Loading...
HomeMy WebLinkAboutResolution 4894-01-2018 A Resolution NO. 4894-01-2018 STATEMENT EXPRESSING OFFICIAL INTENT TO REIMBURSE EXPENDITURES WITH PROCEEDS OF FUTURE DEBT IMPROVEMENTS OF THE PRIMARY AREA MISCELLANEOUS SWITCHGEAR AT THE VILLAGE CREEK WATER RECLAMATION FACILITY PROJECT WHEREAS, the City of Fort Worth, Texas (the "City") is a home-rule municipality and political subdivision of the State of Texas; and WHEREAS, the City expects to pay expenditures in connection with the design, planning, acquisition and construction for the Improvements of the Primary Area Miscellaneous Switchgear at the Village Creek Reclamation Facility Project (the "Project") prior to the issuance of obligations by the City in connection with the financing of the Project from available funds; and WHEREAS, the City finds, considers, and declares that the reimbursement of the City for the payment of such expenditures will be appropriate and consistent with the lawful objectives of the City and, as such, chooses to declare its intention, in accordance with the provisions of Section 1.150-2 of the Treasury Regulations, to reimburse itself for such payments at such time as it issues obligations to finance the Project; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: Section 1. The City reasonably expects debt, as one or more series of obligations, may be issued or incurred by the City with an aggregate maximum principal amount not to exceed $11,750,000.00 for the purpose of paying the aggregate costs of the Project. Section 2. All costs to be reimbursed pursuant hereto will be capital expenditures. No obligations will be issued by the City in furtherance of this Statement after a date which is later than 18 months after the later of (1) the date the expenditures are paid or (2) the date on which the property, with respect to which such expenditures were made, is placed in service. Section 3. The foregoing notwithstanding, no obligation will be issued O TWo;ru pursuant to this Statement more than three years after the date any expenditure which is to be reimbursed is paid. Adopted this 9th day of January, 2018. FRT ATTEST: `'0 By: Mary J. Kays , City Secretary S V . N N o3 Village Creek Water Reclamation Facility (VCWRF) N L � f a,low 1 ir�y � rmw-_ .. ;q I' Primary Area do A u �r� °ms s 01"'r r�I�_ �} U Switchgear Improvement Locations _ , -jai - 71 El Switchgear Improvement Location 0 300 600 we 3 _. i. FORT WO RTCOPYRIGHT 1015 CITY OF FORT WORTH Village Creek Water Reclamation Facility (VCWRF) "'AUTHORIZED REPRODUCTION IS A VIOLATION OF APPLICABLE IAM THIS DATA IS TO BE USED FOR A GRAPHICAL REPRESENTATION ONLY. THE ACCURACY IS NOT TO BE TAKEN/USEDAS DATA PRODUCED FOR Switchgear Improvements-Ph.1 Primary Area ENGINEERING PURPOSES OR BYAREGISTEREDPROFESSIONALIAND SURVEYOR THE WA•1,� FDR OF FOR OF SAID DATA.O RESPONSIBILITY f' 77 77777w City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on..1/9/2918 -Ordinanap"No. 23073-0.1-2018 $z;>:R�esolut�on 48.94-0172x18 DATE: Tuesday, January 9, 2018 REFERENCE NO.: C-28536 LOG NAME: 60VCWRF PRIMARY AREA SWITCHGEAR IMP - CONSTRUCTION SUBJECT: Authorize Execution of a Contract with Texsun Electrical Contractors, Inc., in the Amount of $10,765,692.31 for the Village Creek Water Reclamation Facility Primary Area Switchgear Improvements, Provide for Project Costs and Contingencies for a Total Construction Cost in the Amount of $11,200,000.00, Adopt Resolution Expressing Official Intent to Reimburse Expenditures with Proceeds of Future Debt and Adopt Appropriation Ordinance (COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached resolution expressing official intent to reimburse expenditures with proceeds of future debt for the Village Creek Water Reclamation Facility Primary Area Switchgear Improvements Project; 2. Adopt the attached appropriation ordinance increasing estimated appropriations in the Water and Sewer CP Fund in the amount of$11,200,000.00 and reducing the overall CP appropriation authority; and 3. Authorize execution of a contract with Texsun Electrical Contractors, Inc., in the Amount of $10,765,692.31 for the Village Creek Water Reclamation Facility Primary Area Switchgear Improvements. DISCUSSION: This construction contract will replace and/or rehabilitate critical electrical infrastructure that is corroded, obsolete, difficult to maintain, or unsafe to operate at the primary effluent pump stations, primary sludge pump stations, the bar screen buildings, and the generator distribution station. On May 17, 2016 (M&C C- 27720), the City Council awarded an Engineering Agreement with Gupta and Associates, Inc., for the Design of the Replacement, Removal and/or Modification of the Primary Area Switchgear at the Village Creek Water Reclamation Facility (VCWRF) which was amended one time providing additional funding for surveying, geotechnical investigation, and structural and electrical design. The project was advertised for bid on September 21, 2017 and September 28, 2017 in the Fort Worth Star-Telegram. On November 09, 2017 the following bids were received: Bidder 113ase Bid lContract Time Texsun Electrical F$1 ,765 692.31 548 Calendar Contractors Days ACME Electric $1 1,227,382.31 Company Logname: 60VCWRF PRIMARY AREA SWITCHGEAR IMP - CONSTRUCTION Page 1 of 3 Facility Solutions Group $11,435,192.31 In addition to the contract cost, the amount of$300,000.00 is required for project contingencies and $134,307.69 is provided for inspection, testing, project management and Staff time. Construction is anticipated to commence in February 2018, with a contract time of 548 calendar days, the project is estimated to be complete by Fall 2019. This project will have no impact on the Water Department's operating budget when complete. This project is anticipated to be included in a future revenue bond issue for the Water and Sewer Fund. Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation authority authorized under the Commercial Paper (CP) Program will be used to provide interim financing for this project until debt is issued. To the extent resources other than the Water and Sewer portfolio are used to provide interim financing, the Water and Sewer Fund will be charged interest that is equivalent to the overall rate of return being earned by the City portfolio (currently approximately one-percent annually). Should the City's portfolio not support the liquidity needed to provide an interim short-term financing source, another funding source will be required, which could mean issuance of securities under the CP Program or earlier issuance of Water and Sewer revenue bonds than is currently planned. Once debt associated with this project is sold, bond proceeds will be used to reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached reimbursement resolution. The City Council adopted the Water Department's Fiscal Year 2017-2021 Five Year Capital Improvement Plan on January 24, 2017, Mayor and Council Communication (M&C G-18927). This City Council adopted plan includes this specific project, with funding identified through the CP program to be reimbursed with future revenue bonds. In accordance with the provisions of the Financial Management Policy Statement, Staff anticipates presenting revenue-supported debt issuances to the City Council for consideration within the next three years. This debt must be issued within approximately three years to provide reimbursement for these expenses. If that does not occur, the costs will no longer be reimbursable by issuing tax-exempt debt and the funding source will have to be made whole through budgetary methods. Adoption of this resolution does not obligate the City to sell bonds, but preserves the ability to reimburse the City from tax- exempt bond proceeds. M/WBE OFFICE: Texsun Electrical Contractors, Inc., is in compliance with City's BDE Ordinance by committing to seven percent MBE participation. The City's MBE goal on this project is seven percent. The project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION /CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the Water and Sewer CP Fund for this project. The Water and Sewer CP Fund includes authority of$150,000,000.00 for the purpose of providing interim funding for Water and Sewer Capital Projects. After this transfer, the balance will be $114,825,529.00. Funding for this project is depicted in the table below: Fund Existing Future project Total* Appropriations[Appropriations 2016 Water and Sewer $612,800.00 $0.00 $612,800.00 Bond Fund 156005 lWater/Sewerl Logname: 60VCWRF PRIMARY AREA SWITCHGEAR IMP - CONSTRUCTION Page 2 of 3 4CP Fund $275,000.00 y$11,200,000.00 $11,475,000.00 156014 Project $887,800.00 $11,200,000.00 1$12 087 800.00 Total *Numbers rounded for presentation purposes. FUND IDENTIFIERS (FIDs): TO Fund Department ccoun Project Program ctivity Budget Reference # moun ID ID Year Chartfield 2 FROM Fund Department ccoun Project Program ctivity Budget Reference # moun ID ID Year Chartfield 2 CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Kara Shuror (8819) Additional Information Contact: Farida Goderya (8214) Logname: 60VCWRF PRIMARY AREA SWITCHGEAR IMP - CONSTRUCTION Page 3 of 3