HomeMy WebLinkAboutContract 49942 Developer and Project Information Cover Sheet:
Developer Company Name: Moriah Properties, LTD
Address, State,Zip Code: 303 W. Wall St., Ste.2400,Midland TX,79701
Phone&Email: 432-682-2510,cary@moriahgrop.net
Authorized Signatory,Title: Cary D. Brown,Partner
Project Name: Moriah at Timberland Phase 2
Brief Description: Water, Sewer,Paving, Street Lights
Project Location: NEC North Freeway&Golden Triangle Boulevard
Plat Case Number: FS-15-269,2780 Plat Name: Moriah at Timberland Addition
Mapsco: "j Council District: 2
i
CFA Number: 2017-076 City Project Number: 100619
i
To be completed by staJIJ
400
Receivedby.. Date:
OFFICIAL RECORD
City of Fort Worth,Texas C"—SECRETARY
Standard Community Facilities Agreement-Moriah at Timberland Phase 2
CFA Official Release Date:02.20.2017 FT. WORTH,TX
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. qqq
WHEREAS, Moriah Properties, LTD, ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements")related to
a project generally described as Moriah at Timberland Phase 2 ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Develor e '
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Moriah at Timberland Phase 2 CITY SECRETARY
CFA Official Release Date:02.20.2017
Page 2 of 11 FT. `OF'r§Hl TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A) , Sewer(A-1) ,Paving (B) i , Storm Drain(B-1) , Street Lights & Signs
(C) .
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified,insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Moriah at Timberland Phase 2
CFA Official Release Date:02.20.2017
Page 3 of 11
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Moriah at Timberland Phase 2
CFA Official Release Date:02.20.2017
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits,actions or claims of any character,whether real or asserted,brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged nemlikence of the City of Fort Worth, its
officers,servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from,or in any way connected with,the construction of the infrastructure contemplated
herein,whether or notsuch injuries, death or damages are caused, in whole or in part,
by the alleged neQlizence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify,and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Moriah at Timberland Phase 2
CFA Official Release Date:02.20.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two(2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Moriah at Timberland Phase 2
CFA Official Release Date:02.20.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Moriah at Timberland Phase 2
CFA Official Release Date:02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name: Moriah at Timberland Phase 2
CFA No.: 2017-076 City Project No.: 100619
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1 Water Construction $ 149,842.20
2.Sewer Construction $ 133,217.52
Water and Sewer Construction Total $ 283,059.72
B. TPW Construction
1 Street $ 126,535.50
2.Storm Drain $ -
3.Street Lights Installed by Developer $ 1,560.00
4. Signals $ -
TPW Construction Cost Total $ 128,095.50
Total Construction Cost(excluding the fees): $ 411,155.22
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 5,661.19
D. Water/Sewer Material Testing Fee(2%) $ 5,661.19
Sub-Total for Water Construction Fees $ 11,322.38
E. TPW Inspection Fee(4%) $ 5,061.42
F. TPW Material Testing(2%) $ 2,530.71
G. Street Light Inspsection Cost $ 62.40
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $
Sub-Total for TPW Construction Fees $ 7,654.53
Total Construction Fees: $ 18,976.91
Choice
Financial Guarantee 9 rion$. choose one Amount Marls erne
Bond=100% $ 411,155.22
Completion AQ,eernent- 100%r Holds Plat $ 411,155.22
Cash Escrow WatecSar;;ar Sewer=125% $ 353,?:14.65
Cash Escrow PavinwStofm Drain=125% $ t G t 9.38
Letter of Credit=125%w/2yr expiration period $ 5 i 3,944.03 x
City of Fort Worth,Texas
Standard Community Facilities Agreement-Moriah at Timberland Phase 2
CFA Official Release Date:02.20.2017
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Jesus J. Chapa !�
Assistant City Manager
Date:
'T Name: Cary . Brown
Recommended by: Title: Partner
Date: ��i0/2 o t
Wendy C i-Babulal, EMBA, P.E. ATTEST: (Only if required by Developer)
Development Engineering Manager
Water Department
(-J, U Signature
Dougla . Wiersig, P.E. Name:
Director
Transportation&Public Works Department Contract Compliance Manager:
Approved as to Form & Legality: By signing,I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
Richard A. McCracken requirements.
Assistant City Attorne
M&C No.
S
Date:
anie Morales
1/ ,^ Name:
Form 1295: --/y(-/ e: Development Manager
�4 OF,,
ATTEST: •..0,��
5 �O
Mary J. Kayser
City Secretary S'
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Moriah at Timberland Phase 2 CITY SECRETARY
CFA Official Release Date: 02.20.2017 FT,V11'QRTH TX
Page 9 of 11 +
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 - Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A: Water Improvements
® Water Cost Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Cost Estimate
® Exhibit B: Paving Improvements
® Paving Cost Estimate
❑ Exhibit B-1: Storm Drain Improvements
❑ Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Moriah at Timberland Phase 2
CFA Official Release Date: 02.20.2017
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100619
None
City of Fort Worth,Texas
Standard Community Facilities Agreement-Moriah at Timberland Phase 2
CFA Official Release Date: 02.20.2017
Page 11 of 11
[n7n
BLUE MOUND
z o
O co
a >
KELLER-HICKS TIMBERLAND
SITE
INTERSTATE
35W z
O
z '—
O w
� o
Q o
2 J
O
GOLDEN TRIANGLE
GOLDEN TRIANGLE
MORIAH AT TIMBERLAND ADDITION - PHASE 2 INFRASTRUCTURE
VICINITY MAP
Graham Associates, inc.
CONSULTING ENGINEERS & PLANNERS
1300 SUMMIT AVENUE,SUITE 419
FORT WORTH,TEXAS 76102 (817)640-8535
TBPE FIRM:F-1191rrBPLS FIRM: 101538-00
DRAWN BY: JKP DATE: 5/2212017
PROJECT NO.: 2658-1010 SHEET 1 OF 1
7nn
_ EXI 16' WATER X-15263
TIMRFRI AND POUL F AR^
t
EX. 8" WATV
X-15263
I LOT 2K SM z
MMM AT T1 MNM
ADM N
Q
I �
21+ 1 C
LOT 4.MM Z uJ
C I MOMH AT TN03L W
III / P ADDRgN
PROPOSED 8' WATER
31 ISM zI LINE EXTENSION FOR 4
D( 16' WATER No HAT� TIMBEFUN I FUTURE CONNECTION �
X-13x"76ADW N
_ i
PROPOSED
10' WATER LINE
II
I
LOT 51 RM z
MI"Al ININIEW
II
I I
IIS
MORIAH AT TIMBERLAND ADDITION - PHASE 2 INFRASTRUCTURE
UNIT A - WATER IMPROVEMENTS
Graham Associates, lnc. GRAPHIC SCALE 1 "=200'
Rfl CONSULTING ENGINEERS & PLANNERS -
1,360 SUMV17AVENUE. SUITE 419
FORTi WORTH, TEXAS 75102 Q81'7)640-8535 200 0 200 400
TBPE FORM:F-11911TBPLS FIRM: 161538-00
DRAWN BY: JKP DATE: 5/22/2017
PROJECT NO.: 2658-1010 SHEET 1 OF 1
Enn 1
` LOT 2R,DLOLS(L
LK1RIi+H KT
"IYeETq."Von"
EX. 8" SANITARY SEWER
X-21128 2
PROPOSED MANHOLE—r� ` 7 Z I Lor Lwac z.
NtIRIAFI NDRIAH AT Lu
\ ' T1W9FF1AND I T16ElilAlp ,5
\ Y. +Yoxn ADDITION
PROPOSED ~� \+
8' SANITARY SEWER
EXISTING SS MANHOLE
LOT 5,
am a
WDM KT`i
nuDEikw
AGDRKIN
LOT 1R,L'A=1,
i
1 LOT Ort,Lim 1, PROPOSED >!'
MDW MANHOLES
ADDM
EX. 10' SEWER __.
X-20170
LOT K am 91
1 ) mow AT TIN
( f LZr OR i
+, �_� LOQ ' .. PROPOSED
Uwffr 8 SANITARY SEWER
MOON
/ -
. '--EXISTING SS M,4NFi LE
--���X-21 E 51
-
j _. EX, 8' SANITARY S
X-21681
MORIAH AT TIMBERLAND ADDITION - PHASE 2 INFRASTRUCTURE
UNIT AI - WASTEWATER IMPROVEMENTS
Graham Associates, Inc. GRAPHIC SCALE 1 "=500
IM: CONSULTING ENGINEERS & PLANNERS ----
1300 SUMMIT AVENUE,SUITE 419
FORT WORTH,TEXAS 76102 (817)640-8535 50� 50� 1���
TBPE FIRM:F-1191/TBPLS FIRM:101538-00
DRAWN BY: JKP DATE: 5/2212017
PROJECT Nn• ')RSR-' SHEET 1 '
f
nn
TIMPFRI-AND POUI F ARn
MORN AT WOUND
ADDMON
` f Cr
_ a
LUr 4,MM P, L-
IADDMON
lAf 3,BIDCI(Z,
/
MOM ATNIBETtIIIAI �`; PROPOSED
AMONMETROPORT WAY
{f WIDENING
(37' B-B TOTAL)
PROPOSED E'
DRNE APPROACH
_ I
4
1
PROPOSED
- _ SIDEWALK
Ip W Al
Aum p
I IY
MORIAH AT TIMBERLAND ADDITION - PHASE 2 INFRASTRUCTURE
UNIT B - PAVING IMPROVEMENTS
Graham Associates,lnc. GRAPHIC SCALE 1"=200'
CONSULTING ENGINEERS & PLANNERS
1300 SUMMIT AVENUE,SUITE 419
FORT WORTH,TEXAS 76102 (817)640-8535 2�0 2�0 4�0
TBPE FIRM:F-1191ITBPLS FIRM: 101538-00
DRAWN BY: JKP DATE: 5/22/2017
PROJECT NO.: 2658-1010 SHEET 1 OF 1
n
TIMRFRI AND R^UL FVAR^
I
I Lor aR K=$
MOM AT YNNAMD
AOOIIIOM
PROPOSED LED LIGHT Q
FIXTURE REPLACEMENT
(EX. POLES WEST
OF METROPORT) C
c
LOT 4.9L=Z W
IIOIMH AT TIURINO 5
1J I ADDrtION
Lur3.a a, , I
M I `l
I
_ I
I
MOM
I
LoraK=z
1IORNH a'wMM
MD=
MORIAH AT TIMBERLAND ADDITION - PHASE 2 INFRASTRUCTURE
UNIT C - STREET LIGHT IMPROVEMENTS
Graham Associates,Inc. GRAPHIC SCALE 1 "=200'
CONSULTING ENGINEERS & PLANNERS
1300 SUMMIT AVENUE,SUITE 419
FORT WORTH,TEXAS 76102 (817)640-8535 200 0 200 400
TBPE FIRM:F-1191/TBPLS FIRM: 101538-00
DRAWN BY: JKP DATE: 5/22/2017
PROJECT NO.: 2658-1010 SHEET 1 OF 1
MATRIX SUMMARY
DAP-HM PROFO.CAL
Pogo)a
CFA PROJECT QUANTITY MATRIX
Prepared for.Morlah Real Estate Company,LLC
Water and Sewer to Serve Modah at Timberland Phase 2
May 22,2017
PART I-WATER DEPARTMENT CONSTRUCTION ITEMS
CFAUNIT A-WATER IMPROVEMENTS $ 149,842.20
CFA UNIT Al-SANITARY SEWER IMPROVEMENTS $ 133,217.52
SUBTOTAL PART I-WATER DEPARTMENT CONSTRUCTION ITEMS $ 283,059.72
PART If•TRANSPORTA77ON d PUBLIC WORKS CONSTRUCTION ITEMS
CFA UNIT B-PAVING IMPROVEMENTS $ 126,535.50
CFA UNITC-STREET LIGHT IMPROVEMENTS S 1,S60A0
SUBTOTAL PART 1I-TRANSPORTATION&PUBLIC WORKS CONSTRUCTION ITEMS $ 128,095.50
CONSTRUCTION TOTAL $ 411,155.22
CTTY OF FORT WORTH
STANDARDCONSTRUC ONSPECIFICATIONDOCUM -DEVELOPERAWARDEDPROIECTS
Fvm Vesica Sryleobe I,2015 W 42 43_BW ftapo'sl_DAP Jsdnau M.
MATRIX M I
DAP-BID PROPOSAL
Page t ort
CFA PROJECT QUANTITY MATRIX- PART I
Prepared for:Moriah Real Estate Company,LLC
Water and Sewer to Serve Moriah at Timberland Phase 2
May 22,2017
QUANTITY BY SHEET CONTRACTOR
Bidlistlrem Speciflcminn Section Unit of Bid
No. Deunpnon No. Measure 5 6 7 8 14 IS 20 Quantity Uni[Price Bid Value
UNIT A:WATER IMPROVEMENTS
1 3201 0652 7"Co-Pvrnt Repair 3201 29 Sy 46 _ 46 $121.00 $5,566.00
2 3213.0301 4"Conc Sidewalk 32 13 20 SF 136 136 $6.00 $816.00
3 13305-0109 Trench Safet 33 05 10 __LF 800 1187 1987 $0.10 $198.70
4 3311.0001_Ductile Iron Water Fittin s wl Restraint 3311 11 TON 1.1 1.7 2.B $7,200,00 $20,160.00
5 3311.0241 8"Water Pipe 3311 10,33 11 12 LF 30 30 $46.50 $1,395.00
6 3311_0341 10'Water Pipe_ 3311 10.331112 LF 800 1187 1987 $43.50 $86,434.50
7 3312.0001 Fire Hydrant 33 12 40 EA 1 1 $4,372.00 $4,372.00
8 3312.0117 Connection to Existing 4'-12"Water Main 33 12 25 EA 1 1 $2,000.00 $2,000.00
9 3312.2003 1"Water Servioe 33 12 10 EA 1 1 1 $1,200.00 $1,200.00
111 3312.2103 1 1/2"Water Service _ 3312 10 EA 1 1 $1,700.00 $1,700.00
71 3312.3003 8"Gate Valve 33 12 20 EA 2 2 $1,300.00 $2,600.00
3312.3004 10"Gate Valve 3T1220 20 EA 2 1 5 1 1 1 1 1 7 1 $2000.001 $14.000.00
13 3312.4113 16"x 10"Tapping Sleeve&Valve 333 1225 EA 1 1 1 $9,400.00 $9,400.00
UNIT A.WATER IMPROVEMENTSj $149,842.20
UNIT All:SANITARY SEWER IMPROVEMENTS
I 0330.0001 Concrete Encase Sewer Pipe 03 30 00 CY 5.4 5.4 $475.00
33010002 Post-CCTV Inspection 330131 LF 1852 454 2306 $3.00 $h.91i9-Oli
i 3301.0101 Manhole Vacuu,n Testing 3301 30 EA 4 2 6 $200.00 S!,..-o 04
4 1330li.0109 Trench Safety 33 05 10 LF 1166 418 1584 $1.00 .[84.1`0
5 3305-0112 Concrete Collar 330517 EA 4 2 6 $680.00 $4,080.00
6 3331.4116 8'Sewer Pipe,CSS Backfill 33 11 10,33 31 12, LF 10 10 $76 00 $760 00
33 31 20
7 333'..3101 4"Sewer Service 33 31 50 EA 2 2 $750.00 $1,500.00
8 3331.3301 B"Sewer Service 3331 50 EA 1 1 2 $1,700,00 $3,400.00
9 3331 4115 8"Sewer Pipe 33 11 10,33 31 12, LF 1665 408 2073 $41.24 $85,490.52
_
3331 20
10 3339 1001 4'Manhole 33 39 10,33 39 20 EA 4 2 6 $3.600 00 $21,600 00
t 1 3339.1003 4'Extra Depth Manhole 33 39 10,33 39 20 VF 8 9 17 $160.00 __$2,720.00
I2 9999.0001 Connect to ExistingSanitarySewer Line 33 05 30 EA 1 1 $1 400 oo $1,40000
UNIT Al;SANITARY SEWER IMPROVEMENTS $133,217.52
SUBTOTAL PART I-WATER DEPARTMENT CONSTRUCTION ITEMS $283,059.72
MY OF FORT WORTH
STANDARDCONSTRUCTIONSPECIFICATIONDOC ENTS-DEVELOPF AWARDEDPROIECS
F-Version Sryamber 1,2015 04243_BidP,,-LDAP Jackson PH2.IDs
MATRIX PG.2
DAP.Rro PRnms,v,
Page 1 of I
CFA PROJECT QUANTITY MATRIX- PART II
Prepared for:Moriah Real Estate Company,LLC
Water and ewe
Sr to Serve Moriah at Timberland Phase 2
-rap 2,^.,2017
QUANTITY BY SHEET CONTILACTOR
DescriPtirnr Specif Na ttnn Unit f 5 6 7 R 14 15 20 29 Bid
ry Unit Price Bid Value
UNIT B:PAVING IMPROVEMENTS
0170 0100 Mnhalirat�or, Ti 7U OU LS 1 1 $21,150.00 $21,150.00
131'0.0101 Site G—,,g 311000 IS 1 1 $6,110.00 $6,110.00
3123.0101Und,ssl'led Excavation by Plan 31 231b G 44 29 73 $32.00 $2,336.00
4 3125.0101 SW PPP 1 acre 31 25 cc 1 S 1 1 $9,000.00 $9,000.00
5 3211.0400 Hydrated L me(275lSY) 32 11 29 TON 9.3 6.2 15.5 $182.00 $2,821.00
S 32110,5016"t ime Treatment 32 11 29 SY 693 457 1150 $6.25 $7,187.50
7 32'.3.0102 7'CGnc.F,w 32 13_13 SY 659 434 1093 $64.00 $69,952.00
8 i i2 3.0301 a 01— dewalk 32 1320 SF 252 252 $6.001 $1,512.00
9 '321 3.0506 Barrier Free Ramp,Type P-132 13 20 FA 2 2 $1,600.00 $3,200.00
l0 32.7.0002 v"SLU Pvmt Markiny HAS_(Y) 32 17 23 LF 1022 1022 $1.00 $1,022.00
11 32'7 2103 REFL Raised Marker-Y 11 A 32 17 23 EA 13 !!1123 $6.00 $78.00
3217 4307 Remove Raised Marker 321723 EA 52 $1.00 $52.00
3291.0100 Topsoil 329119 CV 16 11 $45.00 $1,215.00
3441.4003 Furnish/Install Alum Sign Ground Mount City 3441 30 EA 2 $450.00 $900.00
Std.
UNIT B:PAVING IMPROVEMENTS $126,535.50
UNIT C:STREET LIGHT IMPROVEMENTS
1 13441,3301 LED Light Fixture 13441 20 EA I I I I I I 1 1 2 1 2 1 $780-001 $1,560.00
UNIT C:STREET LIGHT IMPROVEMENTS1 $1,560.00
SUBTOTAL PART 11-TRANSPORTATION&PUBLIC WORKS CONSTRUCTION IMPROVEMENTS 5128,095.50
CTTY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
F—Vnsiao Sep,em I'2011 00421]ed P o LDAP J PM.xb
004243
DAP-BID PROPOSAL
Page I of4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Section Unit of Bid Unit Price Bid Value
No. No. Measure Quantity
UNIT A:WATER IMPROVEMENTS
1 3201.0652 7"Conc Pvr,i[Ro;Iair 3201 29 SY 46 $121.00 $5,566.00
2 32'.3 0301 4"Carc Sidewalk 32 1320 SF 136 $6.00 $816.00
3 13305-C',,19 Trench Safety LF 1987 50.10 5192.20
4 3311 OC-J' Ciclile Iron Water Fittings wv Restraint 33 11 11 TON 2.8 $7.200.00 $20.160.00
5 3311.0241 8"„Vater Pie 33 11 10,33 11 12 LF 30 $46.50 $1.395.00
6 43311 0341 10"Water Pie 33 11 10,33 11 12 LF 1987 $43.50 $86,434.50
7 3312.0001 Fi,e H•rdran! 33 1240 EA 1 $4,372.00 $4,372.00
8 Q12.0117 Corr ^i-n'!)Existing 4"-12"Water Main 33 1225 EA 1 $2,000.00Z$144,000.00
r
3312.2%1:;' 331,210 EA 1 $1.200.00
I(% 33122 i? 1:2" "•ljteiSemce 33 12 10 EA 1 51700.00
11 i 1 ;'' 8 Galea'V[flve 33 1220 EA 2 51.30:00
12 3312 3.'' "0"Gate Valve 33 12 20 EA 7 52.000,0013 3312.4-.13 16"x 1G"Ta in Sleeve:&Valve 331225 EA 1 59.410.00
CONTRACTOR'S TOTALI $149,835.70
TOTAL UNIT A:WATER IMPROVEMENTS $149,835.70
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Vmim Sept—W I,2015 00424)Bid Propaal DAP Jackm PH2.x1a
00 42 43
DAP-BID PROPOSAL
P.S.2 of4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
131JL r.Lr., Description Specification Section Unit+ n'd Unit Price Bid Value
No.
UNIT Al:SANITARY SEWER IMPROVEMENTS
033:,0001 Conc-ere E icasp gcv nr Pi�r_._._...._ 03 30 Cry -Y 5» $475.00 $2,565.00
---
330'.0002 Post-CCT!Ins ector 33-21 31 LF 2306 $3,30. $6918.00
3 33;;'.0101 Man hole Vac...lumTestrc 330130 EA 6I $200.00 $1200.00
4 3305.0109 Tench Safery 33 05 10 LF 1584 S'1 W: $1,584.00
5 3305.0112 Conc-ete Co yr 3305 17 EA C $680.00; $4,080.00
33 11 10 3331 12, 10
'
6 3331.4116 8"Sewer P pe.CSS BwC,f11 3331 20 LF $'76.00:; $760.00
7 3331.3101 4"Sewer Se vice 33 31 50 EA 2 $750.00 $1,500.00
S 3331.3301 8"Sewer Sen ice 3331 50 EA 2 $1,700.00 $3,400.00
9 3331.411 c 3"Sewer Pipe 33 11 10,3331 12, LF 2073
3331 20 $41.24 $85,490.52
10 3339.1001 4'Manho,e 31,39 10,333920 EA 6 $3,600.00 $21.600.00
1 I 3339 1003 4'Extra Depih Manhole 33 39 10,333920 VF 17 $160.00 $2J20.001
_ 9999.00C'i Conne r to Existi iu Sanitary Sowmr Line 1330530 EA 1 $140000 $1 400.00
CONTRACTOR'S TOTAL $133,217.52
TOTAL UNIT A7:SANITARY SEWER IMPROVEMENTS $133,217.52
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Pam Vmsian SWWnba I,2015 00 42 43 Bid Prapad_DAP Jmtmm PH2.xb
00 42 43
DAP-BIDPROPOSAL
Page 3 of4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Specification Section Unit of a
No. Description No. Measure it Unit Price Bid Value
UNIT B:PAVING IMPROVEMENTS
1 10170.0100 MobilizaEion C.- 7000 LS 1 S21,150.00 $21,150.00
2 ;31'41 0191 Site Clear'mo (31 10 00 LS 1 $6,"s0.00 $6,110.00
3 3 12 3 010; Unclassified Excavation by Phan 131 23 16 CY 73 532.00 $2,336.00
4 3125 U101 S'APPP 1 acre �3'2500 LS 1 39.1001.00 $9000.00
5 32.1.0400 H drated Lime(27#/SY)
32 ! : TON 15.5 5182.00 $2,821.00
6 32`1.0501 fi"Lime Treatment SY 1150 $6,25 $7,187.50
7 32':3 r}102 7'Corr,F.Wt J 13 SY 1083 454,."01 559.952 09
S 32"s 030. 4"Conc SidewaN 20 SF 252 $6.90 $'.512 DO
9 32'3 0505 Barrier Free Ran rl,T pe P-1 - 2 13 2:i EA 2 S1,600 C,0 5:3.2011. 9
10 :32'.7 0002 4"SLD Pvm!Mafk,lnc HAS jYl _ 32 17 i3 LF 1022 S1.00 $'.022 06
I 1
3217.210:3 RE FL Rau;aed Marker fY 11-A-A 32 1723 EA 13 S6 9() ?8 CSG
12 3217.4307 Rernoee Ra;sc:t Varror 32 172'3 EA 52. S1 010 S52.00
13 3291.01 00 %--,,ad 32 91 '9 1 CY 27- $45 C0
14 Sca' . gr,5rol.r,d CiTr
34 41 3x0 EA 2 $450.010 S a0.;0
CONTRACTOR TOTAL'$ $126,535.50
TOTAL UNIT S:PAVING IMPROVEMENTS1 $126,535.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Vetaioa Septaaber 1,2015 00 42 43Bid Pmpeaal DAP Jadeon PH2.x1s
00 42 43
DAP-BID PROPOSAL
Page 4 of4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
BiJ.:.:IUcm Specification Section Unit of Bid
Description Unit Price Bid Value
No. Measure Quantity
UNIT C:STREET LIGHT IMPROVEMENTS
1 3441.3301 LED Light Fixture 34 41 2`1 LS $1 000.00 $2 000.00
CONTRACTOR TOTAL'S $2,000.00
TOTAL UNIT C:STREET LIGHT IMPROVEMENTS $2,000.00
Bid Sun....
UNIT A:WATER,IMPROVEMENTS $1,93335 70
UN,?A 1:SANI-ARY SEWER IMPROVEMENTS $133.217.52
-.. - UN 1 U ?AV:NG VA1PR OVEMEN'1'$ _. -- - a1e:1.-,.535.5k"
t,KIT C „-REST L10•1T IMPROVEVEN"Sv2.OliCLQ2
Tarot (liar Hid 5411.SK72
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 90 calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Varma.Saptembar I,2015 00 42 43 Bid Propnal DAP Jwks-PH2.A.