Loading...
HomeMy WebLinkAboutContract 49942 Developer and Project Information Cover Sheet: Developer Company Name: Moriah Properties, LTD Address, State,Zip Code: 303 W. Wall St., Ste.2400,Midland TX,79701 Phone&Email: 432-682-2510,cary@moriahgrop.net Authorized Signatory,Title: Cary D. Brown,Partner Project Name: Moriah at Timberland Phase 2 Brief Description: Water, Sewer,Paving, Street Lights Project Location: NEC North Freeway&Golden Triangle Boulevard Plat Case Number: FS-15-269,2780 Plat Name: Moriah at Timberland Addition Mapsco: "j Council District: 2 i CFA Number: 2017-076 City Project Number: 100619 i To be completed by staJIJ 400 Receivedby.. Date: OFFICIAL RECORD City of Fort Worth,Texas C"—SECRETARY Standard Community Facilities Agreement-Moriah at Timberland Phase 2 CFA Official Release Date:02.20.2017 FT. WORTH,TX Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. qqq WHEREAS, Moriah Properties, LTD, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements")related to a project generally described as Moriah at Timberland Phase 2 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Develor e ' City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Moriah at Timberland Phase 2 CITY SECRETARY CFA Official Release Date:02.20.2017 Page 2 of 11 FT. `OF'r§Hl TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) , Sewer(A-1) ,Paving (B) i , Storm Drain(B-1) , Street Lights & Signs (C) . E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 2 CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 2 CFA Official Release Date:02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged nemlikence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or notsuch injuries, death or damages are caused, in whole or in part, by the alleged neQlizence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 2 CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 2 CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 2 CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Moriah at Timberland Phase 2 CFA No.: 2017-076 City Project No.: 100619 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1 Water Construction $ 149,842.20 2.Sewer Construction $ 133,217.52 Water and Sewer Construction Total $ 283,059.72 B. TPW Construction 1 Street $ 126,535.50 2.Storm Drain $ - 3.Street Lights Installed by Developer $ 1,560.00 4. Signals $ - TPW Construction Cost Total $ 128,095.50 Total Construction Cost(excluding the fees): $ 411,155.22 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 5,661.19 D. Water/Sewer Material Testing Fee(2%) $ 5,661.19 Sub-Total for Water Construction Fees $ 11,322.38 E. TPW Inspection Fee(4%) $ 5,061.42 F. TPW Material Testing(2%) $ 2,530.71 G. Street Light Inspsection Cost $ 62.40 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ Sub-Total for TPW Construction Fees $ 7,654.53 Total Construction Fees: $ 18,976.91 Choice Financial Guarantee 9 rion$. choose one Amount Marls erne Bond=100% $ 411,155.22 Completion AQ,eernent- 100%r Holds Plat $ 411,155.22 Cash Escrow WatecSar;;ar Sewer=125% $ 353,?:14.65 Cash Escrow PavinwStofm Drain=125% $ t G t 9.38 Letter of Credit=125%w/2yr expiration period $ 5 i 3,944.03 x City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 2 CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Jesus J. Chapa !� Assistant City Manager Date: 'T Name: Cary . Brown Recommended by: Title: Partner Date: ��i0/2 o t Wendy C i-Babulal, EMBA, P.E. ATTEST: (Only if required by Developer) Development Engineering Manager Water Department (-J, U Signature Dougla . Wiersig, P.E. Name: Director Transportation&Public Works Department Contract Compliance Manager: Approved as to Form & Legality: By signing,I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting Richard A. McCracken requirements. Assistant City Attorne M&C No. S Date: anie Morales 1/ ,^ Name: Form 1295: --/y(-/ e: Development Manager �4 OF,, ATTEST: •..0,�� 5 �O Mary J. Kayser City Secretary S' City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Moriah at Timberland Phase 2 CITY SECRETARY CFA Official Release Date: 02.20.2017 FT,V11'QRTH TX Page 9 of 11 + Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvements ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements ® Paving Cost Estimate ❑ Exhibit B-1: Storm Drain Improvements ❑ Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 2 CFA Official Release Date: 02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100619 None City of Fort Worth,Texas Standard Community Facilities Agreement-Moriah at Timberland Phase 2 CFA Official Release Date: 02.20.2017 Page 11 of 11 [n7n BLUE MOUND z o O co a > KELLER-HICKS TIMBERLAND SITE INTERSTATE 35W z O z '— O w � o Q o 2 J O GOLDEN TRIANGLE GOLDEN TRIANGLE MORIAH AT TIMBERLAND ADDITION - PHASE 2 INFRASTRUCTURE VICINITY MAP Graham Associates, inc. CONSULTING ENGINEERS & PLANNERS 1300 SUMMIT AVENUE,SUITE 419 FORT WORTH,TEXAS 76102 (817)640-8535 TBPE FIRM:F-1191rrBPLS FIRM: 101538-00 DRAWN BY: JKP DATE: 5/2212017 PROJECT NO.: 2658-1010 SHEET 1 OF 1 7nn _ EXI 16' WATER X-15263 TIMRFRI AND POUL F AR^ t EX. 8" WATV X-15263 I LOT 2K SM z MMM AT T1 MNM ADM N Q I � 21+ 1 C LOT 4.MM Z uJ C I MOMH AT TN03L W III / P ADDRgN PROPOSED 8' WATER 31 ISM zI LINE EXTENSION FOR 4 D( 16' WATER No HAT� TIMBEFUN I FUTURE CONNECTION � X-13x"76ADW N _ i PROPOSED 10' WATER LINE II I LOT 51 RM z MI"Al ININIEW II I I IIS MORIAH AT TIMBERLAND ADDITION - PHASE 2 INFRASTRUCTURE UNIT A - WATER IMPROVEMENTS Graham Associates, lnc. GRAPHIC SCALE 1 "=200' Rfl CONSULTING ENGINEERS & PLANNERS - 1,360 SUMV17AVENUE. SUITE 419 FORTi WORTH, TEXAS 75102 Q81'7)640-8535 200 0 200 400 TBPE FORM:F-11911TBPLS FIRM: 161538-00 DRAWN BY: JKP DATE: 5/22/2017 PROJECT NO.: 2658-1010 SHEET 1 OF 1 Enn 1 ` LOT 2R,DLOLS(L LK1RIi+H KT "IYeETq."Von" EX. 8" SANITARY SEWER X-21128 2 PROPOSED MANHOLE—r� ` 7 Z I Lor Lwac z. NtIRIAFI NDRIAH AT Lu \ ' T1W9FF1AND I T16ElilAlp ,5 \ Y. +Yoxn ADDITION PROPOSED ~� \+ 8' SANITARY SEWER EXISTING SS MANHOLE LOT 5, am a WDM KT`i nuDEikw AGDRKIN LOT 1R,L'A=1, i 1 LOT Ort,Lim 1, PROPOSED >!' MDW MANHOLES ADDM EX. 10' SEWER __. X-20170 LOT K am 91 1 ) mow AT TIN ( f LZr OR i +, �_� LOQ ' .. PROPOSED Uwffr 8 SANITARY SEWER MOON / - . '--EXISTING SS M,4NFi LE --���X-21 E 51 - j _. EX, 8' SANITARY S X-21681 MORIAH AT TIMBERLAND ADDITION - PHASE 2 INFRASTRUCTURE UNIT AI - WASTEWATER IMPROVEMENTS Graham Associates, Inc. GRAPHIC SCALE 1 "=500 IM: CONSULTING ENGINEERS & PLANNERS ---- 1300 SUMMIT AVENUE,SUITE 419 FORT WORTH,TEXAS 76102 (817)640-8535 50� 50� 1��� TBPE FIRM:F-1191/TBPLS FIRM:101538-00 DRAWN BY: JKP DATE: 5/2212017 PROJECT Nn• ')RSR-' SHEET 1 ' f nn TIMPFRI-AND POUI F ARn MORN AT WOUND ADDMON ` f Cr _ a LUr 4,MM P, L- IADDMON lAf 3,BIDCI(Z, / MOM ATNIBETtIIIAI �`; PROPOSED AMONMETROPORT WAY {f WIDENING (37' B-B TOTAL) PROPOSED E' DRNE APPROACH _ I 4 1 PROPOSED - _ SIDEWALK Ip W Al Aum p I IY MORIAH AT TIMBERLAND ADDITION - PHASE 2 INFRASTRUCTURE UNIT B - PAVING IMPROVEMENTS Graham Associates,lnc. GRAPHIC SCALE 1"=200' CONSULTING ENGINEERS & PLANNERS 1300 SUMMIT AVENUE,SUITE 419 FORT WORTH,TEXAS 76102 (817)640-8535 2�0 2�0 4�0 TBPE FIRM:F-1191ITBPLS FIRM: 101538-00 DRAWN BY: JKP DATE: 5/22/2017 PROJECT NO.: 2658-1010 SHEET 1 OF 1 n TIMRFRI AND R^UL FVAR^ I I Lor aR K=$ MOM AT YNNAMD AOOIIIOM PROPOSED LED LIGHT Q FIXTURE REPLACEMENT (EX. POLES WEST OF METROPORT) C c LOT 4.9L=Z W IIOIMH AT TIURINO 5 1J I ADDrtION Lur3.a a, , I M I `l I _ I I MOM I LoraK=z 1IORNH a'wMM MD= MORIAH AT TIMBERLAND ADDITION - PHASE 2 INFRASTRUCTURE UNIT C - STREET LIGHT IMPROVEMENTS Graham Associates,Inc. GRAPHIC SCALE 1 "=200' CONSULTING ENGINEERS & PLANNERS 1300 SUMMIT AVENUE,SUITE 419 FORT WORTH,TEXAS 76102 (817)640-8535 200 0 200 400 TBPE FIRM:F-1191/TBPLS FIRM: 101538-00 DRAWN BY: JKP DATE: 5/22/2017 PROJECT NO.: 2658-1010 SHEET 1 OF 1 MATRIX SUMMARY DAP-HM PROFO.CAL Pogo)a CFA PROJECT QUANTITY MATRIX Prepared for.Morlah Real Estate Company,LLC Water and Sewer to Serve Modah at Timberland Phase 2 May 22,2017 PART I-WATER DEPARTMENT CONSTRUCTION ITEMS CFAUNIT A-WATER IMPROVEMENTS $ 149,842.20 CFA UNIT Al-SANITARY SEWER IMPROVEMENTS $ 133,217.52 SUBTOTAL PART I-WATER DEPARTMENT CONSTRUCTION ITEMS $ 283,059.72 PART If•TRANSPORTA77ON d PUBLIC WORKS CONSTRUCTION ITEMS CFA UNIT B-PAVING IMPROVEMENTS $ 126,535.50 CFA UNITC-STREET LIGHT IMPROVEMENTS S 1,S60A0 SUBTOTAL PART 1I-TRANSPORTATION&PUBLIC WORKS CONSTRUCTION ITEMS $ 128,095.50 CONSTRUCTION TOTAL $ 411,155.22 CTTY OF FORT WORTH STANDARDCONSTRUC ONSPECIFICATIONDOCUM -DEVELOPERAWARDEDPROIECTS Fvm Vesica Sryleobe I,2015 W 42 43_BW ftapo'sl_DAP Jsdnau M. MATRIX M I DAP-BID PROPOSAL Page t ort CFA PROJECT QUANTITY MATRIX- PART I Prepared for:Moriah Real Estate Company,LLC Water and Sewer to Serve Moriah at Timberland Phase 2 May 22,2017 QUANTITY BY SHEET CONTRACTOR Bidlistlrem Speciflcminn Section Unit of Bid No. Deunpnon No. Measure 5 6 7 8 14 IS 20 Quantity Uni[Price Bid Value UNIT A:WATER IMPROVEMENTS 1 3201 0652 7"Co-Pvrnt Repair 3201 29 Sy 46 _ 46 $121.00 $5,566.00 2 3213.0301 4"Conc Sidewalk 32 13 20 SF 136 136 $6.00 $816.00 3 13305-0109 Trench Safet 33 05 10 __LF 800 1187 1987 $0.10 $198.70 4 3311.0001_Ductile Iron Water Fittin s wl Restraint 3311 11 TON 1.1 1.7 2.B $7,200,00 $20,160.00 5 3311.0241 8"Water Pipe 3311 10,33 11 12 LF 30 30 $46.50 $1,395.00 6 3311_0341 10'Water Pipe_ 3311 10.331112 LF 800 1187 1987 $43.50 $86,434.50 7 3312.0001 Fire Hydrant 33 12 40 EA 1 1 $4,372.00 $4,372.00 8 3312.0117 Connection to Existing 4'-12"Water Main 33 12 25 EA 1 1 $2,000.00 $2,000.00 9 3312.2003 1"Water Servioe 33 12 10 EA 1 1 1 $1,200.00 $1,200.00 111 3312.2103 1 1/2"Water Service _ 3312 10 EA 1 1 $1,700.00 $1,700.00 71 3312.3003 8"Gate Valve 33 12 20 EA 2 2 $1,300.00 $2,600.00 3312.3004 10"Gate Valve 3T1220 20 EA 2 1 5 1 1 1 1 1 7 1 $2000.001 $14.000.00 13 3312.4113 16"x 10"Tapping Sleeve&Valve 333 1225 EA 1 1 1 $9,400.00 $9,400.00 UNIT A.WATER IMPROVEMENTSj $149,842.20 UNIT All:SANITARY SEWER IMPROVEMENTS I 0330.0001 Concrete Encase Sewer Pipe 03 30 00 CY 5.4 5.4 $475.00 33010002 Post-CCTV Inspection 330131 LF 1852 454 2306 $3.00 $h.91i9-Oli i 3301.0101 Manhole Vacuu,n Testing 3301 30 EA 4 2 6 $200.00 S!,..-o 04 4 1330li.0109 Trench Safety 33 05 10 LF 1166 418 1584 $1.00 .[84.1`0 5 3305-0112 Concrete Collar 330517 EA 4 2 6 $680.00 $4,080.00 6 3331.4116 8'Sewer Pipe,CSS Backfill 33 11 10,33 31 12, LF 10 10 $76 00 $760 00 33 31 20 7 333'..3101 4"Sewer Service 33 31 50 EA 2 2 $750.00 $1,500.00 8 3331.3301 B"Sewer Service 3331 50 EA 1 1 2 $1,700,00 $3,400.00 9 3331 4115 8"Sewer Pipe 33 11 10,33 31 12, LF 1665 408 2073 $41.24 $85,490.52 _ 3331 20 10 3339 1001 4'Manhole 33 39 10,33 39 20 EA 4 2 6 $3.600 00 $21,600 00 t 1 3339.1003 4'Extra Depth Manhole 33 39 10,33 39 20 VF 8 9 17 $160.00 __$2,720.00 I2 9999.0001 Connect to ExistingSanitarySewer Line 33 05 30 EA 1 1 $1 400 oo $1,40000 UNIT Al;SANITARY SEWER IMPROVEMENTS $133,217.52 SUBTOTAL PART I-WATER DEPARTMENT CONSTRUCTION ITEMS $283,059.72 MY OF FORT WORTH STANDARDCONSTRUCTIONSPECIFICATIONDOC ENTS-DEVELOPF AWARDEDPROIECS F-Version Sryamber 1,2015 04243_BidP,,-LDAP Jackson PH2.IDs MATRIX PG.2 DAP.Rro PRnms,v, Page 1 of I CFA PROJECT QUANTITY MATRIX- PART II Prepared for:Moriah Real Estate Company,LLC Water and ewe Sr to Serve Moriah at Timberland Phase 2 -rap 2,^.,2017 QUANTITY BY SHEET CONTILACTOR DescriPtirnr Specif Na ttnn Unit f 5 6 7 R 14 15 20 29 Bid ry Unit Price Bid Value UNIT B:PAVING IMPROVEMENTS 0170 0100 Mnhalirat�or, Ti 7U OU LS 1 1 $21,150.00 $21,150.00 131'0.0101 Site G—,,g 311000 IS 1 1 $6,110.00 $6,110.00 3123.0101Und,ssl'led Excavation by Plan 31 231b G 44 29 73 $32.00 $2,336.00 4 3125.0101 SW PPP 1 acre 31 25 cc 1 S 1 1 $9,000.00 $9,000.00 5 3211.0400 Hydrated L me(275lSY) 32 11 29 TON 9.3 6.2 15.5 $182.00 $2,821.00 S 32110,5016"t ime Treatment 32 11 29 SY 693 457 1150 $6.25 $7,187.50 7 32'.3.0102 7'CGnc.F,w 32 13_13 SY 659 434 1093 $64.00 $69,952.00 8 i i2 3.0301 a 01— dewalk 32 1320 SF 252 252 $6.001 $1,512.00 9 '321 3.0506 Barrier Free Ramp,Type P-132 13 20 FA 2 2 $1,600.00 $3,200.00 l0 32.7.0002 v"SLU Pvmt Markiny HAS_(Y) 32 17 23 LF 1022 1022 $1.00 $1,022.00 11 32'7 2103 REFL Raised Marker-Y 11 A 32 17 23 EA 13 !!1123 $6.00 $78.00 3217 4307 Remove Raised Marker 321723 EA 52 $1.00 $52.00 3291.0100 Topsoil 329119 CV 16 11 $45.00 $1,215.00 3441.4003 Furnish/Install Alum Sign Ground Mount City 3441 30 EA 2 $450.00 $900.00 Std. UNIT B:PAVING IMPROVEMENTS $126,535.50 UNIT C:STREET LIGHT IMPROVEMENTS 1 13441,3301 LED Light Fixture 13441 20 EA I I I I I I 1 1 2 1 2 1 $780-001 $1,560.00 UNIT C:STREET LIGHT IMPROVEMENTS1 $1,560.00 SUBTOTAL PART 11-TRANSPORTATION&PUBLIC WORKS CONSTRUCTION IMPROVEMENTS 5128,095.50 CTTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS F—Vnsiao Sep,em I'2011 00421]ed P o LDAP J PM.xb 004243 DAP-BID PROPOSAL Page I of4 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Section Unit of Bid Unit Price Bid Value No. No. Measure Quantity UNIT A:WATER IMPROVEMENTS 1 3201.0652 7"Conc Pvr,i[Ro;Iair 3201 29 SY 46 $121.00 $5,566.00 2 32'.3 0301 4"Carc Sidewalk 32 1320 SF 136 $6.00 $816.00 3 13305-C',,19 Trench Safety LF 1987 50.10 5192.20 4 3311 OC-J' Ciclile Iron Water Fittings wv Restraint 33 11 11 TON 2.8 $7.200.00 $20.160.00 5 3311.0241 8"„Vater Pie 33 11 10,33 11 12 LF 30 $46.50 $1.395.00 6 43311 0341 10"Water Pie 33 11 10,33 11 12 LF 1987 $43.50 $86,434.50 7 3312.0001 Fi,e H•rdran! 33 1240 EA 1 $4,372.00 $4,372.00 8 Q12.0117 Corr ^i-n'!)Existing 4"-12"Water Main 33 1225 EA 1 $2,000.00Z$144,000.00 r 3312.2%1:;' 331,210 EA 1 $1.200.00 I(% 33122 i? 1:2" "•ljteiSemce 33 12 10 EA 1 51700.00 11 i 1 ;'' 8 Galea'V[flve 33 1220 EA 2 51.30:00 12 3312 3.'' "0"Gate Valve 33 12 20 EA 7 52.000,0013 3312.4-.13 16"x 1G"Ta in Sleeve:&Valve 331225 EA 1 59.410.00 CONTRACTOR'S TOTALI $149,835.70 TOTAL UNIT A:WATER IMPROVEMENTS $149,835.70 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Vmim Sept—W I,2015 00424)Bid Propaal DAP Jackm PH2.x1a 00 42 43 DAP-BID PROPOSAL P.S.2 of4 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal 131JL r.Lr., Description Specification Section Unit+ n'd Unit Price Bid Value No. UNIT Al:SANITARY SEWER IMPROVEMENTS 033:,0001 Conc-ere E icasp gcv nr Pi�r_._._...._ 03 30 Cry -Y 5» $475.00 $2,565.00 --- 330'.0002 Post-CCT!Ins ector 33-21 31 LF 2306 $3,30. $6918.00 3 33;;'.0101 Man hole Vac...lumTestrc 330130 EA 6I $200.00 $1200.00 4 3305.0109 Tench Safery 33 05 10 LF 1584 S'1 W: $1,584.00 5 3305.0112 Conc-ete Co yr 3305 17 EA C $680.00; $4,080.00 33 11 10 3331 12, 10 ' 6 3331.4116 8"Sewer P pe.CSS BwC,f11 3331 20 LF $'76.00:; $760.00 7 3331.3101 4"Sewer Se vice 33 31 50 EA 2 $750.00 $1,500.00 S 3331.3301 8"Sewer Sen ice 3331 50 EA 2 $1,700.00 $3,400.00 9 3331.411 c 3"Sewer Pipe 33 11 10,3331 12, LF 2073 3331 20 $41.24 $85,490.52 10 3339.1001 4'Manho,e 31,39 10,333920 EA 6 $3,600.00 $21.600.00 1 I 3339 1003 4'Extra Depih Manhole 33 39 10,333920 VF 17 $160.00 $2J20.001 _ 9999.00C'i Conne r to Existi iu Sanitary Sowmr Line 1330530 EA 1 $140000 $1 400.00 CONTRACTOR'S TOTAL $133,217.52 TOTAL UNIT A7:SANITARY SEWER IMPROVEMENTS $133,217.52 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Pam Vmsian SWWnba I,2015 00 42 43 Bid Prapad_DAP Jmtmm PH2.xb 00 42 43 DAP-BIDPROPOSAL Page 3 of4 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Specification Section Unit of a No. Description No. Measure it Unit Price Bid Value UNIT B:PAVING IMPROVEMENTS 1 10170.0100 MobilizaEion C.- 7000 LS 1 S21,150.00 $21,150.00 2 ;31'41 0191 Site Clear'mo (31 10 00 LS 1 $6,"s0.00 $6,110.00 3 3 12 3 010; Unclassified Excavation by Phan 131 23 16 CY 73 532.00 $2,336.00 4 3125 U101 S'APPP 1 acre �3'2500 LS 1 39.1001.00 $9000.00 5 32.1.0400 H drated Lime(27#/SY) 32 ! : TON 15.5 5182.00 $2,821.00 6 32`1.0501 fi"Lime Treatment SY 1150 $6,25 $7,187.50 7 32':3 r}102 7'Corr,F.Wt J 13 SY 1083 454,."01 559.952 09 S 32"s 030. 4"Conc SidewaN 20 SF 252 $6.90 $'.512 DO 9 32'3 0505 Barrier Free Ran rl,T pe P-1 - 2 13 2:i EA 2 S1,600 C,0 5:3.2011. 9 10 :32'.7 0002 4"SLD Pvm!Mafk,lnc HAS jYl _ 32 17 i3 LF 1022 S1.00 $'.022 06 I 1 3217.210:3 RE FL Rau;aed Marker fY 11-A-A 32 1723 EA 13 S6 9() ?8 CSG 12 3217.4307 Rernoee Ra;sc:t Varror 32 172'3 EA 52. S1 010 S52.00 13 3291.01 00 %--,,ad 32 91 '9 1 CY 27- $45 C0 14 Sca' . gr,5rol.r,d CiTr 34 41 3x0 EA 2 $450.010 S a0.;0 CONTRACTOR TOTAL'$ $126,535.50 TOTAL UNIT S:PAVING IMPROVEMENTS1 $126,535.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Vetaioa Septaaber 1,2015 00 42 43Bid Pmpeaal DAP Jadeon PH2.x1s 00 42 43 DAP-BID PROPOSAL Page 4 of4 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal BiJ.:.:IUcm Specification Section Unit of Bid Description Unit Price Bid Value No. Measure Quantity UNIT C:STREET LIGHT IMPROVEMENTS 1 3441.3301 LED Light Fixture 34 41 2`1 LS $1 000.00 $2 000.00 CONTRACTOR TOTAL'S $2,000.00 TOTAL UNIT C:STREET LIGHT IMPROVEMENTS $2,000.00 Bid Sun.... UNIT A:WATER,IMPROVEMENTS $1,93335 70 UN,?A 1:SANI-ARY SEWER IMPROVEMENTS $133.217.52 -.. - UN 1 U ?AV:NG VA1PR OVEMEN'1'$ _. -- - a1e:1.-,.535.5k" t,KIT C „-REST L10•1T IMPROVEVEN"Sv2.OliCLQ2 Tarot (liar Hid 5411.SK72 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 90 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Varma.Saptembar I,2015 00 42 43 Bid Propnal DAP Jwks-PH2.A.