HomeMy WebLinkAboutResolution 2474A Resolution Adopted Resoiut~on too, ~`'l ~~ AUTHORIZING AN AGREEMENT BETWEEN THE CITY OF FORT WORTH, THE NORTH TEXAS TOLLWAY AUTHORITY, AND THE TEXAS DEPARTMENT OF TRANSPORTATION CONCERNING DEVELOPMENT OF THE SOUTHWEST PARKWAY WHEREAS, the timely extension of State Highway 121 south and west from Interstate Highway 30 in Fort Worth to U S Highway 67 in Cleburne (the 'Southwest Parkway") is a crucial element in the successful development of the City of Fort Worth (the 'City") as well as benefiting the surrounding region and the State of Texas and WHEREAS, the City acknowledges that the entire S H 121 (I-35 W to U S Highway 67) project is unlikely to be completed due to cost and issues related to routing through existing neighborhoods (some of which are historically significant) and physical obstacles in the project section from I-35 W to approximately I-30 and WHEREAS, the City desires to delete from further consideration this segment of the project (I-35 W to approximately I-30) and WHEREAS, the Southwest Parkway has been on the City's Thoroughfare Plan since the 1960's, and WHEREAS, the City commissioned an .intermediate level feasibility study to consider whether various phases or segments of the Southwest Parkway could be developed as a turnpike and WHEREAS, the City other local governing bodies and private sector interests presented their study to the Texas Transportation Commission (the 'Commission.') in July 1995 and requested the participation of the Texas Department of Transportation ("TxDOT") in the development and funding of some portion of the Southwest Parkway and by adopted minute order the Commission committed to support the development of the Southwest Parkway and WHEREAS, public funding of major transportation projects continues to face significant obstacles and the Southwest Parkway is competing for funding with other worthwhile transportation projects and WHEREAS, the North Texas Tollway Authority (the Authority") is authorized to build and operate 'turnpike projects" as that, term is defined in the Turnpike Act (Tex. Transportation Code Chapter 366) throughout Collin Dallas Denton and Tarrant Counties, and CITY OF FORT WORTH ~:~ ~- x WHEREAS, there exists the potential for expediting the completion of the Southwest Parkway by financing a portion of that projects' design and construction costs through the use of turnpike financing if the Authority can establish that the Southwest Parkway is a feasible turnpike project; and WHEREAS, TxDOT has determined that the Southwest Parkway is necessary to alleviate congestion and ameliorate air quality and supports the development of the Southwest Parkway as a turnpike project if the applicable legal requirements and other conditions can be satisfied and WHEREAS, the Fort Worth City Council and the Tarrant County Commissioner°s Court have adopted resolutions requesting that the Authority take such actions and conduct. such studies as may be necessary to determine the viability of jointly developing and financing the Southwest Parkway with a combination of turnpike revenue bonds City funds and federal and/or state transportation funds, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS That the City Manager is authorized to execute an agreement between the City TxDOT and the Authority which agreement shall ~" (1) Acknowledge the approval and support of the City and TxDOT for the financing design construction operation and maintenance by the Authority of the Southwest Parkway as a turnpike project. (2) Acknowledge the approval and acceptance of certain design assumptions in connection with that portion of the Southwest Parkway extending from its interchange with IntBrstate Highway 30 to the intersection with Alta Mesa Drive (the 'Initial Turnpike Portion'), which design assumptions may be utilized by the Authority in further evaluating the feasibility of the Southwest Parkway as a turnpike project. (3) Provide for the allocation of estimated project costs for the Initial Turnpike Portion (4) Set forth the obligations of the City TxDOT and the Authority with regard to the Initial Turnpike Portion (5) Provide for the creation of a Technical Work Group composed of representatives of the City TxDOT the Authority and the Federal Highway Administration and such other members representing affected governmental or quasi-governmental bodies as designated by the City TxDOT or the Authority (such other members being selected for the purpose of providing technical assistance only and shall not have the authority to bind the City TxDOT or the Authority) CITY OF FORT WORTH CITY OF FORT WORTH