Loading...
HomeMy WebLinkAboutContract 48949-AR1 FO RT WO RT H City of Fort Worth CITY SECRETARY _—� Construction Allowance Request CONTRACT NO. Project Namel Water and Sewer Contract 2011 WSM-A Part 1 City Sec No. 48949 Project_No.(s) 59601/59607-0600430/0700430-C01928-C1780 M&C C-28156 City Proj.No. 1928 Jrlir �" r_U�8 Water and Sewer replacement along Crooked Lane,Primrose Ave,Westbrook St.,N.Recta St.,Plumwood St.and Tof�-'on, Purington Avenue Contractor: Stabile&Winn, Inc. Allowance No: Date: 12/20/2017 City Project Mgr.1 R.Sauceda City Inspector: I Ryan Miller Phone Number: 817-392-2387 Phone Number: 817-397-8306 Dept. TPW Water Sewer Totals Contract Time (Calender days) Original Contract Amount $957,108.25 $1,833,484.50 $1,421,299.25 $4,211,892.00 405 Allowances to Date $0.00 $0.00 $0.00 Credits to Date $0.00 $0.00 $0.00 Pending Change Orders(in M&C Process) Contract Cost to Date $957,108.25 $1,833,484.50 $1,421,299-25 $4,211892.00 405 Amount of Proposed Allocation $30,800.00 $26,550.00 $14,800.00 $72,150.00 115 Revised Contract Amount $987,908.25 $1,860,034.50 $1,436,099.25 $4,284,042.00 520 Original Allowance Available for Allocation $50,000.00 S75,000.00 $50.000.00 $175,000.00 Allowance Funds Previously Allocated $5Q,000.00 $75,000.00 $50,000.00 $175,000.00 Remaining Funds Available for this Allocation Allowances to DATE(INCLUDING THIS ONE)AS``f OF ORIGINAL CONTRACT 0.00% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $5,264,865.00 _.. . .. . _,.. ,. . . . JUSTIFICATION(REASONS)FOR CHANGE ORDER This allowance will provide for the following: • Reconnecting two private sanitary sewer service lines • Connection to existing 12-inch water mains ORT • Installation of a 6-foot sidewalk adjacent to a 6-inch curbC. °""""° •.'!iO • Installation of topsoil behind back of curb . • Removal and replacement of a 4-foot diameter fiberglass manhole. U Staff recommends the approval of 115 additional calendar days in this allow ........p,$ M&C: 1295: k><, c Stacy Itis understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request. itractor Name Stabile&Winn, inc. ry Henderson 12 I 201 Date Prue 12121117 As ist nt Director ater Dept) Date Construction Supervisor Water Dept Date y 3, Assoont orUy Date Assistant City Manager Date WORM,TX tTlJr'gECRLRARY FO R T WO RT H City of Fort Worth Construction Allowance Request Project Name Water and Sewer Contract 2011 WSM-A Part 1 City Sec No. 1 48949 Project No.(s) 59601/59607-0600430/0700430-C01928-C1780 DOE No.= City Proj.No. 1928 Project Water and Sewer replacement along Crooked Lane,Primrose Ave,Westbrook St.,N.Retta St.,Plumwood St.and Description Purington Avenue Contractor Stabile&Winn,Inc. Allowance No: []�] Date: 1212012017 City Project Mgr. R.Sauceda City Inspector I Ran Miller CONSTRUCTION ALLOWANCE ITEMS TO BE ADDETED ITEM -DESCRIPTION DEPT Qty Unit Unit Cost Total 63 Salvage water meter at$125/EA for 46=$5,750.00 and Connec to existing 4-12 Water 0.3540 LS $75,000.00 $26,550.00 inch water main at$800/EA for 26 EA=$20,800.00 for total($26,550.00) 54 4-inch Private Sewer Services at S951LF for 60 LF 7$5,700,Plug 4nch Sewer Tee Sewer 0.2960 LS $50,000.00 $14,800.00 at$625/EA for 2 EA=$1,250,and Cut in 8 x 4 Tee sewer service at$925/EA for 2 EA=$1,850 and replace 4'Dia.Fiberglass manhole at$6,000/EA for 1 EA= $6,000.00 for total of($14,800.00) 22 Additinal sidewalk concrete at$2/SF for 2600 SF=$5,200,Sidewalk curb TPW 0.6160 LS $50,000.00 $30,800.00 at variable height at$12/LF for 500 If=$6000,topsoil at$28/CY for 700 CY _$19,600 for total of($30,800.00) TPW $30,800.00 Water $26,550.00 Sewer $14,800.00 Page 2 of 4 Additions Sub Total $72,150.00 FORT WoRT'H City of Fort Worth Construction Allowance Request Project Name Water and Sewer Contract 2011 WSM-A Part 1 City Sec No. 48949 Project No.(s) 59601/59607-0600430/0700430-C01928-C1780 DOE No. C-28156 City Proj.No, 1 1928 Project Description Water and Sewer replacement along Crooked Lane,Primrose Ave,Westbrook St.,N.Retta St.,Plumwood St.and Purin ton Avenue Contractor Stabile&Winn,Inc. Allowance No: FT-1 Date 12/20/2017 City Project Mgr, R.Sauceda City InspectorFRyan Miller CONSTRUCTION ALLOWANCE ITEMS TO BE DELETED ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total TPW Water Sewer Page 3 of 4 IDeletions Sub Total MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 FORT WORTH Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Roberto C. Sauceda,P. Name of Employee Water Department-Engineering Department Senior Professional En ig neer Title 817-392-2387 Phone /Z l Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, Tx WATER DEPARTMENT ENGINEERING AND FWAL SERVICE'S THE Crrr of Farr Womm * 1000 Twtommo row STREET * Foxr WOM,TE)W 76102 817-392,8240 * FAx 817-392-8195 a Printed on recycled p.per