Loading...
HomeMy WebLinkAboutContract 49985 Developer and Project Information Cover Sheet: Developer Company Name: Lackland Calmont LTD. Address, State,Zip Code: 3045 Lackland Rd.,Fort Worth,TX 76116 Phone&Email: 817-502-2539,dallen@lacklandholdings.com Authorized Signatory,Title: Don E.Allen,Secretary Project Name: The Trails of Marine Creek Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: SW Quadrant of Ferncreek Lane and Cascade Canyon Trail Plat Case Number: None Plat Name: None Mapsco: 46C Council District: 7 City Project Number: 100388 CFA Number: 2017-035 DOE Number: <DOE#> To be completed by staff.- Received by 01 Date: 7-1s City of Fort Worth,Texas �� G� co Standard Community Facilities Agreement-The Trails of Marine Creek t; \ G�G��GR� 14 CFA Official Release Date:01.03.2017 h G a Page 1 of 11 :'� it0V STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No._-H 9 Ot WHEREAS, Lackland Calmont LTD, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements")related to a project generally described as The Trails of Marine Creek ("Project") within the City or the extraterritorial jurisdiction of Fort Worth,Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project____ has been completed and the City has officially accepted the Improvements. Develo* nP.elo er's contrfurther acknowledges that said acceptance process re^"ir, c the act r City of Fort Worth,Texas FFICIAL RECORD Standard Community Facilities Agreement-The Trails of Marine Ci Pe CFA Official Release Date:01.03.2017 CITY SECRETARY Page 2 of 11 FT.WORTH,TX �, u 1 1404 6 $ to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ®, Sewer(A-1) ®, Paving (B) ®, Storm Drain(B-1) ®, Street Lights & Signs (C) Z. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-The Trails of Marine Creek CFA Official Release Date: 01.03.2017 Page 3 of 11 iii. To require the contractor(s)it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-The Trails of Marine Creek CFA Official Release Date:01.03.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City w for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-The Trails of Marine Creek CFA Official Release Date:01.03.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-The Trails of Marine Creek CFA Official Release Date:01.03.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1)does not boycott Israel; and(2) will not boycott Israel during the term of the contract. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-The Trails of Marine Creek CFA Official Release Date:01.03.2017 Page 7 of 11 Cost Summary Sheet Project Name: The Trails of Marine Creek CFA No.: 2017-035 City Project No.: 100388 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1 Water Construction $ 163,725.40 2.Sewer Construction $ 180,824.00 Water and Sewer Construction Total $ 344,549.40 B. TPW Construction 1 Street $ 341,749.69 2.Storm Drain $ 70,809.50 3.Street Lights Installed by Developer $ 48,396.00 4. Signals $ - TPW Construction Cost Total $ 4E O R-5519 9 Total Construction Cost(excluding the fees): $ 805,504.59 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 6,890.99 D. Water/Sewer Material Testing Fee(2%) $ 6,890.99 Sub-Total for Water Construction Fees $ 13,781.98 E. TPW Inspection Fee(4%) $ 16,502.37 F. TPW Material Testing(2%) $ 8,251.18 G. Street Light Inspsection Cost $ 1,935.84 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 26,689.39 Total Construction Fees: $ 40,471.37 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 805,504.59 Completion Agreement=100'1/Holds Plat $ 805,504.59 x Cash Escrow Water/Sanitary Sewer=125% $ 430 686.75 Cash Escrow Paving/Storm Drain=125`%e $ 576,193.99 Letter of Credit=125!o w/2yr expiration period $ 1,006,880.74 City of Fort Worth,Texas Standard Community Facilities Agreement-The Trails of Marine Creek CFA Official Release Date:01.03.2017 Page 8 of 11 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CI LOFFORT WORTH DEVELOPER Lackland Calmont,Ltd.,by Calmont GP,LLC, its General Partner J�444. Chapa Assistantty M a er Date: -LU( ? Na e: Don E. Allen Recommended by: Title: Secretary Date: ll Iq /7 Wendy Chi-Babul , EMBA, P.E. ATTEST: (Only if required by Developer) Development Engineering Manager Water Department 4:),L Cj, 'i Signature Douglas W. iersig, P.E. Name: Director Transportation &Public Works Department Contract Compliance Manager: Approved as to Form &Legality: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting Richard A. McCracken requirements. Assistant City Attorney M&C No. Date: --�� Form 1295: OF Title: ATTEST: V J► Mary J. ser City Secretary City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-The Trails of Marine Creek CITY SECRETARY CFA Official Release Date:01.03.2017 Page 9 of 11 FT.WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvements ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-The Trails of Marine Creek CFA Official Release Date:01.03.2017 Page 10 of 11 ATTACHMENT"I" Changes to Standard Agreement Community Facilities Agreement City Project No. 100388 None City of Fort Worth,Texas Standard Community Facilities Agreement-The Trails of Marine Creek CFA Official Release Date: 01.03.2017 Page 11 of 11 IE TRAILS OF MARINE CREEK SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COS 21 22 23 24 25 35 39 2,694 $ 24.00 564,656.00 2 $ 1,300.00 $2.600.00 3 $ 4,100.00 512,300.00 2 $ 3,300.00 $4,950.00 95 $ 810.00 $76,950.00 2 $ 1,000.00 $2.000.00 2,694 $ 0.10 $269.40 2,530 $ 3L00 578.430.00 80 S 40.00 53.200.00 9 S 2,500.00 S22,500,00 10 S 145.00 $1,479.00 9 S 110.00 $990.00 95 $ 700.00 S66,500.00 2,610 5 1.50 S3.915.00 2,610 S 1.00 52,610.00 2 S 600.00 S 1.200.00 2,536 1,343 2,132 2,785 8,796 S 31.29 5275.226.84 2.713 1,442 2,271 2,983 9,409 S 2.45 523.05"05 49 26.0 41 54 169.36 S 165.01 $27,944.40 1 I S 1.130.00 S'.I"0.00 1 I 685,140 5685.00 1 2 2 5 S 685A0 S? 6/22/2017 CFA PROJECT QUANTITY MATRIX ITEM NO. BID ITEM UNIT 3 4 5 6 1 8"Water Pipe LF 2.694 2 8" akc. EA 2 Fire Hydrant EA 3 4 Ductile Iron Water Fittings wi Restraint TON 2 5 I"Water Service EA 95 6 Crrnnection to Existing 4"-12"Water Main EY I rrnch Safcty LF 2.694 1 8"Sc++cr Pic LF 1.360 1,170 "Scwcr Pipc.C'S,Backfill LF 40 40 i 4'11anhole EA 5 4 4 4'Fx1ra I)ctrh Nlanholc VF 5 5 5 Manhoic Vacuum Tcstut", FA 5 4 6 4"SQ%%er S,:rvice EA 95 Po>1-CCIVInspection LF 2.610 8 Trench Safety LF 2.610 9 C onricct 1.1 Existing Sewer Line EA 2 1 6"(one Pt tut SY 2 6"Lime Trcatment SY 3 Hvdrated Lrnte TN 4 Barrier Frc2:Ramp.Type R-I EA 5 B<n'rier Free Ramp,Tv �:A1-I E4 6 Barrier Prcc Ramp. I�,:P-1 EA 7 Con l Std Strcct Hcadcr& In,.tall Barricade LF 8 -1raitic Control MO 4) Remove Sidewalk SF 1() RenmN c Coatc Curb&Gutter LF 1 1 6"Crm,:rctc Driveway SF 1' Install Alum Sten Ground Mount E4 1 2l" RCI'.C&ass 111 LF 2 24" R("I'.Class III LF 3 33" R(T,('Vass III LF 4 art" RCP.Class III LF 5 10'Curb Inlet EA 6 15'Curh Inlet E4 7 Modified 4'Drop Inlet EA 8 Trench Safely LF 9 Remove 4'Drop Inlet EA Furnishi"Install LED Lighting Fixture 70 watt ATBO Cobra Head) EA 2 Rdwv Ilium TY D-25-6 Pole EA 3 iRdwy Illum Foundation TY 4 E4 4 6-6-6 Triplex Alum Flec Conductor LF 5 2"CONDT PVC SCH 80(T) LF 00 42 43 DAP-BID PROPOSAL Page 2 of 2 SECTION 00 42 43 Developer Awarded Projects-PROP(:':'AL FORM UNIT PRICE BID Bidder's Application UNIT V:PAVING iMP'RRVEMENTS 1 3213.0101 6"Conc Pvmt 32 13 3 Sy 8,796 $31.29 527E 226.84 2 3211.0501 6"Lime Treatment 32 1' 29 SY 9.409 S245 $2 052.05 3 3211.0400 Hydrated Lime 32 I'25 TN 165.36 $1 G5 00 $21 944 40 4 3213 0501 Barrier Free Rarrp.Tyf1e R-1 32 13 20 EA 1 $1.130.00 $1 13000 5 3213 050: 5arrler Free Ramu, I voc M 1 32 13 20 EA 1 $685.00 5685.00 6 3213.050E Barrier Free Ramo.Type P-1 321326 EA 5 $6,85 00 $3 42.5 00 7 9999.0002 Construct Street Header 8 Install Barricade t10 00 00 Lf 29 $6500 S1,88500 8 3471.0003 Traffic C.onbra 34 71 13 L S 1 $2 500 00 $2,500.00 9 0241.0100 Remave Sidewalk 02 41 13 SL 560 $145 S81200 10 0241.1300 Rei OVe Conc Curb&Gutter 02 41 15 'LF 140 $800 $ i2000 11 3213 0401 6 COFicrete Driveway 32 1320 SF f 16 $965 $- 11940 12 3441 400E HSlall.Alum Sign Ground Mount 34 41 30 E.A. �6 - $475 00 $181,000 TOTAL UNIT V:PAVING IMPROVEMENTS $343,749.69 UNIT VI:STREET LIGHTING IMPROVEMENTS 1 3441.3050 FurnisWlnstall LED Lighting Fixt,re;70 wan A'60 Co:rre Head) 34.11 20 LA 12 $26800 $3,216.00 2 3441.3345 Rdwy Ilium TY D-25-6 I'crse 34 41 20 EA 12 $1.84400 $22,128.00 3 3441.3301 Rd"Ilium Foundation I r 4 34 41 20 EA 12 $1,096,00 $13,152.00 4 3441.3401 6-6-6 Triplex Alum Elec Coriducror 34,1 1 20 LF 825 $2.83 $2,334.75 5 2605.3015 2"CONDT PVC SCH 80 ET) 2E:75 33 LF 825 $9.17 $7,565.25 TOTAL UNIT VI:STREET LIGHTING IMPROVEMENTS1 $48,396.00 Bid,.nvrnan UNIT It:WATER IMPROVEMENTS $163,725.40 UNIT III:SANITARY SEWER IMPROVEMENTS $180,824,00 UNIT IV:STORM DRAIN IMPROVEMENTS $70,809,50 UNIT V:PAVING IMPROVEMENTS $341,749.69 UNIT VI:STREET LIGHTING IMPROVEMENTS W.396.00 -r ei t n.n untrue rt0 $805.504.59 Contractor&Vrm to complete WORK for FINAL ACCEPTANCE within calendar days after the date when the CONTRACT commences to ran as provided in the General Conditions. END OF SECTION CIT'OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 CFA Contract Ouentaies.rds 00 42 43 DAP-BID PROPOSAL Peg.1 of 2 SECTION 00 42 43 Developer Awarded Projects•PROPOSAL FORM UNIT PRICE BID Bidder's Application Pmicct Itan 1nfO atton Bkklces Propo. Bidlist Item Unit of Bid No. °" Speci6ation Section No. Measure QuantityUttit Price Bid Value UNIT I. WATER IMPROVEMENTS r61 3311.0261 8"PVC Water Pipe 3:i 1' ti2 LF 2,694 $24.00 $64.656.00 2 3312.3003 8"Gate Valve 33 12,20 EA 2 $1,300.00 $2,600.00 3 3312.0001 Fire Hydrant 33 1240 E. 3 $4,100.00 $12,300.00 4 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TN 1.520 $3,300.00 $4,950.00 5 3312. 03 1"Water Service 33 12 10 1 95 $810.00 $76,950.00 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 2 $1,000.00 $2,000.00 7 3305.0109 Trench Safety 33 05 10 211,694 $0.10 $269.40 TOTAL UNIT 11:WATER IMPROVEMENTS $163,725.40 NIT III:SANITARY SEWER IMPROVEMENTS 1 3331.4115 8"Sewer Pipe 33 11 10.33 3' '.2 33 31 20 LF 2,530_ $31 00 $78,430.00 2 3331.4116 8"Sewer Pipe,CSS Backfill 33 11 10,33 3, 12 33 3120 LF - 80 S,000 $3,200.00 3 3339.1001 4'Manhole 33 39 10.33 39 20 EA9 $2.500.00 $22,500.00 4 3339.1003 4'Extra Depth Manhole 1?3 39 10,33 39 20 VF 10.2 51'45.00 $1,479.00 5 3301.0101 Manhole Vacuum Testing 33 01 30 EA 9 $110 000 $990.00 6 3331.3101 4"Sewer Service 33 31 50 EA 95 $e0f,L,0' $66,500._00 7 3301.0002 Post-CCTV Inspection 33 01 31 LF 2,610, 5150 53,91500 8 3305.0109 Trench Safety 33 05 10 LF 2.610 5i OC 52.61."u 00 9 9999.0007 Correct to Existing Pipe 0:}00 00 EA 2 $600.00 $1,200-00 TOTAL KNIT III:SANITARY SEWER IMPROVEMENTS $180.824.00 UNIT IV.STORM DRAIN IMPROVEMENTS 1 3341.0201 21"RCP,Class III 3341 10 LF L39 61.00 $8,479.00 2 3341.0205 24"RCP,Class III 3341 10 LF 64 69.00 $4,416.00 3 3341.0305 33"RCP,Class III 3341 10 LF 32 11200 $3.584.00 4 3341.0309 36"RCP.Class 111 3341 10 LF 134 119.00 $15946.00 5 3349.5001 10'Curb Inlet 33 49 20 EA 5 3,40000 $17.000.00 6 3349 5002 15'Curb Intel 33 49 20 EA 3 4,600.00 $13,800.00 7 9999 0009 Modified 4'Drop Inlet 0000 00 F A 1 4,100.00 $4,100.00 8 3305 0109 Trench Safety 330610-- _ LF 369 0.50 $184.50 9 0241.4201 Remove 4'Drop inlet 02 41 14 EF 3 1,100.0 1 $3,300.00 OOT 1 UNIT IV:STORM DRAIN IMPROVEMENTS $70,809.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 CFA Contmet OuanOtieuds LAN_ SOF '.4s In 220 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 23 j e � aT3-433 r - - - - - - a Y4 I I 1 2 3 4 5 8 7 8 9 12 13 14 1�5 16 17 18 19 20 21 2 O wp O zs O 6 1-� 1 43 42 41 90 39 38 37 36 35 32 31 90 29 28 27 26 25 24 23 22 ' \ ou 00 1 29 I 1 23 22 1 21 20 19 18 17 a 11 10 9 8 1 8 5 4 3 2 WU Oi i 1 oR ST a REEK -[10NRRGN — G N E CNR,NR RR K R IS RN E ST1 Z�\NE�RE I � I r LEGEND - i . PROPOSED STREET NAME SIGNS - - - CRQMWELLcpARINE GREEK ROAD _ -_. J - 0 EXIST STREET NAME SIGNS EXHIBIT Cl - STREET NAME SIGNS THE TRAILS OF OWNER/DEVELOPER: 1191 PELOTON o �eTM 200' VLMC, INC. 1111 LAND LAY!SOLUTION{ MARINE CREEK 9800HILLWOOD PKWY 250 3045 LACKLAND ROAD SUITE 250 FORT WORTH, TX 76116 KELLER,TX 76177 GRAPHIC SCALE DATE:JANUARY 2017 (817)502-2539 PHONE:817-562-3350 RP1 sp � F(RNEF2EEK LAME T T__— — \ OF MARN�G 0 0 W I 20 19 18 17 16 75 18 13 12 11 10 9 B 7 8 3 4 3 2 7 21 i ATL M-UN AI- T IL 23 l a 24 1 I 1 2 3 4 5 6 7 8 9 10 11 12 73 14 75 18 17 18 19 20 21 L z O o G)25 u,• I 43 42 41 40 39 38 37 36 35 34 33 32 37 30 29 28 27 28 25 24 23 22 '•`, \�$ i I i 27 J. LIF D — .J ,< i W I 29 I I 222 20 118 15 14 13 9 8 7 6 5 000 it 3 21 9 ` w _.. 18 17 12 11 10 d 3_. _. 2 . .. _. MIX O U> � on, J ! Y.MPRI�EGREEK µC-K RG�SSt Ftl (N I BROApW ROPO'� � k I 1 LEGEND ; • PROPOSED STREET LIGHTS V EXIST STREET LIGHTS EXHIBIT C - STREET LIGHTS 200' THE TRAILS OF OWNER DEVELOPER: liixl PELOTON MARINE CREEK VLMC98, iNc. "� 9800 HILLWOOD PKWY 3045 LACKLAND ROAD su1rE 250 FORT WORTH, TX 76116 KELLER,TX 76177 GRAPHIC SCALE DATE:JANUARY,2017 (817)502-2539 PHONE:817-62-3350 'r IN — — FERIVCF2EEtZ LAME---__---------1,, ,�1 �� W I 2\1n 19 1e 17 16 1s 14 13 12 11 10 a e 7 6 s 4 f INLETS �q0o 36"RCP �1 21"RCP p�' 22 -- --- -- •- -- ••— -- --- -- --- -- -- -- --- -- ---�--,_ - 36"RCP 1 I' 2-10'INLETS 21"RCP z3 1 ( 10MITT 24"RCP--l" " 1 2a I 1 2 3 4 5 6 7 e 9 10 11 12 13 14 16 16 17 18 19 20 21 0 � �Fd O �3 24 23 22 \ '7� 1-+ 1 43 42 41 40 39 38 37 36 35 3433 32 31 30 29 29 27 26 25 2-15'INLETS �`\ _ 24"RCP ! l- — — — — — J 21"RCP - -- --- -- --- -- --- -- -- I• � d 2-10'INLETS 33"RCP• �' 1 U J,y I za �'-- R D CIS d N — — - - \ 21"RCP 21"RCP GQ - I zs 1 l zs zz 21 20 1s 1a n 'TIT 1a 1s 12 11 10 a e 7 s s a s 2 1 �.� - 3 ULa 1— ---•---1..1... ._ ._. —�-1. —.. .. .- -- --- -- •-- —. —.. .. .. .. ..— � •—• 16.1CL 1x... �}°_•.' pQ�. pLu 1-5'DROP 36"RCP ) INLET } on pY-MPRj E CR��K INS GNRPST P PCµuR N •(NE,��`�F,—�� Giz^PD �oPO• ifixgl\N I I I LEGEND —� PROPOSED STORM DRAIN INLET EXIST STORM DRAIN STRUCTURES _ QMWEL-L-MARINE CREEK RO-AD------------------------- PROPOSED ------------ _-_--_--_-- PROPOSED STORM DRAIN HEADWALL - - EXHIBIT B1 - STORM DRAINAGE OWNER/DEVELOPER: 1;111 PELOTON THE TRAILS OF 1111, o �*„ zoo' VLMC, INC. MARINE CREEK 9600SUITEHILLWOOD250 3045 LACKLAND ROAD SUITE 250 FORT WORTH, TX 76116 KELLER'TX 76177 GRAPHIC SCALE DATE:JANUARY,2017 (817)502-2539 PHONE:617562-3350 - .. -- -----------_....--- .. .... ------__ ----------- -_ .. t t>5OK - ----------i - - RPt�so FERNGREEK�LAhIE T- - - - -i c'f i tHE d•RE�- - --- -- - PNO 21 20 19 18 1�T 16 15 14 13 1 12 11 10 9 B 7 6 5 I 4 I 3 2 1 a�' J TRA W I 21 11I II,— —_ r— /t �`s I ht �_...— T_'-T- —_... ——— \ J�..I LUo II W U d J I I` 1 2 3 4 5 6 7 B 9 f0 ti 12 13 ib 15 16 1T 18 79 20 21 wa� I O oW p025 ; ; O O Z W W W F W 43 42 41 40 38 37 36 35 34 33 32 31 30 29L2. 2T 26 25 24 23 22 \ Oa Y f 27 .I 23 -- ---------1 I -- ---- __---_ __--- - --- - ' t d 29 II II 23 22 21 ZO 19 18 1] 18 16 14 13 12 11 10 9 8 7 fi 5 4 3 2 1 11 tl O 0 1 i i EK NP�NURCH t _I �yl.—OF pApRtNEGR� �NtERRgS1PNG R iHEt�GREEK I I LEGEND I i 29'B-B 150'ROW(TYP) ' ------- SIDEWALK BYHOMEBUILDER __GRQNIVyeLL-MARINE CREEK ROAD-___ ------J 1__ OH.C.RAMPS BY DEVELOPER J EXHIBIT B - PAVING THE TRAILS OF OWNER/DEVELOPER: Iilli PELOTON 0 200 VLMC, INC. 00 1— MARINE CREEK 9800 HIPKWY 3045 LACKLAND ROAD SUITEUITE 25 250 FORT WORTH, TX 76116 KELLER'TX 76177 GRAPHIC SCALE DATE:JANUARY,2017 (817)502-2539 PHONE:817-562-3350 -------- ---- -- ................... ----------- ---------------------------------__ --------' -------------------------------------6 T04C--------Q t — — — — --------- — — — — — — � F(=RNCREEI�LAME— � �Ott\t \ �R\�'GFtE�K ZO 19 t8 17 18 15 14 13 12 11 10 9 8 7 -6 S O4 7 2 1�•\�\ `\.� 21 )l I _ ® O a za I I t Oz 22 a a 5 6 7 a 9 10 11 12 13 14 1�5 16 77 1a 18 20 21 NN?O� O O \ \� � I 43 42 41 10 39 39 37 38 35 34 33 J2 71 30 29 28 27 28 25 24 23 22 ••, • i 2'A - -- -- - - - - - - - - - �•2 f0�"0� r - - -R [5" "'T 1 tS Vte U C' I 29 I I 23 22 21 20 18 18 17 18 15 14 17 12 11 10 9 8 7 8 5 4 3 2 1 y\ wO UJ - L --._..1. _ •— — — — — •— • •• ••— — —• _. �.. .. o>" Z 1 p 00 j RVEgt � F WAY"MPR�E CREEK 1NS GNR SSO�PCS RCS ��� ,,ROAD ROAD Y}�� -0DI W LEGEND I T PROPOSED SEWER LINES -__. EXIST SEWER LINES NOTE:ALL PROPOSED SANITARY SEWER - CR_QMWELL-MARINE CREEK ROAD LINES ARE 8"UNLESS OTHERWISE NOTED EXHIBIT Al - WASTEWATER IT THE TRAILS OF OWNER DEVELOPER: iiiff PELOTON 0 200 MARINE CREEK VLMC, INC. T """ ® 9800 HILLWOOD PKWY 3045 LACKLAND ROAD sulrE 250 FORT WORTH, TX 76116 KELLER,TX 76177 GRAPHIC SCALE DATE:JANUARY,2017 (817)502-2539 PHONE:817-562-3350 - 1r I EXB"W -----= -1 D.O.E.4094 p 1 LS of MITNCREEFQ LAME- ,, - - -� %\ OF MP NE, i d �RXNs cf' \Q ui i 2 \ 20 19 18 17 18 15 14 13 12 11 10 9 6 7 8 5 I 3 2 1 •,'1 \\%> \\1 22 a24 2 3 4 5 6 7 8 9 10 11 12 13 14 15 18 17 18 19 20L \�„OCO \`43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 '``' �1. \. 27 L)C-) U j-Vt`( 29 I I 23 22 21 20 18 18 17 �.1497j. W> i. ._.._. 1..- _ _ - 18 _ ._. _. _.. .. .. �� 11 0> d Zw d 00. I; LEGEND PROPOSED GATE VALVE BROW R�DRQ 1NT�HRS�PN cHP`NgiCREF' I. I II ---[)Q--- EXIST GATE VALVE 6 I, I' PROPOSED FIRE HYDRANT r I EXIST FIRE HYDRANT - - - - - - - - J J -- -- ----_CRQMVIELL-MARLN CREEK ROAD --------- ---------- NOTE:ALL PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE NOTED ----------`-------------------- - - EXHIBIT A - WATER ... .............................................................. THE TRAILS OF OWNER DEVELOPER: IMI PELOTON 0 �A7N 200' VLMC, INC. 1l `". MARINE CREEK 9800 HDPKWY SUITE 2 3045 LACKLAND ROAD SUITE 250 FORT WORTH, TX 76116 KELLER,TX 76177 GRAPHIC SCALE DATE:JANUARY,2017 (817)502-2539 PHONE:817.562-3350 W McLEROY BLVD m CROMWELL-MARINE CREEK RD �Rn SAGINAW u A w of SITE P LONGHORN RD �a 2.8.7 O q�i< "EIV MI(E 20 m UP$IO U ao p �51�00 J m O AZLE AVE LAKE WORTH y L� 199 SANSOM PARK THE TRAILS OF OWNER DEVELOPER: PELOTON MARINE CREEK VLMC, INC. 80 "LWOODWA NORTH 9800 HSUIITE ODOPKWY NOT TO SCALE FORT OR H NTX 7761D16 KELLER.TX 76177 DATE:JANUARY,2017 (817)502-2539 PHONE:817-562-3350