Loading...
HomeMy WebLinkAboutContract 49962 Developer and Project Information Cover Sheet: Developer Company Name: 7FW Limited Partnership Address,State,Zip Code: 218 West Wall St., Grapevine,TX,76051 Phone&Email: 817-873-0520,rbetancur@zenaland.com Authorized Signatory, Title: Robert J.Betancur,Vice President Project Name: Seventeen Lakes Phase 4 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: West of IH35 , South of SH114,North of Alliance Gateway Parkway Plat Case Number: FP-17-049 Plat Name: Seventeen Lakes,Phase 4 Mapsco: 9E Council District: 7 CFA Number: 2017-155 City Project Number: 101064 To be completed d staff Received by: �1 Date: ` City of Fort Worth,Texas Standard Community Facilities Agreement-Seventeen Lakes Phase 4 CFA Official Release Date: 02.20.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. C C� WHEREAS, 17FW Limited Partnership, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements")related to a project generally described as Seventeen Lakes Phase 4 ("Project') within the City or the extraterritorial jurisdiction of Fort Worth,Texas("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement') in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project_ has been completed and the City has officially accepted the Improvements. 0q,4V60-per � 9 further acknowledges that said acceptance p �nes- veloper's contraAoor�s City of Fort Worth,Texas OFFICIAL RECORD ,Z`v0"^ZO�� #. Standard Community Facilities Agreement-Seventeen Lakes Ph istfTY SECRETARY CFA Official Release Date: 02.20.2017 Page 2of 1FT WORTH' TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) 0, Sewer(A-1) 1�1, Paving (B) Q, Storm Drain (B-1) 0, Street Lights & Signs (C) M. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Seventeen Lakes Phase 4 CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s)it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Seventeen Lakes Phase 4 CFA Official Release Date:02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Seventeen Lakes Phase 4 CFA Official Release Date: 02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Seventeen Lakes Phase 4 CFA Official Release Date: 02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Seventeen Lakes Phase 4 CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Seventeen Lakes Phase 4 CFA No.: 2017-155 City Project No.: 101064 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 413,288.00 2.Sewer Construction $ 552,521.50 Water and Sewer Construction Total $ 965,809.50 B. TPW Construction 1.Street $ 1,173,538.90 2.Storm Drain $ 1,105,110.00 3.Street Lights Installed by Developer $ 148,196.69 4. Signals $ TPW Construction Cost Total $ 2,426,845.59 Total Construction Cost(excluding the fees): $ 3,392,655.09 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 19,316.19 D. Water/Sewer Material Testing Fee(2%) $ 19,316.19 Sub-Total for Water Construction Fees $ 38,632.38 E. TPW Inspection Fee(4%) $ 91,145.96 F. TPW Material Testing(2%) $ 45,572.98 G. Street Light Inspsection Cost $ 5,927.87 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ Sub-Total for TPW Construction Fees $ 142,646.81 Total Construction Fees: $ 181,279.19 Choice Financial Guarantee Options,choose one Amount Mark one Bond - 10011, $ 3,392,655.09 Completion Agreement= 100%/Holds Plat $ 3,302,655.09 x Cash Escrow Water(Sanitary Sewer= 125% $ 1.207.261.88 Cash Escrow Pavin ,'Storm Drain= 125% $ 3,033,556 qa Letter of Credit= 125%w/2yr expiration period $ 4,240,818.86 City of Fort Worth,Texas Standard Community Facilities Agreement-Seventeen Lakes Phase 4 CFA Official Release Date: 02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER 17FW Limited Partnership Jesus J. Chapa Assistant City Ma�ager Date: N Ro ert J. Betancur Recommen ed y: TV:: Vice President Date: Wsl avil Wendy Chi-Babulal, EMBA, P.E. ATTEST: (Only if required by Developer) Development Engineering Manager Water Department Signature Douglas . Wiersig, P.E. Name: Director Transportation &Public Works Department Contract Compliance Manager: Approved as to Form &Legality: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting Richard A. McCracken requirements. Assistant City Attorn y M&C No. N�P-- U Date: Name: Janie Morales Form 1295: �"— Title: Development Manager ATTEST: Mary J. Kaisep :_ City Secretar "F �XAS City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement®Seventeen Lakes Phase 4 CITY SECRETARY CFA Official Release Date: 02.20.2017 Page 9 of 11 FT.WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement 1SI Location Map Exhibit A:Water Improvements Water Cost Estimate ® Exhibit A-1: Sewer Improvements I Sewer Cost Estimate 1gl Exhibit B: Paving Improvements Paving Cost Estimate ® Exhibit 13-1: Storm Drain Improvements Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Seventeen Lakes Phase 4 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101064 None City of Fort Worth,Texas Standard Community Facilities Agreement-Seventeen Lakes Phase 4 CFA Official Release Date:02.20.2017 Page 11 of 11 PROJECT LOCATIO �= � v� TRINITY + . PHASL 4 clka tiny°r S_ 121 q� a 4 �f L 70 7TN - I 82 30 80 z 28 ker — i 820 r " 1MINARY DR w`� � S 2030 / Ld 35 X C.F.A.EXHIBIT FOR... SEVENTEEN LAKES, PHASE 4 Vicinity Map Water Project No. P56008-0600430-101064-00158 Sewer Project No. P56008-0700430-101064-00138 File No. W-2515 SHEET No. 1 of 1 .•1 rx„- � •� /,/// s` ... r ' ` , iii sr �. y r • ..t ' 1 `s. 3" IVA �LA4f EXIST. 15" WI-FN ASSL Y .tf (3:1: �At,l�; f tt ' to < B' WATER L'�� r A 17 21 4444 w11a - S' Y 'a4 T VAL&S. I4F 8 f-£`GATE VAL4E JJ —� x FN ASSEMBLY ti r A 1 'f / $ B'*A'TFR "4`_ 5r _ .� 1 t l Lam^` ' Ja w 'gin iilr / f '� i `•.. J' ;�& f'..q VAC.r� f ` }-5'GAAP VE .�'G+i?I =Tp4 + fr 4JM8tir 41 -- I 25 !M 4 i IER LW ,_.:r>::::e,.��.--�'-`_-�_��.u?+==ice'. ... X�'x�r � I i )�� ff i��. -•�`� ,. z,r.i.:7i±xFFFaia�3li_ ...'•:r '�'+.e.+�; yl __un:a.xaxwzz:::zs.m -. t t � .,M� tirrx ff v - .,•- .�.�j��zi� " sxz+xaxxr:zes..suss s _ urruarx s- _ 4 Matchline See Sheet 2 C.F.A.EXHIBIT FOR . SEVENTEEN LAKES, PHASE 4 Water Exhibit "A" Water Project No. P56008-0600430-101064-001580 Sewer Project No. P56008-0700430-101064-001380 File No. W-2515 SHEET No. 1 of 2 LEGEND . .. EXIST. WA TER PROP. WATER 0 300 PROP. FH. ASSEMBL Y ►� PROP. GATE VALVE Matchline See Sheet Z CAI'VAL In t �`11` .c'., u ,-ss. �. �• 1-fN AGCY ZO 1-6' r Jr VAL1E 1411 AS5EM Y `^5 30 3/ S2 jj f .� .r' Q +.,••rt2y ,Y, �.." l •t=,• f 1. x. -... ' 2-8'GAIF VALWS # 44 1-S'CA1�F 141L11r - 44j fST. 8' 11' B 1-Fm AY 8'WA1En' >,rr a 1. 8' WA M?LWE 17 2-•6'GA T 8'W 1 �A §� f"'• B" aFst IER 149E 20 1122 3d $3 .x.11. ' r�+. /��.•� 57 Env Mg C.F.A.EXHIBIT FOR SEVENTEEN LAKES, PHASE 4 Water Exhibit "A" Water Project No. P56008-0600430-101064-001580 Sewer Project No. P56008-0700430-101064-001380 File No. W-2515 SHEET No. 2 of 2 LEGEND - EXIST. WATER -� - PROP. WATER 0 Sao - PROP. F.H• ASSEMBLY ►� PROP. GA TE VALVE YJ to / 3 V k EEL2 17 12 15 13 25 14 ly T3 1 501 ! k7 e r ,Q "7i _ 1 4,1 Y242 40 `Ai M — { + fid 3 I 17 41 21 t8 _ B5SU'tP ]& fTI 1920 21 _I 29J031 Wit. _ X �� �s,r r»aaaa»»... r t masaaa»rrneaxare:aaaar;-�,�,�:--. x � .� .•... - I _ f - E Matchline See Sheet 2 C.F.A.EXHIBIT FOR ... SEVENTEEN LAKES, PHASE 4 Wastewater Exhibit "A-1" Water Project No. P56008-0600430-101064-001580 Sewer Project No. P56008-0700430-101064-001380 File No. W-2515 SHEEN' No. 1 of 2 LEGEND ------ EXIST. SS PROP. SS 0 300 • EXIST. SSMH • PROP. SSMH Matchline See Sheet 1 B 9 [111 7f f? fJ ti 16 17 0f9 rr20 2J 24 17 .76 128 ?9 -V 3i 32 M _U 5 # J 8'Su t 46 H f1 42 J 1 r 20 i 38 "^ - 59 C.F.A.EXHIBIT FOR. , SEVENTEEN LAKES, PHASE 4 Wastewater Exhibit "A-1" Water Project No. P56008-0600430-101064-001580 Sewer Project No. P56008-0700430-101064-001380 File No. W-2515 LEGEND SHEET No. 2 of 2 ------ EXIST. SS PROP. SS 0 300 EXIST. SSMH PROP. SSMH 41 4 70 14 17 10 21 r AV 12 !� J9 73 , 1? i a 13 2? 2J 17 T Is 9 1D 11 t If t7 712 { 5 78 77 aT ad 14 20 45 14 44 25 7 41 37 PV49VF (({ r 56 21 21 20 t9 18 17 Id 13 1t Mo 27 Z3 2a 2s1? -- 26 2T 2d as 3P � m � � . `tt] 3t J? :U Pq dhi ri It 59 60 62 ff 67 ^n,..�._ y_.:s .r s?iS� :-Y.LY:t' � ' �e._e cs_:...e.....;__x.__._.x_a_=ss rrr_�-..�a - _'�'(� v"♦. f �zr�xr� r `a'�y max \ A ��i�{� 1. � f ���'. yy �.,mm�F *lam•. � ,. Matchline See Sheet 2 C.F.A.EXHIBIT FOR a , , SEVENTEEN LAKES, PHASE 4 Paving Exhibit "B" Water Project No. P56008-0600430-101064-001580 Sewer Project No. P56008-0700430-101064-001380 File No. W-2515 SHEET No. 1 of 2 LEGEND CONCRETE PVMT. Matchline See Sheet 1 81 20 � 2J Pal 1 P5 :&�2T�79 9� p�7 4' ,Vf'+ I CAE&W47 ts CL �: I r Y\ \ Y,iyvdael , M 1..• Yt'+i 17 50 S! 57 \\ 20 21 57 58 4 fir.. — - k 'i � — low o — / — — lo IL _, _ - — _ / / / / / / / / C.F.A.EXHIBIT FOR. . SEVENTEEN LAKES, PHASE 4 Paving Exhibit "B" Water Project No. P56008-0600430-101064-001580 Sewer Project No. P56008-0700430-101064-001380 File No. W-2515 SHEET No. 2 of 2 0 300 LEGEND CONCRETE PVMT. d51 00 ? � ,i / l / � 36'.RCP � �o tS'G� •� � .�' r,�- p. / 2�o 21 RCP 1 / 15 r $ \ _ \. 1;� k 14 - �+- I,y : 111 \*• 1S Tf 'CL g e � \f 'A, i 'C 13 r 42' 19 y ! • T 23 24 12 /� t3 •:• 1 w 1 Kd a�_ 16 25 JS ? 2f 3 " J 24 PvP �'E 0;4 tB } s ` 3 3 — _r p,2 � 39 ,� f ti 2f 2v IS 171 td 15 t1 t3 t2 1' J✓ f 'u t8 19 20 3t ? 23.74 85 26 ?7 28 29 .90 3J J4 'MAdt zaazassruz:u_-aw-.vieeiiuza— �:zsz i•""`—••-••�Y •"s'r' +�•,�,•. �� �' ',62/ ls$ �y'] uiz}iy sa w - �u IL t , Matchline See Sheet 2 C.F.A.EXHIBIT FOR, . SEVENTEEN LAKES, PHASE 4 Storm Drain Exhibit "&1" Water Project No. P56008-0600430-101064-001580 Sewer Project No. P56008-0700430-101064-001380 File No. W-2515 SHEET No. 1 of 2 LEGEND PROP. INLET PROP. SO PROP. RIP-RAP Matchline See Sheet 1 .rry^yr r ' �v 1� d 4. RrF 15 16 1 7X7 R3 23 24 r 25 I �{• \�.., y' 64 Li r. ir 0 ,A M � C.F.A.EXHIBIT FOR... SEVENTEEN LAKES, PHASE 4 Storm Drain Exhibit "B-1" Water Project No. P56008-0600430-101064-001580 Sewer Project No. P56008-0700430-101064-001380 File No. W-2515 SHEET No. 2 of 2 LEGEND PROP. INLET PROP. SD 0 300 MM PROP. RIP-RAP J,, r tit r 4 5 r r A 10 5 �t 2 17 10 I f. f J 1 2 1615 . J 20 1 \ � r� 8 10 13 `,` 12 9 9 27 ! N �,r 8 !3 fo 15 ! IS s I fir f 1! f r i6 ' g rd f1 17 11 I 5 f5 1� 23 tJ1� A 14 15 f 2 20 t4 15 50 51 V 1 4J jJ !V t � ! 42 4110 39 J8 f 91 5 6 7 0 8 10 P 37 AWN 22 71 1p f94J % �. 18 _ 56 #$ 17 fb 15 rs r312i ¢} #9 car ?I F2 32 JJ MM 59 6d r 1 a a.taaru+rrar -t.�—.. ti""• 61 68 69 Matchline See Sheet 2 C.F.A. EXHIBIT FOR.. SEVENTEEN LAKES, PHASE 4 Street Lights Exhibit "C" Water Project No. P56008-0600430-101064-001580 Sewer Project No. P56008-0700430-101064-001380 File No. W-2515 SHEET No. 1 of 2 LEGEND PROP, 57PEET LIGHT 0 300 EXIST. STREET LIGHT F PROP. STREET LIGHT Matchline See Sheet 1 16(17 1j 22 2 26 27 26 7 F ')2 33 4 MvJW R COW 15 14 49 48 'F7 {6 dt 1! s FB 4402 IlRP 17 51 J 19 20i 22 \ A 1 57 7� F_ 59 f _ �fIfm i � i .1e i C.F.A.EXHIBIT FOR... SEVENTEEN LAKES, PHASE 4 Street Lights Exhibit "C" Water Project No. P56008-0600430-101064-001580 Sewer Project No. P56008-0700430-101064-001380 Fife No. W-2515 SHEET No. 2 of 2 LEGEND 0 300E EXIST. STREET LIGHT ~ f PROP. STREET LIGHT le- lk ` T3 s� 10 r T #1 t ff Ar 5 12 IV 27 ,/it F 1e 4 13 _42Z J $ tb 9 14 to t3 i 19 46 Fw ?_ry \ 14 3 49 LO 15 44 50 51 62 t 43 F t p ' s ?2 4th2k i -il f8 wr to PADMV P.IRK lAN£ — 36 f 21 2Q 15 17 +22�-J' x 418 92728 29 30 3/ 32, ` h; _ � r _ -.... bt 5 7 _ Matchline See Sheet 2 C.F.A.EXHIBIT FOR... SEVENTEEN LAKES, PHASE 4 Street Name Signs Exhibit "C-1" Water Project No. P56008-0600430-101064-001580 Sewer Project No. P56008-0700430-101064-001380 File No. W-2515 SHEET No. 1 of 2 0 300 LEGEND a PROP. STREET SIGN (23 TOTAL) Matchline See Sheet 1 to rl t� 13 r5 t6n7rnx f.arres:it ?,.i ,,,xe.ss w `' 8 11r.7r3 19 20 2z 23 24 ZI 26 ?7 28 --- "'" 29 30 .xt 5 AWN J5 J tl i r1 t3 ti 41 48 47 ;6 4FJ 42 3-• 1 1.9 AV 22 2J 67 t 18 ti ,5# �� r;1 I� •�, 1 I 50 - __ __- ------ - "I Ile C.F.A.EXHIBIT FOR . .. SEVENTEEN LAKES, PHASE 4 Street Name Signs Exhibit "C-1" Water Project No. P56008-0600430-101064-001580 Sewer Project No. P56008-0700430-101064-001380 File No. W-2515 SHEET No. 2 of 2 0 300 LEGEND • PROP. SMET SIGN (23 TOTAL) 00 42 43 DAP-BID PROPOSAL Page 1 0f4 SECTION 00 42 43 Developer Awarded Projects PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Iiidlistlt m Specification Unitof Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT 1:WATER IMPROVEMENTS 1-01 3311,0261 8"PVC Water Pipe 3311 12 LF 8993 $20.50 $184.35650 1-02 3311.0001 Ductile Iran Water Fittln sc s w/Restraint 3311 11 TON 2.5 $5.600.00 S14.00000 1-03 3312.3003 8"Gate Valve 33 12 20 EA 17 $1.100.00 $18.700.00 1-04 3312.3002 6"Gate Valve 33 12 20 EA 9 $820.00 $7.380.00 1-05 3312.0001 Fire Hydrant 33 12 40 EA 9 $2 950.00 526.550.00 1-06 3312.2003 1"Water Service 331210 EA 223 $660.00 $147,180.00 1-07 3312.4112 1'6"x8"Tapping Sleeve&Valve 33 12 25 EA $4.025 00i $4.025.00 1-08 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 6 5i 100.00' $6.600.00 11409 3305.0109 Trench Safety33 05 10 LF 8993 $0.50 $4,496.50 . ... _ ........... - .._.__..........._ _.. .._..... . ........-- . .. ....__...... ..__. .._..... ...._......._ .......... ........_. ._ _......_ ........ ................_ _ ... .. ...... ...__. ._ _..__......_ _.. TOTAL U'NtT C MATER rMPRCOVEMQnS $413,288.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April Z 2014 00 42 43_A_Utility_Bid Proposal_DAP.xls 00 42 43 DAP-BID PROPOSAL Page 2 of 4 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Informa6or Bidder's Proposal Lpecification Unit of Bid 3i�lr;t Item Description S.._ _ -,.ire Quantity Unit Price Bid Value UNIT II: SANITARY SEINER IMPROVEMENTS 331110. 11-01 3331.4115 8"Sewer Pipe 3331 12, LF 7412 $32.50 $240,890.00 333120 _.. 3311 10, 11-02 3331.4116 8"Sewer Pipe,CSS Backfill 3331 12, LF 440 $48.00 $21,120.0,., 3331 20 II-03 3339-1001 4'Manhole 333910, EA 34 _ $2,300.00 Y~ $7 5,200.00, 33 39 20 .. _. _.. ..... _,_.._ . .__.. _ _ _............ ___ -- ......._ _. 11-04 3339.1004 4'Shallow Manhole 32 39 10, EA 1 $1,700.00 $1,700.0G 33 39 20 11-053339.1002 4'Drop Manhole 33 39 10, EA 3 $3,400.00 S 1 C SOC OCA 33 39 20 _ 11-06 333u 003 4'Extra Depth Manhole 33 39 10, VF 181 $130 00� $z3,53 .Qu 33 39 20 11-07 3339,)001 Epoxy Manhole Liner(Warren 33 39 60 VF 58 $16000 $9,280.00 Fnvironmental) II-08 33 1.3101 4"Sewer Service 33 31 50 EA 223 . II-09 3301.0002 Post-CCN Inspection 3301 31 LF 7852 51.00 57.852.00 II-10 3301.0101 Manhole Vacuum Testing 33 01 30 EA 38 $160.00 56,080.00 .... ........_ ....__.._ .. _....._ _ __._._. II-11 336501 C9 Safety 330510 LF 7852 51.00 $7.852.00. 1112 3305.0116 Concrete Encasement for Utility Pipes 330510 10 CY 105 $205.00 $3.097.50 TOTAL UNIT H- SANITARY SEWER IMPROVEMENTS $552,521.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Forth Version April 2,2014 00 42 43_A_Utility_Bid Proposal_DAP.xls 00 42 43 DAP-BID PROPOSAL Page 3 of 4 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist kciru 17t ification Unit of Bid No. Description 11_- -- are Quantity Unit Price Bid Value UNIT III: DRAINAGE IMPROVEMENTS 111-01 3341 1604 7x7 Box Culvert 33 41 10 LF 1225 $475.00 $581.875.00 ...._._._ _ _..__ III-02 3341.0409 48"RCP,Class III 3341 10 LF 70 $185.00 512.950,00 III-03 3341.0402 42"RCP,Class III 33 -A 10 LF 498 $160.00 $79,680.00 111-04 3341.0309 36"RCP, Class III 3341 10 LF 615 $130.00 $79.950.00 III-05 3341.0302 30"RCP. Class III 3341 10 LF 30 $11000 $3.300.00 __._.._ ........ . III-06 3341.0205 24"RCP.Class III 3341 10 LF 971 $7200 $69,91200 III-07 3341 "?01 21"RCP,Class III 33 41 10 LF 680 $60.50 $41.140 00 __..._.__ .._.._...... III-08 3349.5'03 20'Curb Inlet 33 49 20 EA 2 $4..800 00 59. 30 III-09 3349 5,'02_ 15'Curb Inlet 33 49 20 EA 11 54,200.00 $462CC 00 _ .._......_ 111-10 3349 6 J1 10'Curb Inlet 33 49 20 EA 9 S2.800 00 $2ti.2; CO 111-11 3349 7001 ' Drop Inlet34 49 20 EA 2 53,100.00 S62 11 C0 ..... ..._ _..._ .._.._ ...__ III-17 334' -_002 Junction Box— 334910 EA 4 53,800.00 $16.200 _01 141-1? 4 001 4'Storm Junction Box 34 49 10 EA 3 52.600.00 ST80F OO i III-14 3349 Headw-d. - -ulvert 334940 CY 40 $690.00 S27.C•'C OC III-15 3340 C5 1 334940 EA 1 $1.900.00 S1 f� C 0C ......... .._ ........_ III-16 3349 4'04 e 33 49 40 EA 1 $1.900.00 $1.91IC OC I11-17 3137 )'Cl Co i . ch R ,mpg - 31 37 00 SY 282 v 552.00 S'4 ,,4 OC' III-18 3137.u1 J4 Mediun. ,ie Riprap,Dry 31 37 00 SY 214 $80.00 S'7 121;[1,c III-19 3305.0109 Trench Safety 330510 LF 4089 $1.00 $4 08c-,IDC, 1II-20 3125.010' SWPPP>_1 Acre 31 25 00LS 1 $3000.00 $3.000.00 111-21 9999 9999 9'Storm Junction Box 32 49 10 EA 2 $13.400.00 S"7 80C 00 III-22 9999.9999 Pedestrian Rail(TxDOT PR1) 00 00 00 LF 57 $131,1100 S 4 10.00 III-23 9999.9999 Steel Fence00 00 00 LF 154 53^111C $4.620.00 _ ......... _ III-24 9999.4999 Pond Outfall Structure 00 00 00 LS 1 $16 5n 51 F 000.00 _._. ...-........... ... ......__... . .. ........_..... __.__. ......... _._ ...... .. ..__................___. ........ ........... ........_.... _._...... ......... ...... _._.. ....... _. ...... _ _.._...._._ ............... _......_._.. _---------... ...---_.. - ...... .. ........... . ..._.._. .._.... .... ..__.. .._.._._ ...... _.._...__ ......... .. ..........._ __. _... . .......... TOTAL UNIT III:DRAINAGE IMPROVEMENTS $1,105,110.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43_A_Utility_Bid Proposil_DAP.xIs SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bid;ist Item Specification Unit of Bid Description Section No. Measure Quantity Unit Price Bid Value Bid Summary UNIT I:WATER IMPROVEMENTS $413,28800 UNIT II:SANITARY SEWER IMPROVEMENTS $552.521.501 UNIT III:DRAINAGE IMPROVEMENTS $1,105,110.00 Total Construction Bid $2,070,919.50 Contractor agrees to complete WORK for FINAL ACCEPTANCE withinIlk working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS•DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43_A_Utility_Bid Proposal_DAP.xis 00 42 43 DAP-BID PROPOSAL Page I of 2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidhst Item Specification Unit of Bid No. Description .ction No. ?Measure Quantity Unit Price Bid Value UNIT IV: PAVING IMPROVEMENTS _..._ IV-01 3213 0101 G"Con Pvrnt 32 13 13 29953 $31.00 $928543.00 IV-02 321 ne T reatment 32 129 SY 3188'Z S3.0U $95 649 00 IV-03 321 040,--, Hydrated Lime 1.32 129 TN 479 5`45 00569 455.00 IV-04 3213 0301 4"Conc Sidewalk 32 320 SF 4953 S5 0C` $24 ;65.C4 IV-05 3213 0501 Barrier Free Ramp,Type R-132 320 EA 20 $1.525 30 S3050).00 IV-06 3213.0502 Barrier Free Ramp, Type M-2 32 320 EA 3 5',52r.0 $4 575 CC, 1 t v , S' $9 50C 00 IV-07 3305 010 Manhole Adjustment, Minor 33 05 14 E�'� �8, �5 ��I IV-08 9999-9999 End of Road Barricade 34 71 13 EA 1 i c 0 $1 300.00 IV 09 9999.9999 Misc Traffic Signs/Blade Signs w/Posts 00 00 00 LS 1 $9,251.911 $9,2.31 90 TOTAL UNIT IV: PAVING IMPROVEMENTS $1,173,538.90 CrrY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUNI NTS-DEVELOPER AWARDED PROJECTS Fort-Version April 2,2014 00 42 43_B_Pav_Bid Proposal_DAP.xls 00 42 43 DAP-BID PROPOSAL Page 2 of 2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal i3;cli�t Itrnt Specification U Bid Description Unit Price Bid Value Section No. Measw° Quantity Bid Sramrnaev UNIT IV PAVING IMPROVEMENTS $1,173,538.90 Total Construction Bid $1,173,538.90 Contractor agrees to complete WORK for FINAL ACCEPTANCE within working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43_B Pav_Bid Proposal_DARAs 00 42 43 DAP-BID PROPOSAL Page 1 of 2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal 34 :;st Item Specification Unit of Bid No. Description *s.:- ,ire Quantity Unit Price Bid Value UNIT V-STREET LIGHT IMPROVEMENTS V-01 3441.3002 Rdwy Illum Assembly TY 25 6 34 d1 20 EA 42 $1.854,65 $77 895.30 V-02 3441.3301 Rd"Ilium Foundation TY4 34,120, EA 42 $1,029.42 $43,235.64 V-03 3441 1502 Ground Box, Small,w/Lid Apron34 41 10 EA 38 $220.00 $8,360.00 ...._.._........_ V-04 3441.3401 6-6-6 Triplex Alum Elec Conductor 3441 20 LF 2545 $1.67 $4,250.15 V-05 2605.3015 2"CONDT PVC SCH 80(T) 26 05 33 LF 2545 $5.68 $14,455.60 TOTAL UNIT V: STREET LIGHT IMPROVEMENTS $148,196.69 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43_C-St Light-Bid Proposal_DAP.xls 00 42 43 DAP-BBD PROPOSAL Page 2 of 2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal kSiJ4ist It ir7 Description Specification Unit of Bid Unit Price Bid Value Section No. Measure Quantity Bid Summary UNIT V:STREET LIGHT IMPROVEMENTS $148,196.69 Total Construction Bid $148,196.69 Contractor agrees to complete WORK for FINAL ACCEPTANCE within y working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April Z 2014 00 42 43_C—St Light_Bid Proposal_DAP.xls