Loading...
HomeMy WebLinkAboutContract 47874-CO1 (3) FORT WORTH® City of Fort Worth CITY SECRETARY Change Order Request Breakdown CONTRACT NO. 41R_7L�— i' I Project Name 2014 CIP YEAR 2 CONTRACT 4 STREET REHAB City Sec# 1 47874 Client Project#(s)l CPN 100181 Contractorl Advance Paving PM Kristian Surgrim Inspector Roy Scharfenberg Change Order Submittal# 0 Date 5/31/2017 Contract Time Dept. T/PW Totals CQ Original Contract Amount $3,771,301.80 $3,771,301.80 310 Extras to Date $0.00 Credits to Date 50.00 Pending Change Orders(in M&C Process) Contract Cost to Date $3,771,301.80 $3,771,301.80 310 Amount of Proposed Change Order $98,341,27 $98,341.27 20 Revised Contract Amount $3,869,643.07 $3;869,643.07 330 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $98,341.27 $98,341.27 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.61 MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,714,127.25 JUSTIFICATION(REASONS)FOR CHANGE ORDER The requests on this change order are to allocate additional funding for the lowering of the street lighting conduits on Harrison Ave.and South Henderson St.,as well as for the sidewalk installation and tree removal on Buck Ave.and Mistletoe Ave.Therefore,an additional 20 days are being added to the contract to compensate for these added activities. P OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX FORT WORTH City of Fort worth *I--- Change Order Additions Project Name 1 2014 CIP YEAR 2 CONTRACT 4 STREET REHAB City Sec# 47874 Client Project# QTPN 100181 Contractorl Advance Paving PM Kristian Surgrim Inspector Ray Scharfenberg Change Order Submittal# Date 5I31I2017 ADDITIONS rnUnl- 38 amson ve reet Lighting Conduit Lowering 7 Concrete,Sidewalk(MistleToe&Buck AveSidewalk) TIPW 4,916.86000000 F Remove !ewalk TIPW 6. F $T?.' i� 711 3South Henderson Street Lighting Foundation Lowering IPW 0L 4,71 .1 TIPW $98,341.27 Sub Total Add-itons Change Order Additions Page 1 of 1 FORTWORTH City of Fort Worth — v-1— Change Order Deletions Project Name 1 2014 CIP YEAR 2 CONTRACT 4 STREET REHAB City Sec# 47874 Client Project# I CPN 100181 Contraclorl Advance Paving PM Kristian Sufgrim Inspector Roy Scharfenberg Change Order Submittal# Date 5/3112017 DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total T/PW $0.00 Sub Total Delebons Change Order Deletions Page 1 of 1 MISBE Breakdown for this Change Order MISBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 CFW Change Order Approval St-COApp02 Page 1 of 4 Routing Assigned To: Due Date: Assigned By: Due Time: Links 2 Fortworthgov/Infrastructure Proiects/100181 - 2014 CIP Year 2 - Contract 4/Contractor/Change Orders/Change Order Breakdown #1 Rev2 (002).xls Fortworthgov/Infrastructure Proiects/100181 - 2014 CIP Year 2 - Contract 4/Contractor/Change Orders/MBE- APCF 100181.odf Attachments(01 No Attachments have been added to this fonn. https://projectpoint.buzzsaw.com/ bz web/Forms/FomiPrint.aspx?SiteId=51500&Processld... 1/9/2018 CFW Change Order Approval St-COApp02 Page 2 of 4 FORTWORTH'. city of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: Change Order No.:rSt-WAPp02 Date Started: 2017-06-30 City Sec. No.: Date Due: 2017-08-19 Project Name: 1100181 - 2014 CIP Year 2 - Contract 4 Street Rehabilitation Project Numbers: DOE Numbers: Project Removal and replacement of non-functional curb & gutter, Description: driveways and sidewalk; pulverization and stabilization of the existing pavement, followed by a 3" HMAC overlay. Project Manager: Kristian Sugrim City Inspector: lRoy Scharfenberg Contractor: JAdvanced Paving Acquisition, Ltd. COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: _ _ $ 93,341.27 Total Cost:l$ 98, 43 143 1 27 Total Requested Days: Approval Status: https://projectpoint.buzzsaw.com/ bz web/Forms/FomiPrint.aspx?SiteId=51500&ProcessId... 1/9/2018 CFW Change Order Approval St-COApp02 Page 3 of 4 Approved: Yes Comments: User: Matt for Brandy Crane Monedero Date: 2017-07-03 9:57 AM Approved: Yes Comments: User: Becky Garrett Date: 2017-07-05 2:16 PM Approved: Yes Comments: User: Kristian Sugrim Date: 2017-07-05 4:37 PM Approved: Yes Comments: User: Najib Fares Date: 2017-07-05 5:01 PM Approved: Yes Comments: User: Najib Fares Date: 2017-07-06 9:23 AM Approved: Yes Comments: User: Kim Arnold Date: 2017-07-10 2:38 PM Approved: Yes Comments: User: Doug Wiersig . 4 Date: 2017-07-12 2:50 PM FORT Attested Approved: Yes _ Comments: * , User: Doug Black Date: 2017-07-12 3:04 PM J. K" �. it _ecre T�y,PS Approved: Yes m&C.__.L� Comments: 'YI V User: Jay Chapa Date: 2017-07-12 5:11 PM 1'5..�.�____ OFFICIAL RIGQRD. C11TV so FT.WORTH, Tl( https://projectpoint.buzzsaw.com/ bz_web/Forms/FonuPrint.aspx?SiteId=51500&ProcessId... 1/9/2018 CFW Change Order Approval St-COApp02 Page 4 of 4 Action Required: https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 1/9/2018 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Kristian Sugrim / ka ` Name of Employee/Signature Project Manager Title This form is N/A as No City Funds are associated with this Contract Kristian Su rim Printed Name Signat re OFFICIAL RECORD CITY SECRETARY FT.WORTN,TX