 54.462.50 7 3314.0541 16"Water Pipe _ 33 11 10.63 11 12 LF 450 350 210 1010 $65.50'- 566,15400 8 3212.00IJI Fire Hydrant 33 1240 EA 2 1 3 54.372.001 513.116.00 9 33129106 Conne0or 1 Exlstij 16 Water Ma n 33 12 25 EA 1 1 2 $4,000.001 $8p00.0O 10 1331 Y30038'Gate Va'.vc, _. 33!220 EA 1 2 1 3 5'1.,300.004_ $3900.00 11_�3J12.3005 12"rate Valva 33 1220 EA 1 1 _ S2 40O 00 _ S2.400 00 12 '3312.3006 1C mate Valve wl Vault 33 1220 EA 1 1 1 3 $17,000.b $51,000.00 1 A:WATER IMPROVEMENTS $211,005.00 UNIT All:SANITARY SEWER IMPROVEMENTS 1 02411101 S"Sewer Plug_ !:241 14 EA 2 2 $50.00 5100.00 2 0330 COJ1 Concrete Encash Se.Wvor Pipe '0330(H7 CY 1.4 1.4 $47.5.00 $665.00 3 3301.0002 Pos:-CCPJ Ins>ec(icm "330131 LF 761 761 53.00 $2,283 DO 4 3301.010' Manhnle Vacuum Testing !33 01 30 E M1 3 3 5200.00 $600 00 5 3305 0109 Trench Safety ;33 05 10 LF _ 425 425 $0.10 542 50 6 3305 0112 Cun;;rete C61a1 33115 17 EA 3 3 $680.00 S2.040 00 7 3331 4115 8"Sewer Pipe _ `3;Y 11 10,33 31 12,33 31 20 LF 425 425 $41.J0 S"7.425.OD 8 3339.1001 4'Mannole i33 39 10 333920 EA 1 1 2 2 $3,600 Q11j .._$7 9 Zdij 11t124 DrnuMan Nfle 333--,jO.333920 EA I 1 1 S5.0000Jl 5" 10 3339.1003 3 ExVa Depth Manhole 333910,333920 VF 8 6 S16J.07` 3 11 099,0001 C 'n v. 1 to EtiiSt g tia_n_ita Sewer Lino 33 05 30 EA 1 1 S-.400 l7, _ 3: :7U _-_ 12 333133018 S.ver Servu.e 33 31 50 EA 2 2 5".7UI 5: i I:11 13 3331 4119_8-DIP Sewer PiPzr 33 11 10 LF 60 6(1 (Y17 - __._.._ 14 3339 001)1 N arren Manhnie l,, 33 39 60 VF 7 7 $215 011 s --.:111 UNIT All:SANITARY SEWER IMPROVEMENTS $48,160.50 SUBTOTAL WATER DEPARTMENT IMPROVEMENTS $259,1 x.50 CM OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENIS-DEVELOPER AWARDED PPOJEC, F-Veal-Sgpvvba 1,:015 W 424I_Bid Pmp"_DAP Irks-MI.A 00 42 43 ?AP•BID PROPOSAL Page 1 of 3 SECTION 00 42 43 Developer Awardea PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Section Unit ofBid Ulvt Price Bid`,26.1,7 No. No. Measure Quantity UNIT A:WATER IMPROVEMENTS 1 0241.1016 Remove 16"Water Line 0241 14 LF 659 $41.00 $27,019.00 2 3305.0109 Trench Safety 3305 10 LF 1085 $0.10 $108.50 3 0241.1406 Abandon 16"Water Valve 0241 14 EA 1 $450.00 $450.00 4 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON 3.9 $720000 $28,080.00 5 3311.0241 8"Water Pie 33 11 10,33 11 12 LF 164 $38.50 $6,314.00 6 3311.0441 12"Water Pie 33 11 10,33 11 12 LF 75 $59.50 $4,462.50 7 3311.0541 16"Water Pie 33 11 10,33 11 12 LF 1010 $65,501 $66,155.00 8 3312.0001 Fire Hydrant 33 1240 EA 3 $4,372.001 $13,116.00 9 33120106 Connection to Existing 16"Water Main 33 1225 EA 2 $4,000.00 $8,000.00 10 3312.3003 8"Gate Valve 33 1220 EA 3 $1,300.00 $3,900.00 11 3312.3005 12"Gate Valve 33 1220 EA 1 $2,400.00 $2.400.00 12 13312.3006 16"Gate Valve w/Vault 133 1220 1 EA 1 3 $17,000.00 $51,000.00 CONTRACTOR'S TOTALI $211,005.00 TOTAL UNIT A:WATER IMPROVEMENTS1 $211,005.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43—Bid Proposal_DAP Jackson PHI.As 00 42 43 DAP-BID PROPOSAL Page 2 of 3 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application 'roiect Item Information Bidlist Item Description Specification Section Unit of Bid Unit PriceF Bid Value �,� No. Measure Quam�r, UNIT At:SANITARY SEWER IMPROVEMENTS 1 0241.1101 8"Sewer Plug 0241 14 EA 21 550.00 $100.00 2 0330.0001 Concrete Encase Sewer Pie 03 30 0C CY 1.4` $475.00 5665.00 3 3301.0002 Post-CCTV Inspection 3301 31 LF 751 $3.00 $2,283.00 4 3301,0101 Manhole Vacuum Testing 3301 30 EA 31 $200.00 $6x0.00 5 3305.0109 Trench Safety 3305 10 LF 425 $0.10 $42.50 6 3305.0112 Concrete Collar 3305 17 EA 3 5680.00 $2,040.00 3331.4115 8"Sewer Pipe 3311 10,3331 12. LF 4251 3331 20 541.00 S17.4225.00 8 3339.1001 4'Manhole 3339 10,33 39 20 EA 2 53,600.00 57.200.00 9 3336.1002 4'Drop Manhole 3339 10,33 39 20 EA 11 $5,000.00 $5,000.00 10 3339.1003 4'Extra Depth Manhole 3339 10,333920 VF 8 5160.00 51.280.00 11 9999.0001 Connect to Existing Sanitary Sewer Line 33 05 30 EA $1,400.00 S1 400 00 12 3331.3301 8"Sewer Service 3331 50 EA 21 $1.700.00 S3.400.00 13 3331.4119 8"DIP Sewer Pipe 33 11 10 LF 60 587.00 $5.220.00 14 3339.0001 Epoxy Manhole Llner 33 39 60 VF 7 $215.00 $1.505.00 CONTRACTOR'S TOTALI $48,160.50 TOTAL UNIT Al:SANITARY SEWER IMPROVEMENTS1 $48,160.501 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43—Bid PropmLDAP Jackson PHI.sls 00 42 43 DAP-BTD PROPOSAL Page 3 of 3 SECTION 00 42 43 Developer Awarded Proiects PROPOSAL FORM UNIT PRICE BID Bidder's Application 1I Project Item Information Bidder's Proposal 13idfisi hem Description 7�ecification Section Unit r' Bid Unit Price Bid Value No. Measw tantity Bid'+mnmari UNIT A: VVAIER IMPROVEMENTS $211.005 J0 UNIT Al SANITARY SEWER IMPROVEMENTS $48,160.50 'total CoTISMUc60n 1316 $269,165.50 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 60 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECTFICATTON DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September I,2015 00 42 43—Bid ProposaLDAP Jackson PHI.xls