_—� Construction Allowance Request CONTRACT NO.
Project Namel Water and Sewer Contract 2011 WSM-A Part 1 City Sec No. 48949
Project_No.(s) 59601/59607-0600430/0700430-C01928-C1780 M&C C-28156 City Proj.No. 1928
Jrlir �" r_U�8
Water and Sewer replacement along Crooked Lane,Primrose Ave,Westbrook St.,N.Recta St.,Plumwood St.and
Tof�-'on, Purington Avenue
Contractor: Stabile&Winn, Inc. Allowance No: Date: 12/20/2017
City Project Mgr.1 R.Sauceda City Inspector: I Ryan Miller
Phone Number: 817-392-2387 Phone Number: 817-397-8306
Dept. TPW Water Sewer Totals Contract Time
(Calender days)
Original Contract Amount $957,108.25 $1,833,484.50 $1,421,299.25 $4,211,892.00 405
Allowances to Date $0.00 $0.00 $0.00
Credits to Date $0.00 $0.00 $0.00
Pending Change Orders(in M&C Process)
Contract Cost to Date $957,108.25 $1,833,484.50 $1,421,299-25 $4,211892.00 405
Amount of Proposed Allocation $30,800.00 $26,550.00 $14,800.00 $72,150.00 115
Revised Contract Amount $987,908.25 $1,860,034.50 $1,436,099.25 $4,284,042.00 520
Original Allowance Available for Allocation $50,000.00 S75,000.00 $50.000.00 $175,000.00
Allowance Funds Previously Allocated $5Q,000.00 $75,000.00 $50,000.00 $175,000.00
Remaining Funds Available for this Allocation
Allowances to DATE(INCLUDING THIS ONE)AS``f OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $5,264,865.00
_.. . .. . _,.. ,. . . . JUSTIFICATION(REASONS)FOR CHANGE ORDER
This allowance will provide for the following:
• Reconnecting two private sanitary sewer service lines
• Connection to existing 12-inch water mains ORT
• Installation of a 6-foot sidewalk adjacent to a 6-inch curbC. °""""° •.'!iO
• Installation of topsoil behind back of curb .
• Removal and replacement of a 4-foot diameter fiberglass manhole.
U
Staff recommends the approval of 115 additional calendar days in this allow ........p,$
M&C:
1295: k><, c Stacy
Itis understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.
itractor Name
Stabile&Winn, inc. ry Henderson 12 I 201
Date Prue
12121117
As ist nt Director ater Dept) Date Construction Supervisor Water Dept Date
y 3,
Assoont orUy Date Assistant City Manager Date
WORM,TX
tTlJr'gECRLRARY
FO R T WO RT H City of Fort Worth
Construction Allowance Request
Project Name Water and Sewer Contract 2011 WSM-A Part 1 City Sec No. 1 48949
Project No.(s) 59601/59607-0600430/0700430-C01928-C1780 DOE No.= City Proj.No. 1928
Project Water and Sewer replacement along Crooked Lane,Primrose Ave,Westbrook St.,N.Retta St.,Plumwood St.and
Description Purington Avenue
Contractor Stabile&Winn,Inc. Allowance No: []�] Date: 1212012017
City Project Mgr. R.Sauceda City Inspector I Ran Miller
CONSTRUCTION ALLOWANCE ITEMS TO BE ADDETED
ITEM -DESCRIPTION DEPT Qty Unit Unit Cost Total
63 Salvage water meter at$125/EA for 46=$5,750.00 and Connec to existing 4-12 Water 0.3540 LS $75,000.00 $26,550.00
inch water main at$800/EA for 26 EA=$20,800.00 for total($26,550.00)
54 4-inch Private Sewer Services at S951LF for 60 LF 7$5,700,Plug 4nch Sewer Tee Sewer 0.2960 LS $50,000.00 $14,800.00
at$625/EA for 2 EA=$1,250,and Cut in 8 x 4 Tee sewer service at$925/EA for 2
EA=$1,850 and replace 4'Dia.Fiberglass manhole at$6,000/EA for 1 EA=
$6,000.00 for total of($14,800.00)
22 Additinal sidewalk concrete at$2/SF for 2600 SF=$5,200,Sidewalk curb TPW 0.6160 LS $50,000.00 $30,800.00
at variable height at$12/LF for 500 If=$6000,topsoil at$28/CY for 700 CY
_$19,600 for total of($30,800.00)
TPW $30,800.00
Water $26,550.00
Sewer $14,800.00
Page 2 of 4 Additions Sub Total $72,150.00
FORT WoRT'H City of Fort Worth
Construction Allowance Request
Project Name Water and Sewer Contract 2011 WSM-A Part 1 City Sec No. 48949
Project No.(s) 59601/59607-0600430/0700430-C01928-C1780 DOE No. C-28156 City Proj.No, 1 1928
Project Description Water and Sewer replacement along Crooked Lane,Primrose Ave,Westbrook St.,N.Retta St.,Plumwood St.and
Purin ton Avenue
Contractor Stabile&Winn,Inc. Allowance No: FT-1 Date 12/20/2017
City Project Mgr, R.Sauceda City InspectorFRyan Miller
CONSTRUCTION ALLOWANCE ITEMS TO BE DELETED
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
TPW
Water
Sewer
Page 3 of 4 IDeletions Sub Total
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
Co# DATE AMOUNT
Total $0.00
FORT WORTH
Contract Compliance Manager
By signing I acknowledge that I am the person responsible for the monitoring and administration of this
contract, including ensuring all performance and reporting requirements.
Signature
Roberto C. Sauceda,P.
Name of Employee
Water Department-Engineering
Department
Senior Professional En ig neer
Title
817-392-2387
Phone
/Z l
Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, Tx
WATER DEPARTMENT
ENGINEERING AND FWAL SERVICE'S
THE Crrr of Farr Womm * 1000 Twtommo row STREET * Foxr WOM,TE)W 76102
817-392,8240 * FAx 817-392-8195
a Printed on recycled p.per