Project M2m8e PROJECT MANUAL
FOR
THE CONSTRUCTION OF
2014 CIP, YEAR 3 — CONTRACT 2
GEDDES AVENUE HOUGHTON AVENUE
HORNE ST.TO BOURINE AVE. HORNE ST.TO COMO PARK CIR.
WELLESLEY AVENUE FLETCHER AVENUE
PREVOST ST.TO MERRICK ST. FARON ST.TO HERVIE ST.
GOODMAN AVENUE FARNSWORTH AVENUE
PREVOST ST.TO DEADEND OF ST. HORNE ST.TO FARON ST.
PREVOST STREET
FARNSWORTH DR.TO HLJMBERT DR.
City Project No. 02693
Betsy Price David Cooke
Mayor City Manager
Kera Shuror
Acting Director, Water Director
Douglas W. Wiersig, P.E.
Director, Transportation and Public Works Department
Prepared for
The City of Fort Worth
r PSE OF rFk\t WATER DEPARTMENT
9S &
*<<t TRANSPORTATION AND PUBLIC WORIKS
00
01............... ......... .....E OFFiCIA,L RECORD
I MO SHAMSUL AREFIN
t� 83867 .... .. CITY SECRETARY
,''0� �cl:►�s�a F'�f 2017 FT,WORTH,TX1\\�S�ONAL ~ '`
�i
STREAM WATER GROUP, INC.
` ENGINEERS & PLANNERS
6737 Brentwood Stair Rd.,Ste,230
Fort Worth,Texas 76112
Phone:800-446-8076
TX Registration No.F-005488
FORT WORTH
PROJECT MANUAL
FOR
THE CONSTRUCTION OF
2014 CIP, YEAR 3 — CONTRACT 2
GEDDES AVENUE HOUGHTON AVENUE
HORNE ST.TO BOURINE AVE. HORNE ST.TO COMO PARK CIR.
WELLESLEY AVENUE FLETCHER AVENUE
PREVOST ST.TO MERRICK ST. FARON ST.TO HERVIE ST.
GOODMAN AVENUE FARNSWORTH AVENUE
PREVOST ST.TO DEADEND OF ST. HORNE ST.TO FARON ST.
PREVOST STREET
FARNSWORTH DR.TO HUMBERT DR.
City Project No.02693
Betsy Price David Cooke
Mayor City Manager
Kera Shuror
Acting Director, Water Director
Douglas W. Wiersig, P.E.
Director,Transportation and Public Works Department
Prepared for
The City of Fort Worth
WATER DEPARTMENT
*tkr TRANSPORTATION AND PUBLIC WORKS
MD SHAMSUL AREhN
83867
t/cENs�O �,� 2017
1OVAL E \
/,- STREAM WATER GROUP, INC.
ENGINEERS & PLANNERS
6737 Brentwood Stair Rd.,Ste.230
Fort Worth,Texas 76112
c
Phone:800-446-8076
TX Registration No.F-005488
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 11/7/2017 - Ordinance No. 22990-11-2017
DATE: Tuesday. November 7, 2017 REFERENCE NO.: C-28469
LOG NAME: 202014 CIP YEAR 3 CONTRACT 2 - JLB
SUBJECT:
Authorize Execution of Contract with JLB Contracting, LLC, in the Amount of$3,377,262.15 for 2014
Capital Improvement Project Year Three Contract No. 2, Combined Street Paving Improvements and
Water and Sanitary Sewer Main Replacements and Adopt Appropriation Ordinance (2014 BOND
PROGRAM) (COUNCIL DISTRICT 3)
RECOMMENDATION:
It is recommended that the City Council:
1, Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water Capital Fund in the amount of$2,101,536.00 from available funds; and
2. Authorize execution of a contract with JLB Contracting, LLC, in the amount of$3,377,262.15 for 2014
CIP Year Three Contract No. 2, Combined Street Paving Improvements and Water and Sanitary Sewer
Main Replacements (City Project No. CO2693).
DISCUSSION:
This Mayor and Council Communication (M&C) is to authorize a construction contract for water and
paving improvements on approximately 3.55 lane miles in the Como Neighborhood on the streets listed
below:
Street From To
rGeddes Street Horne Street Bourine Street
Houghton Avenue F— Horne Street Como Park Drive
'Nellesley Avenue F- Prevost StFCef-I Merrick Street
Fletcher Avenue F— Faron Sireet-1 Hervie Street
Goodman Avenue Prevost Street I Dead End
Farnsworth Avenue F Horne StFeet-1 Faron Street
;Prevost Street Farnsworth Avenue I Humbert Avenue
The Transportation and Public Works Department's share on these contract improvements will be
$1,629,261.10 which is available in the Street Improvement Certificate of Obligation Residuals Fund, 2008
Bond Program Residuals and 2014 Bond Program Funds (CPN CO2693). The Water Department's share
on this contract, $1,748,001.05 is available in the Water Capital Fund of the project (CPN CO2693).
The project was advertised for bid on July 20, 2017 and July 27, 2017 in the Fort Worth
Star-Telegram. On August 24, 2017, the following bids were received:
Lo,Qname: 202014 CIP YEAR 3 CONTRACT 2 - JLB Page 1 of 3
Bidder I Amount Time of Completion
PLB (contracting, LLC F—$3,377262. 5 F-Soo Calendar Days
cClendon Company, Inc. 44 50 F
Packson Construction Ltd. $4.3,94.463.50
7Stabile & Winn, Inc F— 4.576.377.20
;FNH Construction, LLC C $$4,,654,912.00
In addition to the contract amount, $514,190.00 (Water: $266,134.00; TPW: $248,056.00) is required for
project management, material testing and inspection and $168,864.00 (Water: $87,401.00; TPW:
$81,463.00) is provided for project contingencies.
This project will have no impact on the Transportation and Public Works annual operation budget nor on
the Water Department's operating budget when completed. Construction is expected to start in January
2018.
A portion of this project will include 2014 Bond Funds. Available resources within the General Fund will be
used to provide interim financing for these expenses until debt is issued. Once debt associated with this
project is sold, bond proceeds will reimburse the General Fund in accordance with the statement
expressing official intent to reimburse, that was adopted as part of the ordinance canvassing the bond
election (Ordinance No. 21241-05-2014) and subsequent actions.
M/WBE OFFICE - JLB Contracting, LLC, is in compliance with the City's BDE Ordinance by committing to
seven percent MBE participation. The City's MBE goal on this project is seven percent.
The project is located in COUNCIL DISTRICT 3.
FISCAL INFORMATION /CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget as appropriated of
2008 Bond Program Residuals, Street Improvement COs Residuals and 2014 Bond Program Fund and
upon approval of the above recommendations and adoption of the attached appropriation ordinance,
funds will be available in the current capital budget, as appropriated, of the Water Capital Fund. The
Fiscal Year 2018 Water Operating Budget includes appropriations of$29,069,236.00 for the purpose of
providing Pay-As—You-Go funding for Water Capital Projects. After this transfer for Fiscal Year 2018, the
balance will be $26,817,700.00.
FUND IDENTIFIERS (FIDs):
TO
Fund Department ccoun Project �Program�Activityl Budget Reference # moun
ID ID j ; Year (Chartfield 2)
FROM
Fund Department ccoun Project
11?rograTctivity! Budget Reference # mount!
ID ID Year (Chartfleld 2
CERTIFICATIONS:
Submitted for City Manager's Office by: Jay Chapa (5804)
Logname: 202014 CIP YEAR 3 CONTRACT 2 - JLB Page 2 of 3
Originating Department Head: Douglas Wersig (7801)
Additional Information Contact: Mary Hanna (5565)
ATTACHMENTS
1. 202014 CIP Year 3 Contract 2 - JLB FID Table.xlsx (CFW Internal)
2. 202014 CIP YEAR 3 CONTRACT 2 - JLB 20 AO 18.docx (Public)
3. 202014 CIP YEAR 3 CONTRACT 2 ComplianceMemo.pdf (CFW Internal)
4. 202014 CIP Year 3-Contract 2 JLB - 1295 form.pdf (Public)
5. 202214CIPYEAR3CONTRACT2-JLB Map01.pdf (Public)
6. SAM search Results.pdf (CFW Internal)
Logname: 202014 CIP YEAR 3 CONTRACT 2 - JLB Page 3 of 3
CERTIFICATE OF INTERESTED PARTIES FORM 1295
Complete Nos.1.4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number:
of business. 2017-264341
JLB Contracting,LLC
Fort Worth,TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 09/22/2017
being filed.
City of Fort Worth Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identity the contract,and provide a
description of the services,goods,or other property to be provided under the contract.
02693
2014 CIP Year 3,Contract 2
Nature of interest
4
Name of Interested Parry City,State,Country(place of business) (check applicable)
Controlling I Intermediary
Davis, Sam Fort Worth,TX United States x
Cabaza,Aaron Austin,TX United States X
5 Check only if there is NO Interested Party, El
6 AFFIDAVIT I swear•or affirm,under penalty of periury,that the above disclosure is true and correct.
JAMIE GREENWAY
`=� rP %, Notary Public,State of Texas
Comm.Expires 09-25-2020 "
,... t�
Notary IC 12116454 Signature of authorized agent of contracting business entity
AFFIX NOTARY STAMP 1 SEAL ABOVE
Sworn to and su s ribed before me,by the said µ this 17H+v �S the day
of
20��,to r-fy which,witness my hand and seal of office.
igna(ure of ffrcer administ Ing 96th Printed name of officer adminis ering oath Titie of offs er ministering oath
For tproided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.3337
FORTWORTH
City of Fort Worth
Standard Construction Specification
Documents
Adopted September 2011
000000-1
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 1 of 6
SECTION 00 00 00
TABLE OF CONTENTS
Division 00-General Conditions
0005 10 Mayor and Council Communication
0005 15 Addenda
0011 13 Invitation to Bidders
0021 13 Instructions to Bidders
0035 13 Conflict of Interest Affidavit
00 41 00 Bid Form
00 42 43 Proposal Form Unit Price
0043 13 Bid Bond
00 43 37 Vendor Compliance to State Law Nonresident Bidder
0045 11 Bidders Prequalifications
0045 12 Prequalification Statement
0045 13 Bidder Prequalification Application
00 45 26 Contractor Compliance with Workers'Compensation Law
00 45 40 Minority Business Enterprise Goal
0045 41 Small Business Entefpr-ise Geal
00 52 43 Agreement
0061 13 Performance Bond
0061 14 Payment Bond
0061 19 Maintenance Bond
00 61 25 Certificate of Insurance
00 72 00 General Conditions
00 73 00 Supplementary Conditions
Division 01 -General Requirements
01 1100 Summary of Work
01 25 00 Substitution Procedures
01 31 19 Preconstruction Meeting
01 3120 Project Meetings
01 3216 Construction Progress Schedule
01 3233 Preconstruction Video
01 33 00 Submittals
01 35 13 Special Project Procedures
01 45 23 Testing and Inspection Services
01 50 00 Temporary Facilities and Controls
01 55 26 Street Use Permit and Modifications to Traffic Control
0157 13 Storm Water Pollution Prevention Plan
0158 13 Temporary Project Signage
01 60 00 Product Requirements
01 66 00 Product Storage and Handling Requirements
01 70 00 Mobilization and Remobilization
01 71 23 Construction Staking and Survey
01 74 23 Cleaning
01 77 19 Closeout Requirements
01 78 23 Operation and Maintenance Data
01 78 39 Project Record Documents
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised February 2,2016
000000-2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 2 of 6
Technical Specifications which have been modified by the Engineer specifically for this
Project; hard copies are included in the Project's Contract Documents
Division 02-Existing Conditions
0241 15 Paving Removal
Division 03-Concrete
NONE
Division 26-Electrical
NONE
Division 31-Earthwork
NONE
Division 32-Exterior Improvements
NONE
Division 33-Utilities
NONE
Division 34-Transportation
NONE
Technical Specifications listed below are included for this Project by reference and can be
viewed/downloaded from the City's Buzzsaw site at:
hips://proj ectvoint.buzzsaw.com/cl ient/fortworthgov/Resources/02%20-
%20Construction%2ODocuments/Specifications
Division 02-Existing Conditions
0241 13 Selective Site Demolition
0241 14 Utility Removal/Abandonment
0241 15 pa-Afig Removal
Division 03-Concrete
03 30 00 Cast-In-Place Concrete
03 34 13 Controlled Low Strength Material(CLSM)
03 34 16 Concrete Base Material for Trench Repair
03 80 00 Modifications to Existing Concrete Structures
Division 26-Electrical
2605 10 Demolition fer.Pleetripal Systems
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised February 2,2016
000000-3
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 of 6
Division 31 -Earthwork
31 1000 Site Clearing
3123 16 Unclassified Excavation
31 23 23 Borrow
312400 liii baf
31 25 00 Erosion and Sediment Control
313609 Germs
M 37 00 Ripffip
Division 32-Exterior Improvements
3201 17 Permanent Asphalt Paving Repair
3201 18 Temporary Asphalt Paving Repair
32 01 29 Concrete Paving Repair
32 11 23 Flexible Base Courses
32 11 29 Lime Treated Base Courses
32 1133 Cement Treated Base Courses
32 11 37 Liquid Treated Soil Stabilizer
32 12 16 Asphalt Paving
32 12 73 Asphalt Paving Crack Sealants
3213 13 Concrete Paving
32 13 20 Concrete Sidewalks,Driveways and Barrier Free Ramps
32 1373 Concrete Paving Joint Sealants
32 14 16 Brick Unit Paving
32 16 13 Concrete Curb and Gutters and Valley Gutters
32 17 25 Curb Address Painting
3231 13 Chain Fences and Gates
32 31 26 Wire Fences and Gates
32 31 29 Wood Fences and Gates
32 32 13 Cast-in-Place Concrete Retaining Walls
3291 19 Topsoil Placement and Finishing of Parkways
32 92 13 Hydro-Mulching,Seeding,and Sodding
32 93 43 Trees and Shrubs
Division 33-Utilities
33 N 30 Sewer.aftd Manhole Testing
330410 -39ii34_Rvixaiag-R •7 >rle..*.iAfll I..AIRt19a
y
33 04 11 veFf6si6irG01 rFeSt&Rti9as
3304 12 Magnesium Anode Gothedie Prefeetion Systemin
33 04 30 Temporary Water Services
33 04 40 Cleaning and Acceptance Testing of Water Mains
3304 50 Gleeaiag of SeAw Mains
3305 10 Utility Trench Excavation,Embedment,and Backfill
3305 12 Water Line Lowering
3305 13 Frame,Cover and Grade Rings
3305 14 Adjusting Manholes,Inlets,Valve Boxes,and Other Structures to Grade
3305 36 Gererete`-;4er-Vamits
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised February 2,2016
000000-4
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 4 of 6
3305 17 Concrete Collars
330520 Auger-Ber-ing
33-05-:21 Tu ff fiel T; Dl..se
33 05 22 Steel Casing Pipe
33 05 23 Hand Tunneling
Liner-
330526 Utility Markers/Locators
33 05 30 Location of Existing Utilities
33 1105 Bolts,Nuts,and Gaskets
33 11 10 Ductile Iron Pipe
33 11 11 Ductile Iron Fittings
33 11 12 Polyvinyl Chloride(PVC)Pressure Pipe
33 11 13 Cener-ete RFessum Pipe,Bar-W+apped,Steel G�4ioder-:Fyp
33 11 14 Buried Steel Pipe and Fittings
33 1210 Water Services 1-inch to 2-inch
33 1211 Large Water Meters
33 1220 Resilient Seated Gate Valve
33 1221 AWWA Rubber-Seated Butterfly Valves
33 1225 Connection to Existing Water Mains
33 1230 Combination Air Valve Assemblies for Potable Water Systems
33 1240 Fire Hydrants
33 1250 Water Sample Stations
33 1260 Standard Blow off Volvo Assembly
33 11 1:1 Owed in Pisee Pipe(CIPP)
33 31 13 High Density Delyeth) a«e(14PP)Pipe c_gani.aFy Se..,e.
33 M 22 saftitffy Sewer-94 Lining
333123 Sanitaff Sewer-Pipe EnIaFgemeat
33-39 10 Cost in plat;p C-14wwe
3320 Prost-Geaerote Manhole&
33 4010 Fiber-giffiS MAPIWAA
333940 Wastewater.Aeeess Chamber-(WAG)
33 41 11 High Density Pelyetl*)4eae(HDPE)Pipe fef Stefm Ppain
33 41 12 Reinfer-eed Pelyethlene(SRPE) Pipe
334600 Subdr-ainage
33 4601 n�v-01 Slooed Stefm Dr- ins
3346T-Felleh {Mins
3340 10 Gast in Wage Membele.. and 3umetia-:rxes
33 49 20 Curb and Drop Inlets
Division 34-Transportation
34 41 10 T-ffiffie Sig%6
3441 10.01 ARReh-meent- A Gen'-ellerCabinet
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised February 2,2016
000000-5
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 5 of 6
34 41 13
34 41 15 Reetangular-Rapid FlasMag Beaeon
14 43 36
34 4120 Roadway 14himination Assemblies
34 4120.01 Ar4efial LED Roadway I uminsims
34 41 2001
34 41 30 Aluminum Signs
3471 13 Traffic Control
Appendix
GG 4.01 Availability of bands
GC-4.02 Subsurface and Physical Conditions
GG 4.04 UadeFgFetmd Foeilifies
GG 4.06 14amMeus Genditien at
GC-6.06.1) Minority and Women Owned Business Enterprise Compliance
GC-6.07 Wage Rates
00 ne.....:«.. ..nd Irt:t:.:e
2 ..
GG
4 Neadise6mimtim;
GR-01 60 00 Product Requirements
END OF SECTION
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised February 2,2016
CITY OF FORT WORTH
ADDENDUM NO. 1
To the Plans, Specifications&General Contract Documents
2014 CLP,YEAR 3—CONTRACT 2
City Project No.02693
Original Bid Date:Thursday,August 17,2017
Revised Bid Open Date: Thursday August 24,2017
Addendum No. 1: Issued August 10,2017
This Addendum,forms part of the Plans,Contract Documents&Specifications for the above referenced Project
and modifies the original Specifications and Contract Documents. Bidder shall acknowledge receipt of this
addendum in the space provided below,in the proposal(SECTION 00 41 00)and acknowledge receipt on the
outer envelope of your bid.Failure to acknowledge receipt of this addendum could subject the bidder to
disqualification.
The plans and specification documents for 2014 CIP,YEAR 3—CONTRACT 2,City Project No.02693 are
hereby revised by Addendum No. 1 as follows:
SPECIFICATIONS&CONTRACT DOCUMENTS:
1. SECTION 00 1113—INVITATION TO BIDDERS.The bid opening date has been delayed. Sealed bids will
be received by the City of Fort Worth Purchasing Office until 1:30 PM CST,Thursday August 24,2017 and
bids will be opened publicly and read aloud at 2:00 PM CST in the Council Chambers.
A signed copy of the Addendum should be included in the sealed bid envelope at the time of bid submittal.
Failure to acknowledge the receipt of this Addendum could cause the subject bidder to be considered
"NONRESPONSIVE,"resulting in disqualification.
RECE C 1�Q EDGEMI✓
By. K By: To 6 C,
Tony Sholola,P.E.
Company: JLB CONTRACTING, LLC Engineering Manager, Water Department
City of Fort Worth,Texas
Address: _P_n pnX 241��
FORT WORTH,ii 76124
City: State:
Ronald D Stinson,Jr
Vice President of BuMwss
Development
2014 CEP,YEAR 3 -CONTRACT 2
City Project No.02693
Addendum No. 1,Page 1 of 1
r
h
J ,iDWTOAAT1403 S
001113-1
INVITATION TO BIDDERS
Pagel of 2
1 SECTION 00 11 13
2 INVITATION TO BIDDERS
3 RECEIPT OF BIDS
4 Sealed bids for the construction of 2014 CIP,YEAR 3—CONTRACT 2,Unit 1—Water
5 Improvements and Unit 2-Paving Improvements,City Project No.02693 will be received by
6 the City of Fort Worth Purchasing Office:
7
8 City of Fort Worth
9 Purchasing Division
10 200 Texas Street
11 Fort Worth,Texas 76102
12 until 1:30 P.M. CST,Thursday,August 24,2017, and bids will be opened publicly and read
13 aloud at 2:00 PM CST in the Council Chambers.
14
15 GENERAL DESCRIPTION OF WORK
16 The major work will consist of the(approximate)following:
17 Unit 1:
18 7645 LF—8"Water Line by Open Cut
19 23 EA—8"Gate Valve
20 1003 LF—6"Concrete Curb and Gutter(Houghton Ave)
21 3680 SF—6"Concrete Driveway(Houghton Ave&Prevost Street)
22 3,910 SY—11"Pavement Pulverization(Houghton Ave&Prevost Street)
23 3,910 SY—3"Asphalt Pavement(Houghton Ave&Prevost Street)
24
25
26 Unit 2:
27 12,361 LF—6"Concrete Curb and Gutter
28 19,580 SF—6"Concrete Driveway
29 28,180 SY— 11"Pavement Pulverization
30 28,180 SY—3"Asphalt Pavement
31 20,000 SF—4' Concrete Sidewalk
32
33 PREQUALIFICATION
34 The improvements included in this project must be performed by a contractor who is pre-
35 qualified by the City at the time of bid opening.The procedures for qualification and pre-
36 qualification are outlined in the Section 00 21 13—INSTRUCTIONS TO BIDDERS.
37
38 DOCUMENT EXAMINATION AND PROCUREMENTS
39 The Bidding and Contract Documents may be examined or obtained on-line by visiting the City
40 of Fort Worth's Purchasing Division website at http://www.fortworthtexas.gov/purchasin /and
41 clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site.The
42 Contract Documents may be downloaded,viewed,and printed by interested contractors and/or
43 suppliers. The contractor is required to fill out and notarize the Certificate of Interested
44 Parties Form 1295 and the form must be submitted to the Project Manager before the
45 contract will be presented to the City Council. The form can be obtained at
46 https://www.ethics.state.tx.us/tec/1295-Info.htm .
47
48 Copies of the Bidding and Contract Documents may be purchased from Stream Water Group,
49 Inc.,6737 Brentwood Stair Rd., Suite 230,Fort Worth,Texas 76112,Phone: 817-446-4171.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 22,2016
001113-2
INVITATION TO BIDDERS
Page 2 of 2
1
2 The cost of Bidding and Contract Documents is:
3 Set of Bidding and Contract Documents with full size drawings: $80.00
4 Set of Bidding and Contract Documents with half size(if available)drawings: $40.00
5
6
7 PREBID CONFERENCE
8 A prebid conference may be held as described in Section 00 21 13 -INSTRUCTIONS TO
9 BIDDERS at the following location,date,and time:
10 DATE: Tuesday,August 8,2017
11 TIME: 9:00 AM
12 PLACE: 310 West 10th Street
13 Fort Worth,Texas 76120
14 LOCATION: Ground floor of parking garage across the street from the federal building.
15 City of Fort Worth,Water Engineering Department
16
17 CITY'S RIGHT TO ACCEPT OR REJECT BIDS
18 City reserves the right to waive irregularities and to accept or reject bids.
19
20 INQUIRIES
21 All inquiries relative to this procurement should be addressed to the following:
22 Attn: Liam Conlon,City of Fort Worth
23 Email: Liam.Conlon(a)fortworthtexas.gov
24 Phone: (817)392-6824
25 AND/OR
26 Attn: Mary Hanna,P.E.,City of Fort Worth
27 Email: Mga.Hannaafbrtworthtexas.gov
28 Phone: (817)392-5565
29 AND/OR
30 Attn: MD Shamsul Arefin,P.E.,Stream Water Group,Inc.
31 Email: arefin@streamwaterproLip.com
32 Phone: (817)446-4171
33
34 ADVERTISEMENT DATES
35
36 July 20,2017
37 July 27,2017
38
39 END OF SECTION
CITY OF FORT WORTH 2014 CIP,YEAR 3 CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 22,2016
CITY OF FORT WORTH
ADDENDUM NO. 2
To the Plans, Specifications&General Contract Documents
2014 CIP,YEAR 3—CONTRACT 2
City Project No.02693
Revised Bid Open Date: Thursday August 24,2017
(Addendum 1)
Addendum No.2: Issued August 15,2017
This Addendum,forms part of the Plans,Contract Documents&Specifications for the above referenced Project
and modifies the original Specifications and Contract Documents. Bidder shall acknowledge receipt of this
addendum in the space provided below,in the proposal(SECTION 00 41 00)and acknowledge receipt on the
outer envelope of your bid.Failure to acknowledge receipt of this addendum could subject the bidder to
disqualification.
The plans and specification documents for 2014 CIP,YEAR 3--CONTRACT 2,City Project No.02693 are
hereby revised by Addendum No.2 as follows:
SPECIFICATIONS&CONTRACT DOCUMENTS:
1. SECTION 00 42 43 --PROPOSAL FORM.Replaced in its entirety. Modified Unit I - Water
Improvements,bid item 51;REVISED to read 7"Conc Valley Gutter.... A revised Excel spreadsheet of
the proposal form has been uploaded into Buzzsaw.
CONSTRUCTION DRAWINGS:
2. Replace Sheets 35,36,37&38 of 59 with Revised ADDENDUM 2 Sheets 35R,36R,37R&38R of 59.
Revised pavement profile grades.
3. Add ADDENDUM 2 Sheet 58A. Included Concrete Pavement Repair details.
A signed copy of the Addendum should be included in the sealed bid envelope at the time of bid submittal.
Failure to acknowledge the receipt of this Addendum could cause the subject bidder to be considered
"NONRESPONSIVE,"resulting in disqualification.
RECI 10 LEDGE �NT: L
By:CE By: 0 AUJ o!
AS CON RACTWG, LLC Tony Sholola,P.E.
Company: Engineering Manager, Water Department
-*� City of Fort Worth,Texas
Address: p,p,WX241(" _
FORT WORTH,TX 76124
City: State:
Romid D Stinson,Jr
2014 CIP,YEAR 3—CONTRACT 2
City Project No.02693 VICe president of Business
Development Addendum No.2,Page 1 of 1
004243
BID PROPOSAL
Page IR of 3
ADDENDUM 2
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
_.;liption Specification Unit of Bid Unit Price Bid Value
Section No. Measure Quantity
UNIT I--Water Line Improvemen6
F331
titer Pipe F33
12 LF 7,645
2 0161 6"PVC Water Pipe 12 LF 140
3 3003 8"Gate Valve 20 EA 23
4 3002 6"Gate Valve 20 EA 12
5 3112.0001 Fire Hydrant and Extension 33 12 40 EA 8
6 J 1 _ +" die Asphalt Pvmt Repair,Residential 3201 17 LF 500
1rlIt Pvmt Repair Beyond Defined 3201 17 SY 300
8 :?t r_•�uU Temporary Asphalt(2"HMAC on 6"CTB) 3201 18 LF 11,128
Pav r q krNalf
9 3201.0614 Conc Pvmt Repair, Residential^ 32 01 29 SY 300
10 0241.1302 Remove 6"Water Valve 0241 14 EA 11
11 0241 1510 Salvage Fire Hydrant 0241 14 EA 7
12 3312.2004 1"Private Water Service Relocation 33 12 10 LF 1,650
13 3312.2001 1"Water Service,Meter Reconnection 33 12 10 EA 160
14 3312.2003 1"Water Service 33 12 10 EA 160
15 3312.2101 1 1/2"Water Service,Meter Reconnection 3312 10 EA 1
16 3312.2103 1 1/2"Water Service 33 12 10 EA 1
17 3312,2201 2"Water Service,Meter Reconnection 33 12 10 EA 1
18 3312.2203 2"Water Service 33 12 10 EA 1
19 0330.0001 Concrete Encase Utility Pipe 03 30 00 CY 70
20 3305.0202 Imported Embedment/Backfill,CSS 33 05 10CY 50
3305.0204 Imported Embedment/Bawl-ICrus-_.ushed. . _
21 Rack , 33 05 10 CY 50
22 3305.0207 Imported Embedment/Backfill,Select Fill 33 05 10 CY 50
23 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON 8
24 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 20
25 0241.1218 4"-12"Water Abandonment Plug 0241 14 EA 4
26 3304.0101 Temporary Water Services 33 04 30 LS 1
27 3125.0101 SWPPP z 1 acre 31 2500 LS 1
28 3305.0109 Trench Safety 33 05 10 LF 500
29 0241.0100 Remove Sidewalk on Haughton Aveneue 0241 13 SF 180
(Bourine Street to Hervie Street)
30 0241.0401 Remove Concrete Drive on Houghton 0241 13 SF 1,700
Aveneue Bourine Street to Hervie Street)
31 0241.1300 Remove Conc Curb&Gutter on Houghton 0241 15 LF 1,003
Aveneue(Bourine Street to Hervie Street)
32 0241.1700 11"Pavement Pulverization on Houghton 0241 15 SY 2,310
Aveneue(Bourine Street to Hervie Street) _
3123.0101 Unclassified Excavation by Plan on
33 312316 CY 149
Houghton Aveneue(Bourine Street t0 Hervie Street)
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120 02693-00 410000 43 1300 42 43_00 43 3700 45 12_00 35 13—Bid Proposal WorkbookAs
00 42 43
BID PROPOSAL
Page 2R ol`3
ADDENDUM
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Specification Unit of Bid
No Description Section No. Measure Quantity Unit Price Bid Value
34 3211.0600 Cement 26 lbs/SY on Houghton Aveneue 32 11 33 TN 33
(Bourine Street to Hervie Street)
35 3212.0303 3"Asphalt Pvmt Type D on Houghton 32 12 16 SY 2,310
Aveneue(Bourine Street to Hervie Street)
36 3212.0401 HMAC Transition on Houghton Aveneue 32 12 16 TN 8
(Bourine Street to Hervie Street)
37 3213.0301 4"Conc Sidewalk on Houghton Aveneue 32 13 20 SF 84
(Bourine Street to Hervie Street)
38 3213.0401 6"Concrete Driveway on Houghton 32 13 20 SF 3,460
_ Aveneue(Bourine Street to Hervie Street) _ _
39 3216.0101 6"Conc Curb and Gutter on Houghton 32 16 13 LF 1,003
Aveneue(Bourine Str;et to Hervie Street _,._ _
40 3217.5001 Curb Addi Wyss Painting on Houghton 32 17 25 EA 19
Aveneue(Bounne qtr,-ct to Hervie Street).
_.
41 3291'0190 Tr'psn l Houghton Aveneue(Bourine 3291 19 CY 49
Street to I I:!r•�c Strc:nrl
3292,010,.' f31n ��•;i I'I ��,,r,rlt on Houghton
4232 92 13 SY 970
Hu1,r n�Street to ilervie Street)
43 i)�•,.ri1 1 1 Valv,2 Box Adjustment on Houghton 33 05 14 EA 1 _
..,u- 1';l,rine Street t0 H:ivie Street)
t i 01 Remove Concrete Dwe on Prevost Street
44 0241 13 SF 180
o <h Avenue to Hurn-w!,.Drive)
�:.A" `o 11"Pavem^r t�,J :riratinr--Prevost 0241 15 SY 1,600
'1
°et�f amSWOr1h Av�:r'.,.�'tn h-ii:rnf��'rl Llir:r,l
46 3211.0600 Cement 26 1, ? w t ';t;eet 3211 33 TN 25
sFar7- nrth Avenue to t'tr.e)
Asph�iII I'vi it I vl:: I on Prevost Street
47 `1`� 51 32 12 16 SY 1,600
(Farnsworth ',v r.0:tr;111 I i h. t I'riwr)
48 3212.0401 '. T r;l: i,i ( icvusl Street 32 12 16 TN 3
(Farnsv.r rtf ••d r .. to I ,nb•.r l Drive)_,
3215.0 10.1 r t:; I lrrreway on Prevost Street
49 32 13 20 SF 220
f u s s 1f . r� L,I ,rrrbert Drive) _
50 321 I rl i lr;'ss Painting on Prevost Street 32 17 25 EA 2
Tt,, Humbert Drive)
3216_0301 7"Conc Valley Gutter, Residential on
51 Prevost Street(Farnsworth Avenue to Humbert 32 16 13 SY 80
Drive)
52 3305.0111 Valve Box Adjustment on Prevost Street 33 05 14 EA 3
(Farnsworth Avenue to Humbert Drive)
53 0171.0001 Construction Survey(GPS Red Line Survey) 01 71 23 LS 1
54 0171.0001 Construction 01 71 23 LS 1
Staking(Water)
55 3471.0001 Traffic Control 3471 13 MO 5
56 9999.0001 Water Construction Allowance 1000000 LS 1 $100,000.001 $100,000.00
UNIT 1-Water Line Improvements Total Bid
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120 02693-00 410000 43 1300 42 43_00 43 3700 45 1200 35 13—Bid Proposal Workbook.xls
00 42 43
BID PROPOSAL
Page 3R of 3
ADDENDUM 2
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID Bidder's Application
rroject Item Information Biaaers rrop.;
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
1 0241.0100 Remove Sidewalk 02 41 13 SF 2,160
2 0241.0300 Remove ADA Ramp 02 41 13 EA 6
3 0241.0401 Remove Concrete Drive 02 41 13 SF 19`490
4 0241.0550 Remove.Salvage and Reuse Guardrail 0241 13 LF 100
5 0241.0700 Remove,Salvage and Reuse Mailbox 0241 13 EA 14
8 0241.1300 Remove Conc Curb&Gutter 02 41 15 LF 5,006
_. _....._..._ ._._..
7 0241.1700 I V Pavement Pulverization 02 41 15 SY 28,180
8 3123.0101 Unclassified Excavation by Plan 31 2316 CY 1,089
9 3201.0614 Conc Pvmt Repair Res dential 3201 29 SY 50
10 3211.0600 Cement 26 lbs/SY 3211 33 TN 377
11 3212.0303 3"Asphalt Pvmt Type D 32 1216 SY 28,180
12 32120401 I]MAC Transition 32 1216 TN 30
13 3213.0301 G"Conc Sidewalk 32 1320 SF 20,000
14 3213.0401 6"Concrete Driveway 32 1320 SF
__� 19 580
15 3213.:501 Barrier Free Ramp,Type R-1 32 13 20 _ EA 8
16 3213.0506 Barrier Free Rami, yp P-1 321320 EA 2
17 3213.0507 Barrier Free ;1,. rh y:,c f' ;_ 32 13 20 EA 1
18 3216.0101 6"Conc Curb and ' ir:r 32 16 13 LF 12,361
19 3217.5001 Curb Address Painting 32 1725 EA 161
20 3291.0100 Topsoil 3291 19 CY 429
21 3292.0100 Block Sod Placement 32 92 13 SY 11,790
22 3305.0107 Manhole Adjustment,Minor 33 05 14 EA 9
23 3305.0108 Miscellaneous Adjustment(Irrigation) 00 05 08 LS 1 $10,000.00 $10,000.00
24 3305.0108 Miscellaneous Structure Adjustment(WM) 33 05 14 EA 160
25 3305.0111 Valve Box Adjustment 33 05 14 EA 22
26 3125.0101 SWPPP 2 1 acre 31 25 00 LS 1
27 3441.4110 Remove and Reinstall Sign Panel and Post 3441 30 EA 17
28 0171.0001 Construction Staking(Paving) 01 71 23 LS 1
29 9999.0002 Paving Construction Allowance 1 00 00 00 1 LS 1 1 $100,000.00 $100,000.00
UNIT 2-Paving Improvements Total Bid
Bid Summary
UNIT 1-Water Line Improvements
UNIT 2-Paving Improvements
Total Bid
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Forth Revised 20120120 02693-00 410000 43 13_00 42 4300 43 37_00 45 1200 35 13—Bid Proposal Workbook.xis
LEGEND
Ll
1 I ro / a•I— l� LAKECOMO �•� xo�ao�x �
E
OUG
y
/ p 690 L AVENbEI�
S90 _7
700
-- I _.,_` '� _.QST �_� �• �. �
` FLETCHER,AVENUE i ���1 ♦��.• �V'_,
1
fi
so
_
Fk7 'IR CITY OF FORT WORTH,TEXAS
!:iP Y EAR 3•CONTRACT 2
—
xo xr r S�,wE�i.ww
rM v n STREAM WATER GROUR,,INC.
pN,
CITY MAP.-2024-384&1030-304
MAPSCO PAGE.'74M,75,1&751V
ADDEMDUM2
41 �l xlw�T. i 'A nfab�_ M-14M
WELLESLEY AVENUE
rtr-----—-------
wxu'
4 w,
L _4fA9_
CITY MAP:2030-394
MAPSCO PAGE:70,
.............. .............
i.......... .....................
.............. ...................................
1 7 T -7
.......... ..........................
WM* er
................. ..................... ..........
...........
..........
.......... .......... .............. g i ro ....... .............. ...................................... ................ ..........
..........
...........
t .............
................
.................
rDd . ............................ .................
A..........L.-.........
............... .............
................ ...........
..........
.. . Z CITY OF FORT WORTH,TEXAS
..........
............
................. ......
m 2014 CIP YEAR 3-CONTR4CT2
zi, waren oeaearweur
..........
......................... . ---
.... ........ ---
...........................
...............
....................... ......... ................ ............................. ................
...... .......... ............... STIUAM WATTGROUP,INC.
601
........ ...............
R
...........
........... ...
--mi p
.............
EC Br:
..................
............... Be
675
'm 61$
I 1
ADDEMDUA#2
.RAuaeRt aN.aac o.N/Rw+/TS NOTES:
eyd,' �v ���\ � '. � ,JL M(mIKPMNmlxaimKMve
�41�° sT PP ror om
i
WELLESLEYAVEN . `t`. � c5b-gm e.mw.e,FAnwN
---------------------------
VC.HMARKS
n
mn` senuN%°,r
P,Aw1W.^.
aocx u `PCA�` +rosm
Cl/A16fRLAW M[mGi'GN RET"JITS 'R
GTPMAP: CE,756
MAPSCD PAGE;TSM ,� .a.aws.aosro
_ .. _ _ scve nv auasev
-.... -. ...... .__ ...a.. -
- ..
i
.... ._. L. ._._ i.. .i..
:.....0 .....
._y. wum
bb
p
............ /
._ ... jt •_.� _ O6 RQRt Y.JRTN,TEXAS
µTH WAiE PARTMENT
.....
ROE
...... ...... ,,,.4 CIP YEAR x.
. CONTRACT 2
-
_..
IAN--T
mm I
... -
.... _.... .... ° .._.. g� ._.�� i �. _.. STREAM WAllR GROUP,INC.
.....
Y
e•mm
_ J
OFSVY40RAAN8Y'
_ .... .. -
Sfi5
3x00 NPO
ADDEMDLM2
HO q1 4P Teo _ P... 480 4D -60 fi W 4 ! 30 DD 40
1 t NOTES.
..1 Y T �' f� I 1
..I .+�. . ..
... _
_ ...
� t
V :Y ItT I' 5 F ROti�RT
_ .... ...
I
1 ( _
f, l k
la
8.i �T
'a L:T
VI.M1'I,T
e
1
i
RQ Ri i nva—bri
a-� 1
- Ir ex en-amn-e
C i
1 - _. I S k-1.60 8...
< - r �t .o
- I
t`
I RJW LT xarr
A <�4 tr
� ..
A �
I� Iii l .b A-
I 4 RtJ [2T � R RT
«
0 .b' LTL,
.':i:•, y ... ::..__ y I .i 4 r,dC.0 F,kTWfjK?H' '='T N-RT+3,TEXAS
- 3 L. L♦ Sys. .1014 CIP YEA "ONTRACT2
F
. wEi1Fv. - ssecriav
s
r I X STREAM WATER GROUP,INC.
I
6-Y el
31,III k4Ri H
} iw Ix _
I
TA a5
+s^
I _ i :., 2{I... r 3W dDW I.63 8600 t 4000 3006 7300 6006.- GS O...Amur wtih'rtmanandrr,rcs. r.ker av m
F
AOI00 1000 ...1D d0.00 ULl i .: I - -
ADDEMDUM2
M,
O�rllll Cm
RESIDENIIALZCCn[[ '' .TEXAB REVISED:00312013 sva ran F ��, -
ONCTNRETE
STREET SECTION(L) 32 7313-0502 p�.��
aTC,�aR dISTROCTOx JdNT(BETREEN R93}Daaf
ow—
T PatEO PAVEMENia
DRi CITY OF FORT WORT',TFXAS
-TER—T
2014 CIP YEAR 3-CONTRACT 2
.vwc caysrRucmax ucr- xcRa 1
STREAM WATER OROUP,eINC.
E
uxary�axr a:+a�a.oz,e sAwEo.loaro a axu�wsv - r.
t G_h10UM2
CITY OF FORT WORTH
ADDENDUM NO.3
To the Plans, Specifications&General Contract Documents
2014 CIP,YEAR 3—CONTRACT 2
City Project No.02693
Revised Bid Open Date: Thursday August 24,2017
(Addendum 1)
Addendum No. 3: Issued August 21,2017
This Addendum,forms part of the Plans,Contract Documents&Specifications for the above referenced Project
and modifies the original Specifications and Contract Documents. Bidder shall acknowledge receipt of this
addendum in the space provided below,in the proposal(SECTION 00 41 00)and acknowledge receipt on the
outer envelope of your bid.Failure to acknowledge receipt of this addendum could subject the bidder to
disqualification.
The plans and specification documents for 2014 CIP,YEAR 3—CONTRACT 2,City Project No.02693 are
hereby revised by Addendum No. 3 as follows:
SPECIFICATIONS& CONTRACT DOCUMENTS:
1. SECTION 00 42 43--PROPOSAL FORM.Replaced in its entirety. A revised Excel spreadsheet of the
proposal form has been uploaded into Buzzsaw.
A signed copy of the Addendum should be included in the sealed bid envelope at the time of bid submittal.
Failure to acknowledge the receipt of this Addendum could cause the subject bidder to be considered
"NONRESPONSIVE,"resulting in disqualification.
RECEI NOWLE
CKDGEME :
By: By: 1 ny o Gj
JLB CONT TING, LLC Tony Sholola,P.E.
Company: —. .. Engineering Manager, Water Department
City of Fort Worth,Texas
M.
Address:
FORT W 24131
City: 76124
Ronald D Stinson,Jr
Vice President of Business
Deveiopment
2014 CIP,YEAR 3—CONTRACT 2
Cit Project No 02693
Addendum No.3,Page 1 of 1
00 42 43
BID PROPOSAL
Page IRI of3
ADDENDUM
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
n Specification Unit of Bid
description Section No. Measure Quantity Unit Price Bid Value
iter Pipe 3311 12 LF 7,645
� 0161 6"PVC Water Pipe 3311 12 LF 140
3 331).3003 8"Gate Valve 33 12 20 EA 32
4 312.3002 6"Gate Valve 33 12 20 EA 14
5 3312.0001 Fire Hydrant and Extension 33 12 40 EA 8
6 A201.0113 6'Wide Asphalt Pvmt Repair,Residential 3201 17 LF 500
3201.0201 Asphalt Pvmt Repair Beyond Defined 3201 17 SY 300
i, Residential _
M
3201 0400 Temporary Asphalt(2"HAC on 6"CTB)
8 3201-18---
2011S LF 11.128
':Liv r ra irepair
9 3201.0614 Cone Pvmt Repair,Residential 32 01 29 SY 300
10 0241.1302 Remove 6"Water Valve 0241 14 EA 11
11 0241.1510 Salvage Fire Hydrant 0241 14 EA 7
12 3312.2004 1"Private Water Service Relocation 33 12 10 LF 1,650
13 3312.2001 1"Water Service,Meter Reconnection 33 12 10 EA 210
14 3312.2003 1"Water Service 33 12 10 EA 210
15 3312.2101 1 1/2"Water Service,Meter Reconnection 33 12 10 EA 1
16 3312.2103 1 1/2"Water Service 33 12 10 EA 1
17 3312.2201 2"Water Service,Meter Reconnection 33 12 10 EA 1
18 3312.2203 2"Water Service 33 12 10 EA 1
19 0330.0001 Concrete Encase Utility Pipe 03 30 00 CY 70
20 3305.0202 Imported Embedment/Backfill,CSS 33 05 10 CY 50 _
21 3305.0204 Imported Embedment/Backfill,Crushed 33 05 10 CY 50
Rock
22 3305.0207 Imported Embedment/Backfill,Select Fill 33 05 10 CY 50
23 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 8
24 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 27
25 0241.1218 4"-12"Water Abandonment Plug 0241 14 EA 4
26 3304.0101 Temporary Water Services 33 04 30 LS 1
27 3125.0101 SWPPP z 1 acre 31 2500 LS 1
28 3305.0109 Trench Safety 33 05 10 LF 500
29 0241.01 00 Remove Sidewalk on Houghton Aveneue 02 41 13 SF 180
(Bourine Street to Hervie Street)
30 0241.0401 Remove Concrete Drive on Houghton 0241 13 SF 1,700
Aveneue(Bourine Street to Hervie Street)
31 0241.1300 Remove Cone Curb&a Butter on Houghton 0241 15 LF 1,003
Aveneue(Bourine Street to Hervie Street) _
3202 41 15 SY 2,310
0241.1700 11"Pavement Pulverisation on Houghton
Aveneue(Bourine Street to Hervie Street) _
33 3123.0101 Unclassified Lxcavation by Pian on 31 23 16 CY 149 T
Houghton Aveneue(Bourine Street to Hervie Street)
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120 02693-00 410000 43 13_00 42 43_00 43 3700 45 12_00 35 13—Bid Proposal Workbook.xIs
00 42 43
BID PROPOSAL
Page 2R1 of 3
ADDENDUM 3
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlki hem Specification Unit of Bid
Description Unit Price Bid Value
Section No. Measure Quantity
3211.0600 Cement 26 IbsISY on Houghton Aveneue 32 11 33 TN 33
(Rour;ne Street to H(�ivie Strcct)
3r•2.03(33 3"Asp!-olt Pvmt Type D on Houghton
35 321216 SY 2,310
Aveneue�Botrrnr Street to Hervie Street)
36 3212.0401 HMAC 'ransition c"I Inughton Aveneue 32 12 16 TN 8
(Bourine Street to f lel-vie Street)
37 3213.0301 4"C:onc Sidevfalk on Houghton Aveneue 32 13 20 SF 84
(Bourine Street to H(,.rvie Street)
3213.0401 ?"Gnncrete Driveway on Houghton
38 32 13 20 SF 3,460
Aveneue(Bourinm S,,, -'to Hervie Street)
39 3216.0101 6"Con "r.rr, and Gutter on Houghton 32 1613 LF 1,003
Aveneue(Boun r rr ca to Hervie Street)
3217.5001 Curb Addw,;s Paintinq on Houghton
40 32 17 25 EA 19
Aveneue(Bourine Sr; I r:rvii �lrc• t)
41 3291.0100 Topsoil c H::.igl t::n Aveneue(Bourine 3291 19 CY 40
Street to Hervie Street
42 3292.0100 Block Sod Flay ernent on Houghton 32 92 13 SY 970
Avereue(Bourine Street to Hervie Street)
43 3305.0108 Miscellaneous Structure Adjustment(WM) 33 05 14 EA rU
on Houghton Aveneue(Bourine Street to Hervie Street)
44 3305.0111 Valve Box Adjustment on Houghton 33 05 14 EA i
Aveneue(Bourine Street to Hervie Street)
4502 41 13 SF 180
0241.0401 Remove Concrete Drive on Prevost Street
(Farnsworth Avenue to Humbert Drive)
46 0241 1700 11"Pavement Pulverization on Prevost 0241 15 SY 1,600
Street(Farn:;•.vorth Avenue to Humbert Drive)
3211.0600 16 Ih�JSY on Prevost Street
47 321133 TN 25
(Farnsworth:1v n.lc:to Ilurnbert Drive)
48 3212.0303 3 ;asphalt Pvmt Type D on Prevost Street 32 1216 SY 1,600
(Farnswo,th:'venue to Humbert Drive
49 3212.0-(:1 ! MAC Transition on Prevost Street 32 1216 TN 3
(Farnstivortl :,venue to Humbert D-ive)_
3213.0401 6 (;oncrete DrivewayPrevost Street
50 � 32 1320 SF 220
(i arnstin th:'.v,:n.r:to Humbert C--ve)
51 321 7.5001 t;., l; • :::r<r,,•Paintinq Prevost Street 32 1725 EA 2
(Farnsworth r!venuc to Humgert
52 3216.0301 T'Conc Valley Gutter,Residential on 32 16 13 SY 80
Prevost Street(Farnsworth Avenue to Humbert Drive)
53 3305.0111 Valve Box Adjustment on Prevost Street 33 05 14 EA 3
(Farnsworth.Avenue to Humbert Drive)
54 0 17 1.0001 Construction Survey(GPS Red Line Survey) 01 71 23 LS 1
55 0171.0001 Construction 01 71 23 LS 1
Staking(Water)
56 3471.0001 Traffic Control 3471 13 MO 5
57 9999.0001 Water Construction Allowance 00 00 00 LS 1 $100,00o.001 $10000000
UNIT 1-Water Line Improvements Total Bid
CrrY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120 02693-00 410000 43 13_00 42 43_00 43 37_00 45 12_00 35 13—Bid Proposal Workbook.xls
00 42 43
BID PROPOSAL
Page 3R1 of 3
ADDENDUM 3
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID Bidder's Application
Project Item Information Biddees Proposal
lirJli.r 3irnt Specification Unit of Bid
Description Unit Price Bid Value
Section No. Measure Quantity
r r
----------
1 0241.0100 gernnvr. I "i 41 13 SF 2,160
2 0241.0300 Remove , ?:. , 1, 02 41 13 EA 6
3 0241.0401 Remove Concrete DrA c 5241 13 SF 19,490
4 0241.0550 Remove,Salvage and i�cuse(;uardrail 0241 13 LF 100
5 0241.0700 Remove.Salvage:and Reuse Mailbox 02 41 13 EA 14
6 0241 1300 Remove Conc Curb&Gutter 02 41 15 LF 5,006
7 0241 1700 11"Pavement Pulverization 02 41 15 SY 28,180
8 3123.0101 Unclassified Excavation by Plan 31 23 16 CY 1,089
9 3201.0614 Conc Pvmt Repair Residential 3201 29 SY 50
10 3211,0600 Cement 26 lbs/SY 32 11 33 TN 377
11 3212.0303 3"Asphalt Pvmt Type 1) 3212 16 SY 28,180
12 3212.0401 HMAC Transition 32 12 16 TN 30
13 3213.0301 4"Conc Sidewalk 32 1320 SF 20,000
14 3213.0401 6"Concrete Driveway 32 1320 SF 19,580
15 3213.0501 Barrier Free Ramp,Type R-1 32 1320 EA 8
16 3213.0506 Barrier Free Ramp,Type P-1 32 1320 EA 2
17 3213.0507 Barrier Free Ramp:Type P-2 32 1320 EA 1
18 3216.0101 6"Conc Curb and Gutter 32 16 13 LF 12.361
19 3217.5001 Curb Address Painting 32 1725 EA 161
20 3291.0100 Topsoil 3291 19 CY 429
21 3292.0100 Block Sod Placement 32 92 13 SY 1 1 190
22 3305.0107 Manhole Adjustment,Minor 33 05 14 EA a
23 3305.0108 Miscellaneous Adjustment(Irrigation) 00 05 08 LS 1 $10.000.00 $10,000.00
24 3305.0108 Misceltaneous Structure Adjustment(WM) 3305 14 EA 190
25 3305.0111 Valve Box Adjustment 3305 14 EA 42
26 3125.0101 SWPPP L 1 acre 31 25 00 LS 1
27 3441.41 10 Remove and Reinstall Sign Panel and Post 3441 30 EA 97
28 0171.0001 Construction Staking(Paving) 01 71 23 I_S 1
29 9999.0002 Paving Construction Allowance 00 00 00 LS 1 $100,000-001 $100,000.00
UNIT 2-Paving Improvements Total Bid
Bid Summary
UNIT 1-Water Line Improvements
UNIT 2-Paving Improvements
Total Bid
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Forrn Revised 20120120 02693-00 410000 43 13_00 42 43_00 43 37 00 45 12_00 35 13—Bid Proposal Workbook.xls
001113-1
INVITATION TO BIDDERS
Pagel of 2
1 SECTION 00 1113
2 INVITATION TO BIDDERS
3 RECEIPT OF BIDS
4 Sealed bids for the construction of 2014 CIP,YEAR 3—CONTRACT 2,Unit 1—Water
5 Improvements and Unit 2-Paving Improvements,City Project No.02693 will be received by
6 the City of Fort Worth Purchasing Office:
7
8 City of Fort Worth
9 Purchasing Division
10 200 Texas Street
11 Fort Worth,Texas 76102
12 until 1:30 P.M. CST,Thursday,August 24,2017,and bids will be opened publicly and read
13 aloud at 2:00 PM CST in the Council Chambers.
14
15 GENERAL DESCRIPTION OF WORK
16 The major work will consist of the(approximate)following:
17 Unit 1:
18 7645 LF—8"Water Line by Open Cut
19 23 EA—8"Gate Valve
20 1003 LF—6"Concrete Curb and Gutter(Houghton Ave)
21 3680 SF—6"Concrete Driveway(Houghton Ave&Prevost Street)
22 3,910 SY— 11"Pavement Pulverization(Houghton Ave&Prevost Street)
23 3,910 SY—3"Asphalt Pavement(Houghton Ave&Prevost Street)
24
25
26 Unit 2:
27 12,361 LF—6"Concrete Curb and Gutter
28 19,580 SF—6"Concrete Driveway
29 28,180 SY— 11"Pavement Pulverization
30 28,180 SY—3"Asphalt Pavement
31 20,000 SF—4' Concrete Sidewalk
32
33 PREQUALIFICATION
34 The improvements included in this project must be performed by a contractor who is pre-
35 qualified by the City at the time of bid opening.The procedures for qualification and pre-
36 qualification are outlined in the Section 00 21 13—INSTRUCTIONS TO BIDDERS.
37
38 DOCUMENT EXAMINATION AND PROCUREMENTS
39 The Bidding and Contract Documents may be examined or obtained on-line by visiting the City
40 of Fort Worth's Purchasing Division website at htip://www.fortworthtexas.gov/purchasins:/and
41 clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site.The
42 Contract Documents may be downloaded,viewed,and printed by interested contractors and/or
43 suppliers. The contractor is required to fill out and notarize the Certificate of Interested
44 Parties Form 1295 and the form must be submitted to the Project Manager before the
45 contract will be presented to the City Council.The form can be obtained at
46 haps://www.ethics.state.tx.us/tec/1295-Info.htm .
47
48 Copies of the Bidding and Contract Documents may be purchased from Stream Water Group,
49 Inc.,6737 Brentwood Stair Rd., Suite 230,Fort Worth,Texas 76112,Phone: 817-446-4171.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 22,2016
0011 13-2
INVITATION TO BIDDERS
Page 2 of 2
1
2 The cost of Bidding and Contract Documents is:
3 Set of Bidding and Contract Documents with full size drawings: $80.00
4 Set of Bidding and Contract Documents with half size(if available)drawings: $40.00
5
6
7 PREBID CONFERENCE
8 A prebid conference may be held as described in Section 00 21 13 -INSTRUCTIONS TO
9 BIDDERS at the following location, date,and time:
10 DATE: Tuesday,August 8, 2017
11 TIME: 9:00 AM
12 PLACE: 310 West 10th Street
13 Fort Worth,Texas 76120
14 LOCATION: Ground floor of parking garage across the street from the federal building.
15 City of Fort Worth,Water Engineering Department
16
17 CITY'S RIGHT TO ACCEPT OR REJECT BIDS
18 City reserves the right to waive irregularities and to accept or reject bids.
19
20 INQUIRIES
21 All inquiries relative to this procurement should be addressed to the following:
22 Attn: Liam Conlon,City of Fort Worth
23 Email: Liam.Conlonafortworthtexas.gov
24 Phone: (817)392-6824
25 AND/OR
26 Attn: Mary Hanna,P.E.,City of Fort Worth
27 Email: Mary.Hanna@fortworthtexas.gov
28 Phone: (817)392-5565
29 AND/OR
30 Attn: MD Shamsul Arefin,P.E., Stream Water Group,Inc.
31 Email: arefm(a-)streamwatergroup.com
32 Phone: (817)446-4171
33
34 ADVERTISEMENT DATES
35
36 July 20,2017
37 July 27,2017
38
39 END OF SECTION
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 22,2016
0021 13-1
INSTRUCTIONS TO BIDDERS
Page 1 of 9
1 SECTION 00 2113
2 INSTRUCTIONS TO BIDDERS
3
4 1. Defined Terms
5
6 1.1.Terms used in these INSTRUCTIONS TO BIDDERS,which are defined in Section 00 72
7 00-GENERAL CONDITIONS.
8
9 1.2.Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the
10 meanings indicated below which are applicable to both the singular and plural thereof.
11
12 1.2.1. Bidder: Any person,firm,partnership,company,association,or corporation acting
13 directly through a duly authorized representative,submitting a bid for performing
14 the work contemplated under the Contract Documents.
15
16 1.2.2. Nonresident Bidder:Any person,firm,partnership,company,association,or
17 corporation acting directly through a duly authorized representative,submitting a
18 bid for performing the work contemplated under the Contract Documents whose
19 principal place of business is not in the State of Texas.
20
21 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City
22 (on the basis of City's evaluation as hereinafter provided)makes an award.
23
24 2. Copies of Bidding Documents
25
26 2.1.Neither City nor Engineer shall assume any responsibility for errors or misinterpretations
27 resulting from the Bidders use of incomplete sets of Bidding Documents.
28
29 2.2.City and Engineer in making copies of Bidding Documents available do so only for the
30 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant
31 for any other use.
32
33 3. Prequalification of Bidders(Prime Contractors and Subcontractors)
34
35 3.1.All Bidders and their subcontractors are required to be prequalified for the work types
36 requiring prequalification at the time of bidding. Bids received from contractors who are
37 not prequalified(even if inadvertently opened)shall not be considered. Prequalification
38 requirement work types and documentation are as follows:
39
40 3.1.1. Paving—Requirements document located at;
41 https://yroiectl2oint.buzzsaw.com/fortworthizov/Resources/02%20-
42 %20Construction%2ODocuments/Contractor%2OPrequalification/TPW%2OPaving-
43 %20Contractor%2OPrequalification%2OProg_ram/PREQUALIFICATION%20REO
44 UIREMENTS%20FOR%20PAVING%2000NTRACTORS.PDF?12ublic
45
46 3.1.2. Roadway and Pedestrian Lighting—Requirements document located at;
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised August 21,2015
002113-2
INSTRUCTIONS TO BIDDERS
Page 2 of 9
1 https://projectpoint.buzzsaw.com/fortworthizov/Resources/02%20-
2 %20Construction%2ODocuments/Contractor%2OPregualification/TP W%2OPavin�
3 %20Contractor%2OPregualification%2OProgxam/PREOUALIFICATION%20REO
4 UIREMENTS%20FOR%2OPAVING%2000NTRACTORS.PDF?12ublic
5
6 3.1.3. Water and Sanitary Sewer—Requirements document located at;
7 https://projectpoint.buzzsaw.com/fortworthizov/Resources/02%20-
8 %20Construction%2ODocuments/Contractor%2OPregualification/Water%20and%2
9 OSanitarv%2OSewer%2OContractor%20Preaualification%2OProl ram/WSS%20pre
10 qual%20requirements.doc?public
11
12
13 3.2.Each Bidder unless currently prequalified,must be prepared to submit to City within
14 seven(7)calendar days prior to Bid opening,the documentation identified in Section 00
15 45 11,BIDDERS PREQUALIFICATIONS.
16
17 3.2.1. Submission of and/or questions related to prequalification should be addressed to
18 the City contact as provided in Paragraph 6.1.
19
20
21 3.3.The City reserves the right to require any pre-qualified contractor who is the apparent low
22 bidder(s)for a project to submit such additional information as the City,in its sole
23 discretion may require,including but not limited to manpower and equipment records,
24 information about key personnel to be assigned to the project,and construction schedule,
25 to assist the City in evaluating and assessing the ability of the apparent low bidder(s)to
26 deliver a quality product and successfully complete projects for the amount bid within
27 the stipulated time frame.Based upon the City's assessment of the submitted
28 information,a recommendation regarding the award of a contract will be made to the
29 City Council. Failure to submit the additional information, if requested,may be grounds
30 for rejecting the apparent low bidder as non-responsive.Affected contractors will be
31 notified in writing of a recommendation to the City Council.
32
33 3.4.In addition to prequalification,additional requirements for qualification may be required
34 within various sections of the Contract Documents.
35
36 3.5.Special qualifications required for this project include the following:NONE
37
38 4. Examination of Bidding and Contract Documents,Other Related Data,and Site
39
40 4.1.Before submitting a Bid,each Bidder shall:
41
42 4.1.1. Examine and carefully study the Contract Documents and other related data
43 identified in the Bidding Documents(including"technical data"referred to in
44 Paragraph 4.2.below).No information given by City or any representative of the
45 City other than that contained in the Contract Documents and officially
46 promulgated addenda thereto,shall be binding upon the City.
47
48 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general,local and
49 site conditions that may affect cost,progress,performance or furnishing of the
50 Work.
51
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised August 21,2015
002113-3
INSTRUCTIONS TO BIDDERS
Page 3 of 9
1 4.1.3. Consider federal,state and local Laws and Regulations that may affect cost,
2 progress,performance or furnishing of the Work.
3
4 4.1.4. Study all: (i)reports of explorations and tests of subsurface conditions at or
5 contiguous to the Site and all drawings of physical conditions relating to existing
6 surface or subsurface structures at the Site(except Underground Facilities)that
7 have been identified in the Contract Documents as containing reliable"technical
8 data" and(ii)reports and drawings of Hazardous Environmental Conditions, if any,
9 at the Site that have been identified in the Contract Documents as containing
10 reliable "technical data."
11
12 4.1.5. Be advised that the Contract Documents on file with the City shall constitute all of
13 the information which the City will furnish.All additional information and data
14 which the City will supply after promulgation of the formal Contract Documents
15 shall be issued in the form of written addenda and shall become part of the Contract
16 Documents just as though such addenda were actually written into the original
17 Contract Documents.No information given by the City other than that contained in
18 the Contract Documents and officially promulgated addenda thereto, shall be
19 binding upon the City.
20
21 4.1.6. Perform independent research, investigations,tests,borings,and such other means
22 as may be necessary to gain a complete knowledge of the conditions which will be
23 encountered during the construction of the project. On request,City may provide
24 each Bidder access to the site to conduct such examinations,investigations,
25 explorations,tests and studies as each Bidder deems necessary for submission of a
26 Bid. Bidder must fill all holes and clean up and restore the site to its former
27 conditions upon completion of such explorations,investigations,tests and studies.
28
29 4.1.7. Determine the difficulties of the Work and all attending circumstances affecting the
30 cost of doing the Work,time required for its completion,and obtain all information
31 required to make a proposal.Bidders shall rely exclusively and solely upon their
32 own estimates, investigation,research,tests,explorations,and other data which are
33 necessary for full and complete information upon which the proposal is to be based.
34 It is understood that the submission of a proposal is prima-facie evidence that the
35 Bidder has made the investigation,examinations and tests herein required.Claims
36 for additional compensation due to variations between conditions actually
37 encountered in construction and as indicated in the Contract Documents will not be
38 allowed.
39
40 4.1.8. Promptly notify City of all conflicts,errors,ambiguities or discrepancies in or
41 between the Contract Documents and such other related documents.The Contractor
42 shall not take advantage of any gross error or omission in the Contract Documents,
43 and the City shall be permitted to make such corrections or interpretations as may
44 be deemed necessary for fulfillment of the intent of the Contract Documents.
45
46 4.2. Reference is made to Section 00 73 00—Supplementary Conditions for identification of:
47
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised August 21,2015
002113-4
INSTRUCTIONS TO BIDDERS
Page 4 of 9
1 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to
2 the site which have been utilized by City in preparation of the Contract Documents.
3 The logs of Soil Borings,if any,on the plans are for general information only.
4 Neither the City nor the Engineer guarantee that the data shown is representative of
5 conditions which actually exist.
6
7 4.2.2.those drawings of physical conditions in or relating to existing surface and
8 subsurface structures(except Underground Facilities)which are at or contiguous to
9 the site that have been utilized by City in preparation of the Contract Documents.
10
11 4.2.3. copies of such reports and drawings will be made available by City to any Bidder
12 on request. Those reports and drawings may not be part of the Contract
13 Documents,but the "technical data" contained therein upon which Bidder is entitled
14 to rely as provided in Paragraph 4.02.of the General Conditions has been identified
15 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is
16 responsible for any interpretation or conclusion drawn from any"technical data" or
17 any other data,interpretations,opinions or information.
18
19 4.3.The submission of a Bid will constitute an incontrovertible representation by Bidder(i)
20 that Bidder has complied with every requirement of this Paragraph 4,(ii)that without
21 exception the Bid is premised upon performing and furnishing the Work required by the
22 Contract Documents and applying the specific means,methods,techniques, sequences or
23 procedures of construction(if any)that may be shown or indicated or expressly required
24 by the Contract Documents,(iii)that Bidder has given City written notice of all
25 conflicts,errors,ambiguities and discrepancies in the Contract Documents and the
26 written resolutions thereof by City are acceptable to Bidder,and when said conflicts,
27 etc.,have not been resolved through the interpretations by City as described in
28 Paragraph 6.,and(iv)that the Contract Documents are generally sufficient to indicate
29 and convey understanding of all terms and conditions for performing and furnishing the
30 Work.
31
32 4.4.The provisions of this Paragraph 4,inclusive,do not apply to Asbestos, Polychlorinated
33 biphenyls(PCBs),Petroleum,Hazardous Waste or Radioactive Material covered by
34 Paragraph 4.06. of the General Conditions,unless specifically identified in the Contract
35 Documents.
36
37 5. Availability of Lands for Work,Etc.
38
39 5.1.The lands upon which the Work is to be performed,rights-of-way and easements for
40 access thereto and other lands designated for use by Contractor in performing the Work
41 are identified in the Contract Documents. All additional lands and access thereto
42 required for temporary construction facilities,construction equipment or storage of
43 materials and equipment to be incorporated in the Work are to be obtained and paid for
44 by Contractor. Easements for permanent structures or permanent changes in existing
45 facilities are to be obtained and paid for by City unless otherwise provided in the
46 Contract Documents.
47
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised August 21,2015
002113-5
INSTRUCTIONS TO BIDDERS
Page 5 of 9
1 5.2.Outstanding right-of-way,easements,and/or permits to be acquired by the City are listed
2 in Paragraph SC 4.01 of the Supplementary Conditions.In the event the necessary right-
3 of-way,easements,and/or permits are not obtained,the City reserves the right to cancel
4 the award of contract at any time before the Bidder begins any construction work on the
5 project.
6
7 5.3. The Bidder shall be prepared to commence construction without all executed right-of-
8 way,easements,and/or permits, and shall submit a schedule to the City of how
9 construction will proceed in the other areas of the project that do not require permits
10 and/or easements.
11
12 6. Interpretations and Addenda
13
14 6.1.All questions about the meaning or intent of the Bidding Documents are to be directed to
15 City in writing on or before 2 p.m.,the Monday prior to the Bid opening. Questions
16 received after this day may not be responded to.Interpretations or clarifications
17 considered necessary by City in response to such questions will be issued by Addenda
18 delivered to all parties recorded by City as having received the Bidding Documents.
19 Only questions answered by formal written Addenda will be binding. Oral and other
20 interpretations or clarifications will be without legal effect.
21
22 Address questions to:
23
24 City of Fort Worth
25 1000 Throckmorton Street
26 Fort Worth,TX 76102
27 Attn: Liam Conlon,Water Department
28 Fax: (817)392-8195
29 Email:Liam.Conlon(a)fortworthtexas.gov
30 Phone: (817)392-6824
31
32 6.2.Addenda may also be issued to modify the Bidding Documents as deemed advisable by
33 City.
34
35 6.3.Addenda or clarifications maybe posted via Buzzsaw at
36 https:llproiectnoint.buzzsaw.comlfortworthizov/Infrastructure%2OProiects102693%20-
37 %202014%20CIP%20Year%2039lo20-9lo20Contract9lo202?public.
38
39 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or
40 INVITATION TO BIDDERS. Representatives of City will be present to discuss the
41 Project. Bidders are encouraged to attend and participate in the conference. City will
42 transmit to all prospective Bidders of record such Addenda as City considers necessary
43 in response to questions arising at the conference. Oral statements may not be relied
44 upon and will not be binding or legally effective.
45
46 7. Bid Security
47
48 7.1.Each Bid must be accompanied by Bid Bond made payable to City in an amount of five
49 (5)percent of Bidder's maximum Bid price on form attached, issued by a surety meeting
50 the requirements of Paragraphs 5.01 of the General Conditions.
51
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised August 21,2015
0021 13-6
INSTRUCTIONS TO BIDDERS
Page 6 of 9
1 7.2.The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award
2 have been satisfied. If the Successful Bidder fails to execute and deliver the complete
3 Agreement within 10 days after the Notice of Award,City may consider Bidder to be in
4 default,rescind the Notice of Award,and the Bid Bond of that Bidder will be forfeited.
5 Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all
6 other Bidders whom City believes to have a reasonable chance of receiving the award
7 will be retained by City until final contract execution.
8
9 8. Contract Times
10 The number of days within which,or the dates by which,Milestones are to be achieved in
11 accordance with the General Requirements and the Work is to be completed and ready for
12 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the
13 attached Bid Form.
14
15 9. Liquidated Damages
16 Provisions for liquidated damages are set forth in the Agreement.
17
18 10. Substitute and "Or-Equal" Items
19 The Contract, if awarded,will be on the basis of materials and equipment described in the
20 Bidding Documents without consideration of possible substitute or"or-equal" items.
21 Whenever it is indicated or specified in the Bidding Documents that a"substitute"or"or-
22 equal" item of material or equipment may be furnished or used by Contractor if acceptable to
23 City,application for such acceptance will not be considered by City until after the Effective
24 Date of the Agreement. The procedure for submission of any such application by Contractor
25 and consideration by City is set forth in Paragraphs 6.05A.,6.05B.and 6.05C.of the General
26 Conditions and is supplemented in Section 01 25 00 of the General Requirements.
27
28 11. Subcontractors,Suppliers and Others
29
30 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No.20020-
31 12-2011 (as amended),the City has goals for the participation of minority business
32 and/or small business enterprises in City contracts.A copy of the Ordinance can be
33 obtained from the Office of the City Secretary.The Bidder shall submit the MBE and
34 SBE Utilization Form, Subcontractor/Supplier Utilization Form,Prime Contractor
35 Waiver Form and/or Good Faith Effort Form with documentation and/or Joint
36 Venture Form as appropriate. The Forms including documentation must be received
37 by the City no later than 2:00 P.M.CST,on the second business days after the bid
38 opening date.The Bidder shall obtain a receipt from the City as evidence the
39 documentation was received.Failure to comply shall render the bid as non-
40 responsive.
41
42 11.2. No Contractor shall be required to employ any Subcontractor,Supplier, other person
43 or organization against whom Contractor has reasonable objection.
44
45 12. Bid Form
46
47 12.1 The Bid Form is included with the Bidding Documents;additional copies may be
48 obtained from the City.
49
CITY OF FORT WORTH 2014 CIP.YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised August 21,2015
002113-7
INSTRUCTIONS TO BIDDERS
Page 7 of 9
1 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form
2 signed in ink. Erasures or alterations shall be initialed in ink by the person signing
3 the Bid Form. A Bid price shall be indicated for each Bid item,alternative,and unit
4 price item listed therein. In the case of optional alternatives,the words "No Bid,"
5 "No Change," or"Not Applicable"may be entered.Bidder shall state the prices,
6 written in ink in both words and numerals,for which the Bidder proposes to do the
7 work contemplated or furnish materials required.All prices shall be written legibly.
8 In case of discrepancy between price in written words and the price in written
9 numerals,the price in written words shall govern.
10
11 12.3. Bids by corporations shall be executed in the corporate name by the president or a
12 vice-president or other corporate officer accompanied by evidence of authority to
13 sign. The corporate seal shall be affixed. The corporate address and state of
14 incorporation shall be shown below the signature.
15
16 12.4. Bids by partnerships shall be executed in the partnership name and signed by a
17 partner,whose title must appear under the signature accompanied by evidence of
18 authority to sign. The official address of the partnership shall be shown below the
19 signature.
20
21 12.5. Bids by limited liability companies shall be executed in the name of the firm by a
22 member and accompanied by evidence of authority to sign. The state of formation of
23 the firm and the official address of the firm shall be shown.
24
25 12.6. Bids by individuals shall show the Bidder's name and official address.
26
27 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner
28 indicated on the Bid Form. The official address of the joint venture shall be shown.
29
30 12.8. All names shall be typed or printed in ink below the signature.
31
32 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda,the numbers of
33 which shall be filled in on the Bid Form.
34
35 12.10. Postal and e-mail addresses and telephone number for communications regarding the
36 Bid shall be shown.
37
38 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of
39 Texas shall be provided in accordance with Section 00 43 37—Vendor Compliance
40 to State Law Non Resident Bidder.
41
42 13. Submission of Bids
43 Bids shall be submitted on the prescribed Bid Form,provided with the Bidding Documents,
44 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS,
45 addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed
46 envelope,marked with the City Project Number,Project title,the name and address of
47 Bidder,and accompanied by the Bid security and other required documents. If the Bid is sent
48 through the mail or other delivery system,the sealed envelope shall be enclosed in a separate
49 envelope with the notation "BID ENCLOSED" on the face of it.
50
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised August 21,2015
002113-8
INSTRUCTIONS TO BIDDERS
Page 8 of 9
1 14. Modification and Withdrawal of Bids
2
3 14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office
4 cannot be withdrawn prior to the time set for bid opening. A request for withdrawal
5 must be made in writing by an appropriate document duly executed in the manner
6 that a Bid must be executed and delivered to the place where Bids are to be submitted
7 at any time prior to the opening of Bids.After all Bids not requested for withdrawal
8 are opened and publicly read aloud,the Bids for which a withdrawal request has been
9 properly filed may,at the option of the City,be returned unopened.
10
11 14.2. Bidders may modify their Bid by electronic communication at any time prior to the
12 time set for the closing of Bid receipt.
13
14 15. Opening of Bids
15 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An
16 abstract of the amounts of the base Bids and major alternates(if any)will be made available
17 to Bidders after the opening of Bids.
18
19 16. Bids to Remain Subject to Acceptance
20 All Bids will remain subject to acceptance for the time period specified for Notice of Award
21 and execution and delivery of a complete Agreement by Successful Bidder. City may,at
22 City's sole discretion,release any Bid and nullify the Bid security prior to that date.
23
24 17. Evaluation of Bids and Award of Contract
25
26 17.1. City reserves the right to reject any or all Bids,including without limitation the rights
27 to reject any or all nonconforming,nonresponsive,unbalanced or conditional Bids
28 and to reject the Bid of any Bidder if City believes that it would not be in the best
29 interest of the Project to make an award to that Bidder,whether because the Bid is
30 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to
31 meet any other pertinent standard or criteria established by City. City also reserves
32 the right to waive informalities not involving price,contract time or changes in the
33 Work with the Successful Bidder. Discrepancies between the multiplication of units
34 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies
35 between the indicated sum of any column of figures and the correct sum thereof will
36 be resolved in favor of the correct sum. Discrepancies between words and figures
37 will be resolved in favor of the words.
38
39 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists
40 among the Bidders,Bidder is an interested party to any litigation against City,
41 City or Bidder may have a claim against the other or be engaged in litigation,
42 Bidder is in arrears on any existing contract or has defaulted on a previous
43 contract,Bidder has performed a prior contract in an unsatisfactory manner,or
44 Bidder has uncompleted work which in the judgment of the City will prevent or
45 hinder the prompt completion of additional work if awarded.
46
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised August 21,2015
002113-9
INSTRUCTIONS TO BIDDERS
Page 9 of 9
1 17.2. City may consider the qualifications and experience of Subcontractors,Suppliers, and
2 other persons and organizations proposed for those portions of the Work as to which
3 the identity of Subcontractors, Suppliers,and other persons and organizations must
4 be submitted as provided in the Contract Documents or upon the request of the City.
5 City also may consider the operating costs,maintenance requirements,performance
6 data and guarantees of major items of materials and equipment proposed for
7 incorporation in the Work when such data is required to be submitted prior to the
8 Notice of Award.
9
10 17.3. City may conduct such investigations as City deems necessary to assist in the
11 evaluation of any Bid and to establish the responsibility,qualifications,and financial
12 ability of Bidders,proposed Subcontractors, Suppliers and other persons and
13 organizations to perform and furnish the Work in accordance with the Contract
14 Documents to City's satisfaction within the prescribed time.
15
16 17.4. Contractor shall perform with his own organization,work of a value not less than
17 35%of the value embraced on the Contract,unless otherwise approved by the City.
18
19 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and
20 responsive Bidder whose evaluation by City indicates that the award will be in the
21 best interests of the City.
22
23 17.6. Pursuant to Texas Government Code Chapter 2252.001,the City will not award
24 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than
25 the lowest bid submitted by a responsible Texas Bidder by the same amount that a
26 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a
27 comparable contract in the state in which the nonresident's principal place of
28 business is located.
29
30 17.7. A contract is not awarded until formal City Council authorization.If the Contract is
31 to be awarded,City will award the Contract within 90 days after the day of the Bid
32 opening unless extended in writing. No other act of City or others will constitute
33 acceptance of a Bid.Upon the contractor award a Notice of Award will be issued by
34 the City.
35
36 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid.
37
38 18. Signing of Agreement
39 When City issues a Notice of Award to the Successful Bidder,it will be accompanied by the
40 required number of unsigned counterparts of the Agreement. Within 14 days thereafter
41 Contractor shall sign and deliver the required number of counterparts of the Agreement to
42 City with the required Bonds,Certificates of Insurance,and all other required documentation.
43 City shall thereafter deliver one fully signed counterpart to Contractor.
44
45
46
47 END OF SECTION
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised August 21,2015
00 35 13
BID FORM
Page 1 of 1
SECTION 00 3513
CONFLICT OF INTEREST AFFIDAVIT
Each bidder, offeror or respondent (hereinafter also referred to as "you") to a City of Fort Worth (also
referred to as "City") procurement are required to complete Conflict of Interest Questionnaire (the
attached CIQ Form) and Local Government Officer Conflicts Disclosure Statement (the attached CIS
Form) below pursuant to state law. This affidavit will certify that the Bidder has on file with the City
Secretary the required documentation and is eligible to bid on City Work. The referenced forms may also
be downloaded from the website links provided below.
hftp://www.ethics.state.tx.us/forms/CIQ.pdf
hftp://www.ethics.state.tx.us/forms/CIS,pdf
CIQ Form is on file with City Secretary
❑ CIQ Form is being provided to the City Secretary
D CIS Form is on File with City Secretary
❑ CIS Form is being provided to the City Secretary
BIDDER:
JLB Contracting By: Ronala D Stinson, it
PO Box 24131 Signatur .
Fort Worth, Texas 76124 Title: Vice President of Business Development
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120327 Bid Proposal Workbook Add 3
00 41 00
BID FORM
Page 1 of 3
SECTION 00 41 00
BID FORM
TO: The City Manager
c/o: The Purchasing Department
200 Texas Street
City of Fort Worth,Texas 76102
FOR: 2014 CIP-YEAR 3, CONTRACT 2
City Project No.: 02693
Units/Sections: UNIT 1 -Water Line Improvements
UNIT 2-Paving Improvements
1. Enter Into Agreement
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form
included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents
for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions
of the Contract Documents.
2. BIDDER Acknowledgements and Certification
2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and
INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond.
2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will
provide a valid insurance certificate meeting all requirements within 14 days of notification of award.
2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed
individual or entity and is not submitted in conformity with any collusive agreement or rules of any group,
association, organization, or corporation.
2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding.
2.6. Bidder has not engaged in corrupt,fraudulent, collusive, or coercive practices in competing for the Contract.
For the purposes of this Paragraph:
a. "corrupt practice"means the offering, giving, receiving, or soliciting of any thing of value likely to
influence the action of a public official in the bidding process.
b. "fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the
bidding process to the detriment of City(b)to establish Bid prices at artificial non-competitive
levels,or(c)to deprive City of the benefits of free and open competition.
c. "collusive practice"means a scheme or arrangement between two or more Bidders,with or without
the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive
levels.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120327 Bid Proposal Workbook Add 3
004100
BID FORM
Page 2 of 3
d. "coercive practice"means harming or threatening to harm,directly or indirectly, persons or their
property to influence their participation in the bidding process or affect the execution of the
Contract.
3. Prequalification
The Bidder acknowledges that the following work types must be performed only by prequalified contractors and
subcontractors:
a. Water Distribution, Development, 8-inch diameter and smaller
b. Asphalt Paving Construction/Reconstruction(15,000 square yards and GREATER)
C.
d.
4. Time of Completion
4.1 The Work will be complete for Final Acceptance within 300 days after the date when the
the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions.
4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete
the Work{and/or achievement of Milestones}within the times specified in the Agreement.
5. Attached to this Bid
The following documents are attached to and made a part of this Bid:
a. This Bid Form, Section 00 4100
b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph
5.01 of the General Conditions.
c. Proposal Form, Section 00 42 43
d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37
e. MWBE Forms(optional at time of bid)
f. Prequalification Statement, Section 00 45 12
g. Conflict of Interest Affidavit, Section 00 35 13
*If necessary, CIO or CIS forms are to be provided directly to City Secretary
h. Any additional documents that may be required by Section 12 of the Instructions to Bidders
6. Total Bid Amount
6.1 Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the
space provided below, please enter the total bid amount for this project. Only this figure will be read publicly
by the City at the bid opening.
6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120327 Bid Proposal Workbook Add 3
00 41 00
BID FORM
Page 3 of 3
subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective
estimated quantities shown in this proposal and then totaling all of the extended amounts.
6.3. Evaluation of Bid Items
UNIT 1 -Water Improvements $0.00
UNIT 2-Pavement Improvements $0.00
Total Bid $3,377,262.15
7. Bid Submittal
This Bid is submitted on Thursday,August 24, 2017 by the entity named below.
Respectfully submitted, Receipt is acknowledged of the Initial
following Addenda.
By• - `-- Addendum No. 1: U�
(Signature)/ , ' Addendum No. 2:
l/ Addendum No. 3:
Ronald D Stinson,Jr Addendum No. 4:
(Printed Name)
Title: Vice President of Bus
Company: JLB Contracting Corporate Seal:
Address: PO Box 24131
Fort Worth,Texas 76124 GONIRACT���
�ti ,
State of Incorporation: Texas •�~ ��,.
Email: rstinson ,llbcontracting.com n=
SEP. �
Phone: 817-261-2991 %��•� •�
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Forth Revised 20120327 Bid Proposal Workbook Add 3
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Bidder`s:vposal
Ii IdI1a1;10,, lication
-41 Bid
Unit Price BidVinlue
Section No ""`"'� Quantity
-1 331 u.0261 8"PVC Water Pipe 33 11 12 LF 7,645 $56..35 $430,795.75
2 3311.0161 6"PVC Water Pipe 33 11 12 LF 140 $52,70 $7,378.00
3 3312.3003 8"Gate Valve 33 12 20 EA 32 $1,687.10 $53,987.20
4 3312.3002 6"Gate Valve 33 12 20 EA 14 $1,237.20 $17,320.80
5 3312.0001 Fire Hydrant and Extension 33 12 40 EA 8 $4,161.45 $33,291.60
6 3201.0113 6'Wide Asphalt Pvmt Repair, Residential 3201 17 LF 500 $72.00 $36,000.00
7 3201.0201 Asphalt Pvmt Repair Beyond Defined 3201 17 SY 300
Width,Residential $45.00 $13,500.00
8 3201.0400 Temporary Asphalt(2"HMAC on 6"CTB) 32 01 18 LF 11..128
Paving Repair $21.35 $237,582.80
9 3201.0614 Cone Pvmt Repair,Residential 32 01 29 SY 300 $152.00 $45,600.00
10 0241 1302 Remove 6"Water Valve 0241 14 EA 11 $168.70 $1,855.70
11 0241 1510 Salvage Fire Hydrant 0241 14 EA 7 $337.40 $2,361.80
12 3312.2004 1"Private Water Service Relocation 33 12 10 LF 1,650 $5.60 $9,240.00
13 3312.2001 1"Water Service,Meter Reconnection 33 12 10 EA 210 $371 15 $77,941.50
14 3312.2003 1"Water Service 33 12 10 EA 210 $1,428.00 $299,880.00
15 3312.2101 1 112"Water Service,Meter Reconnection 33 12 10 EA 1 $562.00 $562.00
16 3312.2103 1 1/2"Water Service 33 12 10 EA 1 $2,666.00 $2,666,00
17 3312.2201 2"Water Service,Meter Reconnection 33 12 10 EA 1 $618.60 $618.60
18 3312.2203 2"Water Service 33 12 10 EA 1 $2,925.00 $2,925.00
19 0330.0001 Concrete Encase Utility Pipe 03 30 00 CY 70 $157.45 $11,021.50
20 3305.0202 Imported Embedment/Backfill,CSS 33 05 10 CY 50 $94.50 $4,725.00
21 3305.0204 Imported Embedment/Backfill,Crushed 33 05 10 CY 50
Rock $38.25 $1,912.50
22 3305.0207 Imported Embedment/Backfill,Select Fill 33 05 10 CY 50 $27.00 $1,350.00
23 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 8 $112.50 $900.00
24 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 27 $2,081.00 $56,187.00
25 0241 1218 4"-12"Water Abandonment Plug 0241 14 EA 4 $225.00 $900.00
26 3304.0101 Temporary Water Services 33 04 30 LS 1 $78.730.00 $78,730.00
27 3125.0101 SWPPP z 1 acre 31 2500 LS 1 $2,812,00 $2,812.00
28 3305,0109 Trench Safety 33 05 10 LF 500 $1 10 $550.00
29 0241.0100 Remove Sidewalk on Houghton Aveneue 0241 13 SF 180
(Bourine Street to Hervie Street) $2.55 $459.00
30 0241.0401 Remove Concrete Drive on Houghton 0241 13 SF 1,700
Aveneue(Bourine Street to Hervie Street) $1.00 $1 700.00
31 0241 1300 Remove Cone Curb&Gutter on Houghton 0241 15 LF 1,003
Aveneue(Bourine Street to Hervie Street) $6.40 $6,419.20
32 0241 1700 11"Pavement Pulverization on Houghton 0241 15 SY 2,310
Aveneue(Bourine Street to Hervie Street) $5.80 $13,398.00
33 3123.0101 Unclassified Excavation by Plan on 31 2316 CY 149
Houghton Aveneue(Bourine Street to Hervie Street) $16.80 $2,503.20
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120 Bid Proposal Workbook Add 3
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
Description Unit Price Bid Value
No. Section No. Measure Quantity
34 3211.0600 Cement 26 lbs/SY on Houghton Aveneue 3211 33 TN 33
(Bourine Street to Hervie Street) $147.00 $4,851.00
35 3212.0303 3"Asphalt Pvmt Type D on Houghton 32 12 16 SY 2,310
Aveneue(Bourine Street to Hervie Street) $20.73 $47,886.30
36 3212.0401 HMAC Transition on Houghton Aveneue 32 12 16 TN 8
(Bourine Street to Hervie Street) $163.35 $1,306.80
37 3213.0301 4"Conic Sidewalk on Houghton Aveneue 32 13 20 SF 84
(Bourine Street to Hervie Street) $10.35 $869.40
38 3213.0401 6"Concrete Driveway on Houghton 32 13 20 SF 3,460
Aveneue(Bourine Street to Hervie Street) $7.20 $24,912.00
39 3216.0101 6"Conc Curb and Gutter on Houghton 321613 LF 1,003
Aveneue(Bourine Street to Hervie Street) $23.25 $23,319.75
40 3217.5001 Curb Address Painting on Houghton 32 17 25 EA 19
Aveneue(Bourine Street to Hervie Street) $41.60 $790.40
41 3291.0100 Topsoil on Houghton Aveneue(Bourine 3291 19 CY 40
Street to Hervie Street) $15.75 $630.00
42 3292.0100 Block Sod Placement on Houghton 32 92 13 SY 970
Aveneue(Bourine Street to Hervie Street) $5.90 $5,723.00
43 3305,0108 Miscellaneous Structure Adjustment(WM) 33 05 14 EA 20
on Houghton Aveneue(Bourine Street to Hervie Street) $112.45 $2,249.00
44 3305.0111 Valve Box Adjustment on Houghton 33 05 14 EA 1
Aveneue(Bourine Street to Hervie Street) $425.25 $425.25
45 0241.0401 Remove Concrete Drive on Prevost Street 0241 13 SF 180
(Farnsworth Avenue to Humbert Drive) $1.20 $216.00
46 0241 1700 11"Pavement Pulverization on Prevost 0241 15 SY 1,600
Street(Farnsworth Avenue to Humbert Drive) $5.30 $8,480.00
47 3211.0600 Cement 26 lbs/SY on Prevost Street 321133 TN 25
(Farnsworth Avenue to Humbert Drive) $147.35 $3,683.75
48 3212.0303 3"Asphalt Pvmt Type D on Prevost Street 32 12 16 SY 1,600
(Farnsworth Avenue to Humbert Drive) $21.64 $34,624.00
49 3212.0401 HMAC Transition on Prevost Street 32 12 16 TN 3
(Farnsworth Avenue to Humbert Drive) $168.50 $505.50
50 3213.0401 6"Concrete Driveway on Prevost Street 32 13 20 SF 220
(Farnsworth Avenue to Humbert Drive) $7.20 $1,584.00
51 3217.5001 Curb Address Painting on Prevost Street 32 17 25 EA 2
(Farnsworth Avenue to Humbert Drive) $41.60 $83.20
52 3216.0301 7"Conc Valley Gutter Residential on 32 16 13 SY 80
Prevost Street(Farnsworth Avenue to Humbert Drive)
$133.55 $10,684.00
53 3305.0111 Valve Box Adjustment on Prevost Street 33 05 14 EA 3
(Farnsworth Avenue to Humbert Drive) $410.45 $1,231.35
54 0171.0001 Construction Survey(GPS Red Line Survey) 01 71 23 LS 1 $5,623.60 $5,623.60
55 0171.0001 Construction 01 71 23 LS 1
Staking(Water) $5,623.60 $5,623.60
56 3471.0001 Trac Control 3471 13 MO 5 $1 125.00 $5.625 00
57 9999.0001 Water Construction Allowance 00 00 00 LS 1 $100,000m $100,000,00
UNIT 1-Water Line Improvements Total Bid $1,748,001.05
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120 ffid Proposal Workbook Add 3
00 42 43
BID PROPOSAL
Page 3 of 3
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidiist item Description Specification Unit of Bid Unit Price Bid Value
No. Section No. Measure Quantity
1 0241.0100 Remove Sidewalk 0241 13 SF 2,160 $0.95 $2,052.00
2 0241.0300 Remove ADA Ramp 0241 13 EA 6 $123.80 $742.80
3 0241.0401 Remove Concrete Drive 0241 13 SF 19,490 $0.90 $17,541.00
4 0241.0550 Remove,Salvage and Reuse Guardrail 0241 13 LF 100 $30.10 $3,010.00
5 0241.0700 Remove,Salvage and Reuse Mailbox 0241 13 EA 14 $576.95 $8,077.30
6 0241 1300 Remove Conc Curb&Gutter 0241 15 LF 5,006 $5.95 $29,785.70
7 0241 1700 11"Pavement Pulverization 0241 15 SY 28,180 $5.30 $149,354.00
8 3123.0101 Unclassified Excavation by Plan 31 23 16 CY 1,089 $16.00 $17,424.00
9 3201.0614 Conc Pvmt Repair,Residential 32 01 29 SY 50 $131 75 $6,587.50
10 3211.0600 Cement 26 lbs/SY 3211 33 TN 377 $147.35 $55,550.95
11 3212.0303 3"Asphalt Pvmt Type D 32 12 16 SY 28,180 $20.03 $564,445.40
12 3212.0401 HMAC Transition 32 12 16 TN 30 $168.50 $5,055.00
13 3213.0301 4"Conc Sidewalk 32 13 20 SF 20,000 $4.75 $95,000.00
14 3213.0401 6"Concrete Driveway 32 13 20 SF 19,580 $6.75 $132,165.00
15 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA 8 $1,056.75 $8,454.00
16 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 2 $643.25 $1,286.50
17 3213.0507 Barrier Free Ramp,Type P-2 32 13 20 EA 1 $712.70 $712.70
18 3216.0101 6"Conc Curb and Gutter 32 16 13 LF 12,361 $23.65 $292,337.65
19 3217.5001 Curb Address Painting 32 17 25 EA 161 $41.60 $6,697.60
20 3291.0100 Topsoil 3291 19 CY 429 $15.75 $6,756.75
21 3292.0100 Block Sod Placement 32 92 13 SY 11,790 $5.90 $69,561.00
22 3305.0107 Manhole Adjustment,Minor 33 05 14 EA 9 $660.50 $5,944.50
23 3305.0108 Miscellaneous Adjustment(Irrigation) 00 05 08 LS 1 $10,000.00 $10,000.00
24 3305.0108 Miscellaneous Structure Adjustment(WM) 33 05 14 EA 190 $41.20 $7,828.00
25 3305.0111 Valve Box Adjustment 33 05 14 EA 42 $410.50 $17,241.00
26 3125.0101 SWPPP 21 acre 312500 LS 1 $1,687.00 $1,687.00
27 3441.4110 Remove and Reinstall Sign Panel and Post 34 41 30 EA 17 $556.75 $9,464.75
28 0171.0001 Construction Staking(Paving) 01 71 23 LS 1 $4,499.00 $4,499.00
29 9999.0002 Paving Construction Allowance 00 00 00 LS 1 $100 000.00 $100,000.00
UNIT 2-Paving Improvements Total Bid $1,629,261.10
Bid Summary
UNIT 1-Water Line Improvements $1,748,001.05
UNIT 2-Paving Improvements $1,629,261.10
Total Bldl $3,377,262.151
CFTY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Fonn Revised 20120120 Bid Proposal Workbook Add
BID BOND
The American Institute of Architects,
AIA Document No. A310 (February, 1970 Edition)
KNOW ALL MEN BY THESE PRESENTS, that we JLB Contracting; LLC
as Principal hereinafter called the Principal, and Westfield. Insurance Col3anY
as Surety,hereinafter called the Surety, are held and firmly bound unto City of Fort Worth, Texas
as Obligee, hereinafter called the Obligee, in the sum of Five Percent of Bid(5%)----------------------------
Dollars ($ -------------- for the payment of which sum well and truly to be made,the said Principal and the
said Surety,bind ourselves, our heirs, executors, administrators, successors and assigns,jointly and severally,
firmly by these presents.
WHEREAS, the Principal has submitted a bid for 2014 CIP Year 3, Contract 2
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into
a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as
may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful
performance of such Contract and for the prompt payment of labor and material furnished in the
prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such
bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof
between the amount specified in said bid and such larger amount for which the Obligee may in good
faith contract with another party to perform the Work covered by said bid, then this obligation shall be
null and void, otherwise to remain in full force and effect.
Signed and sealed this 17th day of August 2017
011011181111 3LB CONTRACTING,LLC;
`�,1�+�1IriGN �c� ' / , Principal
(Seal)
"�
y�2
CJ )
opt E �. B
O 4 0. 4Ona on,Jr Name/Title
imL VO9.24, IW
Vice President of Business
" WESTFIELD INS COMPANY
.r��j '••... %!' ' Sarfy (Seal)
',,� SORT wpQ�•� /�'
By. _ —
Kyle W. Sweeney, At, ey-t.-Fact
POO,"WER rvn,An yISSr n UE•Dvnn,l.PRIOR oVvo I,' GUFJ.11111YKCVIIJUJ rviYCn ou+a•...•+
#AND 70 .04/20/11, FOR ANY PERSON OR PERSONS NAMED BELOW.
General POWER NO. 4220052 06
Power Westfield Insurance Co.
of Attorney Westfield National Insurance Co.
CERTIFIED COPY Ohio Farmers Insurance Co.
Westfield Center, Ohio
Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO
FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a "Company" and collectively as "Companies," duly
organized and existing under the laws of the State of Ohio, and having its principal office in Westfield Center, Medina County, Ohio,do by these
presents make,constitute and appoint
CHARLES D. SWEENEY, MICHAEL A.SWEENEY,KYLE W.SWEENEY, ELIZABETH GRAY,JOINTLY OR SEVERALLY
of FORT WORTH and State of TX its true and lawful Attorney(s)-in-Fact,with full power and authority hereby conferred in its name,
place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of
suretyship- - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - - --
LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE
GUARANTEE, OR BANK DEPOSITORY BONDS.
and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President,sealed with the corporate
seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do in
the.premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the
WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY:
'Be It Resolved,that the President,any Senior Executive,any Secretary or any Fidelity&Surety Operations Executive or other Executive shall
be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-fact to represent and act for
and on behalf of the Company subject to the following provisions:
The Attorney-in-Fact. may be given full power and authority for and in the name of and on behalf of the Company,to execute,acknowledge and
deliver,any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney-in-Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary.'
'Be it Further Resolved,that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any
power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signatures or facsimile
seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached." (Each adopted at a meeting
held on February 8,2000).
In Witness Whereof,WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE
COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 20th day of
APRIL A.D.,2011 .
Corporate .a'-•.u.wyy, `,,`.J..uuuyq�, �„w..arrsr.�,
seals r�•\�gYR,tkC4'w pt\ONAL iti �NSd WESTFIELD INSURANCE COMPANY
• ��,� 1 0 -s� • .•• =:Q_-% WESTFIELD NATIONAL INSURANCE COMPANY
Affixed .o' ••.a�s� * �•�'��= OHIO FARMERS INSURANCE COMPANY
_ � SEAL : IL
'� - SEAL = Ec*-.
rw%
"'•er. k s.oe•y..e.e•a.a•••"4 By.
State of Ohio Richard L. Kinnaird, Jr., !National Surety Leader and
County of Medina ss.: Senior Executive
On this 20th day of APRIL A.D.,2011 , before me personally came Richard L. Kinnaird, Jr. to me known,who, being by me duly
sworn, did depose and say,that he resldes'In .Medina, Ohio;that he is Senior Executive of WESTFIELD INSURANCE COMPANY,WESTFIELD
NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the above
instrument;that he knows the seals of said Companies,that the seals affixed to said instrument are such corporate seals;that they were so affixed
by order of the Boards of Directors of said Companies;and that he signed his name thereto by like order.
Notarial
Seal
Affixes''
• William J. Kahelin, A rney at Law, Notary Public
State of Ohio .tw o My Commission Does Not Expire(Sec.147.03 Ohio Revised Code)
County of Medina ss.:
I,Frank A..Carrino,Secretary of WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS
INSURANCE COMPANY, do hereby.certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said
Companies,which is still in full force and effect;and furthermore,the resolutions of the Boards of Directors,set out in the Power of Attorney are
in full force and effect.
In Witness Whereof, 1 have hereunto sat my hand' and affixed the seals of said Companies at Westfield Center, Ohio, this17th day of
August A D 201.7
•,.�.....�,;.,,,, •,,aotsl ur
• rr,
gyp ,......• •s ter.
SEAL' .m BCDt. Secretary
�y.,-�• �I� :, ,a =` ; 148: Frank A. Carrino,Secretary
•rl la ialaa• rI11••,raaa•••`',
BPOAC2 (combined) (06-02)
00 43 37
VENDOR COMPLIANCE TO STATE LAW
Page 1 of 1
SECTION 00 43 37
VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER
Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law
provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors
whose corporate offices or principal place of business are outside the State of Texas) bid projects for
construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident
bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in
order to obtain a comparable contract in the State which the nonresident's principal place of business is located.
The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet
specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident
bidders must check the box in Section B.
A. Nonresident bidders in the State of State Here or Blank , our principal place of business,
are required to be % Here percent lower than resident bidders by State Law. A copy of the
statute is attached,
Nonresident bidders in the State of State Here or Blank , our principal place of business,
are not required to underbnresident bidders.
B. The principal place of business of our company or our parent company or majority owner is
in the State of Texas.
BIDDER:
JLB Contracting By: Ronald D Stinson, Jr
PO Box 24131
(Signatur
Fort Worth, Texas 76124
Title: Vice President of Business Development
Date: Thursday,August 24, 2017
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20110627 Bid Proposal Workbook Add 3
004511-1
BIDDERS PREQUALIFICATIONS
Page 1 of 3
1 SECTION 00 4511
2 BIDDERS PREQUALIFICATIONS
3
4 1. Summary.All contractors are required to be prequalified by the City prior to submitting
5 bids.To be eligible to bid the contractor must submit Section 00 45 12,Prequalification
6 Statement for the work type(s)listed with their Bid.Any contractor or subcontractor who is
7 not prequalified for the work type(s)listed must submit Section 00 45 13,Bidder
8 Prequalification Application in accordance with the requirements below.
9
10 The prequalification process will establish a bid limit based on a technical evaluation and
11 financial analysis of the contractor.The information must be submitted seven(7)days prior
12 to the date of the opening of bids.For example,a contractor wishing to submit bids on
13 projects to be opened on the 7th of April must file the information by the 31 st day of March
14 in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's
15 Prequalification Application,the following must accompany the submission.
16 a. A complete set of audited or reviewed financial statements.
17 (1) Classified Balance Sheet
18 (2) Income Statement
19 (3) Statement of Cash Flows
20 (4) Statement of Retained Earnings
21 (5) Notes to the Financial Statements,if any
22 b. A certified copy of the firm's organizational documents(Corporate Charter,Articles
23 of Incorporation,Articles of Organization,Certificate of Formation,LLC
24 Regulations,Certificate of Limited Partnership Agreement).
25 c. A completed Bidder Prequalification Application.
26 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas
27 Comptroller of Public Accounts.To obtain a Texas Taxpayer Identification
28 number visit the Texas Comptroller of Public Accounts online at the
29 following web address www.window.state.tx.us/taxpermit/and fill out the
30 application to apply for your Texas tax ID.
31 (2) The firm's e-mail address and fax number.
32 (3) The firm's DUNS number as issued by Dun&Bradstreet.This number
33 is used by the City for required reporting on Federal Aid projects.The DUNS
34 number may be obtained at www.dnb.com.
35 d. Resumes reflecting the construction experience of the principles of the firm for firms
36 submitting their initial prequalification.These resumes should include the size and
37 scope of the work performed.
38 e. Other information as requested by the City.
39
40 2. Prequalification Requirements
41 a. Financial Statements.Financial statement submission must be provided in
42 accordance with the following:
43 (1) The City requires that the original Financial Statement or a certified copy
44 be submitted for consideration.
CITY OF FORT WORTH 2014 CIP,YEAR 3 -CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
0045 11-2
BIDDERS PREQUALIFICATIONS
Page 2 of 3
1 (2) To be satisfactory,the financial statements must be audited or reviewed
2 by an independent,certified public accounting firm registered and in
3 good standing in any state.Current Texas statues also require that
4 accounting firms performing audits or reviews on business entities within
5 the State of Texas be properly licensed or registered with the Texas State
6 Board of Public Accountancy.
7 (3) The accounting firm should state in the audit report or review whether
8 the contractor is an individual,corporation,or limited liability company.
9 (4) Financial Statements must be presented in U.S. dollars at the current rate
10 of exchange of the Balance Sheet date.
11 (5) The City will not recognize any certified public accountant as
12 independent who is not,in fact,independent.
13 (6) The accountant's opinion on the financial statements of the contracting
14 company should state that the audit or review has been conducted in
15 accordance with auditing standards generally accepted in the United
16 States of America.This must be stated in the accounting firm's opinion.
17 It should: (1)express an unqualified opinion,or(2)express a qualified
18 opinion on the statements taken as a whole.
19 (7) The City reserves the right to require a new statement at any time.
20 (8) The financial statement must be prepared as of the last day of any month,
21 not more than one year old and must be on file with the City 16 months
22 thereafter,in accordance with Paragraph 1.
23 (9) The City will determine a contractor's bidding capacity for the purposes
24 of awarding contracts. Bidding capacity is determined by multiplying the
25 positive net working capital(working capital=current assets—current
26 liabilities)by a factor of 10.Only those statements reflecting a positive
27 net working capital position will be considered satisfactory for
28 prequalification purposes.
29 (10) In the case that a bidding date falls within the time a new financial
30 statement is being prepared,the previous statement shall be updated with
31 proper verification.
32 b. Bidder Prequalification Application. A Bidder Prequalification Application must be
33 submitted along with audited or reviewed financial statements by firms wishing to be
34 eligible to bid on all classes of construction and maintenance projects.Incomplete
35 Applications will be rejected.
36 (1) In those schedules where there is nothing to report,the notation of
37 "None"or"N/A"should be inserted.
38 (2) A minimum of five(5)references of related work must be provided.
39 (3) Submission of an equipment schedule which indicates equipment under
40 the control of the Contractor and which is related to the type of work for
41 which the Contactor is seeking prequalification. The schedule must
42 include the manufacturer,model and general common description of
43 each piece of equipment.Abbreviations or means of describing
44 equipment other than provided above will not be accepted.
45
46 3. Eligibility to Bid
47 a. The City shall be the sole judge as to a contractor's prequalification.
48 b. The City may reject,suspend,or modify any prequalification for failure by the
49 contractor to demonstrate acceptable financial ability or performance.
50 c. The City will issue a letter as to the status of the prequalification approval.
CITY OF FORT WORTH 2014 CIP,YEAR 3 CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
0045 11-3
BIDDERS PREQUALIFICATIONS
Page 3 of 3
1 d. If a contractor has a valid prequalification letter,the contractor will be eligible to bid
2 the prequalified work types until the expiration date stated in the letter.
3
4
5
6
7
8 END OF SECTION
9
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
00 45 12
BID FORM
Page 1 of 1
SECTION 00 4512
PREQUALIFICATION STATEMENT
Each Bidder for a City procurement is required to complete the information below by identifying the prequalified
contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed.
Major Work Type Contractor/Subcontractor Company Name Prequalification
Expiration Date
Water Distribution,
Development, 8-inch diameter Woody Contractors 8/30/2018
and smaller
Asphalt Paving
Construction/Reconstruction JLB Contracting, LLC 12/31/2019
(15,000 square yards and
GREATER)
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are
currently prequalified for the work types listed.
BIDDER:
JLB Contracting By: Ronald D Stinson, Jr
PO Box 24131 -.
(Signatur
Fort Worth, Texas 76124
Title: Vice President of Business Development
Date: Thursday, August 24, 2017
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Forth Revised 20120120 Bid Proposal Workbook Add 3
004526-1
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page 1 of 1
1 SECTION 00 45 26
2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
3 Pursuant to Texas Labor Code Section 406.096(a),as amended, Contractor certifies that it
4 provides worker's compensation insurance coverage for all of its employees employed on City
5 Project No. 100744& 100747.Contractor further certifies that,pursuant to Texas Labor Code,
6 Section 406.096(b),as amended, it will provide to City its subcontractor's certificates of
7 compliance with worker's compensation coverage.
8
9 CONTRACTOR:
10
11 JLB Contracting,LLC By: Ronald D Stenson Jr
12 Company (Please Print
13 (::2 Z )
Z-
14 PO Box 24131 Signature:
15 Address
16
17 Fort Worth,Texas 76124 Title: Vice President,Business Development
18 City/State/Zip (Please Print)
19
20
21 THE STATE OF TEXAS §
22
23 COUNTY OF TARRANT §
24
25 gnajd
FORE ME, the undersigned authority, on this day personally appeared
26 >,�!im Jr , known to me to be the person whose name is
27 subscribed to the foreoin i stru ent, and acknowledged to me that he/she executed the same as
28 the act and deed of L /Jli`i for the purD@ ses and
29 consideration therein expressed and in the c acity therein stated.
30
31 GI EN DER MY HAND AND SEAL OF OFFICE this 7 d of
32 DI/U11 , 20L7.33
34
35 ,
r JE GREENWAY
O µ JAMIE
36 .`.otr,...�a�'�
SYS fSNotary Public,State of Texas No ublic in d for the Stat of T as
37 }��� Comm.Expires 09 25-2020
� Notary ID 1211545.4
�rnw
38 END OF SECT O
39
CITY OF FORT WORTH 2014 CIP YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.CO2693
Revised July 1,2011
004540-1
Minority Business Enterprise Specifications
Page I of 2
1 SECTION 00 45 40
2 Minority Business Enterprise Specifications
3
4 APPLICATION OF POLICY
5 If the total dollar value of the contract is greater than $50,000, then a MBE subcontracting goal is
6 applicable.
7
8 POLICY STATEMENT
9 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority
10 Business Enterprises (MBE) in the procurement of all goods and services. All requirements and
I I regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid.
12
13 MBE PROJECT GOALS
14 The City's. MBE goal on this project is 7% of the total bid value of the contract (Base bid applies to
15 Parks and Community Services.
16
17 Note: If both MBE and SBE subcontracting goals are established for this project, then an Offeror
18 must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive.
19
20 COMPLIANCE TO BID SPECIFICATIONS
21 On City contracts $50,000 or more where a MBE subcontracting goal is applied, Offerors are required to
22 comply with the intent of the City's Busincss Diversity Enterprise Ordinance by one of the following:
23 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation,or
24 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation,or
25 3. Good Faith Effort documentation,or;
26 4. Prime Waiver documentation.
27
28 SUBMITTAL OF REQUIRED DOCUMENTATION
29 The applicable documents must be received by the Purchasing Division, within the following times
30 allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall
31 deliver the MBE documentation in person to the appropriate employee of the purchasing division and
32 obtain a date/time receipt. Such receipt shall be evidence that the City received the documentation in the
33 time allocated. A faxed and/or emailed copy will not be accepted.
34
1. Subcontractor Utilization Form, if received no later than 2:00 p.m., on the second City business
goal is met or exceeded: day after the bid opening date, exclusive of the bid opening
date.
2. Good Faith Effort and received no later than 2:00 p.m., on the second City business
Subcontractor Utilization Form,if day after the bid opening date, exclusive of the bid opening
participation is less than statedgoal: date.
3, Good Faith Effort and received no later than 2:00 p.m., on the second City business
Subcontractor Utilization Form, if no day after the bid opening date, exclusive of the bid opening
MBE participation: date.
4. Prime Contractor Waiver Form, received no later than 2:00 p.m., on the second City business
if you will perform all day after the bid opening date, exclusive of the bid opening
contracting/supplier work: date;.
35
CITY OF FORT WORTH 2014 C1P,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Prajeot No.02693
Revised June 9,2015
004540-2
Minority Business Enterprise Specifications
Page 2 of 2
1
5. Joint Venture Form, if goal is met received no later than 2:00 p.m., on the second City business
or exceeded. day after the bid opening date, exclusive of the bid opening
date.
2 FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE
3 WILL RESULT IN THE BID BEING CONSIDERED NON-RESONSIVE TO SPECIFICATIONS.
4 FAILURE TO SUBMIT THE REQUIRED MBE DOCUMENTATION WILL RESULT IN THE BID
BEING CONSIDERED NON-RESPONSIVE.A SECOND FAILURE WILL RESULT IN THE OFFEROR
S BEING DISQUALIFIED FOR A PERIOD OF ONE YEAR THREE FAILURES IN A FIVE YEAR
PERIOD WILL RESULT IN A DISQUALIFICAITON PERIOD OF THREE YEARS.
6
7 Any Questions,Please Contact The M/WBE Office at(817)212-2674.
8 END OF SECTION
9
10
11
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised lune 9,2015
005243-1
Agreement
Page 1 of 5
1 SECTION 00 52 43
2 AGREEMENT
3 THIS AGREEMENT, authorized on 11/7/2017 is made by and between the City of Forth
4 Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager,
5 ("City"),and JLB Contracting,LLC, authorized to do business in Texas, acting by and through its
6 duly authorized representative,("Contractor").
7 City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
8 follows:
9 Article 1.WORK
10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the
11 Project identified herein.
12 Article 2.PROJECT
13 The project for which the Work under the Contract Documents may be the whole or only a part is
14 generally described as follows:
15 2014 CEP Year 3—Contract 2
16 CO2693
17 Article 3.CONTRACT TIME
18 3.1 Time is of the essence.
19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
20 Documents are of the essence to this Contract.
21 3.2 Final Acceptance.
22 The Work will be complete for Final Acceptance within 300 days after the date when the
23 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions.
24 3.3 Liquidated damages
25 Contractor recognizes that time is of the essence of this Agreement and that City will
26 suffer financial loss if the Work is not completed within the times specified in Paragraph
27 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the
28 General Conditions. The Contractor also recognizes the delays, expense and difficulties
29 involved in proving in a legal proceeding the actual loss suffered by the City if the Work
30 is not completed on time. Accordingly, instead of requiring any such proof, Contractor
31 agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay
32 City Six Hundred and Fifty Dollars ($650.00for each day that expires after the time
33 specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of
34 Acceptance.
CITY OF FORT WORTH 2014 CIP YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.CO2693
Revised January 6,2017
005243-2
Agreement
Page 2 of 5
35 Article 4. CONTRACT PRICE
36 City agrees to pay Contractor for performance of the Work in accordance with the Contract
37 Documents an amount in current funds of Three Million,Three Hundred Seven, -Seven
38 Thousand,Two Hundred Sixty-Two and 151100 Dollars($3,377,262.15).
39 Article 5. CONTRACT DOCUMENTS
40 5.1 CONTENTS:
41 A. The Contract Documents which comprise the entire agreement between City and
42 Contractor concerning the Work consist of the following:
43 1. This Agreement.
44 2. Attachments to this Agreement:
45 a. Bid Form
46 1) Proposal Form
47 2) Vendor Compliance to State Law Non-Resident Bidder
48 3) Prequalification Statement
49 4) State and Federal documents(project specific)
50 b. Current Prevailing Wage Rate Table
51 c. Insurance ACORD Form(s)
52 d. Payment Bond
53 e. Performance Bond
54 f. Maintenance Bond
55 g. Power of Attorney for the Bonds
56 h. Worker's Compensation Affidavit
57 i. MBE and/or SBE Commitment Form
58 j. Form 1295 Certification No. 2017-264341
59 3. General Conditions.
60 4. Supplementary Conditions.
61 S. Specifications specifically made a part of the Contract Documents by attachment
62 or, if not attached, as incorporated by reference and described in the Table of
63 Contents of the Project's Contract Documents.
64 6. Drawings.
65 7. Addenda.
66 8. Documentation submitted by Contractor prior to Notice of Award.
67 9. The following which may be delivered or issued after the Effective Date of the
68 Agreement and,if issued,become an incorporated part of the Contract Documents:
69 a. Notice to Proceed.
70 b. Field Orders.
71 c. Change Orders.
72 d. Letter of Final Acceptance.
73
74
CITY OF FORT WORTH 2014 CIP YEAR 3,_CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.CO2693
Revised January 6,2017
005243-3
Agreement
Page 3 of 5
75 Article 6.INDEMNIFICATION
76 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
77 expense, the city, its officers, servants and employees, from and against any and all
78 claims arising out of, or alleged to arise out of, the work and services to be performed
79 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
80 under this contract. This indemnification provision is specifically intended to operate
81 and be effective even if it is alleged or proven that all or some of the damages being
82 sought were caused, in whole or in part, by any act, omission or negligence of the city.
83 This indemnity provision is intended to include, without limitation, indemnity for
84 costs,expenses and legal fees incurred by the city in defending against such claims and
85 causes of actions.
86
87 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
88 the city,its officers,servants and employees,from and against any and all loss,damage
89 or destruction of property of the city,arising out of,or alleged to arise out of,the work
90 and services to be performed by the contractor, its officers, agents, employees,
91 subcontractors, licensees or invitees under this contract. This indemnification
92 provision is specifically intended to operate and be effective even if it is alleged or
93 proven that all or some of the damages being sought were caused, in whole or in part,
94 by any act,omission or negligence of the city.
95
96 Article 7.MISCELLANEOUS
97 7.1 Terms.
98 Terms used in this Agreement which are defined in Article I of the General Conditions will
99 have the meanings indicated in the General Conditions.
100 7.2 Assignment of Contract.
101 This Agreement, including all of the Contract Documents may not be assigned by the
102 Contractor without the advanced express written consent of the City.
103 7.3 Successors and Assigns.
104 City and Contractor each binds itself, its partners, successors, assigns and legal
105 representatives to the other party hereto, in respect to all covenants, agreements and
106 obligations contained in the Contract Documents.
107 7.4 Severability.
108 Any provision or part of the Contract Documents held to be unconstitutional, void or
109 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
110 remaining provisions shall continue to be valid and binding upon CITY and
111 CONTRACTOR.
112 7.5 Governing Law and Venue.
113 This Agreement, including all of the Contract Documents is performable in the State of
114 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
115 Northern District of Texas,Fort Worth Division.
CITY OF FORT WORTH 2014 CIP YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.CO2693
Revised January 6,2017
005243-4
Agreement
Page 4 of 5
116 7.6 Other Provisions.
117 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is
118 classified, promulgated and set out by the City, a copy of which is attached hereto and
119 made a part hereof the same as if it were copied verbatim herein.
120 7.7 Authority to Sign.
121 Contractor shall attach evidence of authority to sign Agreement, if other than duly
122 authorized signatory of the Contractor.
123
124
CITY OF FORT WORTH 2014 CIP YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.CO2693
Revised January 6,2017
005243-5
Agreement
Page 5 of 5
125 IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple
126 counterparts.
127
128 This Agreement is effective as of the last date signed by the Parties("Effective Date").
129
Contractor: City of Fort Worth
JLB Contracting, LLC �-
By:_ �-
Jay Chapa
By Assistant City Manager
(Signature)
Date
Ronald D. Stinson,Jr. Attest: l •.12�
(Printed Name) City S Wtary
(Seal) --I
Title: Vice President,
Business Development '•Mfr
Address: PO Box 24131 "`AS
M&C C-28469
Date: 11/7/2017
City/State/Zip: Fort Worth, Texas 76124 Contra t Compliance Manager:
By signing, I acknowledge that I am the person responsible
y,��� for the monitoring and administration of this contract,
Date including ensuring all performance and reporting
require nts.
P oje
airy
Approved a to Form and Legality:
Douglas W. Black
Assistant City Attorney
130
131
132 4D�
AL RECOMMENDED:
133
134
135
136 Gr iersig,P.E.
137
138 l"ra hsportatioii &Public Works
OFFICIAL RECORD
CITY OF FORT WORTH CITY SECRETARY 2014 CIP YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Fr.WORTM,TX City Project No.CO2693
Revised January 6,2017
PROHIBITION ON CONTRACTS WITH COMPANIES BOYCOTTING
ISRAEL
Contractor acknowledges that in accordance with Chapter 2270 of the Texas
Government Code, the City is prohibited from entering into a contract with a
company for goods or services unless the contract contains a written verification
from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel
during the term of the contract. The terms "boycott Israel" and "company" shall
have the meanings ascribed to those terms in Section 808.001 of the Texas
Government Code. By signing this contract, Contractor certifies that Contractor's
signature provides written verification to the City that Contractor: (1) does not
boycott Israel; and (2) will not bo cott Israel during the term of the contract.
Signature Ronald D Stlns; ,Jr
Vloe President of Business
Development
Title
Date
0061 13-1
PERFORMANCE BOND
Page l of 2
Bond No. 8368033
1 SECTION 00 61 13
2 PERFORMANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, JLB Contracting,LLC , known as "Principal"herein and
8 Westfield Insurance Company , a corporate surety(sureties, if more than one)
9 duly authorized to do business in the State of Texas,known as"Surety"herein(whether one or
10 more),are held and firmly bound unto the City of Fort Worth, a municipal corporation created
11 pursuant to the laws of Texas, known as"City"herein, in the penal sum of,Three Million,Three
12 Hundred Seventy-Seven Thousand,Two Hundred Sixty-Two Dollars &Fifteen Cents
13 ($3,377,262.15) lawful money of the United States,to be paid in Fort Worth,Tarrant County,
14 Texas for the payment of which sum well and truly to be made,we bind ourselves, our heirs,
15 executors, administrators, successors and assigns,jointly and severally, firmly by these presents.
16 WHEREAS,the Principal has entered into a certain written contract with the City
17 awarded the 7d' day of November___,2017,which Contract is hereby referred to and
18 made a part hereof for all purposes as if fully set forth herein,to furnish all materials,equipment
19 labor and other accessories defined by law, in the prosecution of the Work, including any Change
20 Orders, as provided for in said Contract designated as 2014 CIP YEAR 3 —CONTRACT 2,
21 CO2693.
22 NOW,THEREFORE,the condition of this obligation is such that if the said Principal
23 shall faithfully perform it obligations under the Contract and shall in all respects duly and
24 faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
25 specifications, and contract documents therein referred to,and as well during any period of
26 extension of the Contract that may be granted on the part of the City,then this obligation shall be
27 and become null and void,otherwise to remain in full force and effect.
28 PROVIDED FURTHER,that if any legal action be filed on this Bond,venue shall lie in
29 Tarrant County,Texas or the United States District Court for the Northern District of Texas, Fort
30 Worth Division.
CITY OF FORT WORTH 2014 CIP YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CO2693
Revised July 1,2011
0061 13-2
PERFORMANCE BOND
Page 2 of 2
Bond No. 8368033
1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
2 Texas Government Code, as amended,and all liabilities on this bond shall be determined in
3 accordance with the provisions of said statue.
4 IN WITNESS WHEREOF,the Principal and the Surety have SIGNED and SEALED
5 this instrument by duly authorized agents and officers on this the 15'h day of_November, 20 17.
6 PRINCIPAL:
7 JLB CONTRACTING,LLC
8 _
9
10 BY��
11 Signatur Ronald 0 Stlnsln,Jr
12 TTEST:
13 ,,ice president of Business
14 IL— pevewpment
15 (Prirn pal Secre ry Name and Title
16
17 Address:P.O.Box 24131
18 Fort Worth,Texas 76124
19
20
21 Witn s as to Principal
22 SURETY:
23 WESTFIELD INSURANCE COMPANY
24 _
25
26 BY
27 Signature
28
29 Kyle W. Sweeney,Attorney-in-Fact -
30 Name and Title
31
32 Address: 555 Republic Drive, Suite 450
33 Plano,Texas 75074
34
35
36 Witness o Surety Elizabeth Gray Telephone Number: 972-516-2600
37
38
39
40 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract
41 from the by-laws showing that this person has authority to sign such obligation. If
42 Surety's physical address is different from its mailing address, both must be provided.
43 The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH 2014rt BAR 3-CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS ---_— - CO2693
Revised July 1,2011
0061 14-1
PAYMENTBOND
Page 1 of 2
Bond No. 8368033
1 SECTION 00 61 14
2 PAYMENT BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, JLB Contracting,LLC known as "Principal" herein, and
8 Westfield Insurance Company , a corporate surety (sureties), duly authorized to
9 do business in the State of Texas, known as"Surety" herein (whether one or more), are held and
10 firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of
11 the State of Texas, known as "City" herein, in the penal sum of Three Million, Three Hundred
12 Seventy-Seven Thousand, Two Hundred Sixty-Two Dollars & Fifteen Cents ($3,377,262.15),
13 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the
14 payment of which sum well and truly be made, we bind ourselves, our heirs, executors,
15 administrators, successors and assigns,jointly and severally, firmly by these presents:
16 WHEREAS, Principal has entered into a certain written Contract with City, awarded
17 the 7`h day of November , 2017 ,which Contract is hereby referred to and made a part
18 hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor and
19 other accessories as defined by law, in the prosecution of the Work as provided for in said
20 Contract and designated as 2014 CIP YEAR 3 —CONTRACT 2, CO2693.
21 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
22 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
23 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
24 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
25 force and effect.
26 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
27 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
28 accordance with the provisions of said statute.
29
CITY OF FORT WORTH 2014 CIP YEAR 3 CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CO2693
Revised July 1,2011
0061 14-2
PAYMENT BOND
Page 2 of 2
Bond No. 8368033
1 IN WITNESS WHEREOF,the Principal and Surety have each SIGNED and SEALED
2 this instrument by duly authorized agents and officers on this the 15t1i day of November,20 17.
3
PRINCIPAL:
JLB CONTRACTING, LLC
EST. BY
Signature onald D St n,Jr
Vice President of Business
De�lnnm.nt
T
(Pri ip 1) Secr a Name and Title •1
Address: P.O. Box 24131
6? Fort Worth,Texas 76124
itne as to Principal
SURETY:
WESTFIELD INSURANCE COMPANY
ATTEST: BY:
ggnatureO"�
Kyle W. Sweeney,Attorney-in-Fact
(Surety) Secretary Frank A. Carrino Name and Title
Address: 555 Republic Drive, Suite 450
Plano,Texas 75074
Witness to Surety Eliza �thGrayy
Telephone Number: 972-516-2600
4
5 Note: If signed by an officer of the Surety, there must be on file a certified extract from the
6 bylaws showing that this person has authority to sign such obligation. If Surety's physical
7 address is different from its mailing address,both must be provided.
8
9 The date of the bond shall not be prior to the date the Contract is awarded.
10 END OF SECTION
11
CITY OF FORT WORTH :CIP YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CO2693
Revised July 1,2011
0061 19-1
MAINTENANCE BOND
Page l of 3
Bond No. 8368033
1 SECTION 00 61 19
2 MAINTENANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7
8 That we JLB Contracting, LLC , known as"Principal'herein and
9 Westfield Insurance Company , a corporate surety(sureties, if more than one)
10 duly authorized to do business in the State of Texas, known as"Surety"herein(whether one or
11 more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created
12 pursuant to the laws of the State of Texas,known as"City"herein, in the sum of Three Million,
13 Three Hundred Seventy-Seven Thousand,Two Hundred Sixty-Two Dollars&Fifteen Cents
14 ($3,377,262.15), lawful money of the United States,to be paid in Fort Worth,Tarrant County,
15 Texas, for payment of which sum well and truly be made unto the City and its successors,we
16 bind ourselves,our heirs, executors,administrators,successors and assigns,jointly and severally,
17 firmly by these presents.
18
19 WHEREAS,the Principal has entered into a certain written contract with the City awarded
20 the 7' day of November ,2017 , which Contract is hereby referred to and a made
21 part hereof for all purposes as if fully set forth herein,to furnish all materials,equipment labor
22 and other accessories as defined by law, in the prosecution of the Work, including any Work
23 resulting from a duly authorized Change Order(collectively herein,the"Work")as provided for
24 in said contract and designated as 2014 CIP YEAR 3 —CONTRACT 2, CO2693; and
25
26 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
27 accordance with the plans, specifications and Contract Documents that the Work is and will
28 remain free from defects in materials or workmanship for and during the period of two(2)years
29 after the date of Final Acceptance of the Work by the City("Maintenance Period");and
30
31 WHEREAS,Principal binds itself to repair or reconstruct the Work in whole or in part
32 upon receiving notice from the City of the need thereof at any time within the Maintenance
33 Period.
34
CITY OF FORT WORTH 2014 CIP YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CO2693
Revised July 1,2011
0061 19-2
MAINTENANCE BOND
Page 2 of 3
Bond No. 8368033
1 NOW THEREFORE, the condition of this obligation is such that if Principal shall
2 remedy any defective Work, for which timely notice was provided by City,to a completion
3 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in
4 full force and effect.
5
6 PROVIDED,HOWEVER, if Principal shall fail so to repair or reconstruct any timely
7 noticed defective Work, it is agreed that the City may cause any and all such defective Work to
8 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and
9 the Surety under this Maintenance bond; and
10
11 PROVIDED FURTHER, that if any legal action be filed on this Bond,venue shall lie in
12 Tarrant County,Texas or the United States District Court for the Northern District of Texas, Fort
13 Worth Division;and
14
15 PROVIDED FURTHER,that this obligation shall be continuous in nature and
16 successive recoveries may be had hereon for successive breaches.
17
18
19
CITY OF FORT WORTH 2014 CIP YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CO2693
Revised July 1,2011
0061 19-3
MAINTENANCE BOND
Page 3 of 3
Bond No. 8368033
l IN WITNESS WHEREOF,the Principal and the Surety have each SIGNED and SEALED this
2 instrument by duly authorized agents and officers on this the 15t1i day of November ,20 17
3
4 PRINCIPAL:
5 JLB CONTRACTING,LLC
6 _
7
8 B
Ronald D
10 TTE Stinson, r
11 Vice President of Business
12 nt
13 (P ipal)tecretly Name an It e r
14
15 Address:P.O. Box 24131
16 Fort Worth,Texas 76124
17
18
19 Wit ess as to Principal
20 SURETY:
21 WESTFIELD INSURANCE COMPANY
22
'23
24 BY:
25 Signature
26
27 Kyle W. Sweeney, Attorney-in-Fact
28 ATTEST�:� Name and Title
29
30 "'"""` -� Address: 555 Republic Drive, Suite 450
31 (Surety)Secretary Frank A. Carrino Plano,Texas 75074
32
33
34 Witness &Ko Surety Elizabeth Gray Telephone Number:972-516-2600
35
36 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract
37 from the by-laws showing that this person has authority to sign such obligation. If
38 Surety's physical address is different from its mailing address, both must be provided.
39 The date of the bond shall not be prior to the date the Contract is awarded.
40
CITY OF FORT WORTH `2014 CIP YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CO2693
Revised July 1,2011
IMPORTANT NOTICE AVISO IMPORTANTE
To obtain information or make a complaint: Para obtener informacion o para someter una
queja:
You may call Westfield Insurance Company's
and/or Ohio Farmers Insurance Company's Usted puede Ilamar al numero de telefono gratis de
toll-free telephone number for information or to Westfield Insurance Company's /Ohio Farmers
make a complaint at: Insurance Company's para informacion o para
someter una queja al:
1-800-368-3597
1-800-368-3597
You may also write to Westfield Insurance
Company and/or Ohio Farmers Insurance Usted tambien puede escribir a Westfield Insurance
Company at: Company /Ohio Farmers Insurance Company:
555 Republic Drive, Suite 450 555 Republic Drive, Suite 450
Plano, Texas 75074-8848 Plano, Texas 75074-8848
You may contact the Texas Department of Puede comunicarse con el Departamento de
Insurance to obtain information on Seguros de Texas para obtener informacion acerca
companies, coverages, rights or complaints de companias, coberturas, derechos o quejas al:
at:
1-800-252-3439
1-800-252-3439
Puede escribir al Departamento de Seguros de
You may write the Texas Department of Texas:
Insurance:
P. O. Box 149104
P. O. Box 149104 Austin, TX 78714-9104
Austin, TX 78714-9104 Fax: (512) 475-1771
Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us
Web: http://www.tdi.state.tx.us E-mail: Cons umerProtection(-)tdi.state.tx.us
E-mail: ConsumerProtection(aD-tdi.state.tx.us
DISPUTAS SOBRE PRIMAS O RECLAMOS:
PREMIUM OR CLAIM DISPUTES: Si tiene una disputa concerniente a su prima o a un
Should you have a dispute concerning your reclamo, debe comunicarse con el agente o
premium or about a claim you should Westfield Insurance Company/Ohio Farmers
contact the agent or Westfield Insurance Insurance Company primero. Si no se resuelve la
Company and/or Ohio Farmers Insurance disputa, puede entonces comunicarse con el
Comapny first. If the dispute is not resolved, departamento (TDI).
you may contact the Texas Department of
Insurance. UNA ESTE AVISO A SU POLIZA: Este aviso es
solo para proposito de informacion y no se
ATTACH THIS NOTICE TO YOUR convierte en parte o condicion del documento
POLICY: This notice is for information only adjunto.
and does not become a part or condition of
the attached document.
THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING 1 till JAMt
POWER#AND ISSUED PRIOR TO 04120/11, FOR ANY PERSON OR PERSONS NAMED BELOW.
POWER NO 4220052 06
General
Power Westfield Insurance Co.
of Attorney Westfield National Insurance Co.
Ohio Farmers Insurance Co.
CERTIFIED COPY Westfield Cen,er, Ohio
Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO
FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a "Company" and collectively as "Companies," duly
organized and existing under the laws of the State of Ohio, and having its principal office in Westfield Center, Medina County, Ohio,do by these
presents make,constitute and appoint
CHARLES D. SWEENEY, MICHAEL A.SWEENEY, KYLE W. SWEENEY, ELIZABETH GRAY,JOINTLY OR SEVERALLY
of FORT WORTH and State of TX its true and lawful Attorney(s)-in-Fact,with full power and authority hereby conferred in its name,
place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of
suretyship- - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - - --
LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE
GUARANTEE, OR BANK DEPOSITORY BONDS.
and to bind any of the Companies thereby as fully and to the same extent-as if such bonds were signed by the President,sealed with the corporate
seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do in
the premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the
WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY:
"Be It Resolved,that the President,any Senior Executive, any Secretary or any Fidelity& Surety Operations Executive or other Executive shall
be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorneys)-in-Fact to represent and act for
and on behalf of the Company subject to the following provisions:
The Attorney-in-Fact. may be given full power and authority for and in the name of and on behalf of the Company,to execute,acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney-in-Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary."
'Be it Further Resolved,that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any
power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signatures or facsimile
seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached.' (Each adopted at a meeting
held on February 8,2000).
In Witness Whereof,WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE
COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 20th day of
APRIL A.D.,2011
.�,w....w,„•y ,•u.ua.",.• „•..aura
Corporate
`asuR pc'- aP�%oNA�.!N '' �1lisu, WESTFIELD INSURANCE COMPANY
Affixed v''..ea. •F ;p: <<: '' ' `'�Z'+� WESTFIELD NATIONAL INSURANCE COMPANY
`.: , .f f y�:G1i�TEIR D� OHIO FARMERS INSURANCE COMPANY
xx rr `1u;
SEAL h T
ilk"l � > C3Ltsv N SEAL :$v=
�,• .,e. .�� 3 :• •:O sd:. 1848
.'`•.....rte �'` * .p. '•!= • ' 1r
t k..•'
By:
State of Ohio ��•w. •,,,,,,,,,,,,,,••' •••.�....«...,.•.
Richard L. Kinnaird, Jr., National Surety Leader and
County of Medina ss.: Senior Executive
On this 20th day of APRIL A.D.,2011 , before me personally came Richard L. Kinnaird, Jr. to me known, who, being by me duly
sworn, did depose and say,that he resides-in Medina, Ohio;that he is Senior Executive of WESTFIELD INSURANCE COMPANY,WESTFIELD
NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the above
instrument;that he knows the seals of said Companies;that the seals affixed to said instrument are such corporate seals;that they were so affixed
by order of the Boards of Directors of said Companies;and that he signed his name thereto by like order.
Notarial ,` .....«M4, �
Seal ,•`• �1 A I-
S
Affixed �°
• William J. Kahelin, A rney at Law, Notary Public
State of Ohio ;1P o My Commission Does Not Expire(Sec. 147.03 Ohio Revised Code)
County of Medina ss.:
.,ti•f O F
I, Frank A.Carrino,Secretary of WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS
INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said
Companies,which is still in full force and effect;and furthermore,the resolutions of the Boards of Directors, set out in the Power of Attorney are
in full force and effect.
In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies atr;'4?hlo, this 15th day of
Noveml 2;:,,,, 2017 - _ -
...»..•, � s �1C)
AC
•.N /BSc r'"�� �,(�•`4
4
4�4AiL,t• CIL i SEA :m _ .Ci1♦�i .33 -
�iy :� '�. ?�j:• Secrdary
1848
l ti•'�` ,,+'�tj sz�• :o. •�_ Frank A. Carrino,secrdory
BPOAC2(combined) (06-02)
STANDARD GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febmary2,2016
STANDARD GENERAL CONDITIONS OF THE
CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1 —Definitions and Terminology..........................................................................................................l
1.01 Defined Terms...............................................................................................................................l
1.02 Terminology..................................................................................................................................6
Article2—Preliminary Matters.........................................................................................................................7
2.01 Copies of Documents....................................................................................................................7
2.02 Commencement of Contract Time;Notice to Proceed................................................................7
2.03 Starting the Work..........................................................................................................................8
2.04 Before Starting Construction........................................................................................................8
2.05 Preconstruction Conference..........................................................................................................8
2.06 Public Meeting..............................................................................................................................8
2.07 Initial Acceptance of Schedules....................................................................................................8
Article 3—Contract Documents: Intent,Amending,Reuse............................................................................8
3.01 Intent..............................................................................................................................................8
3.02 Reference Standards......................................................................................................................9
3.03 Reporting and Resolving Discrepancies.......................................................................................9
3.04 Amending and Supplementing Contract Documents.................................................................10
3.05 Reuse of Documents....................................................................................................................10
3.06 Electronic Data............................................................................................................................11
Article 4—Availability of Lands; Subsurface and Physical Conditions;Hazardous Environmental
Conditions; Reference Points...........................................................................................................11
4.01 Availability of Lands..................................................................................................................11
4.02 Subsurface and Physical Conditions..........................................................................................12
4.03 Differing Subsurface or Physical Conditions.............................................................................12
4.04 Underground Facilities...............................................................................................................13
4.05 Reference Points.........................................................................................................................14
4.06 Hazardous Environmental Condition at Site..............................................................................14
Article 5—Bonds and Insurance.....................................................................................................................16
5.01 Licensed Sureties and Insurers...................................................................................................16
5.02 Performance,Payment,and Maintenance Bonds.......................................................................16
5.03 Certificates of Insurance.............................................................................................................16
5.04 Contractor's Insurance................................................................................................................18
5.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................19
Article 6—Contractor's Responsibilities........................................................................................................19
6.01 Supervision and Superintendence...............................................................................................19
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fly 2,2016
6.02 Labor;Working Hours................................................................................................................20
6.03 Services,Materials, and Equipment...........................................................................................20
6.04 Project Schedule..............,,..........................................................................................................21
6.05 Substitutes and"Or-Equals".......................................................................................................21
6.06 Concerning Subcontractors, Suppliers,and Others....................................................................24
6.07 Wage Rates..................................................................................................................................25
6.08 Patent Fees and Royalties...........................................................................................................26
6.09 Permits and Utilities....................................................................................................................27
6.10 Laws and Regulations.................................................................................................................27
6.11 Taxes...........................................................................................................................................28
6.12 Use of Site and Other Areas.......................................................................................................28
6.13 Record Documents......................................................................................................................29
6.14 Safety and Protection..................................................................................................................29
6.15 Safety Representative..................................................................................................................30
6.16 Hazard Communication Programs.............................................................................................30
6.17 Emergencies and/or Rectification...............................................................................................30
6.18 Submittals....................................................................................................................................31
6.19 Continuing the Work...................................................................................................................32
6.20 Contractor's General Warranty and Guarantee..........................................................................32
6.21 Indemnification.........................................................................................................................33
6.22 Delegation of Professional Design Services..............................................................................34
6.23 Right to Audit.......................................................................................... ...................................34
6.24 Nondiscrimination.......................................................................................................................35
Article7-Other Work at the Site...................................................................................................................35
7.01 Related Work at Site...................................................................................................................35
7.02 Coordination................................................................................................................................36
Article8-City's Responsibilities...................................................................................................................36
8.01 Communications to Contractor...................................................................................................36
8.02 Furnish Data................................................................................................................................36
8.03 Pay When Due............................................................................................................................36
8.04 Lands and Easements;Reports and Tests...................................................................................36
8.05 Change Orders.............................................................................................................................36
8.06 Inspections,Tests, and Approvals..............................................................................................36
8.07 Limitations on City's Responsibilities.......................................................................................37
8.08 Undisclosed Hazardous Environmental Condition....................................................................37
8.09 Compliance with Safety Program...............................................................................................37
Article 9-City's Observation Status During Construction...........................................................................37
9.01 City's Project Manager ............................................................................................................37
9.02 Visits to Site................................................................................................................................37
9.03 Authorized Variations in Work..................................................................................................38
9.04 Rejecting Defective Work..........................................................................................................38
9.05 Determinations for Work Performed..........................................................................................38
9.06 Decisions on Requirements of Contract Documents and Acceptability of Work.....................38
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnmy 2,2016
Article 10-Changes in the Work;Claims; Extra Work................................................................................38
10.01 Authorized Changes in the Work...............................................................................................38
10.02 Unauthorized Changes in the Work...........................................................................................39
10.03 Execution of Change Orders.......................................................................................................39
10.04 Extra Work..................................................................................................................................39
10.05 Notification to Surety..................................................................................................................39
10.06 Contract Claims Process.............................................................................................................40
Article 11 -Cost of the Work;Allowances; Unit Price Work; Plans Quantity Measurement......................41
11.01 Cost of the Work.........................................................................................................................41
11.02 Allowances..................................................................................................................................43
11.03 Unit Price Work..........................................................................................................................44
11.04 Plans Quantity Measurement......................................................................................................45
Article 12---Change of Contract Price; Change of Contract Time.................................................................46
12.01 Change of Contract Price............................................................................................................46
12.02 Change of Contract Time............................................................................................................47
12.03 Delays..........................................................................................................................................47
Article 13-Tests and Inspections; Correction,Removal or Acceptance of Defective Work......................48
13.01 Notice of Defects........................................................................................................................48
13.02 Access to Work...........................................................................................................................48
13.03 Tests and Inspections..................................................................................................................48
13.04 Uncovering Work........................................................................................................................49
13.05 City May Stop the Work.............................................................................................................49
13.06 Correction or Removal of Defective Work................................................................................50
13.07 Correction Period........................................................................................................................50
13.08 Acceptance of Defective Work...................................................................................................51
13.09 City May Correct Defective Work.............................................................................................51
Article 14-Payments to Contractor and Completion....................................................................................52
14.01 Schedule of Values......................................................................................................................52
14.02 Progress Payments......................................................................................................................52
14.03 Contractor's Warranty of Title...................................................................................................54
14.04 Partial Utilization........................................................................................................................55
14.05 Final Inspection...........................................................................................................................55
14.06 Final Acceptance.........................................................................................................................55
14.07 Final Payment..............................................................................................................................56
14.08 Final Completion Delayed and Partial Retainage Release........................................................56
14.09 Waiver of Claims........................................................................................................................57
Article 15-Suspension of Work and Termination........................................................................................57
15.01 City May Suspend Work.............................................................................................................57
15.02 City May Terminate for Cause...................................................................................................58
15.03 City May Terminate For Convenience.......................................................................................60
Article16-Dispute Resolution......................................................................................................................61
16.01 Methods and Procedures.............................................................................................................61
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnuay2,2016
Article17—Miscellaneous..............................................................................................................................62
17.01 Giving Notice..............................................................................................................................62
17.02 Computation of Times................................................................................................................62
17.03 Cumulative Remedies.................................................................................................................62
17.04 Survival of Obligations...............................................................................................................63
17.05 Headings......................................................................................................................................63
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fdmmy 2,2016
007200-1
GENERAL CONDITIONS
Page 1 of 63
ARTICLE 1–DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in these General Conditions or in other Contract Documents, the terms listed
below have the meanings indicated which are applicable to both the singular and plural thereof,
and words denoting gender shall include the masculine, feminine and neuter. Said terms are
generally capitalized or written in italics, but not always. When used in a context consistent with
the definition of a listed-defined term, the term shall have a meaning as defined below whether
capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial
capital letters in the Contract Documents include references to identified articles and paragraphs,
and the titles of other documents or forms.
1. Addenda—Written or graphic instruments issued prior to the opening of Bids which clarify,
correct,or change the Bidding Requirements or the proposed Contract Documents.
2. Agreement—The written instrument which is evidence of the agreement between City and
Contractor covering the Work.
3. Application for Payment—The form acceptable to City which is to be used by Contractor
during the course of the Work in requesting progress or final payments and which is to be
accompanied by such supporting documentation as is required by the Contract Documents.
4. Asbestos Any material that contains more than one percent asbestos and is friable or is
releasing asbestos fibers into the air above current action levels established by the United
States Occupational Safety and Health Administration.
5. Award--Authorization by the City Council for the City to enter into an Agreement.
6. Bid—The offer or proposal of a Bidder submitted on the prescribed form setting forth the
prices for the Work to be performed.
7. Bidder—The individual or entity who submits a Bid directly to City.
8. Bidding Documents—The Bidding Requirements and the proposed Contract Documents
(including all Addenda).
9. Bidding Requirements—The advertisement or Invitation to Bid, Instructions to Bidders, Bid
security of acceptable form, if any, and the Bid Form with any supplements.
10. Business Day – A business day is defined as a day that the City conducts normal business,
generally Monday through Friday,except for federal or state holidays observed by the City.
11.Buzzsaw–City's on-line,electronic document management and collaboration system.
12. Calendar Day–A day consisting of 24 hours measured from midnight to the next midnight.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnmry2,2016
0072 00-1
GENERAL CONDITIONS
Page 2 of 63
13. Change Order—A document, which is prepared and approved by the City, which is signed
by Contractor and City and authorizes an addition, deletion, or revision in the Work or an
adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date
of the Agreement.
14. City— The City of Fort Worth, Texas, a home-rule municipal corporation, authorized and
chartered under the Texas State Statutes, acting by its governing body through its City
Manager, his designee, or agents authorized under his behalf, each of which is required by
Charter to perform specific duties with responsibility for final enforcement of the contracts
involving the City of Fort Worth is by Charter vested in the City Manager and is the entity
with whom Contractor has entered into the Agreement and for whom the Work is to be
performed.
15. City Attorney– The officially appointed City Attorney of the City of Fort Worth, Texas, or
his duly authorized representative.
16. City Council - The duly elected and qualified governing body of the City of Fort Worth,
Texas.
17. City Manager– The officially appointed and authorized City Manager of the City of Fort
Worth,Texas,or his duly authorized representative.
18. Contract Claim—A demand or assertion by City or Contractor seeking an adjustment of
Contract Price or Contract Time, or both, or other relief with respect to the terms of the
Contract.A demand for money or services by a third party is not a Contract Claim.
19. Contract—The entire and integrated written document between the City and Contractor
concerning the Work. The Contract contains the Agreement and all Contract Documents and
supersedes prior negotiations,representations,or agreements,whether written or oral.
20. Contract Documents—Those items so designated in the Agreement. All items listed in the
Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and
the reports and drawings of subsurface and physical conditions are not Contract Documents.
21. Contract Price—The moneys payable by City to Contractor for completion of the Work in
accordance with the Contract Documents as stated in the Agreement (subject to the
provisions of Paragraph 11.03 in the case of Unit Price Work).
22. Contract Time—The number of days or the dates stated in the Agreement to: (i) achieve
Milestones,if any and(ii)complete the Work so that it is ready for Final Acceptance.
23. Contractor—The individual or entity with whom City has entered into the Agreement.
24. Cost of the Work—See Paragraph 11.01 of these General Conditions for definition.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febmay2,2016
007200-1
GENERAL CONDITIONS
Page 3 of 63
25. Damage Claims — A demand for money or services arising from the Project or Site from a
third party,City or Contractor exclusive of a Contract Claim.
26.Day or day—A day,unless otherwise defined, shall mean a Calendar Day.
27. Director of Aviation —The officially appointed Director of the Aviation Department of the
City of Fort Worth,Texas,or his duly appointed representative,assistant, or agents.
28. Director of Parks and Community Services — The officially appointed Director of the Parks
and Community Services Department of the City of Fort Worth,Texas, or his duly appointed
representative, assistant,or agents.
29. Director of Planning and Development --- The officially appointed Director of the Planning
and Development Department of the City of Fort Worth, Texas, or his duly appointed
representative,assistant,or agents.
30.Director of Transportation Public Works — The officially appointed Director of the
Transportation Public Works Department of the City of Fort Worth, Texas, or his duly
appointed representative, assistant,or agents.
31. Director of Water Department— The officially appointed Director of the Water Department
of the City of Fort Worth,Texas,or his duly appointed representative, assistant,or agents.
32. Drawings—That part of the Contract Documents prepared or approved by Engineer which
graphically shows the scope, extent, and character of the Work to be performed by
Contractor. Submittals are not Drawings as so defined.
33. Effective Date of the Agreement—The date indicated in the Agreement on which it becomes
effective,but if no such date is indicated, it means the date on which the Agreement is signed
and delivered by the last of the two parties to sign and deliver.
34. Engineer—The licensed professional engineer or engineering firm registered in the State of
Texas performing professional services for the City.
35. Extra Work — Additional work made necessary by changes or alterations of the Contract
Documents or of quantities or for other reasons for which no prices are provided in the
Contract Documents.Extra work shall be part of the Work.
36.Field Order--A written order issued by City which requires changes in the Work but which
does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer.
Field Orders are paid from Field Order Allowances incorporated into the Contract by funded
work type at the time of award.
37. Final Acceptance — The written notice given by the City to the Contractor that the Work
specified in the Contract Documents has been completed to the satisfaction of the City.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnoy 2,2016
007200-1
GENERAL CONDITIONS
Page 4 of 63
38. Final Inspection — Inspection carried out by the City to verify that the Contractor has
completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in
conformance with the Contract Documents.
39. General Requirements—Sections of Division 1 of the Contract Documents.
40. Hazardous Environmental Condition—The presence at the Site of Asbestos, PCBs,
Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or
circumstances that may present a substantial danger to persons or property exposed thereto.
41. Hazardous Waste—Hazardous waste is defined as any solid waste listed as hazardous or
possesses one or more hazardous characteristics as defined in the federal waste regulations,
as amended from time to time.
42. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes,
and orders of any and all governmental bodies, agencies, authorities, and courts having
jurisdiction.
43. Liens—Charges, security interests, or encumbrances upon Project funds, real property, or
personal property.
44.Major Item--An Item of work included in the Contract Documents that has a total cost equal
to or greater than 5%of the original Contract Price or$25,000 whichever is less.
45.Milestone—A principal event specified in the Contract Documents relating to an intermediate
Contract Time prior to Final Acceptance of the Work.
46. Notice of Award—The written notice by City to the Successful Bidder stating that upon
timely compliance by the Successful Bidder with the conditions precedent listed therein,City
will sign and deliver the Agreement.
47.Notice to Proceed—A written notice given by City to Contractor fixing the date on which the
Contract Time will commence to run and on which Contractor shall start to perform the
Work specified in Contract Documents.
48.PCBs—Polychlorinated biphenyls.
49. Petroleum—Petroleum, including crude oil or any fraction thereof which is liquid at standard
conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square
inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and
oil mixed with other non-Hazardous Waste and crude oils.
50.Plans—See definition of Drawings.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnmy 2,2016
007200-1
GENERAL CONDITIONS
Page 5 of 63
51. Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with
the General Requirements, describing the sequence and duration of the activities comprising
the Contractor's plan to accomplish the Work within the Contract Time.
52.Project—The Work to be performed under the Contract Documents.
53. Project Manager—The authorized representative of the City who will be assigned to the
Site.
54.Public Meeting – An announced meeting conducted by the City to facilitate public
participation and to assist the public in gaining an informed view of the Project.
55.Radioactive Material—Source, special nuclear, or byproduct material as defined by the
Atomic Energy Act of 1954(42 USC Section 2011 et seq.)as amended from time to time.
56. Regular Working Hours – Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday
thru Friday(excluding legal holidays).
57. Samples—Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and which establish the standards by which such
portion of the Work will be judged.
58. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required
submittals and the time requirements to support scheduled performance of related
construction activities.
59. Schedule of Values—A schedule, prepared and maintained by Contractor, allocating portions
of the Contract Price to various portions of the Work and used as the basis for reviewing
Contractor's Applications for Payment.
60. Site—Lands or areas indicated in the Contract Documents as being furnished by City upon
which the Work is to be performed, including rights-of-way, permits, and easements for
access thereto, and such other lands furnished by City which are designated for the use of
Contractor.
61. Specifications—That part of the Contract Documents consisting of written requirements for
materials, equipment, systems, standards and workmanship as applied to the Work, and
certain administrative requirements and procedural matters applicable thereto. Specifications
may be specifically made a part of the Contract Documents by attachment or,if not attached,
may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00)
of each Project.
62. Subcontractor—An individual or entity having a direct contract with Contractor or with any
other Subcontractor for the performance of a part of the Work at the Site.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnuy2,2016
007200-1
GENERAL CONDITIONS
Page 6 of 63
63. Submittals—All drawings, diagrams, illustrations, schedules, and other data or information
which are specifically prepared or assembled by or for Contractor and submitted by
Contractor to illustrate some portion of the Work.
64. Successful Bidder—The Bidder submitting the lowest and most responsive Bid to whom City
makes an Award.
65. Superintendent—The representative of the Contractor who is available at all times and able
to receive instructions from the City and to act for the Contractor.
66. Supplementary Conditions—That part of the Contract Documents which amends or
supplements these General Conditions.
67. Supplier—A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a
direct contract with Contractor or with any Subcontractor to furnish materials or equipment
to be incorporated in the Work by Contractor or Subcontractor.
68. Underground Facilities—All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements
containing such facilities, including but not limited to, those that convey electricity, gases,
steam, liquid petroleum products, telephone or other communications, cable television,
water,wastewater,storm water,other liquids or chemicals,or traffic or other control systems.
69. Unit Price Work—See Paragraph 11.03 of these General Conditions for definition.
70. Weekend Working Hours—Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday,
Sunday or legal holiday, as approved in advance by the City.
71. Work—The entire construction or the various separately identifiable parts thereof required to
be provided under the Contract Documents. Work includes and is the result of performing or
providing all labor, services, and documentation necessary to produce such construction
including any Change Order or Field Order, and furnishing, installing, and incorporating all
materials and equipment into such construction, all as required by the Contract Documents.
72. Working Day—A working day is defined as a day,not including Saturdays, Sundays, or legal
holidays authorized by the City for contract purposes, in which weather or other conditions
not under the control of the Contractor will permit the performance of the principal unit of
work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m.
1.02 Terminology
A. The words and terms discussed in Paragraph 1.02.B through E are not defined but, when used in
the Bidding Requirements or Contract Documents,have the indicated meaning.
B. Intent of Certain Terms or Adjectives:
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnoy 2,2016
007200-1
GENERAL CONDITIONS
Page 7 of 63
1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as
directed" or terms of like effect or import to authorize an exercise of judgment by City. In
addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or
adjectives of like effect or import are used to describe an action or determination of City as to
the Work. It is intended that such exercise of professional judgment, action, or determination
will be solely to evaluate, in general, the Work for compliance with the information in the
Contract Documents and with the design concept of the Project as a functioning whole as
shown or indicated in the Contract Documents (unless there is a specific statement indicating
otherwise).
C. Defective:
1. The word "defective," when modifying the word "Work," refers to Work that is
unsatisfactory,faulty,or deficient in that it:
a. does not conform to the Contract Documents; or
b. does not meet the requirements of any applicable inspection, reference standard, test, or
approval referred to in the Contract Documents; or
c. has been damaged prior to City's written acceptance.
D. Furnish,Install,Perform, Provide:
1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or
the word "Supply," or any combination or similar directive or usage thereof, shall mean
furnishing and incorporating in the Work including all necessary labor, materials, equipment,
and everything necessary to perform the Work indicated, unless specifically limited in the
context used.
E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known
technical or construction industry or trade meaning are used in the Contract Documents in
accordance with such recognized meaning.
ARTICLE 2—PRELIMINARY MATTERS
2.01 Copies of Documents
City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the
Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be
furnished upon request at the cost of reproduction.
2.02 Commencement of Contract Time,Notice to Proceed
The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to
Proceed may be given at any time within 14 days after the Effective Date of the Agreement.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febmay 2,2016
007200-1
GENERAL CONDITIONS
Page 8 of 63
2.03 Starting the Work
Contractor shall start to perform the Work on the date when the Contract Time commences to run.
No Work shall be done at the Site prior to the date on which the Contract Time commences to run.
2.04 Before Starting Construction
Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the
Work.
2.05 Preconstruction Conference
Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as
specified in the Contract Documents.
2.06 Public Meeting
Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor
attending the Public Meeting as scheduled by the City.
2.07 Initial Acceptance of Schedules
No progress payment shall be made to Contractor until acceptable schedules are submitted to City in
accordance with the Schedule Specification as provided in the Contract Documents.
ARTICLE 3—CONTRACT DOCUMENTS: INTENT,AMENDING,REUSE
3.01 Intent
A. The Contract Documents are complementary; what is required by one is as binding as if required
by all.
B. It is the intent of the Contract Documents to describe a functionally complete project (or part
thereof) to be constructed in accordance with the Contract Documents. Any labor,
documentation, services, materials, or equipment that reasonably may be inferred from the
Contract Documents or from prevailing custom or trade usage as being required to produce the
indicated result will be provided whether or not specifically called for, at no additional cost to
City.
C. Clarifications and interpretations of the Contract Documents shall be issued by City.
D. The Specifications may vary in form, format and style. Some Specification sections may be
written in varying degrees of streamlined or declarative style and some sections may be
relatively narrative by comparison. Omission of such words and phrases as "the Contractor
shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined
sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions
may appear in various parts of a section or articles within a part depending on the format of the
CrTY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnmy2,2016
00 72 00-1
GENERAL CONDITIONS
Page 9 of 63
section. The Contractor shall not take advantage of any variation of form, format or style in
making Contract Claims.
E. The cross referencing of specification sections under the subparagraph heading "Related
Sections include but are not necessarily limited to:" and elsewhere within each Specification
section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on
the cross referencing provided and shall be responsible to coordinate the entire Work under the
Contract Documents and provide a complete Project whether or not the cross referencing is
provided in each section or whether or not the cross referencing is complete.
3.02 Reference Standards
A. Standards, Specifications,Codes,Laws, and Regulations
1. Reference to standards, specifications, manuals, or codes of any technical society,
organization, or association, or to Laws or Regulations,whether such reference be specific or
by implication, shall mean the standard, specification, manual, code, or Laws or Regulations
in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there
were no Bids),except as may be otherwise specifically stated in the Contract Documents.
2. No provision of any such standard, specification, manual, or code, or any instruction of a
Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any
of their subcontractors, consultants, agents,or employees, from those set forth in the Contract
Documents.No such provision or instruction shall be effective to assign to City, or any of its
officers, directors, members, partners, employees, agents, consultants, or subcontractors, any
duty or authority to supervise or direct the performance of the Work or any duty or authority
to undertake responsibility inconsistent with the provisions of the Contract Documents.
3.03 Reporting and Resolving Discrepancies
A. Reporting Discrepancies:
1. Contractor's Review of Contract Documents Before Starting Work. Before undertaking each
part of the Work, Contractor shall carefully study and compare the Contract Documents and
check and verify pertinent figures therein against all applicable field measurements and
conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity,
or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a
written interpretation or clarification from City before proceeding with any Work affected
thereby.
2. Contractor's Review of Contract Documents During Per of Work. If, during the
performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy
within the Contract Documents, or between the Contract Documents and (a) any applicable
Law or Regulation, (b) any standard, specification, manual, or code, or(c) any instruction of
any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not
proceed with the Work affected thereby (except in an emergency as required by Paragraph
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnay2,2016
007200-1
GENERAL CONDITIONS
Page 10 of 63
6.17.A) until an amendment or supplement to the Contract Documents has been issued by
one of the methods indicated in Paragraph 3.04.
3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or
discrepancy in the Contract Documents unless Contractor had actual knowledge thereof
B. Resolving Discrepancies:
1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of
the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or
discrepancy between the provisions of the Contract Documents and the provisions of any
standard, specification,manual, or the instruction of any Supplier(whether or not specifically
incorporated by reference in the Contract Documents).
2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall
govern over Specifications, Supplementary Conditions shall govern over General Conditions
and Specifications, and quantities shown on the Plans shall govern over those shown in the
proposal.
3.04 Amending and Supplementing Contract Documents
A. The Contract Documents may be amended to provide for additions, deletions, and revisions in
the Work or to modify the terms and conditions thereof by a Change Order.
B. The requirements of the Contract Documents may be supplemented, and minor variations and
deviations in the Work not involving a change in Contract Price or Contract Time, may be
authorized,by one or more of the following ways:
1. A Field Order;
2. City's review of a Submittal(subject to the provisions of Paragraph 6.18.C); or
3. City's written interpretation or clarification.
3.05 Reuse of Documents
A. Contractor and any Subcontractor or Supplier shall not:
1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or
other documents (or copies of any thereof) prepared by or bearing the seal of Engineer,
including electronic media editions;or
2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of
the Project or any other project without written consent of City and specific written
verification or adaptation by Engineer.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fdxumy2,2016
007200-1
GENERAL CONDITIONS
Page 11 of 63
B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the
Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract
Documents for record purposes.
3.06 Electronic Data
A. Unless otherwise stated in the Supplementary Conditions,the data furnished by City or Engineer
to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the
printed copies included in the Contract Documents (also known as hard copies) and other
Specifications referenced and located on the City's Buzzsaw site. Files in electronic media
format of text, data, graphics, or other types are furnished only for the convenience of the
receiving party. Any conclusion or information obtained or derived from such electronic files
will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard
copies,the hard copies govern.
B. When transferring documents in electronic media format, the transferring party makes no
representations as to long term compatibility, usability, or readability of documents resulting
from the use of software application packages, operating systems, or computer hardware
differing from those used by the data's creator.
ARTICLE 4—AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS;
HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS
4.01 Availability of Lands
A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of
general application but specifically related to use of the Site with which Contractor must comply
in performing the Work. City will obtain in a timely manner and pay for easements for
permanent structures or permanent changes in existing facilities.
1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or
easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in
accordance with the schedule set forth in the Supplementary Conditions. The Project
Schedule submitted by the Contractor in accordance with the Contract Documents must
consider any outstanding right-of-way, and/or easements.
2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site.
Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance
with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted
by the Contractor in accordance with the Contract Documents must consider any outstanding
utilities or obstructions to be removed,adjusted, and/or relocated by others.
B. Upon reasonable written request, City shall furnish Contractor with a current statement of record
legal title and legal description of the lands upon which the Work is to be performed.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnaay2,2016
007200-1
GENERAL CONDITIONS
Page 12 of 63
C. Contractor shall provide for all additional lands and access thereto that may be required for
construction facilities or storage of materials and equipment.
4.02 Subsurface and Physical Conditions
A. Reports and Drawings: The Supplementary Conditions identify:
1. those reports known to City of explorations and tests of subsurface conditions at or
contiguous to the Site; and
2. those drawings known to City of physical conditions relating to existing surface or
subsurface structures at the Site(except Underground Facilities).
B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the
accuracy of the "technical data" contained in such reports and drawings, but such reports and
drawings are not Contract Documents. Such "technical data" is identified in the Supplementary
Conditions. Contractor may not make any Contract Claim against City, or any of their officers,
directors,members,partners,employees, agents,consultants,or subcontractors with respect to:
1. the completeness of such reports and drawings for Contractor's purposes, including, but not
limited to, any aspects of the means, methods, techniques, sequences, and procedures of
construction to be employed by Contractor, and safety precautions and programs incident
thereto;or
2. other data, interpretations, opinions, and information contained in such reports or shown or
indicated in such drawings; or
3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such
other data,interpretations,opinions,or information.
4.03 Differing Subsurface or Physical Conditions
A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or
revealed either:
1. is of such a nature as to establish that any"technical data" on which Contractor is entitled to
rely as provided in Paragraph 4.02 is materially inaccurate; or
2. is of such a nature as to require a change in the Contract Documents;or
3. differs materially from that shown or indicated in the Contract Documents; or
4. is of an unusual nature, and differs materially from conditions ordinarily encountered and
generally recognized as inherent in work of the character provided for in the Contract
Documents;
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnwy 2,2016
0072 00-1
GENERAL CONDITIONS
Page 13 of 63
then Contractor shall, promptly after becoming aware thereof and before further disturbing the
subsurface or physical conditions or performing any Work in connection therewith (except in an
emergency as required by Paragraph 6.17.A),notify City in writing about such condition.
B. Possible Price and Time Adjustments
Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if:
1. Contractor knew of the existence of such conditions at the time Contractor made a final
commitment to City with respect to Contract Price and Contract Time by the submission of a
Bid or becoming bound under a negotiated contract; or
2. the existence of such condition could reasonably have been discovered or revealed as a result
of the examination of the Contract Documents or the Site; or
3. Contractor failed to give the written notice as required by Paragraph 4.03.A.
4.04 Underground Facilities
A. Shown or Indicated.• The information and data shown or indicated in the Contract Documents
with respect to existing Underground Facilities at or contiguous to the Site is based on
information and data furnished to City or Engineer by the owners of such Underground
Facilities, including City, or by others. Unless it is otherwise expressly provided in the
Supplementary Conditions:
I. City and Engineer shall not be responsible for the accuracy or completeness of any such
information or data provided by others; and
2. the cost of all of the following will be included in the Contract Price, and Contractor shall
have full responsibility for:
a. reviewing and checking all such information and data;
b. locating all Underground Facilities shown or indicated in the Contract Documents;
c. coordination and adjustment of the Work with the owners of such Underground
Facilities,including City,during construction; and
d. the safety and protection of all such Underground Facilities and repairing any damage
thereto resulting from the Work.
B. Not Shown or Indicated.-
1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or
contiguous to the Site which was not shown or indicated, or not shown or indicated with
reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming
aware thereof and before further disturbing conditions affected thereby or performing any
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febmary2,2016
007200-1
GENERAL CONDITIONS
Page 14 of 63
Work in connection therewith (except in an emergency as required by Paragraph 6.17.A),
identify the owner of such Underground Facility and give notice to that owner and to City.
City will review the discovered Underground Facility and determine the extent, if any, to
which a change may be required in the Contract Documents to reflect and document the
consequences of the existence or location of the Underground Facility. Contractor shall be
responsible for the safety and protection of such discovered Underground Facility.
2. If City concludes that a change in the Contract Documents is required, a Change Order may
be issued to reflect and document such consequences.
3. Verification of existing utilities, structures, and service lines shall include notification of all
utility companies a minimum of 48 hours in advance of construction including exploratory
excavation if necessary.
4.05 Reference Points
A. City shall provide engineering surveys to establish reference points for construction, which in
City's judgment are necessary to enable Contractor to proceed with the Work. City will provide
construction stakes or other customary method of marking to establish line and grades for
roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall
protect and preserve the established reference points and property monuments, and shall make no
changes or relocations. Contractor shall report to City whenever any reference point or property
monument is lost or destroyed or requires relocation because of necessary changes in grades or
locations. The City shall be responsible for the replacement or relocation of reference points or
property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall
notify City in advance and with sufficient time to avoid delays.
B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or
willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full
cost for replacing such points plus 25% will be charged against the Contractor, and the full
amount will be deducted from payment due the Contractor.
4.06 Hazardous Environmental Condition at Site
A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings
known to City relating to Hazardous Environmental Conditions that have been identified at the
Site.
B. Limited Reliance by Contractor on Technical Data Authorized. Contractor may rely upon the
accuracy of the "technical data" contained in such reports and drawings, but such reports and
drawings are not Contract Documents. Such "technical data" is identified in the Supplementary
Conditions. Contractor may not make any Contract Claim against City, or any of their officers,
directors,members,partners,employees, agents,consultants,or subcontractors with respect to:
1. the completeness of such reports and drawings for Contractor's purposes, including, but not
limited to, any aspects of the means, methods, techniques, sequences and procedures of
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnwy2,2016
007200-1
GENERAL CONDITIONS
Page 15 of 63
construction to be employed by Contractor and safety precautions and programs incident
thereto;or
2. other data, interpretations, opinions and information contained in such reports or shown or
indicated in such drawings; or
3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such
other data,interpretations,opinions or information.
C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or
revealed at the Site which was not shown or indicated in Drawings or Specifications or identified
in the Contract Documents to be within the scope of the Work. Contractor shall be responsible
for a Hazardous Environmental Condition created with any materials brought to the Site by
Contractor, Subcontractors,Suppliers,or anyone else for whom Contractor is responsible.
D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for
whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall
immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with
such condition and in any area affected thereby (except in an emergency as required by
Paragraph 6.17.A); and (iii) notify City(and promptly thereafter confirm such notice in writing).
City may consider the necessity to retain a qualified expert to evaluate such condition or take
corrective action,if any.
E. Contractor shall not be required to resume Work in connection with such condition or in any
affected area until after City has obtained any required permits related thereto and delivered
written notice to Contractor: (i) specifying that such condition and any affected area is or has
been rendered suitable for the resumption of Work; or (ii) specifying any special conditions
under which such Work may be resumed.
F. If after receipt of such written notice Contractor does not agree to resume such Work based on a
reasonable belief it is unsafe, or does not agree to resume such Work under such special
conditions, then City may order the portion of the Work that is in the area affected by such
condition to be deleted from the Work. City may have such deleted portion of the Work
performed by City's own forces or others.
G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold
harmless City,from and against all claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous
Environmental Condition created by Contractor or by anyone for whom Contractor is
responsible. Nothing in this Paragraph 4.06G shall obligate Contractor to indemnify any
individual or entity from and against the consequences of that individual's or entity's own
negligence.
H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental
Condition uncovered or revealed at the Site.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnffiy2,2016
007200-1
GENERAL CONDITIONS
Page 16 of 63
ARTICLE 5—BONDS AND INSURANCE
5.01 Licensed Sureties and Insurers
All bonds and insurance required by the Contract Documents to be purchased and maintained by
Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized
in the State of Texas to issue bonds or insurance policies for the limits and coverages so required.
Such surety and insurance companies shall also meet such additional requirements and qualifications
as may be provided in the Supplementary Conditions.
5.02 Performance,Payment, and Maintenance Bonds
A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government
Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as
security for the faithful performance and payment of all of Contractor's obligations under the
Contract Documents.
B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security
to protect the City against any defects in any portion of the Work described in the Contract
Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final
Acceptance by the City.
C. All bonds shall be in the form prescribed by the Contract Documents except as provided
otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list
of"Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and
as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial
Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed
by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney
which shall show that it is effective on the date the agent or attorney-in-fact signed each bond.
D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or
its right to do business is terminated in the State of Texas or it ceases to meet the requirements of
Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event
giving rise to such notification, provide another bond and surety, both of which shall comply
with the requirements of Paragraphs 5.01 and 5.02.C.
5.03 Certificates of Insurance
Contractor shall deliver to City, with copies to each additional insured and loss payee identified in
the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested
by City or any other additional insured)which Contractor is required to purchase and maintain.
1. The certificate of insurance shall document the City, and all identified entities named in the
Supplementary Conditions as"Additional Insured"on all liability policies.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fcbnoy2,2016
0072 00-1
GENERAL CONDITIONS
Page 17 of 63
2. The Contractor's general liability insurance shall include a, "per project" or "per location",
endorsement,which shall be identified in the certificate of insurance provided to the City.
3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the
insured, be complete in its entirety, and show complete insurance carrier names as listed in
the current A.M. Best Property&Casualty Guide
4. The insurers for all policies must be licensed and/or approved to do business in the State of
Texas. Except for workers' compensation, all insurers must have a minimum rating of A-:
VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial
strength and solvency to the satisfaction of Risk Management. If the rating is below that
required,written approval of City is required.
5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor
of the City. In addition, the Contractor agrees to waive all rights of subrogation against the
Engineer (if applicable), and each additional insured identified in the Supplementary
Conditions
6. Failure of the City to demand such certificates or other evidence of full compliance with the
insurance requirements or failure of the City to identify a deficiency from evidence that is
provided shall not be construed as a waiver of Contractor's obligation to maintain such lines
of insurance coverage.
7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess
Liability insurance for any differences is required. Excess Liability shall follow form of the
primary coverage.
8. Unless otherwise stated, all required insurance shall be written on the"occurrence basis". If
coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with
or prior to the date of the effective date of the agreement and the certificate of insurance shall
state that the coverage is claims-made and the retroactive date. The insurance coverage shall
be maintained for the duration of the Contract and for three (3) years following Final
Acceptance provided under the Contract Documents or for the warranty period, whichever is
longer. An annual certificate of insurance submitted to the City shall evidence such
insurance coverage.
9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the
required lines of coverage,nor decrease the limits of said coverage unless such endorsements
are approved in writing by the City. In the event a Contract has been bid or executed and the
exclusions are determined to be unacceptable or the City desires additional insurance
coverage, and the City desires the contractor/engineer to obtain such coverage, the contract
price shall be adjusted by the cost of the premium for such additional coverage plus 10%.
10. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance
coverage shall be approved by the City in regards to asset value and stockholders' equity. In
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnmry2,2016
0072 00-1
GENERAL CONDITIONS
Page 18 of 63
lieu of traditional insurance, alternative coverage maintained through insurance pools or risk
retention groups,must also be approved by City.
11. Any deductible in excess of$5,000.00, for any policy that does not provide coverage on a
first-dollar basis,must be acceptable to and approved by the City.
12. City, at its sole discretion, reserves the right to review the insurance requirements and to
make reasonable adjustments to insurance coverage's and their limits when deemed
necessary and prudent by the City based upon changes in statutory law, court decision or the
claims history of the industry as well as of the contracting party to the City. The City shall
be required to provide prior notice of 90 days, and the insurance adjustments shall be
incorporated into the Work by Change Order.
13. City shall be entitled, upon written request and without expense, to receive copies of policies
and endorsements thereto and may make any reasonable requests for deletion or revision or
modifications of particular policy terms, conditions, limitations, or exclusions necessary to
conform the policy and endorsements to the requirements of the Contract. Deletions,
revisions, or modifications shall not be required where policy provisions are established by
law or regulations binding upon either party or the underwriter on any such policies.
14. City shall not be responsible for the direct payment of insurance premium costs for
Contractor's insurance.
5.04 Contractor's Insurance
A. Workers Compensation and Employers'Liability. Contractor shall purchase and maintain such
insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers'
Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for
Employers' Liability as is appropriate for the Work being performed and as will provide
protection from claims set forth below which may arise out of or result from Contractor's
performance of the Work and Contractor's other obligations under the Contract Documents,
whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly
or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts
any of them may be liable:
1. claims under workers' compensation, disability benefits, and other similar employee benefit
acts;
2. claims for damages because of bodily injury, occupational sickness or disease, or death of
Contractor's employees.
B. Commercial General Liability. Coverage shall include but not be limited to covering liability
(bodily injury or property damage) arising from: premises/operations, independent contractors,
products/completed operations,personal injury, and liability under an insured contract. Insurance
shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services
Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febmy2,2016
0072 00-1
GENERAL CONDITIONS
Page 19 of 63
insurance or self-insurance programs afforded to the City. The Commercial General Liability
policy, shall have no exclusions by endorsements that would alter of nullify premises/operations,
products/completed operations, contractual, personal injury, or advertising injury, which are
normally contained with the policy,unless the City approves such exclusions in writing.
For construction projects that present a substantial completed operation exposure, the City may
require the contractor to maintain completed operations coverage for a minimum of no less than
three (3) years following the completion of the project (if identified in the Supplementary
Conditions).
C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto",
defined as autos owned, hired and non-owned and provide indemnity for claims for damages
because bodily injury or death of any person and or property damage arising out of the work,
maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by
anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone
for whose acts any of them may be liable.
D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of
railroad right-of-way, the Contractor shall comply with the requirements identified in the
Supplementary Conditions.
E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation
or other loss of insurance coverage. Contractor shall stop work until replacement insurance has
been procured.There shall be no time credit for days not worked pursuant to this section.
5.05 Acceptance of Bonds and Insurance; Option to Replace
If City has any objection to the coverage afforded by or other provisions of the bonds or insurance
required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis
of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing
within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor
shall provide to the City such additional information in respect of insurance provided as the City may
reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance
required by the Contract Documents, the City shall notify the Contractor in writing of such failure
prior to the start of the Work, or of such failure to maintain prior to any change in the required
coverage.
ARTICLE 6—CONTRACTOR'S RESPONSIBILITIES
6.01 Supervision and Superintendence
A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting
such attention thereto and applying such skills and expertise as may be necessary to perform the
Work in accordance with the Contract Documents. Contractor shall be solely responsible for the
means,methods,techniques,sequences, and procedures of construction.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:FebnwyZ2016
0072 00-1
GENERAL CONDITIONS
Page 20 of 63
B. At all times during the progress of the Work, Contractor shall assign a competent, English-
speaking, Superintendent who shall not be replaced without written notice to City. The
Superintendent will be Contractor's representative at the Site and shall have authority to act on
behalf of Contractor. All communication given to or received from the Superintendent shall be
binding on Contractor.
C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of
construction.
6.02 Labor: Working Hours
A. Contractor shall provide competent, suitably qualified personnel to perform construction as
required by the Contract Documents. Contractor shall at all times maintain good discipline and
order at the Site.
B. Except as otherwise required for the safety or protection of persons or the Work or property at
the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work
at the Site shall be performed during Regular Working Hours. Contractor will not permit the
performance of Work beyond Regular Working Hours or for Weekend Working Hours without
City's written consent (which will not be unreasonably withheld). Written request (by letter or
electronic communication)to perform Work:
1. for beyond Regular Working Hours request must be made by noon at least two (2) Business
Days prior
2. for Weekend Working Hours request must be made by noon of the preceding Thursday
3. for legal holidays request must be made by noon two Business Days prior to the legal
holiday.
6.03 Services,Materials, and Equipment
A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full
responsibility for all services,materials, equipment, labor,transportation, construction equipment
and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities,
temporary facilities, and all other facilities and incidentals necessary for the performance,
Contractor required testing,start-up,and completion of the Work.
B. All materials and equipment incorporated into the Work shall be as specified or, if not specified,
shall be of good quality and new, except as otherwise provided in the Contract Documents. All
special warranties and guarantees required by the Specifications shall expressly run to the benefit
of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of
required tests)as to the source,kind,and quality of materials and equipment.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febn=y2,2016
007200-1
GENERAL CONDITIONS
Page 21 of 63
C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed,
connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of
the applicable Supplier,except as otherwise may be provided in the Contract Documents.
D. All items of standard equipment to be incorporated into the Work shall be the latest model at the
time of bid,unless otherwise specified.
6.04 Project Schedule
A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07
and the General Requirements as it may be adjusted from time to time as provided below.
1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and
the General Requirements) proposed adjustments in the Project Schedule that will not result
in changing the Contract Time. Such adjustments will comply with any provisions of the
General Requirements applicable thereto.
2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment
for the duration of the Contract in accordance with the schedule specification 0132 16.
3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be
submitted in accordance with the requirements of Article 12. Adjustments in Contract Time
may only be made by a Change Order.
6.05 Substitutes and "Or-Equals"
A. Whenever an item of material or equipment is specified or described in the Contract Documents
by using the name of a proprietary item or the name of a particular Supplier, the specification or
description is intended to establish the type, function, appearance, and quality required. Unless
the specification or description contains or is followed by words reading that no like, equivalent,
or"or-equal" item or no substitution is permitted, other items of material or equipment of other
Suppliers may be submitted to City for review under the circumstances described below.
1. "Or-Equal"Items: If in City's sole discretion an item of material or equipment proposed by
Contractor is functionally equal to that named and sufficiently similar so that no change in
related Work will be required, it may be considered by City as an "or-equal" item, in which
case review and approval of the proposed item may, in City's sole discretion, be
accomplished without compliance with some or all of the requirements for approval of
proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of
material or equipment will be considered functionally equal to an item so named if:
a. the City determines that:
1) it is at least equal in materials of construction, quality, durability, appearance,
strength, and design characteristics;
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:February 2,2016
007200-1
GENERAL CONDITIONS
Page 22 of 63
2) it will reliably perform at least equally well the function and achieve the results
imposed by the design concept of the completed Project as a functioning whole; and
3) it has a proven record of performance and availability of responsive service; and
b. Contractor certifies that,if approved and incorporated into the Work:
1) there will be no increase in cost to the City or increase in Contract Time; and
2) it will conform substantially to the detailed requirements of the item named in the
Contract Documents.
2. Substitute Items:
a. If in City's sole discretion an item of material or equipment proposed by Contractor does
not qualify as an "or-equal" item under Paragraph 6.05.A.1, it may be submitted as a
proposed substitute item.
b. Contractor shall submit sufficient information as provided below to allow City to
determine if the item of material or equipment proposed is essentially equivalent to that
named and an acceptable substitute therefor. Requests for review of proposed substitute
items of material or equipment will not be accepted by City from anyone other than
Contractor.
c. Contractor shall make written application to City for review of a proposed substitute item
of material or equipment that Contractor seeks to furnish or use. The application shall
comply with Section 0125 00 and:
1) shall certify that the proposed substitute item will:
a) perform adequately the functions and achieve the results called for by the general
design;
b) be similar in substance to that specified;
c) be suited to the same use as that specified; and
2) will state:
a) the extent, if any, to which the use of the proposed substitute item will prejudice
Contractor's achievement of final completion on time;
b) whether use of the proposed substitute item in the Work will require a change in
any of the Contract Documents (or in the provisions of any other direct contract
with City for other work on the Project) to adapt the design to the proposed
substitute item;
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnwy 2,2016
007200-1
GENERAL CONDITIONS
Page 23 of 63
c) whether incorporation or use of the proposed substitute item in connection with
the Work is subject to payment of any license fee or royalty; and
3) will identify:
a) all variations of the proposed substitute item from that specified;
b) available engineering, sales,maintenance,repair,and replacement services; and
4) shall contain an itemized estimate of all costs or credits that will result directly or
indirectly from use of such substitute item, including costs of redesign and Damage
Claims of other contractors affected by any resulting change.
B. Substitute Construction Methods or Procedures: If a specific means, method, technique,
sequence, or procedure of construction is expressly required by the Contract Documents,
Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure
of construction approved by City. Contractor shall submit sufficient information to allow City, in
City's sole discretion, to determine that the substitute proposed is equivalent to that expressly
called for by the Contract Documents. Contractor shall make written application to City for
review in the same manner as those provided in Paragraph 6.05.A.2.
C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each
proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.B. City may require
Contractor to furnish additional data about the proposed substitute. City will be the sole judge of
acceptability. No "or-equal" or substitute will be ordered, installed or utilized until City's review
is complete, which will be evidenced by a Change Order in the case of a substitute and an
accepted Submittal for an"or-equal."City will advise Contractor in writing of its determination.
D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special
performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall
indemnify and hold harmless City and anyone directly or indirectly employed by them from and
against any and all claims, damages, losses and expenses (including attorneys fees) arising out
of the use of substituted materials or equipment.
E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or
submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.B. Whether or not City
approves a substitute so proposed or submitted by Contractor, Contractor may be required to
reimburse City for evaluating each such proposed substitute. Contractor may also be required to
reimburse City for the charges for making changes in the Contract Documents (or in the
provisions of any other direct contract with City) resulting from the acceptance of each proposed
substitute.
F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or
"or-equal"at Contractor's expense.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:I dwary 2,2016
007200-1
GENERAL CONDITIONS
Page 24 of 63
G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a
substitute shall be incorporated to the Contract by Change Order.
H. Time Extensions:No additional time will be granted for substitutions.
6.06 Concerning Subcontractors, Suppliers, and Others
A. Contractor shall perform with his own organization, work of a value not less than 35% of the
value embraced on the Contract,unless otherwise approved by the City.
B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether
initially or as a replacement, against whom City may have reasonable objection. Contractor shall
not be required to employ any Subcontractor, Supplier, or other individual or entity to fiunish or
perform any of the Work against whom Contractor has reasonable objection (excluding those
acceptable to City as indicated in Paragraph 6.06.C).
C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other
individuals or entities on the project, and will provide such requirements in the Supplementary
Conditions.
D. Minority Business Enterprise Compliance: It is City policy to ensure the full and equitable
participation by Minority Business Enterprises (MBE) in the procurement of goods and services
on a contractual basis. If the Contract Documents provide for a MBE goal, Contractor is required
to comply with the intent of the City's MBE Ordinance(as amended)by the following:
1. Contractor shall, upon request by City, provide complete and accurate information regarding
actual work performed by a MBE on the Contract and payment therefor.
2. Contractor will not make additions, deletions, or substitutions of accepted MBE without
written consent of the City. Any unjustified change or deletion shall be a material breach of
Contract and may result m debarment in accordance with the procedures outlined in the
Ordinance.
3. Contractor shall, upon request by City, allow an audit and/or examination of any books,
records, or files in the possession of the Contractor that will substantiate the actual work
performed by an MBE. Material misrepresentation of any nature will be grounds for
termination of the Contract in accordance with Paragraph 15.02.A. Any such
misrepresentation may be grounds for disqualification of Contractor to bid on future
contracts with the City for a period of not less than three years.
E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors,
Suppliers, and other individuals or entities performing or furnishing any of the Work just as
Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract
Documents:
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febutiry2,2016
00 72 00-1
GENERAL CONDITIONS
Page 25 of 63
1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity
any contractual relationship between City and any such Subcontractor, Supplier or other
individual or entity;nor
2. shall create any obligation on the part of City to pay or to see to the payment of any moneys
due any such Subcontractor, Supplier, or other individual or entity except as may otherwise
be required by Laws and Regulations.
F. Contractor shall be solely responsible for scheduling and coordinating the Work of
Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the
Work under a direct or indirect contract with Contractor.
G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any
of the Work shall communicate with City through Contractor.
H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an
appropriate agreement between Contractor and the Subcontractor or Supplier which specifically
binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract
Documents for the benefit of City.
6.07 Wage Rates
A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of
Chapter 2258,Texas Government Code(as amended), including the payment of not less than the
rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in
accordance with Chapter 2258. Such prevailing wage rates are included in these Contract
Documents.
B. Penaltyfor Violation. A Contractor or any Subcontractor who does not pay the prevailing wage
shall, upon demand made by the City, pay to the City $60 for each worker employed for each
calendar day or part of the day that the worker is paid less than the prevailing wage rates
stipulated in these contract documents. This penalty shall be retained by the City to offset its
administrative costs,pursuant to Texas Government Code 2258.023.
C. Complaints of Violations and City Determination of Good Cause. On receipt of information,
including a complaint by a worker, concerning an alleged violation of 2258.023, Texas
Government Code, by a Contractor or Subcontractor, the City shall make an initial
determination, before the 31 st day after the date the City receives the information, as to whether
good cause exists to believe that the violation occurred. The City shall notify in writing the
Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's
determination that there is good cause to believe the Contractor or Subcontractor has violated
Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the
difference between wages paid and wages due under the prevailing wage rates, such amounts
being subtracted from successive progress payments pending a final determination of the
violation.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febmwy Z 2016
00n00-I
GENERAL CONDITIONS
Page 26 of 63
D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of
Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected
worker, shall be submitted to binding arbitration in accordance with the Texas General
Arbitration Act(Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any
affected worker does not resolve the issue by agreement before the 15th day after the date the
City makes its initial determination pursuant to Paragraph C above. If the persons required to
arbitrate under this section do not agree on an arbitrator before the 1 Ith day after the date that
arbitration is required, a district court shall appoint an arbitrator on the petition of any of the
persons. The City is not a party in the arbitration. The decision and award of the arbitrator is
final and binding on all parties and may be enforced in any court of competent jurisdiction.
E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three(3)
years following the date of acceptance of the work, maintain records that show (i) the name and
occupation of each worker employed by the Contractor in the construction of the Work provided
for in this Contract; and (ii)the actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right
to Audit, shall pertain to this inspection.
F. Progress Payments. With each progress payment or payroll period, whichever is less, the
Contractor shall submit an affidavit stating that the Contractor has complied with the
requirements of Chapter 2258,Texas Government Code.
G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at
all times.
H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall
otherwise require all of its Subcontractors to comply with Paragraphs A through G above.
6.08 Patent Fees and Royalties
A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the
performance of the Work or the incorporation in the Work of any invention, design, process,
product, or device which is the subject of patent rights or copyrights held by others. If a
particular invention, design, process, product, or device is specified in the Contract Documents
for use in the performance of the Work and if, to the actual knowledge of City, its use is subject
to patent rights or copyrights calling for the payment of any license fee or royalty to others, the
existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City
to disclose such information does not relieve the Contractor from its obligations to pay for the
use of said fees or royalties to others.
B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold
harmless City,from and against all claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) arising out of or relating to any infringement of
patent rights or copyrights incident to the use in the performance of the Work or resulting from
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fdxumy2,2016
007200-1
GENERAL CONDITIONS
Page 27 of 63
the incorporation in the Work of any invention, design,process,product, or device not specified
in the Contract Documents.
6.09 Permits and Utilities
A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction
permits and licenses except those provided for in the Supplementary Conditions or Contract
Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses.
Contractor shall pay all governmental charges and inspection fees necessary for the prosecution
of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the
Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.B.
City shall pay all charges of utility owners for connections for providing permanent service to the
Work.
B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as
provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's
responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the
Contract and the City approves the changes, the Contractor is responsible for obtaining
clearances and coordinating with the appropriate regulatory agency. The City will not reimburse
the Contractor for any cost associated with these requirements of any City acquired permit. The
following are permits the City will obtain if required:
1. Texas Department of Transportation Permits
2. U.S. Army Corps of Engineers Permits
3. Texas Commission on Environmental Quality Permits
4. Railroad Company Permits
C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits
and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance
with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by
the Contractor in accordance with the Contract Documents must consider any outstanding
permits and licenses.
6.10 Laws and Regulations
A. Contractor shall give all notices required by and shall comply with all Laws and Regulations
applicable to the performance of the Work. Except where otherwise expressly required by
applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's
compliance with any Laws or Regulations.
B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or
Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnjmy2,2016
007200-1
GENERAL CONDITIONS
Page 28 of 63
court or arbitration or other dispute resolution costs) arising out of or relating to such Work.
However, it shall not be Contractor's responsibility to make certain that the Specifications and
Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of
Contractor's obligations under Paragraph 3.02.
C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on
the cost or time of performance of the Work may be the subject of an adjustment in Contract
Price or Contract Time.
6.11 Taxes
A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to
Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may
purchase, rent or lease all materials, supplies and equipment used or consumed in the
performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax,
said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption
certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the
provision of State Comptroller's Ruling .011, and any other applicable rulings pertaining to the
Texas Tax Code, Subchapter H.
B. Texas Tax permits and information may be obtained from:
1. Comptroller of Public Accounts
Sales Tax Division
Capitol Station
Austin,TX 78711; or
2. http://www.window.state.tx.us/taxinfo/taxforms/93-fonns.hbnl
6.12 Use of Site and Other Areas
A. Limitation on Use of Site and Other Areas:
1. Contractor shall confine construction equipment,the storage of materials and equipment, and
the operations of workers to the Site and other areas permitted by Laws and Regulations, and
shall not unreasonably encumber the Site and other areas with construction equipment or
other materials or equipment. Contractor shall assume full responsibility for any damage to
any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas
resulting from the performance of the Work.
2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is
carrying on operations in a portion of a street, right-of-way, or easement greater than is
necessary for proper execution of the Work, the City may require the Contractor to finish the
section on which operations are in progress before work is commenced on any additional
area of the Site.
CrfY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnoy2,2016
007200-1
GENERAL CONDITIONS
Page 29 of 63
3. Should any Damage Claim be made by any such owner or occupant because of the
performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim.
4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City,from and
against all claims, costs, losses, and damages arising out of or relating to any claim or
action, legal or equitable, brought by any such owner or occupant against City.
B. Removal of Debris During Performance of the Work. During the progress of the Work
Contractor shall keep the Site and other areas free from accumulations of waste materials,
rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other
debris shall conform to applicable Laws and Regulations.
C. Site Maintenance Cleaning. 24 hours after written notice is given to the Contractor that the
clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor
fails to correct the unsatisfactory procedure, the City may take such direct action as the City
deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written
notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of
such costs,shall be deducted from the monies due or to become due to the Contractor.
D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and
the Work and make it ready for utilization by City or adjacent property owner. At the completion
of the Work Contractor shall remove from the Site all tools, appliances, construction equipment
and machinery, and surplus materials and shall restore to original condition or better all property
disturbed by the Work.
E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded
in any manner that will endanger the structure, nor shall Contractor subject any part of the Work
or adjacent property to stresses or pressures that will endanger it.
6.13 Record Documents
A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and
approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change
Orders, Field Orders, and written interpretations and clarifications in good order and annotated to
show changes made during construction. These record documents together with all approved
Samples and a counterpart of all accepted Submittals will be available to City for reference.
Upon completion of the Work, these record documents, any operation and maintenance manuals,
and Submittals will be delivered to City prior to Final Inspection. Contractor shall include
accurate locations for buried and imbedded items.
6.14 Safety and Protection
A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subcontractors of their responsibility for the safety of persons or property in the performance of
their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:February Z 2016
00 72 00-1
GENERAL CONDITIONS
Page 30 of 63
take all necessary precautions for the safety of, and shall provide the necessary protection to
prevent damage,injury or loss to:
1. all persons on the Site or who may be affected by the Work;
2. all the Work and materials and equipment to be incorporated therein, whether in storage on
or off the Site; and
3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and Underground Facilities not designated for
removal,relocation,or replacement in the course of construction.
B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of
persons or property, or to the protection of persons or property from damage, injury, or loss; and
shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall
notify owners of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the protection,
removal,relocation, and replacement of their property.
C. Contractor shall comply with the applicable requirements of City's safety programs,if any.
D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any,
with which City's employees and representatives must comply while at the Site.
E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused,
directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any
other individual or entity directly or indirectly employed by any of them to perform any of the
Work,or anyone for whose acts any of them may be liable, shall be remedied by Contractor.
F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue
until such time as all the Work is completed and City has accepted the Work.
6.15 Safety Representative
Contractor shall inform City in writing of Contractor's designated safety representative at the Site.
6.16 Hazard Communication Programs
Contractor shall be responsible for coordinating any exchange of material safety data sheets or other
hazard communication information required to be made available to or exchanged between or among
employers in accordance with Laws or Regulations.
6.17 Emergencies and/or Rectification
A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or
adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss.
Contractor shall give City prompt written notice if Contractor believes that any significant
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febmary Z 2016
007200-1
GENERAL CONDITIONS
Page 31 of 63
changes in the Work or variations from the Contract Documents have been caused thereby or are
required as a result thereof. If City determines that a change in the Contract Documents is
required because of the action taken by Contractor in response to such an emergency, a Change
Order may be issued.
B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies,
omissions, or correction necessary to conform with the requirements of the Contract Documents,
the City shall give the Contractor written notice that such work or changes are to be performed.
The written notice shall direct attention to the discrepant condition and request the Contractor to
take remedial action to correct the condition. In the event the Contractor does not take positive
steps to fulfill this written request, or does not show just cause for not taking the proper action,
within 24 hours, the City may take such remedial action with City forces or by contract. The City
shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any
funds due or become due the Contractor on the Project.
6.18 Submittals
A. Contractor shall submit required Submittals to City for review and acceptance in accordance
with the accepted Schedule of Submittals(as required by Paragraph 2.07). Each submittal will be
identified as City may require.
1. Submit number of copies specified in the General Requirements.
2. Data shown on the Submittals will be complete with respect to quantities, dimensions,
specified performance and design criteria, materials, and similar data to show City the
services, materials, and equipment Contractor proposes to provide and to enable City to
review the information for the limited purposes required by Paragraph 6.18.C.
3. Submittals submitted as herein provided by Contractor and reviewed by City for
conformance with the design concept shall be executed in conformity with the Contract
Documents unless otherwise required by City.
4. When Submittals are submitted for the purpose of showing the installation in greater detail,
their review shall not excuse Contractor from requirements shown on the Drawings and
Specifications.
5. For-Information-Only submittals upon which the City is not expected to conduct review or
take responsive action may be so identified in the Contract Documents.
6. Submit required number of Samples specified in the Specifications.
7. Clearly identify each Sample as to material, Supplier,pertinent data such as catalog numbers,
the use for which intended and other data as City may require to enable City to review the
submittal for the limited purposes required by Paragraph 6.18.C.
MY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnuy 2,2016
0072 00-1
GENERAL CONDITIONS
Page 32 of 63
B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any
related Work performed prior to City's review and acceptance of the pertinent submittal will be
at the sole expense and responsibility of Contractor.
C. City's Review:
1. City will provide timely review of required Submittals in accordance with the Schedule of
Submittals acceptable to City. City's review and acceptance will be only to determine if the
items covered by the submittals will, after installation or incorporation in the Work, conform
to the information given in the Contract Documents and be compatible with the design
concept of the completed Project as a functioning whole as indicated by the Contract
Documents.
2. City's review and acceptance will not extend to means, methods, techniques, sequences, or
procedures of construction (except where a particular means, method, technique, sequence,
or procedure of construction is specifically and expressly called for by the Contract
Documents)or to safety precautions or programs incident thereto.The review and acceptance
of a separate item as such will not indicate approval of the assembly in which the item
functions.
3. City's review and acceptance shall not relieve Contractor from responsibility for any
variation from the requirements of the Contract Documents unless Contractor has complied
with the requirements of Section 01 33 00 and City has given written acceptance of each
such variation by specific written notation thereof incorporated in or accompanying the
Submittal. City's review and acceptance shall not relieve Contractor from responsibility for
complying with the requirements of the Contract Documents.
6.19 Continuing the Work
Except as otherwise provided, Contractor shall cavy on the Work and adhere to the Project Schedule
during all disputes or disagreements with City. No Work shall be delayed or postponed pending
resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in
writing.
6.20 Contractor's General Warranty and Guarantee
A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract
Documents and will not be defective. City and its officers, directors, members, partners,
employees, agents, consultants, and subcontractors shall be entitled to rely on representation of
Contractor's warranty and guarantee.
B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by:
1. abuse, modification, or improper maintenance or operation by persons other than Contractor,
Subcontractors, Suppliers, or any other individual or entity for whom Contractor is
responsible;or
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febmay2,2016
007200-1
GENERAL CONDITIONS
Page 33 of 63
2. normal wear and tear under normal usage.
C. Contractor's obligation to perform and complete the Work in accordance with the Contract
Documents shall be absolute.None of the following will constitute an acceptance of Work that is
not in accordance with the Contract Documents or a release of Contractor's obligation to perform
the Work in accordance with the Contract Documents:
1. observations by City;
2. recommendation or payment by City of any progress or final payment;
3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by
City;
4. use or occupancy of the Work or any part thereof by City;
5. any review and acceptance of a Submittal by City;
6. any inspection,test,or approval by others;or
7. any correction of defective Work by City.
D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to
other work or property resulting therefrom which shall appear within a period of two (2) years
from the date of Final Acceptance of the Work unless a longer period is specified and shall
furnish a good and sufficient maintenance bond, complying with the requirements of Article
5.02.13.The City will give notice of observed defects with reasonable promptness.
621 Indemnification
A, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
expense, the City, its officers, servants and employees, from and against any and all claims
arising out of, or alleged to arise out of, the work and services to be performed by the
Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this
Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO
OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL
OR SOME OF THE DAMAGES BEING SOUGHT WERE, CAUSED. IN WHOLE OR IN
PART. BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. This indemnity
provision is intended to include, without limitation, indemnity for costs, expenses and legal
fees incurred by the City in defending against such claims and causes of actions.
B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the
City, its officers, servants and employees, from and against any and all loss, damage or
destruction of property of the City, arising out of, or alleged to arise out of, the work and
services to be performed by the Contractor, its officers, agents, employees, subcontractors,
licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fcbnrmy2,2016
007200-1
GENERAL CONDITIONS
Page 34 of 63
SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS
ALLEGED OR PROVEN 111A ' LL OR SOME OF THE DAMAGES BEING SOUGHT
WERE CAUSED, IN WHOLE OR IN PART. BY ANY ACT. OMISSION OR
NEGLIGENCE OF THE CITY.
6.22 Delegation of Professional Design Services
A. Contractor will not be required to provide professional design services unless such services are
specifically required by the Contract Documents for a portion of the Work or unless such
services are required to carry out Contractor's responsibilities for construction means, methods,
techniques,sequences and procedures.
B. If professional design services or certifications by a design professional related to systems,
materials or equipment are specifically required of Contractor by the Contract Documents, City
will specify all performance and design criteria that such services must satisfy. Contractor shall
cause such services or certifications to be provided by a properly licensed professional, whose
signature and seal shall appear on all drawings, calculations, specifications, certifications, and
Submittals prepared by such professional. Submittals related to the Work designed or certified by
such professional, if prepared by others, shall bear such professional's written approval when
submitted to City.
C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services,
certifications or approvals performed by such design professionals, provided City has specified
to Contractor performance and design criteria that such services must satisfy.
D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design
drawings will be only for the limited purpose of checking for conformance with performance and
design criteria given and the design concept expressed in the Contract Documents. City's review
and acceptance of Submittals (except design calculations and design drawings) will be only for
the purpose stated in Paragraph 6.18.C.
6.23 Right to Audit
A. The Contractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents,papers, and records of the Contractor involving transactions relating
to this Contract. Contractor agrees that the City shall have access during Regular Working Hours
to all necessary Contractor facilities and shall be provided adequate and appropriate work space
in order to conduct audits in compliance with the provisions of this Paragraph. The City shall
give Contractor reasonable advance notice of intended audits.
B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that
the subcontractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of such Subcontractor, involving transactions to
the subcontract, and further, that City shall have access during Regular Working Hours to all
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fe1m y2,2016
007200-1
GENERAL CONDITIONS
Page 35 of 63
Subcontractor facilities, and shall be provided adequate and appropriate work space in order to
conduct audits in compliance with the provisions of this Paragraph. The City shall give
Subcontractor reasonable advance notice of intended audits.
C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the
City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate
published in the Texas Administrative Code in effect as of the time copying is performed.
6.24 Nondiscrimination
A. The City is responsible for operating Public Transportation Programs and implementing transit-
related projects, which are funded in part with Federal financial assistance awarded by the U.S.
Department of Transportation and the Federal Transit Administration (FTA), without
discriminating against any person in the United States on the basis of race, color, or national
origin.
B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of
the Act and the Regulations as further defined in the Supplementary Conditions for any project
receiving Federal assistance.
ARTICLE 7—OTHER WORK AT THE SITE
7.01 Related Work at Site
A. City may perform other work related to the Project at the Site with City's employees, or other
City contractors, or through other direct contracts therefor, or have other work performed by
utility owners. If such other work is not noted in the Contract Documents, then written notice
thereof will be given to Contractor prior to starting any such other work; and
B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility
owner, and City, if City is performing other work with City's employees or other City
contractors, proper and safe access to the Site, provide a reasonable opportunity for the
introduction and storage of materials and equipment and the execution of such other work, and
properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of
the Work that may be required to properly connect or otherwise make its several parts come
together and properly integrate with such other work. Contractor shall not endanger any work of
others by cutting, excavating, or otherwise altering such work; provided, however, that
Contractor may cut or alter others' work with the written consent of City and the others whose
work will be affected.
C. If the proper execution or results of any part of Contractor's Work depends upon work performed
by others under this Article 7, Contractor shall inspect such other work and promptly report to
City in writing any delays, defects, or deficiencies in such other work that render it unavailable
or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so
report will constitute an acceptance of such other work as fit and proper for integration with
Contractor's Work except for latent defects in the work provided by others.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnwy2,2016
007200-1
GENERAL CONDITIONS
Page 36 of 63
7.02 Coordination
A. If City intends to contract with others for the performance of other work on the Project at the
Site,the following will be set forth in Supplementary Conditions:
1. the individual or entity who will have authority and responsibility for coordination of the
activities among the various contractors will be identified;
2. the specific matters to be covered by such authority and responsibility will be itemized; and
3. the extent of such authority and responsibilities will be provided.
B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such
coordination.
ARTICLE 8—CITY'S RESPONSIBILITIES
8.01 Communications to Contractor
Except as otherwise provided in the Supplementary Conditions, City shall issue all communications
to Contractor.
8.02 Furnish Data
City shall timely fiunish the data required under the Contract Documents.
8.03 Pay When Due
City shall make payments to Contractor in accordance with Article 14.
8.04 Lands and Easements;Reports and Tests
City's duties with respect to providing lands and easements and providing engineering surveys to
establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's
identifying and making available to Contractor copies of reports of explorations and tests of
subsurface conditions and drawings of physical conditions relating to existing surface or subsurface
structures at or contiguous to the Site that have been utilized by City in preparing the Contract
Documents.
8.05 Change Orders
City shall execute Change Orders in accordance with Paragraph 10.03.
8.06 Inspections, Tests, and Approvals
City's responsibility with respect to certain inspections,tests,and approvals is set forth in Paragraph
13.03.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnay2,2016
007200-1
GENERAL CONDITIONS
Page 37 of 63
8.07 Limitations on City's Responsibilities
A. The City shall not supervise, direct, or have control or authority over, nor be responsible for,
Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety
precautions and programs incident thereto, or for any failure of Contractor to comply with Laws
and Regulations applicable to the performance of the Work. City will not be responsible for
Contractor's failure to perform the Work in accordance with the Contract Documents.
B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14.
8.08 Undisclosed Hazardous Environmental Condition
City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth
in Paragraph 4.06.
8.09 Compliance with Safety Program
While at the Site, City's employees and representatives shall comply with the specific applicable
requirements of Contractor's safety programs of which City has been informed pursuant to
Paragraph 6.14.
ARTICLE 9—CITY'S OBSERVATION STATUS DURING CONSTRUCTION
9.01 City's Project Manager
City will provide one or more Project Manager(s) during the construction period. The duties and
responsibilities and the limitations of authority of City's Project Manager during construction are set
forth in the Contract Documents. The City's Project Manager for this Contract is Liam Conlon, or
his/her successor pursuant to written notification from the Director of the Water Department.
9.02 Visits to Site
A. City's Project Manager will make visits to the Site at intervals appropriate to the various stages
of construction as City deems necessary in order to observe the progress that has been made and
the quality of the various aspects of Contractor's executed Work. Based on information
obtained during such visits and observations, City's Project Manager will determine, in general,
if the Work is proceeding in accordance with the Contract Documents. City's Project Manager
will not be required to make exhaustive or continuous inspections on the Site to check the
quality or quantity of the Work. City's Project Manager's efforts will be directed toward
providing City a greater degree of confidence that the completed Work will conform generally to
the Contract Documents.
B. City's Project Manager's visits and observations are subject to all the limitations on authority and
responsibility in the Contract Documents including those set forth in Paragraph
8.07.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnary2,2016
007200-1
GENERAL CONDITIONS
Page 38 of 63
9.03 Authorized Variations in Work
City's Project Manager may authorize minor variations in the Work from the requirements of the
Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time
and are compatible with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. These may be accomplished by a Field Order and will be
binding on City and also on Contractor,who shall perform the Work involved promptly.
9.04 Rejecting Defective Work
City will have authority to reject Work which City's Project Manager believes to be defective, or
will not produce a completed Project that conforms to the Contract Documents or that will prejudice
the integrity of the design concept of the completed Project as a functioning whole as indicated by
the Contract Documents. City will have authority to conduct special inspection or testing of the
Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed.
9.05 Determinations for Work Per
Contractor will determine the actual quantities and classifications of Work performed. City's Project
Manager will review with Contractor the preliminary determinations on such matters before
rendering a written recommendation. City's written decision will be final (except as modified to
reflect changed factual conditions or more accurate data).
9.06 Decisions on Requirements of Contract Documents and Acceptability of Work
A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the
acceptability of the Work thereunder.
B. City will render a written decision on any issue referred.
C. City's written decision on the issue referred will be final and binding on the Contractor, subject
to the provisions of Paragraph 10.06.
ARTICLE 10—CHANGES IN THE WORK; CLAIMS; EXTRA WORK
10.01 Authorized Changes in the Work
A. Without invalidating the Contract and without notice to any surety,City may, at any time or from
time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly
proceed with the Work involved which will be performed under the applicable conditions of the
Contract Documents (except as otherwise specifically provided). Extra Work shall be
memorialized by a Change Order which may or may not precede an order of Extra work.
B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field
Order may be issued by the City.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fdmay 2,2016
007200-1
GENERAL CONDITIONS
Page 39 of 63
10.02 Unauthorized Changes in the Work
Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract
Time with respect to any work performed that is not required by the Contract Documents as
amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an
emergency as provided in Paragraph 6.17.
10.03 Execution of Change Orders
A. City and Contractor shall execute appropriate Change Orders covering:
1. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (ii)
required because of acceptance of defective Work under Paragraph 13.08 or City's correction
of defective Work under Paragraph 13.09,or(iii)agreed to by the parties;
2. changes in the Contract Price or Contract Time which are agreed to by the parties, including
any undisputed sum or amount of time for Work actually performed.
10.04 Extra Work
A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment
thereof, and the City insists upon its performance, the Contractor shall proceed with the work
after making written request for written orders and shall keep accurate account of the actual
reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to
Paragraph 10.06.
B. The Contractor shall furnish the City such installation records of all deviations from the original
Contract Documents as may be necessary to enable the City to prepare for permanent record a
corrected set of plans showing the actual installation.
C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall
be a full, complete and final payment for all costs Contractor incurs as a result or relating to the
change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that
time, including without limitation, any costs for delay, extended overhead, ripple or impact cost,
or any other effect on changed or unchanged work as a result of the change or Extra Work.
10.05 Notification to Surety
If the provisions of any bond require notice to be given to a surety of any change affecting the
general scope of the Work or the provisions of the Contract Documents (including, but not limited
to, Contract Price or Contract Time), the giving of any such notice will be Contractor's
responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the
effect of any such change.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnoy2,2016
007200-1
GENERAL CONDITIONS
Page 40 of 63
10.06 Contract Claims Process
A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph
14.09, shall be referred to the City for decision. A decision by City shall be required as a
condition precedent to any exercise by Contractor of any rights or remedies he may otherwise
have under the Contract Documents or by Laws and Regulations in respect of such Contract
Claims.
B. Notice:
1. Written notice stating the general nature of each Contract Claim shall be delivered by the
Contractor to City no later than 15 days after the start of the event giving rise thereto. The
responsibility to substantiate a Contract Claim shall rest with the party making the Contract
Claim.
2. Notice of the amount or extent of the Contract Claim,with supporting data shall be delivered
to the City on or before 45 days from the start of the event giving rise thereto(unless the City
allows additional time for Contractor to submit additional or more accurate data in support of
such Contract Claim).
3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with
the provisions of Paragraph 12.01.
4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with
the provisions of Paragraph 12.02.
5. Each Contract Claim shall be accompanied by Contractor's written statement that the
adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a
result of said event.
6. The City shall submit any response to the Contractor within 30 days after receipt of the
claimant's last submittal(unless Contract allows additional time).
C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last
submittal of the Contractor,if any,take one of the following actions in writing:
1. deny the Contract Claim in whole or in part;
2. approve the Contract Claim;or
3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's
sole discretion, it would be inappropriate for the City to do so. For purposes of further
resolution of the Contract Claim, such notice shall be deemed a denial.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnoy 2,2016
0072 00-1
GENERAL CONDITIONS
Page 41 of 63
D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or
Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such
action or denial.
E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not
submitted in accordance with this Paragraph 10.06.
ARTICLE 11—COST OF THE WORK;ALLOWANCES; UNIT PRICE WORK; PLANS
QUANTITY MEASUREMENT
11.01 Cost of the Work
A. Costs Included. The term Cost of the Work means the sum of all costs, except those excluded in
Paragraph 11.013, necessarily incurred and paid by Contractor in the proper performance of the
Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to
Contractor will be only those additional or incremental costs required because of the change in
the Work. Such costs shall not include any of the costs itemized in Paragraph 11.013, and shall
include but not be limited to the following items:
1. Payroll costs for employees in the direct employ of Contractor in the performance of the
Work under schedules of job classifications agreed upon by City and Contractor. Such
employees shall include, without limitation, superintendents, foremen, and other personnel
employed full time on the Work. Payroll costs for employees not employed full time on the
Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall
include;
a. salaries with a 55%markup,or
b. salaries and wages plus the cost of fringe benefits, which shall include social security
contributions, unemployment, excise, and payroll taxes, workers' compensation, health
and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto.
The expenses of performing Work outside of Regular Working Hours, Weekend
Working Hours, or legal holidays, shall be included in the above to the extent authorized
by City.
2. Cost of all materials and equipment furnished and incorporated in the Work, including costs
of transportation and storage thereof, and Suppliers' field services required in connection
therewith.
3. Rentals of all construction equipment and machinery, and the parts thereof whether rented
from Contractor or others in accordance with rental agreements approved by City, and the
costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All
such costs shall be in accordance with the terms of said rental agreements. The rental of any
such equipment, machinery, or parts shall cease when the use thereof is no longer necessary
for the Work.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fdmmy2,2016
007200-1
GENERAL CONDITIONS
Page 42 of 63
4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If
required by City, Contractor shall obtain competitive bids from subcontractors acceptable to
City and Contractor and shall deliver such bids to City,who will then determine, which bids,
if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on
the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall
be determined in the same manner as Contractor's Cost of the Work and fee as provided in
this Paragraph 11.01.
5. Costs of special consultants (including but not limited to engineers, architects, testing
laboratories, surveyors, attorneys, and accountants) employed for services specifically related
to the Work.
6. Supplemental costs including the following:
a. The proportion of necessary transportation, travel, and subsistence expenses of
Contractor's employees incurred in discharge of duties connected with the Work.
b. Cost, including transportation and maintenance, of all materials, supplies, equipment,
machinery, appliances, office, and temporary facilities at the Site, and hand tools not
owned by the workers, which are consumed in the performance of the Work, and cost,
less market value, of such items used but not consumed which remain the property of
Contractor.
c. Sales, consumer, use, and other similar taxes related to the Work, and for which
Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and
Regulations.
d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or
anyone directly or indirectly employed by any of them or for whose acts any of them may
be liable,and royalty payments and fees for permits and licenses.
e. Losses and damages (and related expenses) caused by damage to the Work, not
compensated by insurance or otherwise, sustained by Contractor in connection with the
performance of the Work, provided such losses and damages have resulted from causes
other than the negligence of Contractor, any Subcontractor, or anyone directly or
indirectly employed by any of them or for whose acts any of them may be liable. Such
losses shall include settlements made with the written consent and approval of City. No
such losses, damages, and expenses shall be included in the Cost of the Work for the
purpose of determining Contractor's fee.
f. The cost of utilities,fuel, and sanitary facilities at the Site.
g. Minor expenses such as telegrams, long distance telephone calls, telephone and
communication services at the Site, express and courier services, and similar petty cash
items in connection with the Work.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnwy2,2016
007200-1
GENERAL CONDITIONS
Page 43 of 63
h. The costs of premiums for all bonds and insurance Contractor is required by the Contract
Documents to purchase and maintain.
B. Costs Excluded:The term Cost of the Work shall not include any of the following items:
1. Payroll costs and other compensation of Contractor's officers, executives, principals (of
partnerships and sole proprietorships), general managers, safety managers, engineers,
architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents,
expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the
Site or in Contractor's principal or branch office for general administration of the Work and
not specifically included in the agreed upon schedule of job classifications referred to in
Paragraph 11.01.A.1 or specifically covered by Paragraph 11.0l.A.4, all of which are to be
considered administrative costs covered by the Contractor's fee.
2. Expenses of Contractor's principal and branch offices other than Contractor's office at the
Site.
3. Any part of Contractor's capital expenses, including interest on Contractor's capital
employed for the Work and charges against Contractor for delinquent payments.
4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly
employed by any of them or for whose acts any of them may be liable, including but not
limited to, the correction of defective Work, disposal of materials or equipment wrongly
supplied, and making good any damage to property.
5. Other overhead or general expense costs of any kind.
C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee
shall be determined as set forth in the Agreement. When the value of any Work covered by a
Change Order for an adjustment in Contract Price is determined on the basis of Cost of the
Work,Contractor's fee shall be determined as set forth in Paragraph 12.01.C.
D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to
Paragraphs 11.01.A and 11.01.13, Contractor will establish and maintain records thereof in
accordance with generally accepted accounting practices and submit in a form acceptable to City
an itemized cost breakdown together with supporting data.
11.02 Allowances
A. Specified Allowance: It is understood that Contractor has included in the Contract Price all
allowances so named in the Contract Documents and shall cause the Work so covered to be
performed for such sums and by such persons or entities as may be acceptable to City.
B. Pre-bid Allowances:
1. Contractor agrees that:
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fd mmy 2,2016
007200-1
GENERAL CONDITIONS
Page 44 of 63
a. the pre-bid allowances include the cost to Contractor of materials and equipment required
by the allowances to be delivered at the Site, and all applicable taxes; and
b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead,
profit, and other expenses contemplated for the pre-bid allowances have been included in
the allowances, and no demand for additional payment on account of any of the
foregoing will be valid.
C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole
use of City.
D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due
Contractor on account of Work covered by allowances, and the Contract Price shall be
correspondingly adjusted.
11.03 Unit Price Work
A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work,
initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to
the sum of the unit price for each separately identified item of Unit Price Work times the
estimated quantity of each item as indicated in the Agreement.
B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the
purpose of comparison of Bids and determining an initial Contract Price. Determinations of the
actual quantities and classifications of Unit Price Work performed by Contractor will be made by
City subject to the provisions of Paragraph 9.05.
C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to
cover Contractor's overhead and profit for each separately identified item. Work described in the
Contract Documents, or reasonably inferred as required for a functionally complete installation,
but not identified in the listing of unit price items shall be considered incidental to unit price
work listed and the cost of incidental work included as part of the unit price.
D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 if:
1. the quantity of any item of Unit Price Work performed by Contractor differs materially and
significantly from the estimated quantity of such item indicated in the Agreement; and
2. there is no corresponding adjustment with respect to any other item of Work.
E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in
accordance with Paragraph 10.01.
1. If the changes in quantities or the alterations do not significantly change the character of
work under the Contract Documents, the altered work will be paid for at the Contract unit
price.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnoy 2,2016
007200-1
GENERAL CONDITIONS
Page 45 of 63
2. If the changes in quantities or alterations significantly change the character of work, the
Contract will be amended by a Change Order.
3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended
by a Change Order in accordance with Article 12.
4. A significant change in the character of work occurs when:
a. the character of work for any Item as altered differs materially in kind or nature from that
in the Contract or
b. a Major Item of work varies by more than 25% from the original Contract quantity.
5. When the quantity of work to be done under any Major Item of the Contract is more than
125% of the original quantity stated in the Contract, then either party to the Contract may
request an adjustment to the unit price on the portion of the work that is above 125%.
6. When the quantity of work to be done under any Major Item of the Contract is less than 75%
of the original quantity stated in the Contract, then either party to the Contract may request
an adjustment to the unit price.
11.04 Plans Quantity Measurement
A. Plans quantities may or may not represent the exact quantity of work performed or material
moved, handled, or placed during the execution of the Contract. The estimated bid quantities are
designated as final payment quantities,unless revised by the governing Section or this Article.
B. If the quantity measured as outlined under"Price and Payment Procedures" varies by more than
25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total
estimated quantity for an individual Item originally shown in the Contract Documents, an
adjustment may be made to the quantity of authorized work done for payment purposes. The
party to the Contract requesting the adjustment will provide field measurements and calculations
showing the final quantity for which payment will be made. Payment for revised quantity will be
made at the unit price bid for that Item, except as provided for in Article 10.
C. When quantities are revised by a change in design approved by the City, by Change Order, or to
correct an error, or to correct an error on the plans, the plans quantity will be increased or
decreased by the amount involved in the change, and the 25% variance will apply to the new
plans quantity.
D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than
$250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans
quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans
quantity.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnwy2,2016
0072 00-1
GENERAL CONDITIONS
Page 46 of 63
E. For callout work or non-site specific Contracts,the plans quantity measurement requirements are
not applicable.
ARTICLE 12—CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME
12.01 Change of Contract Price
A. The Contract Price may only be changed by a Change Order.
B. The value of any Work covered by a Change Order will be determined as follows:
1. where the Work involved is covered by unit prices contained in the Contract Documents,by
application of such unit prices to the quantities of the items involved (subject to the
provisions of Paragraph 11.03);or
2. where the Work involved is not covered by unit prices contained in the Contract Documents,
by a mutually agreed lump sum or unit price(which may include an allowance for overhead
and profit not necessarily in accordance with Paragraph 12.0l.C.2), and shall include the cost
of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work;
or
3. where the Work involved is not covered by unit prices contained in the Contract Documents
and agreement to a lump sum or unit price is not reached under Paragraph 12.013.2, on the
basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a
Contractor's fee for overhead and profit(determined as provided in Paragraph 12.01.C).
C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as
follows:
1. a mutually acceptable fixed fee;or
2. if a fixed fee is not agreed upon,then a fee based on the following percentages of the various
portions of the Cost of the Work:
a. for costs incurred under Paragraphs 11.0l.A.1, 11.0l.A.2. and 11.0l.A.3, the
Contractor's additional fee shall be 15 percent except for:
1) rental fees for Contractor's own equipment using standard rental rates;
2) bonds and insurance;
b. for costs incurred under Paragraph 11.01.A.4 and 11.01.A.5,the Contractor's fee shall be
five percent(5%);
1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a
fee and no fixed fee is agreed upon, the intent of Paragraphs 12.0l.C.2.a and
12.01.C.2.b is that the Subcontractor who actually performs the Work, at whatever
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fdmwy 2,2016
0072 00-1
GENERAL CONDITIONS
Page 47 of 63
tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under
Paragraphs 11.0l.A.1 and 11.0l.A.2 and that any higher tier Subcontractor and
Contractor will each be paid a fee of five percent(5%) of the amount paid to the next
lower tier Subcontractor,however in no case shall the cumulative total of fees paid be
in excess of 25%;
c. no fee shall be payable on the basis of costs itemized under Paragraphs 11.0l.A.6, and
11.01.B;
d. the amount of credit to be allowed by Contractor to City for any change which results in
a net decrease in cost will be the amount of the actual net decrease in cost plus a
deduction in Contractor's fee by an amount equal to five percent (5%) of such net
decrease.
12.02 Change of Contract Time
A. The Contract Time may only be changed by a Change Order.
B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless
the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project
Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or
claimed delay adversely affects the critical path.
12.03 Delays
A. Where Contractor is reasonably delayed in the performance or completion of any part of the
Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time
may be extended in an amount equal to the time lost due to such delay if a Contract Claim is
made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts
or neglect by City, acts or neglect of utility owners or other contractors performing other work as
contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God.
Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in
this Paragraph.
B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or
damages (including but not limited to all fees and charges of engineers, architects, attorneys, and
other professionals and all court or arbitration or other dispute resolution costs) sustained by
Contractor on or in connection with any other project or anticipated project.
C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays
within the control of Contractor. Delays attributable to and within the control of a Subcontractor
or Supplier shall be deemed to be delays within the control of Contractor.
D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when
direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide
information or material,if any,which is to be furnished by the City.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Felnny 2,2016
007200 1
GENERAL CONDITIONS
Page 48 of 63
ARTICLE 13—TESTS AND INSPECTIONS; CORRECTION,REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
13.01 Notice of Defects
Notice of all defective Work of which City has actual knowledge will be given to Contractor.
Defective Work may be rejected,corrected,or accepted as provided in this Article 13.
13.02 Access to Work
City, independent testing laboratories, and governmental agencies with jurisdictional interests will
have access to the Site and the Work at reasonable times for their observation, inspection, and
testing. Contractor shall provide them proper and safe conditions for such access and advise them of
Contractor's safety procedures and programs so that they may comply therewith as applicable.
13.03 Tests and Inspections
A. Contractor shall give City timely notice of readiness of the Work for all required inspections,
tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required
inspections or tests.
B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any
of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full
responsibility for arranging and obtaining such independent inspections, tests, retests or
approvals, pay all costs in connection therewith, and furnish City the required certificates of
inspection or approval; excepting, however, those fees specifically identified in the
Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR)
inspections,which shall be paid as described in the Supplementary Conditions.
C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection
with any inspections, tests, re-tests, or approvals required for City's acceptance of materials or
equipment to be incorporated in the Work; or acceptance of materials,mix designs, or equipment
submitted for approval prior to Contractor's purchase thereof for incorporation in the Work.
Such inspections, tests, re-tests, or approvals shall be performed by organizations acceptable to
City.
D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to
perform any inspections or tests ("Testing") for any part of the Work, as determined solely by
City.
1. City will coordinate such Testing to the extent possible,with Contractor;
2. Should any Testing under this Section 13.03 D result in a "fail", "did not pass" or other
similar negative result, the Contractor shall be responsible for paying for any and all retests.
Contractor's cancellation without cause of City initiated Testing shall be deemed a negative
result and require a retest.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fdmay2,2016
007200-1
GENERAL CONDITIONS
Page 49 of 63
3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the
Testing Lab by Contractor. City will forward all invoices for retests to Contractor.
4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing
Lab is paid.
E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by
Contractor without written concurrence of City, Contractor shall, if requested by City, uncover
such Work for observation.
F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense.
G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued
under Section 13.03 D.
13.04 Uncovering Work
A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it
must, if requested by City, be uncovered for City's observation and replaced at Contractor's
expense.
B. If City considers it necessary or advisable that covered Work be observed by City or inspected or
tested by others,Contractor, at City's request, shall uncover, expose, or otherwise make available
for observation, inspection, or testing as City may require, that portion of the Work in question,
furnishing all necessary labor,material,and equipment.
1. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs,
losses, and damages(including but not limited to all fees and charges of engineers, architects,
attorneys, and other professionals and all court or other dispute resolution costs) arising out
of or relating to such uncovering, exposure, observation, inspection, and testing, and of
satisfactory replacement or reconstruction (including but not limited to all costs of repair or
replacement of work of others); or City shall be entitled to accept defective Work in
accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all
costs associated with exposing,observing,and testing the defective Work.
2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase
in the Contract Price or an extension of the Contract Time, or both, directly attributable to
such uncovering, exposure,observation,inspection,testing,replacement, and reconstruction.
13.05 City May Stop the Work
If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials
or equipment, or fails to perform the Work in such a way that the completed Work will conform to
the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until
the cause for such order has been eliminated; however, this right of City to stop the Work shall not
give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fdxtmry2,2016
007200-1
GENERAL CONDITIONS
Page 50 of 63
Subcontractor,any Supplier,any other individual or entity,or any surety for,or employee or agent of
any of them.
13.06 Correction or Removal of Defective Work
A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to
an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has
been rejected by City, remove it from the Project and replace it with Work that is not defective.
Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such correction
or removal (including but not limited to all costs of repair or replacement of work of others).
Failure to require the removal of any defective Work shall not constitute acceptance of such
Work.
B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07,
Contractor shall take no action that would void or otherwise impair City's special warranty and
guarantee,if any,on said Work.
13.07 Correction Period
A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may
be prescribed by the terms of any applicable special guarantee required by the Contract
Documents), any Work is found to be defective, or if the repair of any damages to the land or
areas made available for Contractor's use by City or permitted by Laws and Regulations as
contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without
cost to City and in accordance with City's written instructions:
1. repair such defective land or areas;or
2. correct such defective Work;or
3. if the defective Work has been rejected by City, remove it from the Project and replace it
with Work that is not defective,and
4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work
of others or other land or areas resulting therefrom.
B. If Contractor does not promptly comply with the terms of City's written instructions, or in an
emergency where delay would cause serious risk of loss or damage, City may have the defective
Work corrected or repaired or may have the rejected Work removed and replaced. All claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or other dispute resolution costs)
arising out of or relating to such correction or repair or such removal and replacement(including
but not limited to all costs of repair or replacement of work of others)will be paid by Contractor.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fd ayZ2016
007200-1
GENERAL CONDITIONS
Page 51 of 63
C. In special circumstances where a particular item of equipment is placed in continuous service
before Final Acceptance of all the Work,the correction period for that item may start to run from
an earlier date if so provided in the Contract Documents.
D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or
removed and replaced under this Paragraph 13.07, the correction period hereunder with respect
to such Work may be required to be extended for an additional period of one year after the end of
the initial correction period. City shall provide 30 days written notice to Contractor should such
additional warranty coverage be required. Contractor may dispute this requirement by filing a
Contract Claim,pursuant to Paragraph 10.06.
E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or
warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a
waiver of,the provisions of any applicable statute of limitation or repose.
13.08 Acceptance of Defective Work
If, instead of requiring correction or removal and replacement of defective Work, City prefers to
accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but
not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or other dispute resolution costs) attributable to City's evaluation of and determination to
accept such defective Work and for the diminished value of the Work to the extent not otherwise
paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be
issued incorporating the necessary revisions in the Contract Documents with respect to the Work,
and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished
value of Work so accepted.
13.09 City May Correct Defective Work
A. If Contractor fails within a reasonable time after written notice from City to correct defective
Work, or to remove and replace rejected Work as required by City in accordance with Paragraph
13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents,
or if Contractor fails to comply with any other provision of the Contract Documents, City may,
after seven(7)days written notice to Contractor, correct,or remedy any such deficiency.
B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed
expeditiously. In connection with such corrective or remedial action, City may exclude
Contractor from all or part of the Site, take possession of all or part of the Work and suspend
Contractor's services related thereto, and incorporate in the Work all materials and equipment
incorporated in the Work, stored at the Site or for which City has paid Contractor but which are
stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants,
employees, and City's other contractors, access to the Site to enable City to exercise the rights
and remedies under this Paragraph.
C. All claims, costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or other dispute resolution
MY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnmy 2,2016
007200-1
GENERAL CONDITIONS
Page 52 of 63
costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph
13.09 will be charged against Contractor, and a Change Order will be issued incorporating the
necessary revisions in the Contract Documents with respect to the Work, and City shall be
entitled to an appropriate decrease in the Contract Price.
D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the
performance of the Work attributable to the exercise of City's rights and remedies under this
Paragraph 13.09.
ARTICLE 14—PAYMENTS TO CONTRACTOR AND COMPLETION
14.01 Schedule of Values
The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve
as the basis for progress payments and will be incorporated into a form of Application for Payment
acceptable to City. Progress payments on account of Unit Price Work will be based on the number of
units completed.
14.02 Progress Payments
A. Applications for Payments.
1. Contractor is responsible for providing all information as required to become a vendor of the
City.
2. At least 20 days before the date established in the General Requirements for each progress
payment, Contractor shall submit to City for review an Application for Payment filled out
and signed by Contractor covering the Work completed as of the date of the Application and
accompanied by such supporting documentation as is required by the Contract Documents.
3. If payment is requested on the basis of materials and equipment not incorporated in the Work
but delivered and suitably stored at the Site or at another location agreed to in writing, the
Application for Payment shall also be accompanied by a bill of sale, invoice, or other
documentation warranting that City has received the materials and equipment free and clear
of all Liens and evidence that the materials and equipment are covered by appropriate
insurance or other arrangements to protect City's interest therein, all of which must be
satisfactory to City.
4. Beginning with the second Application for Payment, each Application shall include an
affidavit of Contractor stating that previous progress payments received on account of the
Work have been applied on account to discharge Contractor's legitimate obligations
associated with prior Applications for Payment.
5. The amount of retainage with respect to progress payments will be as stipulated in the
Contract Documents.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnny2,2016
007200-1
GENERAL CONDITIONS
Page 53 of 63
B. Review of Applications:
1. City will, after receipt of each Application for Payment, either indicate in writing a
recommendation of payment or return the Application to Contractor indicating reasons for
refusing payment. In the latter case, Contractor may make the necessary corrections and
resubmit the Application.
2. City's processing of any payment requested in an Application for Payment will be based on
City's observations of the executed Work, and on City's review of the Application for
Payment and the accompanying data and schedules,that to the best of City's knowledge:
a. the Work has progressed to the point indicated;
b. the quality of the Work is generally in accordance with the Contract Documents (subject
to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance,
the results of any subsequent tests called for in the Contract Documents, a final
determination of quantities and classifications for Work performed under Paragraph 9.05,
and any other qualifications stated in the recommendation).
3. Processing any such payment will not thereby be deemed to have represented that:
a. inspections made to check the quality or the quantity of the Work as it has been
performed have been exhaustive, extended to every aspect of the Work in progress, or
involved detailed inspections of the Work beyond the responsibilities specifically
assigned to City in the Contract Documents; or
b. there may not be other matters or issues between the parties that might entitle Contractor
to be paid additionally by City or entitle City to withhold payment to Contractor,or
c. Contractor has complied with Laws and Regulations applicable to Contractor's
performance of the Work.
4. City may refuse to process the whole or any part of any payment because of subsequently
discovered evidence or the results of subsequent inspections or tests, and revise or revoke
any such payment previously made, to such extent as may be necessary to protect City from
loss because:
a. the Work is defective, or the completed Work has been damaged by the Contractor or his
subcontractors,requiring correction or replacement;
b, discrepancies in quantities contained in previous applications for payment;
c. the Contract Price has been reduced by Change Orders;
d. City has been required to correct defective Work or complete Work in accordance with
Paragraph 13.09;or
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnrery2,2016
0072 00-1
GENERAL CONDITIONS
Page 54 of 63
e. City has actual knowledge of the occurrence of any of the events enumerated in
Paragraph 15.02.A.
C. Retainage:
1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent
(10%).
2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent
(5%).
D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the
time specified in the Contract Documents, the sum per day specified in the Agreement, will be
deducted from the monies due the Contractor, not as a penalty, but as liquidated damages
suffered by the City.
E. Payment. Contractor will be paid pursuant to the requirements of this Article 14 and payment
will become due in accordance with the Contract Documents.
F. Reduction in Payment:
1. City may refuse to make payment of the amount requested because:
a. Liens have been filed in connection with the Work, except where Contractor has
delivered a specific bond satisfactory to City to secure the satisfaction and discharge of
such Liens;
b. there are other items entitling City to a set-off against the amount recommended;or
c. City has actual knowledge of the occurrence of any of the events enumerated in
Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A.
2. If City refuses to make payment of the amount requested, City will give Contractor written
notice stating the reasons for such action and pay Contractor any amount remaining after
deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or
any adjustment thereto agreed to by City and Contractor, when Contractor remedies the
reasons for such action.
14.03 Contractor's Warranty of Title
Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any
Application for Payment, whether incorporated in the Project or not, will pass to City no later than
the time of payment free and clear of all Liens.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fdmuy2,2016
007200 1
GENERAL CONDITIONS
Page 55 of 63
14.04 Partial Utilization
A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed
part of the Work which has specifically been identified in the Contract Documents, or which
City, determines constitutes a separately functioning and usable part of the Work that can be
used by City for its intended purpose without significant interference with Contractor's
performance of the remainder of the Work. City at any time may notify Contractor in writing to
permit City to use or occupy any such part of the Work which City determines to be ready for its
intended use, subject to the following conditions:
1. Contractor at any time may notify City in writing that Contractor considers any such part of
the Work ready for its intended use.
2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and
Contractor shall make an inspection of that part of the Work to determine its status of
completion. If City does not consider that part of the Work to be substantially complete, City
will notify Contractor in writing giving the reasons therefor.
3. Partial Utilization will not constitute Final Acceptance by City.
14.05 Final Inspection
A. Upon written notice from Contractor that the entire Work is complete in accordance with the
Contract Documents:
1. within 10 days,City will schedule a Final Inspection with Contractor.
2. City will notify Contractor in writing of all particulars in which this inspection reveals that
the Work is incomplete or defective. Contractor shall immediately take such measures as are
necessary to complete such Work or remedy such deficiencies.
B. No time charge will be made against the Contractor between said date of notification of the City
and the date of Final Inspection. Should the City determine that the Work is not ready for Final
Inspection, City will notify the Contractor in writing of the reasons and Contract Time will
resume.
14.06 Final Acceptance
Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final
Inspection,City will issue to Contractor a letter of Final Acceptance.
C]TY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fcbnarty 2,2016
007200-1
GENERAL CONDITIONS
Page 56 of 63
14.07 Final Payment
A. Application for Payment.-
1.
ayment.1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for
final payment following the procedure for progress payments in accordance with the
Contract Documents.
2. The final Application for Payment shall be accompanied(except as previously delivered)by:
a. all documentation called for in the Contract Documents, including but not limited to the
evidence of insurance required by Paragraph 5.03;
b. consent of the surety,if any,to final payment;
c. a list of all pending or released Damage Claims against City that Contractor believes are
unsettled; and
d. affidavits of payments and complete and legally effective releases or waivers
(satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the
Work.
B. Payment Becomes Due:
1. After City's acceptance of the Application for Payment and accompanying documentation,
requested by Contractor, less previous payments made and any sum City is entitled,
including but not limited to liquidated damages,will become due and payable.
2. After all Damage Claims have been resolved:
a. directly by the Contractor or;
b. Contractor provides evidence that the Damage Claim has been reported to Contractor's
insurance provider for resolution.
3. The making of the final payment by the City shall not relieve the Contractor of any
guarantees or other requirements of the Contract Documents which specifically continue
thereafter.
14.08 Final Completion Delayed and Partial Retainage Release
A. If final completion of the Work is significantly delayed, and if City so confirms, City may,upon
receipt of Contractor's final Application for Payment, and without terminating the Contract,
make payment of the balance due for that portion of the Work fully completed and accepted If
the remaining balance to be held by City for Work not fully completed or corrected is less than
the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in
Paragraph 5.02, the written consent of the surety to the payment of the balance due for that
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fdxuwy 2,2016
0072 00-1
GENERAL CONDITIONS
Page 57 of 63
portion of the Work fully completed and accepted shall be submitted by Contractor to City with
the Application for such payment. Such payment shall be made under the terms and conditions
governing final payment,except that it shall not constitute a waiver of Contract Claims.
B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment
and maintenance, and test and performance periods following the completion of all other
construction in the Contract Documents for all Work locations, the City may release a portion of
the amount retained provided that all other work is completed as determined by the City. Before
the release, all submittals and final quantities must be completed and accepted for all other work.
An amount sufficient to ensure Contract compliance will be retained.
14.09 Waiver of Claims
The acceptance of final payment will constitute a release of the City from all claims or liabilities
under the Contract for anything done or furnished or relating to the work under the Contract
Documents or any act or neglect of City related to or connected with the Contract.
ARTICLE 15—SUSPENSION OF WORK AND TERMINATION
15.01 City May Suspend Work
A. At any time and without cause, City may suspend the Work or any portion thereof by written
notice to Contractor and which may fix the date on which Work will be resumed. Contractor
shall resume the Work on the date so fixed. During temporary suspension of the Work covered
by these Contract Documents, for any reason, the City will make no extra payment for stand-by
time of construction equipment and/or construction crews.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
control of and without the fault or negligence of the Contractor, and should it be determined by
mutual consent of the Contractor and City that a solution to allow construction to proceed is not
available within a reasonable period of time, Contractor may request an extension in Contract
Time,directly attributable to any such suspension.
C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall
store all materials in such a manner that they will not obstruct or impede the public unnecessarily
nor become damaged in any way, and he shall take every precaution to prevent damage or
deterioration of the work performed; he shall provide suitable drainage about the work, and erect
temporary structures where necessary.
D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the
necessary equipment to the job when it is determined by the City that construction may be
resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the
equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is
moved to another construction project for the City.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fehnopy 2,2016
007200-1
GENERAL CONDITIONS
Page 58 of 63
15.02 City May Terminate for Cause
A. The occurrence of any one or more of the following events by way of example, but not of
limitation,may justify termination for cause:
1. Contractor's persistent failure to perform the Work in accordance with the Contract
Documents (including, but not limited to, failure to supply sufficient skilled workers or
suitable materials or equipment, failure to adhere to the Project Schedule established under
Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere
to the City's Business Diversity Enterprise Ordinance #20020-12-2011 established under
Paragraph 6.06.D);
2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction;
3. Contractor's repeated disregard of the authority of City; or
4. Contractor's violation in any substantial way of any provisions of the Contract Documents;
or
5. Contractor's failure to promptly make good any defect in materials or workmanship, or
defects of any nature,the correction of which has been directed in writing by the City;or
6. Substantial indication that the Contractor has made an unauthorized assignment of the
Contract or any funds due therefrom for the benefit of any creditor or for any other purpose;
or
7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise
financially unable to carry on the Work satisfactorily;or
8. Contractor commences legal action in a court of competent jurisdiction against the City.
B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written
notice to Contractor and Surety to arrange a conference with Contractor and Surety to address
Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after
receipt of notice.
1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to
perform the construction Contract, the City may, to the extent permitted by Laws and
Regulations, declare a Contractor default and formally terminate the Contractor's right to
complete the Contract. Contractor default shall not be declared earlier than 20 days after the
Contractor and Surety have received notice of conference to address Contractor's failure to
perform the Work.
2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the
Work. If Surety does not commence performance thereof within 15 consecutive calendar
days after date of an additional written notice demanding Surety's performance of its
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febmery 2,2016
007200-1
GENERAL CONDITIONS
Page 59 of 63
obligations, then City, without process or action at law, may take over any portion of the
Work and complete it as described below.
a. If City completes the Work, City may exclude Contractor and Surety from the site and
take possession of the Work, and all materials and equipment incorporated into the Work
stored at the Site or for which City has paid Contractor or Surety but which are stored
elsewhere, and finish the Work as City may deem expedient.
3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any
further payment until the Work is finished. If the unpaid balance of the Contract Price
exceeds all claims, costs, losses and damages sustained by City arising out of or resulting
from completing the Work, such excess will be paid to Contractor. If such claims, costs,
losses and damages exceed such unpaid balance, Contractor shall pay the difference to City.
Such claims, costs, losses and damages incurred by City will be incorporated in a Change
Order, provided that when exercising any rights or remedies under this Paragraph, City shall
not be required to obtain the lowest price for the Work performed.
4. Neither City, nor any of its respective consultants, agents, officers, directors or employees
shall be in any way liable or accountable to Contractor or Surety for the method by which the
completion of the said Work, or any portion thereof, may be accomplished or for the price
paid therefor.
5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right
to recover damages from Contractor or Surety for Contractor's failure to timely complete the
entire Contract. Contractor shall not be entitled to any claim on account of the method used
by City in completing the Contract.
6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as
provided for in the bond requirements of the Contract Documents or any special guarantees
provided for under the Contract Documents or any other obligations otherwise prescribed by
law.
C. Notwithstanding Paragraphs 15.02.B, Contractor's services will not be terminated if Contractor
begins within seven days of receipt of notice of intent to terminate to correct its failure to
perform and proceeds diligently to cure such failure within no more than 30 days of receipt of
said notice.
D. Where Contractor's services have been so terminated by City, the termination will not affect any
rights or remedies of City against Contractor then existing or which may thereafter accrue. Any
retention or payment of moneys due Contractor by City will not release Contractor from liability.
E. If and to the extent that Contractor has provided a performance bond under the provisions of
Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this
Article.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnwy 2,2016
007200-1
GENERAL CONDITIONS
Page 60 of 63
15.03 City May Terminate For Convenience
A. City may,without cause and without prejudice to any other right or remedy of City,terminate the
Contract. Any termination shall be effected by mailing a notice of the termination to the
Contractor specifying the extent to which performance of Work under the contract is terminated,
and the date upon which such termination becomes effective. Receipt of the notice shall be
deemed conclusively presumed and established when the letter is placed in the United States
Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and
established that such termination is made with just cause as therein stated; and no proof in any
claim,demand or suit shall be required of the City regarding such discretionary action.
B. After receipt of a notice of termination, and except as otherwise directed by the City, the
Contractor shall:
1. Stop work under the Contract on the date and to the extent specified in the notice of
termination;
2. place no further orders or subcontracts for materials, services or facilities except as may be
necessary for completion of such portion of the Work under the Contract as is not terminated;
3. terminate all orders and subcontracts to the extent that they relate to the performance of the
Work terminated by notice of termination;
4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any,
directed by the City:
a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and
other material produced as a part of, or acquired in connection with the performance of,
the Work terminated by the notice of the termination; and
b. the completed, or partially completed plans, drawings, information and other property
which, if the Contract had been completed, would have been required to be furnished to
the City.
5. complete performance of such Work as shall not have been terminated by the notice of
termination; and
6. take such action as may be necessary, or as the City may direct, for the protection and
preservation of the property related to its contract which is in the possession of the
Contractor and in which the owner has or may acquire the rest.
C. At a time not later than 30 days after the termination date specified in the notice of termination,
the Contractor may submit to the City a list, certified as to quantity and quality, of any or all
items of termination inventory not previously disposed of, exclusive of items the disposition of
which has been directed or authorized by City.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fetmmy2,2016
007200-1
GENERAL CONDITIONS
Page 61 of 63
D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list
submitted shall be subject to verification by the City upon removal of the items or, if the items
are stored, within 45 days from the date of submission of the list, and any necessary adjustments
to correct the list as submitted, shall be made prior to final settlement.
E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination
claim to the City in the form and with the certification prescribed by the City. Unless an
extension is made in writing within such 60 day period by the Contractor, and granted by the
City,any and all such claims shall be conclusively deemed waived.
F. In such case,Contractor shall be paid for(without duplication of any items):
1. completed and acceptable Work executed in accordance with the Contract Documents prior
to the effective date of termination, including fair and reasonable sums for overhead and profit on
such Work;
2. expenses sustained prior to the effective date of termination in performing services and
furnishing labor, materials, or equipment as required by the Contract Documents in connection
with uncompleted Work,plus fair and reasonable sums for overhead and profit on such expenses;
and
3. reasonable expenses directly attributable to termination.
G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid
to the Contractor by reason of the termination of the Work, the City shall determine, on the basis
of information available to it, the amount, if any, due to the Contractor by reason of the
termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid
on account of loss of anticipated profits or revenue or other economic loss arising out of or
resulting from such termination.
ARTICLE 16—DISPUTE RESOLUTION
16.01 Methods and Procedures
A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision
under Paragraph 10.06 before such decision becomes final and binding. The request for
mediation shall be submitted to the other party to the Contract. Timely submission of the request
shall stay the effect of Paragraph 10.06.E.
B. City and Contractor shall participate in the mediation process in good faith. The process shall be
commenced within 60 days of filing of the request.
C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a
denial pursuant to Paragraphs 10.06.C.3 or 10.06.1) shall become final and binding 30 days after
termination of the mediation unless,within that time period,City or Contractor:
Cn'Y OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Fdzusy 2,2016
007200-1
GENERAL CONDITIONS
Page 62 of 63
1. elects in writing to invoke any other dispute resolution process provided for in the
Supplementary Conditions; or
2. agrees with the other party to submit the Contract Claim to another dispute resolution
process;or
3. gives written notice to the other party of the intent to submit the Contract Claim to a court of
competent jurisdiction.
ARTICLE 17—MISCELLANEOUS
17.01 Giving Notice
A. Whenever any provision of the Contract Documents requires the giving of written notice, it will
be deemed to have been validly given if:
1. delivered in person to the individual or to a member of the firm or to an officer of the
corporation for whom it is intended;or
2. delivered at or sent by registered or certified mail, postage prepaid, to the last business
address known to the giver of the notice.
B. Business address changes must be promptly made in writing to the other party.
C. Whenever the Contract Documents specifies giving notice by electronic means such electronic
notice shall be deemed sufficient upon confirmation of receipt by the receiving party.
17.02 Computation of Times
When any period of time is referred to in the Contract Documents by days, it will be computed to
exclude the first and include the last day of such period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last
day of the period.
17.03 Cumulative Remedies
The duties and obligations imposed by these General Conditions and the rights and remedies
available hereunder to the parties hereto are in addition to, and are not to be construed in any way as
a limitation of, any rights and remedies available to any or all of them which are otherwise imposed
or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the
Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically
in the Contract Documents in connection with each particular duty, obligation, right, and remedy to
which they apply.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febnwy 2,2016
0072 00-1
GENERAL CONDITIONS
Page 63 of 63
17.04 Survival of Obligations
All representations, indemnifications, warranties, and guarantees made in, required by, or given in
accordance with the Contract Documents, as well as all continuing obligations indicated in the
Contract Documents, will survive final payment, completion, and acceptance of the Work or
termination or completion of the Contract or termination of the services of Contractor.
17.05 Headings
Article and paragraph headings are inserted for convenience only and do not constitute parts of these
General Conditions.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revision:Febmay2,2016
007300-1
SUPPLEMENTARY CONDITIONS
Pagel of 5
1 SECTION 00 73 00
2 SUPPLEMENTARY CONDITIONS
3 TO
4 GENERAL CONDITIONS
5
6
7 Supplementary Conditions
8
9 These Supplementary Conditions modify and supplement Section 00 72 00-General Conditions,and other
10 provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are
11 modified or supplemented remain in full force and effect as so modified or supplemented. All provisions
12 of the General Conditions which are not so modified or supplemented remain in full force and effect.
13
14 Defined Terms
15
16 The terms used in these Supplementary Conditions which are defined in the General Conditions have the
17 meaning assigned to them in the General Conditions,unless specifically noted herein.
18
19 Modifications and Supplements
20
21 The following are instructions that modify or supplement specific paragraphs in the General Conditions and
22 other Contract Documents.
23
24 SC-3.03B.2,"Resolving Discrepancies"
25
26 Plans govern over Specifications.
27
28 SC-4.01A
29
30 Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding.
31 Upon receiving the final easements descriptions,Contractor shall compare them to the lines shown on the
32 Contract Drawings.
33
34 SC4.01A.1.,"Availability of Lands"
35
36 The following is a list of known outstanding right-of-way,and/or easements to be acquired,if any as of
37 April 4,2017:
38
39 Outstanding Right-Of-Way,and/or Easements to Be Acquired
PARCEL OWNER TARGET DATE
NUMBER OF POSSESSION
None
40 The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed,
41 and do not bind the City.
42
43 If Contractor considers the final easements provided to differ materially from the representations on the
44 Contract Drawings, Contractor shall within five(5)Business Days and before proceeding with the Work,
45 notify City in writing associated with the differing easement line locations.
46
47 SC-4.01A.2,"Availability of Lands"
CITY OF FORT WORTH 2014 CII',YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised January 22,2016
007300-2
SUPPLEMENTARY CONDITIONS
Page 2 of 5
1
2 Utilities or obstructions to be removed,adjusted,and/or relocated
3
4 The following is list of utilities and/or obstructions that have not been removed,adjusted,and/or relocated
5 as of April 4,2017
6
EXPECTED UTILITY AND LOCATION TARGET DATE OF
OWNER ADJUSTMENT
None
7 The Contractor understands and agrees that the dates listed above are estimates only,are not guaranteed,
8 and do not bind the City.
9
10 SC4.02A.,"Subsurface and Physical Conditions"
11
12 The following are reports of explorations and tests of subsurface conditions at the site of the Work:
13
14 A Report No.NONE,dated NONE,prepared by a consultant of the City,providing additional information
15 on NONE.
16
17 The following are drawings of physical conditions in or relating to existing surface and subsurface
18 structures(except Underground Facilities)which are at or contiguous to the site of the Work:
19 NONE
20
21 SC4.06A.,"Hazardous Environmental Conditions at Site"
22
23 The following are reports and drawings of existing hazardous environmental conditions known to the City:
24 NONE
25
26 SC-5.03A.,"Certificates of Insurance"
27
28 The entities listed below are"additional insureds as their interest may appear"including their respective
29 officers,directors,agents and employees.
30
31 (1) City
32 (2) Consultant: NONE
33 (3) Other: NONE
34
35 SC-5.04A.,"Contractor's Insurance"
36
37 The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following
38 coverages for not less than the following amounts or greater where required by laws and regulations:
39
40 5.04A.Workers'Compensation,under Paragraph GC-5.04A.
41
42 Statutory limits
43 Employer's liability
44 $100,000 each accident/occurrence
45 $100,000 Disease-each employee
46 $500,000 Disease-policy limit
47
48 SC-5.04B.,"Contractor's Insurance"
49
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised January 22,2016
007300-3
SUPPLEMENTARY CONDITIONS
Page 3 of 5
1 5.04B.Commercial General Liability,under Paragraph GC-5.0413.Contractor's Liability Insurance
2 under Paragraph GC-5.04B.,which shall be on a per project basis covering the Contractor with
3 minimum limits of:
4
5 $1,000,000 each occurrence
6 $2,000,000 aggregate limit
7
8 The policy must have an endorsement(Amendment—Aggregate Limits of Insurance)making the
9 General Aggregate Limits apply separately to each job site.
10
11 The Commercial General Liability Insurance policies shall provide"X","C",and"U"coverage's.
12 Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance.
13
14 SC 5.04C.,"Contractor's Insurance"
15 5.04C. Automobile Liability,under Paragraph GC-5.04C.Contractor's Liability Insurance under
16 Paragraph GC-5.04C.,which shall be in an amount not less than the following amounts:
17
18 (1) Automobile Liability-a commercial business policy shall provide coverage on"Any Auto",
19 defined as autos owned,hired and non-owned.
20
21 $1,000,000 each accident on a combined single limit basis.Split limits are acceptable if limits are at
22 least:
23
24 $250,000 Bodily Injury per person/
25 $500,000 Bodily Injury per accident/
26 $100,000 Property Damage
27
28 SC-5.04D.,"Contractor's Insurance"
29
30 The Contractor's construction activities will require its employees,agents,subcontractors,equipment,and
31 material deliveries to cross railroad properties and tracks.NONE
32
33 The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with,
34 hinder,or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains
35 or other property. Such operations on railroad properties may require that Contractor to execute a"Right of
36 Entry Agreement"with the particular railroad company or companies involved,and to this end the
37 Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute
38 the right-of-entry(if any)required by a railroad company.The requirements specified herein likewise relate
39 to the Contractor's use of private and/or construction access roads crossing said railroad company's
40 properties.
41
42 The Contractual Liability coverage required by Paragraph 5.041)of the General Conditions shall provide
43 coverage for not less than the following amounts,issued by companies satisfactory to the City and to the
44 Railroad Company for a term that continues for so long as the Contractor's operations and work cross,
45 occupy,or touch railroad property:
46
47 (1) General Aggregate: $Confirm Limits with Railroad
48
49 (2) Each Occurrence: $Confirm Limits with Railroad
50
51 _Required for this Contract X Not required for this Contract
52
53
54 With respect to the above outlined insurance requirements,the following shall govern:
55
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised January 22,2016
007300-4
SUPPLEMENTARY CONDITIONS
Page 4 of 5
1 1. Where a single railroad company is involved,the Contractor shall provide one insurance policy in
2 the name of the railroad company. However, if more than one grade separation or at-grade
3 crossing is affected by the Project at entirely separate locations on the line or lines of the same
4 railroad company,separate coverage may be required,each in the amount stated above.
5
6 2. Where more than one railroad company is operating on the same right-of-way or where several
7 railroad companies are involved and operated on their own separate rights-of-way,the Contractor
8 may be required to provide separate insurance policies in the name of each railroad company.
9
10 3. If,in addition to a grade separation or an at-grade crossing,other work or activity is proposed on a
11 railroad company's right-of-way at a location entirely separate from the grade separation or at-
12 grade crossing,insurance coverage for this work must be included in the policy covering the grade
13 separation.
14
15 4. If no grade separation is involved but other work is proposed on a railroad company's right-of-
16 way,all such other work may be covered in a single policy for that railroad,even though the work
17 may be at two or more separate locations.
18
19 No work or activities on a railroad company's property to be performed by the Contractor shall be
20 commenced until the Contractor has furnished the City with an original policy or policies of the insurance
21 for each railroad company named,as required above. All such insurance must be approved by the City and
22 each affected Railroad Company prior to the Contractor's beginning work.
23
24 The insurance specified above must be carried until all Work to be performed on the railroad right-of-way
25 has been completed and the grade crossing,if any,is no longer used by the Contractor. In addition,
26 insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way.
27 Such insurance must name the railroad company as the insured,together with any tenant or lessee of the
28 railroad company operating over tracks involved in the Project.
29
30 SC-6.04.,"Project Schedule"
31
32 Project schedule shall be tier 3 for the project.
33
34 SC-6.07.,"Wage Rates"
35
36 The following is the prevailing wage rate table(s)applicable to this project and is provided in the
37 Appendixes:
38 2013 Prevailing Wage Rates(Heavy and Highway Construction Projects
39
40 SC-6.09.,"Permits and Utilities"
41
42 SC-6.09A.,"Contractor obtained permits and licenses"
43 The following are known permits and/or licenses required by the Contract to be acquired by the Contractor:
44 NONE
45
46 SC-6.098."City obtained permits and licenses"
47 The following are known permits and/or licenses required by the Contract to be acquired by the City:
48 NONE
49
50 SC-6.09C."Outstanding permits and licenses"
51
52 The following is a list of known outstanding permits and/or licenses to be acquired,if any as of:April 4,
53 2017
54
55 Outstanding Permits and/or Licenses to Be Acquired
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised January 22,2016
007300-5
SUPPLEMENTARY CONDITIONS
Page 5 of 5
OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE
OF POSSESSION
NONE
1
2
3 SC-7.02.,"Coordination"
4
5 The individuals or entities listed below have contracts with the City for the performance of other work at
6 the Site:
7
Vendor Scope of Work Coordination Authority
NONE
8
9
10 SC-8.01,"Communications to Contractor"
11
12 NONE
13
14 SC-9.01.,"City's Project Manager"
15
16 The City's Project Manager for this Contract is Liam Conlon,or his/her successor pursuant to written
17 notification from the Director of the Water Department.
18
19 SC-13.03C.,"Tests and Inspections"
20
21 NONE
22
23 SC-16.01C.1,"Methods and Procedures"
24
25 NONE
26
27
28
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
1/22/2016 F Griffin SC-9.01 "City's Project Representative"wording changed to City's Project
Manager
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised January 22,2016
01 1100-1
SUMMARY OF WORK
Page 1 of 3
SECTION 011100
SUMMARY OF WORK
3 PART1 - GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Summary of Work to be performed in accordance with the Contract Documents
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include,but are not necessarily limited to:
10 1. Division 0-Bidding Requirements,Contract Forms,and Conditions of the Contract
11 2. Division 1 -General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Work associated with this Item is considered subsidiary to the various items bid.
15 No separate payment will be allowed for this Item.
16 1.3 REFERENCES [NOT USED]
17 1.4 ADMINISTRATIVE REQUIREMENTS
18 A. Work Covered by Contract Documents
19 1. Work is to include furnishing all labor,materials,and equipment,and performing
20 all Work necessary for this construction project as detailed in the Drawings and
21 Specifications.
22 B. Subsidiary Work
23 1. Any and all Work specifically governed by documentary requirements for the
24 project,such as conditions imposed by the Drawings or Contract Documents in
25 which no specific item for bid has been provided for in the Proposal and the item is
26 not a typical unit bid item included on the standard bid item list,then the item shall
27 be considered as a subsidiary item of Work,the cost of which shall be included in
28 the price bid in the Proposal for various bid items.
29 C. Use of Premises
30 1. Coordinate uses of premises under direction of the City.
31 2. Assume full responsibility for protection and safekeeping of materials and
32 equipment stored on the Site.
33 3. Use and occupy only portions of the public streets and alleys,or other public places
34 or other rights-of-way as provided for in the ordinances of the City,as shown in the
35 Contract Documents,or as may be specifically authorized in writing by the City.
36 a. A reasonable amount of tools,materials,and equipment for construction
37 purposes may be stored in such space,but no more than is necessary to avoid
38 delay in the construction operations.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
01 1100-2
SUMMARY OF WORK
Page 2 of 3
1 b. Excavated and waste materials shall be stored in such a way as not to interfere
2 with the use of spaces that may be designated to be left free and unobstructed
3 and so as not to inconvenience occupants of adjacent property.
4 c. If the street is occupied by railroad tracks,the Work shall be carried on in such
5 manner as not to interfere with the operation of the railroad.
6 1) All Work shall be in accordance with railroad requirements set forth in
7 Division 0 as well as the railroad permit.
8 D. Work within Easements
9 1. Do not enter upon private property for any purpose without having previously
10 obtained permission from the owner of such property.
11 2. Do not store equipment or material on private property unless and until the
12 specified approval of the property owner has been secured in writing by the
13 Contractor and a copy furnished to the City.
14 3. Unless specifically provided otherwise,clear all rights-of-way or easements of
15 obstructions which must be removed to make possible proper prosecution of the
16 Work as a part of the project construction operations.
17 4. Preserve and use every precaution to prevent damage to,all trees,shrubbery,plants,
18 lawns,fences,culverts,curbing,and all other types of structures or improvements,
19 to all water,sewer,and gas lines,to all conduits,overhead pole lines,or
20 appurtenances thereof,including the construction of temporary fences and to all
21 other public or private property adjacent to the Work.
22 5. Notify the proper representatives of the owners or occupants of the public or private
23 lands of interest in lands which might be affected by the Work.
24 a. Such notice shall be made at least 48 hours in advance of the beginning of the
25 Work.
26 b. Notices shall be applicable to both public and private utility companies and any
27 corporation,company,individual,or other,either as owners or occupants,
28 whose land or interest in land might be affected by the Work.
29 c. Be responsible for all damage or injury to property of any character resulting
30 from any act,omission,neglect,or misconduct in the manner or method or
31 execution of the Work,or at any time due to defective work,material,or
32 equipment.
33 6. Fence
34 a. Restore all fences encountered and removed during construction of the Project
35 to the original or a better than original condition.
36 b. Erect temporary fencing in place of the fencing removed whenever the Work is
37 not in progress and when the site is vacated overnight,and/or at all times to
38 provide site security.
39 c. The cost for all fence work within easements,including removal,temporary
40 closures and replacement,shall be subsidiary to the various items bid in the
41 project proposal,unless a bid item is specifically provided in the proposal.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
011100-3
SUMMARY OF WORK
Page 3 of 3
1 1.5 SUBMITTALS [NOT USED]
2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
3 1.7 CLOSEOUT SUBMITTALS [NOT USED]
4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
5 1.9 QUALITY ASSURANCE [NOT USED]
6 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED]
7 1.11 FIELD [SITE] CONDITIONS [NOT USED]
8 1.12 WARRANTY[NOT USED]
9 PART 2- PRODUCTS [NOT USED]
10 PART 3- EXECUTION [NOT USED]
11 END OF SECTION
12
Revision Log
DATE NAME SUMMARY OF CHANGE
13
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
012500-1
SUBSTITUTION PROCEDURES
Page 1 of 4
SECTION 0125 00
SUBSTITUTION PROCEDURES
PART1 - GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. The procedure for requesting the approval of substitution of a product that is not
7 equivalent to a product which is specified by descriptive or performance criteria or
8 defined by reference to 1 or more of the following:
9 a. Name of manufacturer
10 b. Name of vendor
11 c. Trade name
12 d. Catalog number
13 2. Substitutions are not"or-equals".
14 B. Deviations from this City of Fort Worth Standard Specification
15 1. None.
16 C. Related Specification Sections include,but are not necessarily limited to:
17 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
18 2. Division 1 —General Requirements
19 1.2 PRICE AND PAYMENT PROCEDURES
20 A. Measurement and Payment
21 1. Work associated with this Item is considered subsidiary to the various items bid.
22 No separate payment will be allowed for this Item.
23 1.3 REFERENCES [NOT USED]
24 1.4 ADMINISTRATIVE REQUIREMENTS
25 A. Request for Substitution-General
26 1. Within 30 days after award of Contract(unless noted otherwise),the City will
27 consider formal requests from Contractor for substitution of products in place of
28 those specified.
29 2. Certain types of equipment and kinds of material are described in Specifications by
30 means of references to names of manufacturers and vendors,trade names,or
31 catalog numbers.
32 a. When this method of specifying is used,it is not intended to exclude from
33 consideration other products bearing other manufacturer's or vendor's names,
34 trade names,or catalog numbers,provided said products are"or-equals,"as
35 determined by City.
36 3. Other types of equipment and kinds of material may be acceptable substitutions
37 under the following conditions:
38 a. Or-equals are unavailable due to strike,discontinued production of products
39 meeting specified requirements,or other factors beyond control of Contractor;
40 or,
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
012500-2
SUBSTITUTION PROCEDURES
Page 2 of 4
1 b. Contractor proposes a cost and/or time reduction incentive to the City.
2 1.5 SUBMITTALS
3 A. See Request for Substitution Form(attached)
4 B. Procedure for Requesting Substitution
5 1. Substitution shall be considered only:
6 a. After award of Contract
7 b. Under the conditions stated herein
8 2. Submit 3 copies of each written request for substitution,including:
9 a. Documentation
10 1) Complete data substantiating compliance of proposed substitution with
11 Contract Documents
12 2) Data relating to changes in construction schedule,when a reduction is
13 proposed
14 3) Data relating to changes in cost
15 b. For products
16 1) Product identification
17 a) Manufacturer's name
18 b) Telephone number and representative contact name
19 c) Specification Section or Drawing reference of originally specified
20 product,including discrete name or tag number assigned to original
21 product in the Contract Documents
22 2) Manufacturer's literature clearly marked to show compliance of proposed
23 product with Contract Documents
24 3) Itemized comparison of original and proposed product addressing product
25 characteristics including,but not necessarily limited to:
26 a) Size
27 b) Composition or materials of construction
28 c) Weight
29 d) Electrical or mechanical requirements
30 4) Product experience
31 a) Location of past projects utilizing product
32 b) Name and telephone number of persons associated with referenced
33 projects knowledgeable concerning proposed product
34 c) Available field data and reports associated with proposed product
35 5) Samples
36 a) Provide at request of City.
37 b) Samples become the property of the City.
38 c. For construction methods:
39 1) Detailed description of proposed method
40 2) Illustration drawings
41 C. Approval or Rejection
42 1. Written approval or rejection of substitution given by the City
43 2. City reserves the right to require proposed product to comply with color and pattern
44 of specified product if necessary to secure design intent.
45 3. In the event the substitution is approved,the resulting cost and/or time reduction
46 will be documented by Change Order in accordance with the General Conditions.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
012500-3
SUBSTITUTION PROCEDURES
Page 3 of 4
1 4. No additional contract time will be given for substitution.
2 5. Substitution will be rejected if-
3 a. Submittal is not through the Contractor with his stamp of approval
4 b. Request is not made in accordance with this Specification Section
5 c. In the City's opinion,acceptance will require substantial revision of the original
6 design
7 d. In the City's opinion,substitution will not perform adequately the function
8 consistent with the design intent
9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
10 1.7 CLOSEOUT SUBMITTALS [NOT USED]
11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
12 1.9 QUALITY ASSURANCE
13 A. In making request for substitution or in using an approved product,the Contractor
14 represents that the Contractor:
15 1. Has investigated proposed product,and has determined that it is adequate or
16 superior in all respects to that specified,and that it will perform function for which
17 it is intended
18 2. Will provide same guarantee for substitute item as for product specified
19 3. Will coordinate installation of accepted substitution into Work,to include building
20 modifications if necessary,making such changes as may be required for Work to be
21 complete in all respects
22 4. Waives all claims for additional costs related to substitution which subsequently
23 arise
24 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED]
25 1.11 FIELD [SITE] CONDITIONS [NOT USED]
26 1.12 WARRANTY [NOT USED]
27 PART 2- PRODUCTS [NOT USED]
28 PART 3- EXECUTION [NOT USED]
29 END OF SECTION
30
Revision Log
DATE NAME SUMMARY OF CHANGE
31
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
012500-4
SUBSTITUTION PROCEDURES
Page 4 of 4
1 EXHIBIT A
2 REQUEST FOR SUBSTITUTION FORM:
3
4 TO:
5 PROJECT: DATE:
6 We hereby submit for your consideration the following product instead of the specified item for
7 the above project:
8 SECTION PARAGRAPH SPECIFIED ITEM
9
10
11 Proposed Substitution:
12 Reason for Substitution:
13 Include complete information on changes to Drawings and/or Specifications which proposed
14 substitution will require for its proper installation.
15
16 Fill in Blanks Below:
17 A. Will the undersigned contractor pay for changes to the building design,including engineering
18 and detailing costs caused by the requested substitution?
19
20
21 B. What effect does substitution have on other trades?
22
23
24 C. Differences between proposed substitution and specified item?
25
26
27 D. Differences in product cost or product delivery time?
28
29
30 E. Manufacturer's guarantees of the proposed and specified items are:
31
32 Equal Better(explain on attachment)
33 The undersigned states that the function, appearance and quality are equivalent or superior to the
34 specified item.
35 Submitted By: For Use by City
36
37 Signature _Recommended _Recommended
38 as noted
39
40 Firm _Not recommended _Received late
41 Address By
42 Date
43 Date Remarks
44 Telephone
45
46 For Use by City:
47
48 Approved Rejected
49 City Date
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
013119-1
PRECONSTRUCTION MEETING
Page 1 of 3
SECTION 013119
PRECONSTRUCTION MEETING
3 PART1 - GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to
7 clarify construction contract administration procedures
8 B. Deviations from this City of Fort Worth Standard Specification
9 1. None.
10 C. Related Specification Sections include,but are not necessarily limited to:
11 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
12 2. Division 1 General Requirements
13 1.2 PRICE AND PAYMENT PROCEDURES
14 A. Measurement and Payment
15 1. Work associated with this Item is considered subsidiary to the various items bid.
16 No separate payment will be allowed for this Item.
17 1.3 REFERENCES [NOT USED]
18 1.4 ADMINISTRATIVE REQUIREMENTS
19 A. Coordination
20 1. Attend preconstruction meeting.
21 2. Representatives of Contractor, subcontractors and suppliers attending meetings
22 shall be qualified and authorized to act on behalf of the entity each represents.
23 3. Meeting administered by City may be tape recorded.
24 a. If recorded,tapes will be used to prepare minutes and retained by City for
25 future reference.
26 B. Preconstruction Meeting
27 1. A preconstruction meeting will be held within 14 days after the execution of the
28 Agreement and before Work is started.
29 a. The meeting will be scheduled and administered by the City.
30 2. The Project Representative will preside at the meeting,prepare the notes of the
31 meeting and distribute copies of same to all participants who so request by fully
32 completing the attendance form to be circulated at the beginning of the meeting.
33 3. Attendance shall include:
34 a. Project Representative
35 b. Contractor's project manager
36 c. Contractor's superintendent
37 d. Any subcontractor or supplier representatives whom the Contractor may desire
38 to invite or the City may request
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised August 17,2012
013119-2
PRECONSTRUCTION MEETING
Page 2 of 3
1 e. Other City representatives
2 f. Others as appropriate
3 4. Construction Schedule
4 a. Prepare baseline construction schedule in accordance with Section 0132 16 and
5 provide at Preconstruction Meeting.
6 b. City will notify Contractor of any schedule changes upon Notice of
7 Preconstruction Meeting.
8 5. Preliminary Agenda may include:
9 a. Introduction of Project Personnel
10 b. General Description of Project
11 c. Status of right-of-way,utility clearances,easements or other pertinent permits
12 d. Contractor's work plan and schedule
13 e. Contract Time
14 f. Notice to Proceed
15 g. Construction Staking
16 h. Progress Payments
17 i. Extra Work and Change Order Procedures
18 j. Field Orders
19 k. Disposal Site Letter for Waste Material
20 1. Insurance Renewals
21 m. Payroll Certification
22 n. Material Certifications and Quality Control Testing
23 o. Public Safety and Convenience
24 p. Documentation of Pre-Construction Conditions
25 q. Weekend Work Notification
26 r. Legal Holidays
27 s. Trench Safety Plans
28 t. Confined Space Entry Standards
29 u. Coordination with the City's representative for operations of existing water
30 systems
31 v. Storm Water Pollution Prevention Plan
32 w. Coordination with other Contractors
33 x. Early Warning System
34 y. Contractor Evaluation
35 z. Special Conditions applicable to the project
36 aa. Damages Claims
37 bb. Submittal Procedures
38 cc. Substitution Procedures
39 dd. Correspondence Routing
40 ee. Record Drawings
41 ff. Temporary construction facilities
42 gg. M/WBE or MBE/SBE procedures
43 hh. Final Acceptance
44 ii. Final Payment
45 jj. Questions or Comments
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised August 17,2012
0131 19-3
PRECONSTRUCTION MEETING
Page 3 of 3
1 1.5 SUBMITTALS [NOT USED]
2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
3 1.7 CLOSEOUT SUBMITTALS [NOT USED]
4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
5 1.9 QUALITY ASSURANCE [NOT USED]
6 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED]
7 1.11 FIELD [SITE] CONDITIONS [NOT USED]
8 1.12 WARRANTY [NOT USED]
9 PART 2- PRODUCTS [NOT USED]
10 PART 3- EXECUTION [NOT USED]
11 END OF SECTION
12
Revision Log
DATE NAME SUMMARY OF CHANGE
13
CITY OF FORT WORTH 2014 CIP,YEAR 3--CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised August 17,2012
013120-1
PROJECT MEETINGS
Page I of 3
SECTION 013120
2 PROJECT MEETINGS
3
4 PART1- GENERAL
5 1.1 SUMMARY
6 A. Section Includes:
7 1. Provisions for project meetings throughout the construction period to enable orderly
8 review of the progress of the Work and to provide for systematic discussion of
9 potential problems
10 B. Deviations this City of Fort Worth Standard Specification
11 1. None.
12 C. Related Specification Sections include,but are not necessarily limited to:
13 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
14 2. Division 1 —General Requirements
15 1.2 PRICE AND PAYMENT PROCEDURES
16 A. Measurement and Payment
17 1. Work associated with this Item is considered subsidiary to the various items bid.
18 No separate payment will be allowed for this Item.
19 1.3 REFERENCES [NOT USED]
20 1.4 ADMINISTRATIVE REQUIREMENTS
21 A. Coordination
22 1. Schedule,attend and administer as specified,periodic progress meetings,and
23 specially called meetings throughout progress of the Work.
24 2. Representatives of Contractor,subcontractors and suppliers attending meetings
25 shall be qualified and authorized to act on behalf of the entity each represents.
26 3. Meetings administered by City may be tape recorded.
27 a. If recorded,tapes will be used to prepare minutes and retained by City for
28 future reference.
29 4. Meetings,in addition to those specified in this Section,may be held when requested
30 by the City,Engineer or Contractor.
31 B. Pre-Construction Neighborhood Meeting
32 1. After the execution of the Agreement,but before construction is allowed to begin,
33 attend 1 Public Meeting with affected residents to:
34 a. Present projected schedule,including construction start date
35 b. Answer any construction related questions
36 2. Meeting Location
37 a. Location of meeting to be determined by the City.
38 3. Attendees
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
013120.2
PROJECT MEETINGS
Page 2 of 3
1 a. Contractor
2 b. Project Representative
3 c. Other City representatives
4 4. Meeting Schedule
5 a. In general,the neighborhood meeting will occur within the 2 weeks following
6 the pre-construction conference.
7 b. In no case will construction be allowed to begin until this meeting is held.
8 C. Progress Meetings
9 1. Formal project coordination meetings will be held periodically. Meetings will be
10 scheduled and administered by Project Representative.
11 2. Additional progress meetings to discuss specific topics will be conducted on an as-
12 needed basis. Such additional meetings shall include,but not be limited to:
13 a. Coordinating shutdowns
14 b. Installation of piping and equipment
15 c. Coordination between other construction projects
16 d. Resolution of construction issues
17 e. Equipment approval
18 3. The Project Representative will preside at progress meetings,prepare the notes of
19 the meeting and distribute copies of the same to all participants who so request by
20 fully completing the attendance form to be circulated at the beginning of each
21 meeting.
22 4. Attendance shall include:
23 a. Contractor's project manager
24 b. Contractor's superintendent
25 c. Any subcontractor or supplier representatives whom the Contractor may desire
26 to invite or the City may request
27 d. Engineer's representatives
28 e. City's representatives
29 f. Others,as requested by the Project Representative
30 5. Preliminary Agenda may include:
31 a. Review of Work progress since previous meeting
32 b. Field observations,problems,conflicts
33 c. Items which impede construction schedule
34 d. Review of off-site fabrication,delivery schedules
35 e. Review of construction interfacing and sequencing requirements with other
36 construction contracts
37 f. Corrective measures and procedures to regain projected schedule
38 g. Revisions to construction schedule
39 h. Progress,schedule,during succeeding Work period
40 i. Coordination of schedules
41 j. Review submittal schedules
42 k. Maintenance of quality standards
43 1. Pending changes and substitutions
44 m. Review proposed changes for:
45 1) Effect on construction schedule and on completion date
46 2) Effect on other contracts of the Project
47 n. Review Record Documents
48 o. Review monthly pay request
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 2011
013120-3
PROJECT MEETINGS
Page 3 of 3
1 p. Review status of Requests for Information
2 6. Meeting Schedule
3 a. Progress meetings will be held periodically as determined by the Project
4 Representative.
5 1) Additional meetings may be held at the request of the:
6 a) City
7 b) Engineer
8 c) Contractor
9 7. Meeting Location
10 a. The City will establish a meeting location.
11 1) To the extent practicable,meetings will be held at the Site.
12 1.5 SUBMITTALS [NOT USED]
13 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
14 1.7 CLOSEOUT SUBMITTALS [NOT USED]
15 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
16 1.9 QUALITY ASSURANCE [NOT USED]
17 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED]
18 1.11 FIELD [SITE] CONDITIONS [NOT USED]
19 1.12 WARRANTY [NOT USED]
20 PART 2- PRODUCTS [NOT USED]
21 PART 3- EXECUTION [NOT USED]
22 END OF SECTION
23
Revision Log
DATE NAME SUMMARY OF CHANGE
24
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
013216-1
CONSTRUCTION PROGRESS SCHEDULE
Pagel of 5
1 SECTION 013216
2 CONSTRUCTION PROGRESS SCHEDULE
3 PART1 - GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. General requirements for the preparation,submittal,updating,status reporting and
7 management of the Construction Progress Schedule
8 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance
9 Document
10 B. Deviations from this City of Fort Worth Standard Specification
11 1. None.
12 C. Related Specification Sections include,but are not necessarily limited to:
13 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
14 2. Division 1 —General Requirements
15 1.2 PRICE AND PAYMENT PROCEDURES
16 A. Measurement and Payment
17 1. Work associated with this Item is considered subsidiary to the various items bid.
18 No separate payment will be allowed for this Item.
19 1.3 REFERENCES
20 A. Definitions
21 1. Schedule Tiers
22 a. Tier 1 -No schedule submittal required by contract. Small,brief duration
23 projects
24 b. Tier 2-No schedule submittal required by contract,but will require some
25 milestone dates. Small,brief duration projects
26 c. Tier 3-Schedule submittal required by contract as described in the
27 Specification and herein.Majority of City projects,including all bond program
28 projects
29 d. Tier 4-Schedule submittal required by contract as described in the
30 Specification and herein.Large and/or complex projects with long durations
31 1) Examples:large water pump station project and associated pipeline with
32 interconnection to another governmental entity
33 e. Tier 5-Schedule submittal required by contract as described in the
34 Specification and herein.Large and/or very complex projects with long
35 durations,high public visibility
36 1) Examples might include a water or wastewater treatment plant
37 2. Baseline Schedule-Initial schedule submitted before work begins that will serve
38 as the baseline for measuring progress and departures from the schedule.
39 3. Progress Schedule-Monthly submittal of a progress schedule documenting
40 progress on the project and any changes anticipated.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
013216-2
CONSTRUCTION PROGRESS SCHEDULE
Page 2 of 5
1 4. Schedule Narrative-Concise narrative of the schedule including schedule
2 changes,expected delays,key schedule issues,critical path items,etc
3 B. Reference Standards
4 1. City of Fort Worth Schedule Guidance Document
5 1.4 ADMINISTRATIVE REQUIREMENTS
6 A. Baseline Schedule
7 1. General
8 a. Prepare a cost-loaded baseline Schedule using approved software and the
9 Critical Path Method(CPM)as required in the City of Fort Worth Schedule
10 Guidance Document.
11 b. Review the draft cost-loaded baseline Schedule with the City to demonstrate
12 understanding of the work to be performed and known issues and constraints
13 related to the schedule.
14 c. Designate an authorized representative(Project Scheduler)responsible for
15 developing and updating the schedule and preparing reports.
16 B. Progress Schedule
17 1. Update the progress Schedule monthly as required in the City of Fort Worth
18 Schedule Guidance Document.
19 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule.
20 3. Change Orders
21 a. Incorporate approved change orders,resulting in a change of contract time,in
22 the baseline Schedule in accordance with City of Fort Worth Schedule
23 Guidance Document.
24 C. Responsibility for Schedule Compliance
25 1. Whenever it becomes apparent from the current progress Schedule and CPM Status
26 Report that delays to the critical path have resulted and the Contract completion
27 date will not be met,or when so directed by the City,make some or all of the
28 following actions at no additional cost to the City
29 a. Submit a Recovery Plan to the City for approval revised baseline Schedule
30 outlining:
31 1) A written statement of the steps intended to take to remove or arrest the
32 delay to the critical path in the approved schedule
33 2) Increase construction manpower in such quantities and crafts as will
34 substantially eliminate the backlog of work and return current Schedule to
35 meet projected baseline completion dates
36 3) Increase the number of working hours per shift,shifts per day,working
37 days per week,the amount of construction equipment,or any combination
38 of the foregoing,sufficiently to substantially eliminate the backlog of work
39 4) Reschedule activities to achieve maximum practical concurrency of
40 accomplishment of activities,and comply with the revised schedule
41 2. If no written statement of the steps intended to take is submitted when so requested
42 by the City,the City may direct the Contractor to increase the level of effort in
43 manpower(trades),equipment and work schedule(overtime,weekend and holiday
44 work,etc.)to be employed by the Contractor in order to remove or arrest the delay
45 to the critical path in the approved schedule.
46 a. No additional cost for such work will be considered.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
013216-3
CONSTRUCTION PROGRESS SCHEDULE
Page 3 of 5
1 D. The Contract completion time will be adjusted only for causes specified in this
2 Contract.
3 a. Requests for an extension of any Contract completion date must be
4 supplemented with the following:
5 1) Furnish justification and supporting evidence as the City may deem
6 necessary to determine whether the requested extension of time is entitled
7 under the provisions of this Contract.
8 a) The City will,after receipt of such justification and supporting
9 evidence,make findings of fact and will advise the Contractor,in
10 writing thereof.
11 2) If the City finds that the requested extension of time is entitled,the City's
12 determination as to the total number of days allowed for the extensions
13 shall be based upon the approved total baseline schedule and on all data
14 relevant to the extension.
15 a) Such data shall be included in the next updating of the Progress
16 schedule.
17 b) Actual delays in activities which,according to the Baseline schedule,
18 do not affect any Contract completion date shown by the critical path in
19 the network will not be the basis for a change therein.
20 2. Submit each request for change in Contract completion date to the City within 30
21 days after the beginning of the delay for which a time extension is requested but
22 before the date of final payment under this Contract.
23 a. No time extension will be granted for requests which are not submitted within
24 the foregoing time limit.
25 b. From time to time,it may be necessary for the Contract schedule or completion
26 time to be adjusted by the City to reflect the effects of job conditions,weather,
27 technical difficulties,strikes,unavoidable delays on the part of the City or its
28 representatives,and other unforeseeable conditions which may indicate
29 schedule adjustments or completion time extensions.
30 1) Under such conditions,the City will direct the Contractor to reschedule the
31 work or Contract completion time to reflect the changed conditions and the
32 Contractor shall revise his schedule accordingly.
33 a) No additional compensation will be made to the Contractor for such
34 schedule changes except for unavoidable overall contract time
35 extensions beyond the actual completion of unaffected work,in which
36 case the Contractor shall take all possible action to minimize any time
37 extension and any additional cost to the City.
38 b) Available float time in the Baseline schedule may be used by the City
39 as well as by the Contractor.
40 3. Float or slack time is defined as the amount of time between the earliest start date
41 and the latest start date or between the earliest finish date and the latest finish date
42 of a chain of activities on the Baseline Schedule.
43 a. Float or slack time is not for the exclusive use or benefit of either the
44 Contractor or the City.
45 b. Proceed with work according to early start dates,and the City shall have the
46 right to reserve and apportion float time according to the needs of the project.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
013216-4
CONSTRUCTION PROGRESS SCHEDULE
Page 4 of 5
1 c. Acknowledge and agree that actual delays,affecting paths of activities
2 containing float time,will not have any effect upon contract completion times,
3 providing that the actual delay does not exceed the float time associated with
4 those activities.
5 E. Coordinating Schedule with Other Contract Schedules
6 1. Where work is to be performed under this Contract concurrently with or contingent
7 upon work performed on the same facilities or area under other contracts,the
8 Baseline Schedule shall be coordinated with the schedules of the other contracts.
9 a. Obtain the schedules of the other appropriate contracts from the City for the
10 preparation and updating of Baseline schedule and make the required changes
11 in his schedule when indicated by changes in corresponding schedules.
12 2. In case of interference between the operations of different contractors,the City will
13 determine the work priority of each contractor and the sequence of work necessary
14 to expedite the completion of the entire Project.
15 a. In such cases,the decision of the City shall be accepted as final.
16 b. The temporary delay of any work due to such circumstances shall not be
17 considered as justification for claims for additional compensation.
18 1.5 SUBMITTALS
19 A. Baseline Schedule
20 1. Submit Schedule in native file format and pdf format as required in the City of Fort
21 Worth Schedule Guidance Document.
22 a. Native file format includes:
23 1) Primavera(P6 or Primavera Contractor)
24 2. Submit draft baseline Schedule to City prior to the pre-construction meeting and
25 bring in hard copy to the meeting for review and discussion.
26 B. Progress Schedule
27 1. Submit progress Schedule in native file format and pdf format as required in the
28 City of Fort Worth Schedule Guidance Document.
29 2. Submit progress Schedule monthly no later than the last day of the month.
30 C. Schedule Narrative
31 1. Submit the schedule narrative in pdf format as required in the City of Fort Worth
32 Schedule Guidance Document.
33 2. Submit schedule narrative monthly no later than the last day of the month.
34 D. Submittal Process
35 1. The City administers and manages schedules through Buzzsaw.
36 2. Contractor shall submit documents as required in the City of Fort Worth Schedule
37 Guidance Document.
38 3. Once the project has been completed and Final Acceptance has been issued by the
39 City,no further progress schedules are required.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
013216-5
CONSTRUCTION PROGRESS SCHEDULE
Page 5 of 5
1 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
2 1.7 CLOSEOUT SUBMITTALS [NOT USED]
3 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
4 1.9 QUALITY ASSURANCE
5 A. The person preparing and revising the construction Progress Schedule shall be
6 experienced in the preparation of schedules of similar complexity.
7 B. Schedule and supporting documents addressed in this Specification shall be prepared,
8 updated and revised to accurately reflect the performance of the construction.
9 C. Contractor is responsible for the quality of all submittals in this section meeting the
10 standard of care for the construction industry for similar projects.
11 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED]
12 1.11 FIELD [SITE] CONDITIONS [NOT USED]
13 1.12 WARRANTY [NOT USED]
14 PART 2- PRODUCTS [NOT USED]
15 PART 3- EXECUTION [NOT USED]
16 END OF SECTION
17
Revision Log
DATE NAME SUMMARY OF CHANGE
18
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
013233-1
PRECONSTRUCTION VIDEO
Page 1 of 2
1 SECTION 0132 33
2 PRECONSTRUCTION VIDEO
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Administrative and procedural requirements for:
7 a. Preconstruction Videos
8 B. Deviations from this City of Fort Worth Standard Specification
9 1. None.
10 C. Related Specification Sections include,but are not necessarily limited to:
11 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
12 2. Division 1 —General Requirements
13 1.2 PRICE AND PAYMENT PROCEDURES
14 A. Measurement and Payment
15 1. Work associated with this Item is considered subsidiary to the various items bid.
16 No separate payment will be allowed for this Item.
17 1.3 REFERENCES [NOT USED]
18 1.4 ADMINISTRATIVE REQUIREMENTS
19 A. Preconstruction Video
20 1. Produce a preconstruction video of the site/alignment,including all areas in the
21 vicinity of and to be affected by construction.
22 a. Provide digital copy of video upon request by the City.
23 2. Retain a copy of the preconstruction video until the end of the maintenance surety
24 period.
25 1.5 SUBMITTALS [NOT USED]
26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
27 1.7 CLOSEOUT SUBMITTALS [NOT USED]
28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
29 1.9 QUALITY ASSURANCE [NOT USED]
30 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED]
31 1.11 FIELD [SITE] CONDITIONS [NOT USED]
32 1.12 WARRANTY [NOT USED]
33 PART 2- PRODUCTS [NOT USED]
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
013233-2
PRECONSTRUCTION VIDEO
Page 2 of 2
1 PART 3- EXECUTION [NOT USED]
2 END OF SECTION
3
Revision Log
DATE NAME SUMMARY OF CHANGE
4
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
01 33 00 1
SUBMITTALS
Page 1 of 8
1 SECTION 0133 00
2 SUBMITTALS
3 PART1 - GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. General methods and requirements of submissions applicable to the following
7 Work-related submittals:
8 a. Shop Drawings
9 b. Product Data(including Standard Product List submittals)
10 c. Samples
11 d. Mock Ups
12 B. Deviations from this City of Fort Worth Standard Specification
13 1. None.
14 C. Related Specification Sections include,but are not necessarily limited to:
15 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
16 2. Division 1 —General Requirements
17 1.2 PRICE AND PAYMENT PROCEDURES
18 A. Measurement and Payment
19 1. Work associated with this Item is considered subsidiary to the various items bid.
20 No separate payment will be allowed for this Item.
21 1.3 REFERENCES [NOT USED]
22 1.4 ADMINISTRATIVE REQUIREMENTS
23 A. Coordination
24 1. Notify the City in writing,at the time of submittal,of any deviations in the
25 submittals from the requirements of the Contract Documents.
26 2. Coordination of Submittal Times
27 a. Prepare,prioritize and transmit each submittal sufficiently in advance of
28 performing the related Work or other applicable activities,or within the time
29 specified in the individual Work Sections,of the Specifications.
30 b. Contractor is responsible such that the installation will not be delayed by
31 processing times including,but not limited to:
32 a) Disapproval and resubmittal(if required)
33 b) Coordination with other submittals
34 c) Testing
35 d) Purchasing
36 e) Fabrication
37 f) Delivery
38 g) Similar sequenced activities
39 c. No extension of time will be authorized because of the Contractor's failure to
40 transmit submittals sufficiently in advance of the Work.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
013300-2
SUBMITTALS
Page 2 of 8
1 d. Make submittals promptly in accordance with approved schedule,and in such
2 sequence as to cause no delay in the Work or in the work of any other
3 contractor.
4 B. Submittal Numbering
5 1. When submitting shop drawings or samples,utilize a 9-character submittal cross-
6 reference identification numbering system in the following manner:
7 a. Use the first 6 digits of the applicable Specification Section Number.
8 b. For the next 2 digits number use numbers 01-99 to sequentially number each
9 initial separate item or drawing submitted under each specific Section number.
10 c. Last use a letter,A-Z,indicating the resubmission of the same drawing(i.e.
11 A=2nd submission,B=3rd submission,C=4th submission,etc.). A typical
12 submittal number would be as follows:
13
14 03 30 00-08-B
15
16 1) 03 30 00 is the Specification Section for Concrete
17 2) 08 is the eighth initial submittal under this Specification Section
18 3) B is the third submission(second resubmission)of that particular shop
19 drawing
20 C. Contractor Certification
21 1. Review shop drawings,product data and samples,including those by
22 subcontractors,prior to submission to determine and verify the following:
23 a. Field measurements
24 b. Field construction criteria
25 c. Catalog numbers and similar data
26 d. Conformance with the Contract Documents
27 2. Provide each shop drawing,sample and product data submitted by the Contractor
28 with a Certification Statement affixed including:
29 a. The Contractor's Company name
30 b. Signature of submittal reviewer
31 c. Certification Statement
32 1) `By this submittal,I hereby represent that I have determined and verified
33 field measurements,field construction criteria,materials,dimensions,
34 catalog numbers and similar data and I have checked and coordinated each
35 item with other applicable approved shop drawings."
36 D. Submittal Format
37 1. Fold shop drawings larger than 8 t/2 inches x 11 inches to 8 %2 inches x I Iinches.
38 2. Bind shop drawings and product data sheets together.
39 3. Order
40 a. Cover Sheet
41 1) Description of Packet
42 2) Contractor Certification
43 b. List of items/Table of Contents
44 c. Product Data/Shop Drawings/Samples/Calculations
45 E. Submittal Content
46 1. The date of submission and the dates of any previous submissions
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
013300-3
SUBMITTALS
Page 3 of 8
1 2. The Project title and number
2 3. Contractor identification
3 4. The names of-
4 a. Contractor
5 b. Supplier
6 c. Manufacturer
7 5. Identification of the product,with the Specification Section number,page and
8 paragraph(s)
9 6. Field dimensions,clearly identified as such
10 7. Relation to adjacent or critical features of the Work or materials
11 8. Applicable standards,such as ASTM or Federal Specification numbers
12 9. Identification by highlighting of deviations from Contract Documents
13 10. Identification by highlighting of revisions on resubmittals
14 11. An 8-inch x 3-inch blank space for Contractor and City stamps
15 F. Shop Drawings
16 1. As specified in individual Work Sections includes,but is not necessarily limited to:
17 a. Custom-prepared data such as fabrication and erection/installation(working)
18 drawings
19 b. Scheduled information
20 c. Setting diagrams
21 d. Actual shopwork manufacturing instructions
22 e. Custom templates
23 f. Special wiring diagrams
24 g. Coordination drawings
25 h. Individual system or equipment inspection and test reports including:
26 1) Performance curves and certifications
27 i. As applicable to the Work
28 2. Details
29 a. Relation of the various parts to the main members and lines of the structure
30 b. Where correct fabrication of the Work depends upon field measurements
31 1) Provide such measurements and note on the drawings prior to submitting
32 for approval.
33 G. Product Data
34 1. For submittals of product data for products included on the City's Standard Product
35 List,clearly identify each item selected for use on the Project.
36 2. For submittals of product data for products not included on the City's Standard
37 Product List,submittal data may include,but is not necessarily limited to:
38 a. Standard prepared data for manufactured products(sometimes referred to as
39 catalog data)
40 1) Such as the manufacturer's product specification and installation
41 instructions
42 2) Availability of colors and patterns
43 3) Manufacturer's printed statements of compliances and applicability
44 4) Roughing-in diagrams and templates
45 5) Catalog cuts
46 6) Product photographs
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
013300-4
SUBMITTALS
Page 4 of 8
1 7) Standard wiring diagrams
2 8) Printed performance curves and operational-range diagrams
3 9) Production or quality control inspection and test reports and certifications
4 10) Mill reports
5 11) Product operating and maintenance instructions and recommended
6 spare-parts listing and printed product warranties
7 12)As applicable to the Work
8 H. Samples
9 1. As specified in individual Sections,include,but are not necessarily limited to:
10 a. Physical examples of the Work such as:
11 1) Sections of manufactured or fabricated Work
12 2) Small cuts or containers of materials
13 3) Complete units of repetitively used products color/texture/pattern swatches
14 and range sets
15 4) Specimens for coordination of visual effect
16 5) Graphic symbols and units of Work to be used by the City for independent
17 inspection and testing,as applicable to the Work
18 I. Do not start Work requiring a shop drawing,sample or product data nor any material to
19 be fabricated or installed prior to the approval or qualified approval of such item.
20 1. Fabrication performed,materials purchased or on-site construction accomplished
21 which does not conform to approved shop drawings and data is at the Contractor's
22 risk.
23 2. The City will not be liable for any expense or delay due to corrections or remedies
24 required to accomplish conformity.
25 3. Complete project Work,materials,fabrication,and installations in conformance
26 with approved shop drawings,applicable samples,and product data.
27 J. Submittal Distribution
28 1. Electronic Distribution
29 a. Confirm development of Project directory for electronic submittals to be
30 uploaded to City's Bia aw site,or another external FTP site approved by the
31 City.
32 b. Shop Drawings
33 1) Upload submittal to designated project directory and notify appropriate
34 City representatives via email of submittal posting.
35 2) Hard Copies
36 a) 3 copies for all submittals
37 b) If Contractor requires more than 1 hard copy of Shop Drawings
38 returned,Contractor shall submit more than the number of copies listed
39 above.
40 c. Product Data
41 1) Upload submittal to designated project directory and notify appropriate
42 City representatives via email of submittal posting.
43 2) Hard Copies
44 a) 3 copies for all submittals
45 d. Samples
46 1) Distributed to the Project Representative
47 2. Hard Copy Distribution(if required in lieu of electronic distribution)
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
013300-5
SUBMITTALS
Page 5 of 8
1 a. Shop Drawings
2 1) Distributed to the City
3 2) Copies
4 a) 8 copies for mechanical submittals
5 b) 7 copies for all other submittals
6 c) If Contractor requires more than 3 copies of Shop Drawings returned,
7 Contractor shall submit more than the number of copies listed above.
8 b. Product Data
9 1) Distributed to the City
10 2) Copies
11 a) 4 copies
12 c. Samples
13 1) Distributed to the Project Representative
14 2) Copies
15 a) Submit the number stated in the respective Specification Sections.
16 3. Distribute reproductions of approved shop drawings and copies of approved
17 product data and samples,where required,to the job site file and elsewhere as
18 directed by the City.
19 a. Provide number of copies as directed by the City but not exceeding the number
20 previously specified.
21 K. Submittal Review
22 1. The review of shop drawings,data and samples will be for general conformance
23 with the design concept and Contract Documents. This is not to be construed as:
24 a. Permitting any departure from the Contract requirements
25 b. Relieving the Contractor of responsibility for any errors,including details,
26 dimensions,and materials
27 c. Approving departures from details furnished by the City,except as otherwise
28 provided herein
29 2. The review and approval of shop drawings,samples or product data by the City
30 does not relieve the Contractor from his/her responsibility with regard to the
31 fulfillment of the terms of the Contract.
32 a. All risks of error and omission are assumed by the Contractor,and the City will
33 have no responsibility therefore.
34 3. The Contractor remains responsible for details and accuracy,for coordinating the
35 Work with all other associated work and trades,for selecting fabrication processes,
36 for techniques of assembly and for performing Work in a safe manner.
37 4. If the shop drawings,data or samples as submitted describe variations and show a
38 departure from the Contract requirements which City finds to be in the interest of
39 the City and to be so minor as not to involve a change in Contract Price or time for
40 performance,the City may return the reviewed drawings without noting an
41 exception.
42 5. Submittals will be returned to the Contractor under 1 of the following codes:
43 a. Code 1
44 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or
45 comments on the submittal.
46 a) When returned under this code the Contractor may release the
47 equipment and/or material for manufacture.
48 b. Code 2
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
013300-6
SUBMITTALS
Page 6 of 8
1 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of
2 the notations and comments IS NOT required by the Contractor.
3 a) The Contractor may release the equipment or material for manufacture;
4 however,all notations and comments must be incorporated into the
5 final product.
6 c. Code 3
7 1) "EXCEPTIONS NOTED/RESUBMIT", This combination of codes is
8 assigned when notations and comments are extensive enough to require a
9 resubmittal of the package.
10 a) The Contractor may release the equipment or material for manufacture;
11 however,all notations and comments must be incorporated into the
12 final product.
13 b) This resubmittal is to address all comments,omissions and
14 non-conforming items that were noted.
15 c) Resubmittal is to be received by the City within 15 Calendar Days of
16 the date of the City's transmittal requiring the resubmittal.
17 d. Code 4
18 1) "NOT APPROVED"is assigned when the submittal does not meet the
19 intent of the Contract Documents.
20 a) The Contractor must resubmit the entire package revised to bring the
21 submittal into conformance.
22 b) It may be necessary to resubmit using a different manufacturer/vendor
23 to meet the Contract Documents.
24 6. Resubmittals
25 a. Handled in the same manner as first submittals
26 1) Corrections other than requested by the City
27 2) Marked with revision triangle or other similar method
28 a) At Contractor's risk if not marked
29 b. Submittals for each item will be reviewed no more than twice at the City's
30 expense.
31 1) All subsequent reviews will be performed at times convenient to the City
32 and at the Contractor's expense,based on the City's or City
33 Representative's then prevailing rates.
34 2) Provide Contractor reimbursement to the City within 30 Calendar Days for
35 all such fees invoiced by the City.
36 c. The need for more than 1 resubmission or any other delay in obtaining City's
37 review of submittals,will not entitle the Contractor to an extension of Contract
38 Time.
39 7. Partial Submittals
40 a. City reserves the right to not review submittals deemed partial,at the City's
41 discretion.
42 b. Submittals deemed by the City to be not complete will be returned to the
43 Contractor,and will be considered"Not Approved"until resubmitted.
44 c. The City may at its option provide a list or mark the submittal directing the
45 Contractor to the areas that are incomplete.
46 8. If the Contractor considers any correction indicated on the shop drawings to
47 constitute a change to the Contract Documents,then written notice must be
48 provided thereof to the City at least 7 Calendar Days prior to release for
49 manufacture.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
013300-7
SUBMITTALS
Page 7 of 8
1 9. When the shop drawings have been completed to the satisfaction of the City,the
2 Contractor may carry out the construction in accordance therewith and no further
3 changes therein except upon written instructions from the City.
4 10. Each submittal,appropriately coded,will be returned within 30 Calendar Days
5 following receipt of submittal by the City.
6 L. Mock ups
7 1. Mock Up units as specified in individual Sections,include,but are not necessarily
8 limited to,complete units of the standard of acceptance for that type of Work to be
9 used on the Project. Remove at the completion of the Work or when directed.
10 M. Qualifications
11 1. If specifically required in other Sections of these Specifications,submit a P.E.
12 Certification for each item required.
13 N. Request for Information(RFI)
14 1. Contractor Request for additional information
15 a. Clarification or interpretation of the contract documents
16 b. When the Contractor believes there is a conflict between Contract Documents
17 c. When the Contractor believes there is a conflict between the Drawings and
18 Specifications
19 1) Identify the conflict and request clarification
20 2. Use the Request for Information(RFI)form provided by the City.
21 3. Numbering of RFI
22 a. Prefix with"RFI"followed by series number,"-xxx",beginning with"01"and
23 increasing sequentially with each additional transmittal.
24 4. Sufficient information shall be attached to permit a written response without further
25 information.
26 5. The City will log each request and will review the request.
27 a. If review of the project information request indicates that a change to the
28 Contract Documents is required,the City will issue a Field Order or Change
29 Order,as appropriate.
30 1.5 SUBMITTALS [NOT USED]
31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
32 1.7 CLOSEOUT SUBMITTALS [NOT USED]
33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
34 1.9 QUALITY ASSURANCE [NOT USED]
35 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED]
36 1.11 FIELD [SITE] CONDITIONS [NOT USED]
37 1.12 WARRANTY [NOT USED]
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
01 3300 3
SUBMITTALS
Page 3 of 3
I PART 2- PRODUCTS [NOT USED]
2 PART 3- EXECUTION [NOT USED]
3 END OF SECTION
4
Revision Log
DATE NAME SUNIMARY OF CHANGE
12/20/2012 D.Johnson 1.4.x.8.Working Days modified to Calendar Days
5
CITY OF FORT WORTH 2014 CII',YEAR 3_CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
013513-1
SPECIAL PROJECT PROCEDURES
Page 1 of 8
1 SECTION 013513
2 SPECIAL PROJECT PROCEDURES
3
4 PART1 - GENERAL
5 1.1 SUMMARY
6 A. Section Includes:
7 1. The procedures for special project circumstances that includes,but is not limited to:
8 a. Coordination with the Texas Department of Transportation
9 b. Work near High Voltage Lines
10 c. Confined Space Entry Program
11 d. Air Pollution Watch Days
12 e. Use of Explosives,Drop Weight,Etc.
13 f. Water Department Notification
14 g. Public Notification Prior to Beginning Construction
15 h. Coordination with United States Army Corps of Engineers
16 i. Coordination within Railroad permits areas
17 j. Dust Control
18 k. Employee Parking
19
20 B. Deviations from this City of Fort Worth Standard Specification
21 1. None.
22 C. Related Specification Sections include,but are not necessarily limited to:
23 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
24 2. Division 1 —General Requirements
25 3. Section 33 12 25—Connection to Existing Water Mains
26 1.2 PRICE AND PAYMENT PROCEDURES
27 A. Measurement and Payment
28 1. Coordination within Railroad permit areas
29 a. Measurement
30 1) Measurement for this Item will be by lump sum.
31 b. Payment
32 1) The work performed and materials furnished in accordance with this Item
33 will be paid for at the lump sum price bid for Railroad Coordination.
34 c. The price bid shall include:
35 1) Mobilization
36 2) Inspection
37 3) Safety training
38 4) Additional Insurance
39 5) Insurance Certificates
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
013513-2
SPECIAL PROJECT PROCEDURES
Page 2 of 8
1 6) Other requirements associated with general coordination with Railroad,
2 including additional employees required to protect the right-of-way and
3 property of the Railroad from damage arising out of and/or from the
4 construction of the Project.
5 2. Railroad Flagmen
6 a. Measurement
7 1) Measurement for this Item will be per working day.
8 b. Payment
9 1) The work performed and materials furnished in accordance with this Item
10 will be paid for each working day that Railroad Flagmen are present at the
11 Site.
12 c. The price bid shall include:
13 1) Coordination for scheduling flagmen
14 2) Flagmen
15 3) Other requirements associated with Railroad
16 3. All other items
17 a. Work associated with these Items is considered subsidiary to the various Items
18 bid. No separate payment will be allowed for this Item.
19 1.3 REFERENCES
20 A. Reference Standards
21 1. Reference standards cited in this Specification refer to the current reference
22 standard published at the time of the latest revision date logged at the end of this
23 Specification,unless a date is specifically cited.
24 2. Health and Safety Code,Title 9.Safety, Subtitle A.Public Safety,Chapter 752.
25 High Voltage Overhead Lines.
26 3. North Central Texas Council of Governments(NCTCOG)—Clean Construction
27 Specification
28 1.4 ADMINISTRATIVE REQUIREMENTS
29 A. Coordination with the Texas Department of Transportation
30 1. When work in the right-of-way which is under the jurisdiction of the Texas
31 Department of Transportation(TxDOT):
32 a. Notify the Texas Department of Transportation prior to commencing any work
33 therein in accordance with the provisions of the permit
34 b. All work performed in the TxDOT right-of-way shall be performed in
35 compliance with and subject to approval from the Texas Department of
36 Transportation
37 B. Work near High Voltage Lines
38 1. Regulatory Requirements
39 a. All Work near High Voltage Lines(more than 600 volts measured between
40 conductors or between a conductor and the ground)shall be in accordance with
41 Health and Safety Code,Title 9,Subtitle A,Chapter 752.
42 2. Warning sign
43 a. Provide sign of sufficient size meeting all OSHA requirements.
44 3. Equipment operating within 10 feet of high voltage lines will require the following
45 safety features
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
013513-3
SPECIAL PROJECT PROCEDURES
Page 3 of 8
1 a. Insulating cage-type of guard about the boom or arm
2 b. Insulator links on the lift hook connections for back hoes or dippers
3 c. Equipment must meet the safety requirements as set forth by OSHA and the
4 safety requirements of the owner of the high voltage lines
5 4. Work within 6 feet of high voltage electric lines
6 a. Notification shall be given to:
7 1) The power company(example:ONCOR)
8 a) Maintain an accurate log of all such calls to power company and record
9 action taken in each case.
10 b. Coordination with power company
11 1) After notification coordinate with the power company to:
12 a) Erect temporary mechanical barriers,de-energize the lines,or raise or
13 lower the lines
14 c. No personnel may work within 6 feet of a high voltage line before the above
15 requirements have been met.
16 C. Confined Space Entry Program
17 1. Provide and follow approved Confined Space Entry Program in accordance with
18 OSHA requirements.
19 2. Confined Spaces include:
20 a. Manholes
21 b. All other confined spaces in accordance with OSHA's Permit Required for
22 Confined Spaces
23 D. Air Pollution Watch Days
24 1. General
25 a. Observe the following guidelines relating to working on City construction sites
26 on days designated as"AIR POLLUTION WATCH DAYS".
27 b. Typical Ozone Season
28 1) May 1 through October 31.
29 c. Critical Emission Time
30 1) 6:00 a.m.to 10:00 a.m.
31 2. Watch Days
32 a. The Texas Commission on Environmental Quality(TCEQ),in coordination
33 with the National Weather Service,will issue the Air Pollution Watch by 3:00
34 p.m. on the afternoon prior to the WATCH day.
35 b. Requirements
36 1) Begin work after 10:00 a.m.whenever construction phasing requires the
37 use of motorized equipment for periods in excess of 1 hour.
38 2) However,the Contractor may begin work prior to 10:00 a.m.if-
39
f39 a) Use of motorized equipment is less than 1 hour,or
40 b) If equipment is new and certified by EPA as "Low Emitting",or
41 equipment burns Ultra Low Sulfur Diesel(ULSD),diesel emulsions,or
42 alternative fuels such as CNG.
43 E. TCEQ Air Permit
44 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ.
45 F. Use of Explosives,Drop Weight,Etc.
46 1. When Contract Documents permit on the project the following will apply:
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
013513-4
SPECIAL PROJECT PROCEDURES
Page 4 of 8
1 a. Public Notification
2 1) Submit notice to City and proof of adequate insurance coverage,24 hours
3 prior to commencing.
4 2) Minimum 24 hour public notification in accordance with Section 01 31 13
5 G. Water Department Coordination
6 1. During the construction of this project,it will be necessary to deactivate,for a
7 period of time,existing lines. The Contractor shall be required to coordinate with
8 the Water Department to determine the best times for deactivating and activating
9 those lines.
10 2. Coordinate any event that will require connecting to or the operation of an existing
11 City water line system with the City's representative.
12 a. Coordination shall be in accordance with Section 33 12 25.
13 b. If needed,obtain a hydrant water meter from the Water Department for use
14 during the life of named project.
15 c. In the event that a water valve on an existing live system be turned off and on
16 to accommodate the construction of the project is required,coordinate this
17 activity through the appropriate City representative.
18 1) Do not operate water line valves of existing water system.
19 a) Failure to comply will render the Contractor in violation of Texas Penal
20 Code Title 7,Chapter 28.03 (Criminal Mischief)and the Contractor
21 will be prosecuted to the full extent of the law.
22 b) In addition,the Contractor will assume all liabilities and
23 responsibilities as a result of these actions.
24 H. Public Notification Prior to Beginning Construction
25 1. Prior to beginning construction on any block in the project, on a block by block
26 basis,prepare and deliver a notice or flyer of the pending construction to the front
27 door of each residence or business that will be impacted by construction.The notice
28 shall be prepared as follows:
29 a. Post notice or flyer 7 days prior to beginning any construction activity on each
30 block in the project area.
31 1) Prepare flyer on the Contractor's letterhead and include the following
32 information:
33 a) Name of Project
34 b) City Project No(CPN)
35 c) Scope of Project(i.e.type of construction activity)
36 d) Actual construction duration within the block
37 e) Name of the contractor's foreman and phone number
38 f) Name of the City's inspector and phone number
39 g) City's after-hours phone number
40 2) A sample of the`pre-construction notification' flyer is attached as Exhibit
41 A.
42 3) Submit schedule showing the construction start and finish time for each
43 block of the project to the inspector.
44 4) Deliver flyer to the City Inspector for review prior to distribution.
45 b. No construction will be allowed to begin on any block until the flyer is
46 delivered to all residents of the block.
47 1. Public Notification of Temporary Water Service Interruption during Construction
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
0135 13-5
SPECIAL PROJECT PROCEDURES
Page 5 of 8
1 1. In the event it becomes necessary to temporarily shut down water service to
2 residents or businesses during construction,prepare and deliver a notice or flyer of
3 the pending interruption to the front door of each affected resident.
4 2. Prepared notice as follows:
5 a. The notification or flyer shall be posted 24 hours prior to the temporary
6 interruption.
7 b. Prepare flyer on the contractor's letterhead and include the following
8 information:
9 1) Name of the project
10 2) City Project Number
11 3) Date of the interruption of service
12 4) Period the interruption will take place
13 5) Name of the contractor's foreman and phone number
14 6) Name of the City's inspector and phone number
15 c. A sample of the temporary water service interruption notification is attached as
16 Exhibit B.
17 d. Deliver a copy of the temporary interruption notification to the City inspector
18 for review prior to being distributed.
19 e. No interruption of water service can occur until the flyer has been delivered to
20 all affected residents and businesses.
21 f. Electronic versions of the sample flyers can be obtained from the Project
22 Construction Inspector.
23 J. Coordination with United States Army Corps of Engineers(USACE)
24 1. At locations in the Project where construction activities occur in areas where
25 USACE permits are required,meet all requirements set forth in each designated
26 permit.
27 K. Coordination within Railroad Permit Areas
28 1. At locations in the project where construction activities occur in areas where
29 railroad permits are required,meet all requirements set forth in each designated
30 railroad permit. This includes,but is not limited to,provisions for:
31 a. Flagmen
32 b. Inspectors
33 c. Safety training
34 d. Additional insurance
35 e. Insurance certificates
36 f. Other employees required to protect the right-of-way and property of the
37 Railroad Company from damage arising out of and/or from the construction of
38 the project. Proper utility clearance procedures shall be used in accordance
39 with the permit guidelines.
40 2. Obtain any supplemental information needed to comply with the railroad's
41 requirements.
42 3. Railroad Flagmen
43 a. Submit receipts to City for verification of working days that railroad flagmen
44 were present on Site.
45 L. Dust Control
46 1. Use acceptable measures to control dust at the Site.
47 a. If water is used to control dust,capture and properly dispose of waste water.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
0135 13-6
SPECIAL PROJECT PROCEDURES
Page 6 of 8
1 b. If wet saw cutting is performed,capture and properly dispose of slurry.
2 M. Employee Parking
3 1. Provide parking for employees at locations approved by the City.
4 1.5 SUBMITTALS [NOT USED]
5 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
6 1.7 CLOSEOUT SUBMITTALS [NOT USED]
7 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
8 1.9 QUALITY ASSURANCE [NOT USED]
9 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED]
10 1.11 FIELD [SITE] CONDITIONS [NOT USED]
11 1.12 WARRANTY [NOT USED]
12 PART 2- PRODUCTS [NOT USED]
13 PART 3- EXECUTION [NOT USED]
14 END OF SECTION
1S
Revision Log
DATE NAME SUNB4ARY OF CHANGE
1.4.13--Added requirement of compliance with Health and Safety Code,Title 9.
8/31/2012 D.Johnson Safety,Subtitle A.Public Safety,Chapter 752.High Voltage Overhead Lines.
1.4.E Added Contractor responsibility for obtaining a TCEQ Air Permit
16
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
013513-7
SPECIAL PROJECT PROCEDURES
Page 7 of 8
1 EXHIBIT A
2 (To be printed on Contractor's Letterhead)
3
4
5
6 Date:
7
8 CPN No.:
9 Project Name:
10 Mapsco Location:
11 Limits of Construction:
12
13
14
15
16
17 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT
18 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR
19 PROPERTY.
20
21 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE
22 OF THIS NOTICE.
23
24 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER
25 ISSUE, PLEASE CALL:
26
27
28 Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.>
29
30 OR
31
32 Mr. <CITY INSPECTOR> AT< TELEPHONE NO.>
33
34 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306
35
36 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL
37
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
013513-8
SPECIAL PROJECT PROCEDURES
Page 8 of 8
1 EXHIBIT B
FORT WORTH
DOW
DOE NO.aaaa
NOTICE OF TEMPORARY WATER SERVICE
INTERRUPTION
DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR
WATER SERVICE WILL BE INTERRUPTED ON
BETWEEN THE HOURS OF AND
IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT,PLEASE CALL:
MR. AT
(CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER)
OR
MR. AT
(CITY INSPECTOR) (TELEPHONE NUMBER)
THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE.
THANK YOU,
CONTRACTOR
3 -.
4
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
014523-1
TESTING AND INSPECTION SERVICES
Page 1 of 2
1 SECTION 0145 23
2 TESTING AND INSPECTION SERVICES
3 PART1 - GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Testing and inspection services procedures and coordination
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include,but are not necessarily limited to:
10 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
11 2. Division 1 —General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Work associated with this Item is considered subsidiary to the various Items bid.
15 No separate payment will be allowed for this Item.
16 a. Contractor is responsible for performing,coordinating,and payment of all
17 Quality Control testing.
18 b. City is responsible for performing and payment for first set of Quality
19 Assurance testing.
20 1) If the first Quality Assurance test performed by the City fails,the
21 Contractor is responsible for payment of subsequent Quality Assurance
22 testing until a passing test occurs.
23 a) Final acceptance will not be issued by City until all required payments
24 for testing by Contractor have been paid in full.
25 1.3 REFERENCES [NOT USED]
26 1.4 ADMINISTRATIVE REQUIREMENTS
27 A. Testing
28 1. Complete testing in accordance with the Contract Documents.
29 2. Coordination
30 a. When testing is required to be performed by the City,notify City,sufficiently
31 in advance,when testing is needed.
32 b. When testing is required to be completed by the Contractor,notify City,
33 sufficiently in advance,that testing will be performed.
34 3. Distribution of Testing Reports
35 a. Electronic Distribution
36 1) Confirm development of Project directory for electronic submittals to be
37 uploaded to City's Buzzsaw site,or another external FTP site approved by
38 the City.
CITY OF FORT WORTH 2014 CEP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
014523-2
TESTING AND INSPECTION SERVICES
Page 2 of 2
1 2) Upload test reports to designated project directory and notify appropriate
2 City representatives via email of submittal posting.
3 3) Hard Copies
4 a) 1 copy for all submittals submitted to the Project Representative
5 b. Hard Copy Distribution(if required in lieu of electronic distribution)
6 1) Tests performed by City
7 a) Distribute 1 hard copy to the Contractor
8 2) Tests performed by the Contractor
9 a) Distribute 3 hard copies to City's Project Representative
10 4. Provide City's Project Representative with trip tickets for each delivered load of
11 Concrete or Lime material including the following information:
12 a. Name of pit
13 b. Date of delivery
14 c. Material delivered
15 B. Inspection
16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to
17 perform work in accordance with the Contract Documents.
18 1.5 SUBMITTALS [NOT USED]
19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
20 1.7 CLOSEOUT SUBMITTALS [NOT USED]
21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
22 1.9 QUALITY ASSURANCE [NOT USED]
23 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED]
24 1.11 FIELD [SITE] CONDITIONS [NOT USED]
25 1.12 WARRANTY [NOT USED]
26 PART 2- PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
29
Revision Log
DATE NAME SUMMARY OF CHANGE
30
CITY OF FORT WORTH 2014 CEP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
015000-1
TEMPORARY FACILITIES AND CONTROLS
Page 1 of 4
1 SECTION 0150 00
2 TEMPORARY FACILITIES AND CONTROLS
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Provide temporary facilities and controls needed for the Work including,but not
7 necessarily limited to:
8 a. Temporary utilities
9 b. Sanitary facilities
10 c. Storage Sheds and Buildings
11 d. Dust control
12 e. Temporary fencing of the construction site
13 B. Deviations from this City of Fort Worth Standard Specification
14 1. None.
15 C. Related Specification Sections include,but are not necessarily limited to:
16 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
17 2. Division 1 —General Requirements
18 1.2 PRICE AND PAYMENT PROCEDURES
19 A. Measurement and Payment
20 1. Work associated with this Item is considered subsidiary to the various Items bid.
21 No separate payment will be allowed for this Item.
22 1.3 REFERENCES [NOT USED]
23 1.4 ADMINISTRATIVE REQUIREMENTS
24 A. Temporary Utilities
25 1. Obtaining Temporary Service
26 a. Make arrangements with utility service companies for temporary services.
27 b. Abide by rules and regulations of utility service companies or authorities
28 having jurisdiction.
29 c. Be responsible for utility service costs until Work is approved for Final
30 Acceptance.
31 1) Included are fuel,power,light,heat and other utility services necessary for
32 execution,completion,testing and initial operation of Work.
33 2. Water
34 a. Contractor to provide water required for and in connection with Work to be
35 performed and for specified tests of piping,equipment,devices or other use as
36 required for the completion of the Work.
37 b. Provide and maintain adequate supply of potable water for domestic
38 consumption by Contractor personnel and City's Project Representatives.
39 c. Coordination
40 1) Contact City 1 week before water for construction is desired
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
015000-2
TEMPORARY FACILITIES AND CONTROLS
Page 2 of 4
1 d. Contractor Payment for Construction Water
2 1) Obtain construction water meter from City for payment as billed by City's
3 established rates.
4 3. Electricity and Lighting
5 a. Provide and pay for electric powered service as required for Work,including
6 testing of Work.
7 1) Provide power for lighting,operation of equipment,or other use.
8 b. Electric power service includes temporary power service or generator to
9 maintain operations during scheduled shutdown.
10 4. Telephone
11 a. Provide emergency telephone service at Site for use by Contractor personnel
12 and others performing work or furnishing services at Site.
13 5. Temporary Heat and Ventilation
14 a. Provide temporary heat as necessary for protection or completion of Work.
15 b. Provide temporary heat and ventilation to assure safe working conditions.
16 B. Sanitary Facilities
17 1. Provide and maintain sanitary facilities for persons on Site.
18 a. Comply with regulations of State and local departments of health.
19 2. Enforce use of sanitary facilities by construction personnel at job site.
20 a. Enclose and anchor sanitary facilities.
21 b. No discharge will be allowed from these facilities.
22 c. Collect and store sewage and waste so as not to cause nuisance or health
23 problem.
24 d. Haul sewage and waste off-site at no less than weekly intervals and properly
25 dispose in accordance with applicable regulation.
26 3. Locate facilities near Work Site and keep clean and maintained throughout Project.
27 4. Remove facilities at completion of Project
28 C. Storage Sheds and Buildings
29 1. Provide adequately ventilated,watertight,weatherproof storage facilities with floor
30 above ground level for materials and equipment susceptible to weather damage.
31 2. Storage of materials not susceptible to weather damage may be on blocks off
32 ground.
33 3. Store materials in a neat and orderly manner.
34 a. Place materials and equipment to permit easy access for identification,
35 inspection and inventory.
36 4. Equip building with lockable doors and lighting,and provide electrical service for
37 equipment space heaters and heating or ventilation as necessary to provide storage
38 environments acceptable to specified manufacturers.
39 5. Fill and grade site for temporary structures to provide drainage away from
40 temporary and existing buildings.
41 6. Remove building from site prior to Final Acceptance.
42 D. Temporary Fencing
43 1. Provide and maintain for the duration or construction when required in contract
44 documents
45 E. Dust Control
CITY OF FORT WORTH 2014 CEP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
015000-3
TEMPORARY FACILITIES AND CONTROLS
Page 3 of 4
1 1. Contractor is responsible for maintaining dust control through the duration of the
2 project.
3 a. Contractor remains on-call at all times
4 b. Must respond in a timely manner
5 F. Temporary Protection of Construction
6 1. Contractor or subcontractors are responsible for protecting Work from damage due
7 to weather.
8 1.5 SUBMITTALS [NOT USED]
9 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
10 1.7 CLOSEOUT SUBMITTALS [NOT USED)
11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
12 1.9 QUALITY ASSURANCE [NOT USED]
13 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED]
14 1.11 FIELD [SITE] CONDITIONS [NOT USED]
15 1.12 WARRANTY [NOT USED]
PART 2- PRODUCTS [NOT USED]
17 PART 3- EXECUTION[NOT USED]
18 3.1 INSTALLERS [NOT USED)
19 3.2 EXAMINATION [NOT USED]
20 3.3 PREPARATION [NOT USED]
21 3.4 INSTALLATION
22 A. Temporary Facilities
23 1. Maintain all temporary facilities for duration of construction activities as needed.
24 3.5 [REPAIR]/[RESTORATION]
25 3.6 RE-INSTALLATION
26 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
27 3.8 SYSTEM STARTUP [NOT USED]
28 3.9 ADJUSTING[NOT USED]
29 3.10 CLEANING [NOT USED]
30 3.11 CLOSEOUT ACTIVITIES
31 A. Temporary Facilities
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
015000-4
TEMPORARY FACILITIES AND CONTROLS
Page 4 of 4
1 1, Remove all temporary facilities and restore area after completion of the Work,to a
2 condition equal to or better than prior to start of Work.
3 3.12 PROTECTION [NOT USED]
4 3.13 MAINTENANCE [NOT USED]
5 3.14 ATTACHMENTS [NOT USED]
6 END OF SECTION
7
Revision Log
DATE NAME SUNMARY OF CHANGE
8
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
015526-1
STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 1 of 3
1 SECTION 0155 26
2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
3 PART1 - GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Administrative procedures for:
7 a. Street Use Permit
8 b. Modification of approved traffic control
9 c. Removal of Street Signs
10 B. Deviations from this City of Fort Worth Standard Specification
11 1. None.
12 C. Related Specification Sections include,but are not necessarily limited to:
13 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
14 2. Division 1 —General Requirements
15 3. Section 34 71 13—Traffic Control
16 1.2 PRICE AND PAYMENT PROCEDURES
17 A. Measurement and Payment
18 1. Work associated with this Item is considered subsidiary to the various Items bid.
19 No separate payment will be allowed for this Item.
20 1.3 REFERENCES
21 A. Reference Standards
22 1. Reference standards cited in this specification refer to the current reference standard
23 published at the time of the latest revision date logged at the end of this
24 specification,unless a date is specifically cited.
25 2. Texas Manual on Uniform Traffic Control Devices(TMUTCD).
26 1.4 ADMINISTRATIVE REQUIREMENTS
11 1 11 A. Traffic Control
28 1. General
29 a. When traffic control plans are included in the Drawings,provide Traffic
30 Control in accordance with Drawings and Section 34 71 13.
31 b. When traffic control plans are not included in the Drawings,prepare traffic
32 control plans in accordance with Section 34 71 13 and submit to City for
33 review.
34 1) Allow minimum 10 working days for review of proposed Traffic Control.
35 B. Street Use Permit
36 1. Prior to installation of Traffic Control,a City Street Use Permit is required.
37 a. To obtain Street Use Permit,submit Traffic Control Plans to City
38 Transportation and Public Works Department.
CITY OF FORT WORTH 2014 CEP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
015526-2
STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 2 of 3
1 1) Allow a minimum of 5 working days for permit review.
2 2) Contractor's responsibility to coordinate review of Traffic Control plans for
3 Street Use Permit,such that construction is not delayed.
4 C. Modification to Approved Traffic Control
5 1. Prior to installation traffic control:
6 a. Submit revised traffic control plans to City Department Transportation and
7 Public Works Department.
8 1) Revise Traffic Control plans in accordance with Section 34 71 13.
9 2) Allow minimum 5 working days for review of revised Traffic Control.
10 3) It is the Contractor's responsibility to coordinate review of Traffic Control
11 plans for Street Use Permit,such that construction is not delayed.
12 D. Removal of Street Sign
13 1. If it is determined that a street sign must be removed for construction,then contact
14 City Transportation and Public Works Department, Signs and Markings Division to
15 remove the sign.
16 E. Temporary Signage
17 1. In the case of regulatory signs,replace permanent sign with temporary sign meeting
18 requirements of the latest edition of the Texas Manual on Uniform Traffic Control
19 Devices(MUTCD).
20 2. Install temporary sign before the removal of permanent sign.
21 3. When construction is complete,to the extent that the permanent sign can be
22 reinstalled,contact the City Transportation and Public Works Department, Signs
23 and Markings Division,to reinstall the permanent sign.
24 F. Traffic Control Standards
25 1. Traffic Control Standards can be found on the City's Buzzsaw website.
26 1.5 SUBMITTALS [NOT USED]
27 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
28 1.7 CLOSEOUT SUBMITTALS [NOT USED]
29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
30 1.9 QUALITY ASSURANCE [NOT USED]
31 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED]
32 1.11 FIELD [SITE] CONDITIONS [NOT USED]
33 1.12 WARRANTY [NOT USED]
34 PART 2- PRODUCTS [NOT USED]
35 PART 3- EXECUTION[NOT USED]
36 END OF SECTION
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
015526-3
STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 3 of 3
1
Revision Log
DATE NAME SUMMARY OF CHANGE
2
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
015713-1
STORM WATER POLLUTION PREVENTION
Page 1 of 3
1 SECTION 0157 13
2 STORM WATER POLLUTION PREVENTION
3 PART1 - GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Procedures for Storm Water Pollution Prevention Plans
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include,but are not necessarily limited to:
10 1. Division 0— Bidding Requirements,Contract Forms and Conditions of the
11 Contract
12 2. Division I —General Requirements
13 3. Section 3125 00—Erosion and Sediment Control
14 1.2 PRICE AND PAYMENT PROCEDURES
15 A. Measurement and Payment
16 1. Construction Activities resulting in less than 1 acre of disturbance
17 a. Work associated with this Item is considered subsidiary to the various Items
18 bid. No separate payment will be allowed for this Item.
19 2. Construction Activities resulting in greater than 1 acre of disturbance
20 a. Measurement and Payment shall be in accordance with Section 3125 00.
21 1.3 REFERENCES
22 A. Abbreviations and Acronyms
23 1. Notice of Intent:NOI
24 2. Notice of Termination:NOT
25 3. Storm Water Pollution Prevention Plan: SWPPP
26 4. Texas Commission on Environmental Quality:TCEQ
27 5. Notice of Change:NOC
28 A. Reference Standards
29 1. Reference standards cited in this Specification refer to the current reference
30 standard published at the time of the latest revision date logged at the end of this
31 Specification,unless a date is specifically cited.
32 2. Integrated Storm Management(iSWM)Technical Manual for Construction
33 Controls
34 1.4 ADMINISTRATIVE REQUIREMENTS
35 A. General
36 1. Contractor is responsible for resolution and payment of any fines issued associated
37 with compliance to Stormwater Pollution Prevention Plan.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
015713-2
STORM WATER POLLUTION PREVENTION
Page 2 of 3
1 B. Construction Activities resulting in:
2 1. Less than 1 acre of disturbance
3 a. Provide erosion and sediment control in accordance with Section 3125 00 and
4 Drawings.
5 2. 1 to less than 5 acres of disturbance
6 a. Texas Pollutant Discharge Elimination System(TPDES)General Construction
7 Permit is required
8 b. Complete SWPPP in accordance with TCEQ requirements
9 1) TCEQ Small Construction Site Notice Required under general permit
10 TXR150000
11 a) Sign and post at job site
12 b) Prior to Preconstruction Meeting,send 1 copy to City Department of
13 Transportation and Public Works,Environmental Division,(817)392-
14 6088.
15 2) Provide erosion and sediment control in accordance with:
16 a) Section 3125 00
17 b) The Drawings
18 c) TXR150000 General Permit
19 d) SWPPP
20 e) TCEQ requirements
21 3. 5 acres or more of Disturbance
22 a. Texas Pollutant Discharge Elimination System(TPDES)General Construction
23 Permit is required
24 b. Complete SWPPP in accordance with TCEQ requirements
25 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee
26 a) Sign and post at job site
27 b) Send copy to City Department of Transportation and Public Works,
28 Environmental Division,(817)392-6088.
29 2) TCEQ Notice of Change required if making changes or updates to NOI
30 3) Provide erosion and sediment control in accordance with:
31 a) Section 3125 00
32 b) The Drawings
33 c) TXR150000 General Permit
34 d) SWPPP
35 e) TCEQ requirements
36 4) Once the project has been completed and all the closeout requirements of
37 TCEQ have been met a TCEQ Notice of Termination can be submitted.
38 a) Send copy to City Department of Transportation and Public Works,
39 Environmental Division,(817)392-6088.
40 1.5 SUBMITTALS
41 A. SWPPP
42 1. Submit in accordance with Section 0133 00,except as stated herein.
43 a. Prior to the Preconstruction Meeting,submit a draft copy of SWPPP to the City
44 as follows:
45 1) 1 copy to the City Project Manager
46 a) City Project Manager will forward to the City Department of
47 Transportation and Public Works,Environmental Division for review
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
015713-3
STORM WATER POLLUTION PREVENTION
Page 3 of 3
1 B. Modified SWPPP
2 1. If the SWPPP is revised during construction,resubmit modified SWPPP to the City
3 in accordance with Section 0133 00.
4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
5 1.7 CLOSEOUT SUBMITTALS [NOT USED]
6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
7 1.9 QUALITY ASSURANCE [NOT USED]
8 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED]
9 1.11 FIELD[SITE] CONDITIONS [NOT USED]
10 1.12 WARRANTY [NOT USED]
1.1 PART 2- PRODUCTS [NOT USED]
12 PART 3- EXECUTION [NOT USED]
13 END OF SECTION
14
Revision Log
DATE NAME SUND4ARY OF CHANGE
15
CITY OF FORT WORTH 2014 CIP,YEAR 3 CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
015813-1
TEMPORARY PROJECT SIGNAGE
Page 1 of 3
1 SECTION 015813
2 TEMPORARY PROJECT SIGNAGE
3 PART1 - GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Temporary Project Signage Requirements
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include,but are not necessarily limited to:
10 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
11 2. Division 1—General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Work associated with this Item is considered subsidiary to the various Items bid.
15 No separate payment will be allowed for this Item.
16 1.3 REFERENCES [NOT USED]
17 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
18 1.5 SUBMITTALS [NOT USED]
19 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
20 1.7 CLOSEOUT SUBMITTALS [NOT USED]
21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
22 1.9 QUALITY ASSURANCE [NOT USED]
23 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED]
24 1.11 FIELD [SITE] CONDITIONS [NOT USED]
25 1.12 WARRANTY [NOT USED]
26 PART 2- PRODUCTS
27 2.1 OWNER-FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED]
28 2.2 EQUIPMENT,PRODUCT TYPES,AND MATERIALS
29 A. Design Criteria
30 1. Provide free standing Project Designation Sign in accordance with City's Standard
31 Details for project signs.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
015813-2
TEMPORARY PROJECT SIGNAGE
Page 2 of 3
1 B. Materials
2 1. Sign
3 a. Constructed of/4-inch fir plywood,grade A-C(exterior)or better
4 2.3 ACCESSORIES [NOT USED]
5 2.4 SOURCE QUALITY CONTROL [NOT USED]
6 PART 3- EXECUTION
7 3.1 INSTALLERS [NOT USED]
8 3.2 EXAMINATION [NOT USED]
9 3.3 PREPARATION [NOT USED]
10 3.4 INSTALLATION
11 A. General
12 1. Provide vertical installation at extents of project.
13 2. Relocate sign as needed,upon request of the City.
14 B. Mounting options
15 a. Skids
16 b. Posts
17 c. Barricade
18 3.5 REPAIR/RESTORATION [NOT USED]
19 3.6 RE-INSTALLATION [NOT USED]
20 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED]
21 3.8 SYSTEM STARTUP [NOT USED]
22 3.9 ADJUSTING [NOT USED]
23 3.10 CLEANING[NOT USED]
24 3.11 CLOSEOUT ACTIVITIES [NOT USED]
25 3.12 PROTECTION [NOT USED]
26 3.13 MAINTENANCE
27 A. General
28 1. Maintenance will include painting and repairs as needed or directed by the City.
29 3.14 ATTACHMENTS [NOT USED]
30 END OF SECTION
31
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
015813-3
TEMPORARY PROJECT SIGNAGE
Page 3 of 3
1
Revision Log
DATE NAME SUMMARY OF CHANGE
2
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
016000-1
PRODUCT REQUIREMENTS
Page 1 of 2
1 SECTION 0160 00
2 PRODUCT REQUIREMENTS
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. References for Product Requirements and City Standard Products List
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include,but are not necessarily limited to:
10 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
11 2. Division 1—General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED]
13 1.3 REFERENCES [NOT USED]
14 1.4 ADMINISTRATIVE REQUIREMENTS
15 A. A list of City approved products for use is located on Buzzsaw as follows:
16 1. Resources\02-Construction Documents\Standard Products List
17 B. Only products specifically included on City's Standard Product List in these Contract
18 Documents shall be allowed for use on the Project.
19 1. Any subsequently approved products will only be allowed for use upon specific
20 approval by the City.
21 C. Any specific product requirements in the Contract Documents supersede similar
22 products included on the City's Standard Product List.
23 1. The City reserves the right to not allow products to be used for certain projects even
24 though the product is listed on the City's Standard Product List.
25 D. Although a specific product is included on City's Standard Product List,not all
26 products from that manufacturer are approved for use,including but not limited to,that
27 manufacturer's standard product.
28 E. See Section 01 33 00 for submittal requirements of Product Data included on City's
29 Standard Product List.
30 1.5 SUBMITTALS [NOT USED]
31 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
32 1.7 CLOSEOUT SUBMITTALS [NOT USED]
33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
34 1.9 QUALITY ASSURANCE [NOT USED]
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
016000-2
PRODUCT REQUIREMENTS
Page 2 of 2
1 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED]
2 1.11 FIELD [SITE] CONDITIONS [NOT USED]
3 1.12 WARRANTY [NOT USED]
4 PART 2- PRODUCTS [NOT USED]
5 PART 3- EXECUTION[NOT USED]
6 END OF SECTION
7
Revision Log
DATE NAME SUMMARY OF CHANGE
10/12/12 D.Johnson Modified Location of City's Standard Product List
8
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
01 66 00-1
PRODUCT STORAGE AND HANDLING REQUIREMENTS
Pagel of 4
1 SECTION 0166 00
2 PRODUCT STORAGE AND HANDLING REQUIREMENTS
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Scheduling of product delivery
7 2. Packaging of products for delivery
8 3. Protection of products against damage from:
9 a. Handling
10 b. Exposure to elements or harsh environments
11 B. Deviations from this City of Fort Worth Standard Specification
12 1. None.
13 C. Related Specification Sections include,but are not necessarily limited to:
14 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
15 2. Division 1 —General Requirements
16 1.2 PRICE AND PAYMENT PROCEDURES
17 A. Measurement and Payment
18 1. Work associated with this Item is considered subsidiary to the various Items bid.
19 No separate payment will be allowed for this Item.
20 1.3 REFERENCES [NOT USED]
21 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
22 1.5 SUBMITTALS [NOT USED]
23 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
24 1.7 CLOSEOUT SUBMITTALS [NOT USED]
25 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
26 1.9 QUALITY ASSURANCE [NOT USED]
27 1.10 DELIVERY AND HANDLING
28 A. Delivery Requirements
29 1. Schedule delivery of products or equipment as required to allow timely installation
30 and to avoid prolonged storage.
31 2. Provide appropriate personnel and equipment to receive deliveries.
32 3. Delivery trucks will not be permitted to wait extended periods of time on the Site
33 for personnel or equipment to receive the delivery.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
016600-2
PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 2 of 4
1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other
2 containers designed and constructed to protect the contents from physical or
3 environmental damage.
4 5. Clearly and fully mark and identify as to manufacturer,item and installation
5 location.
6 6. Provide manufacturer's instructions for storage and handling.
7 B. Handling Requirements
8 1. Handle products or equipment in accordance with these Contract Documents and
9 manufacturer's recommendations and instructions.
10 C. Storage Requirements
11 1. Store materials in accordance with manufacturer's recommendations and
12 requirements of these Specifications.
13 2. Make necessary provisions for safe storage of materials and equipment.
14 a. Place loose soil materials and materials to be incorporated into Work to prevent
15 damage to any part of Work or existing facilities and to maintain free access at
16 all times to all parts of Work and to utility service company installations in
17 vicinity of Work.
18 3. Keep materials and equipment neatly and compactly stored in locations that will
19 cause minimum inconvenience to other contractors,public travel,adjoining owners,
20 tenants and occupants.
21 a. Arrange storage to provide easy access for inspection.
22 4. Restrict storage to areas available on construction site for storage of material and
23 equipment as shown on Drawings,or approved by City's Project Representative.
24 5. Provide off-site storage and protection when on-site storage is not adequate.
25 a. Provide addresses of and access to off-site storage locations for inspection by
26 City's Project Representative.
27 6. Do not use lawns,grass plots or other private property for storage purposes without
28 written permission of owner or other person in possession or control of premises.
29 7. Store in manufacturers' unopened containers.
30 8. Neatly,safely and compactly stack materials delivered and stored along line of
31 Work to avoid inconvenience and damage to property owners and general public
32 and maintain at least 3 feet from fire hydrant.
33 9. Keep public and private driveways and street crossings open.
34 10. Repair or replace damaged lawns,sidewalks,streets or other improvements to
35 satisfaction of City's Project Representative.
36 a. Total length which materials may be distributed along route of construction at
37 one time is 1,000 linear feet,unless otherwise approved in writing by City's
38 Project Representative.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
016600-3
PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 3 of 4
1 1.11 FIELD [SITE] CONDITIONS [NOT USED]
2 1.12 WARRANTY [NOT USED]
3 PART 2- PRODUCTS [NOT USED]
4 PART 3- EXECUTION
5 3.1 INSTALLERS [NOT USED]
6 3.2 EXAMINATION [NOT USED]
7 3.3 PREPARATION [NOT USED]
8 3.4 ERECTION [NOT USED]
9 3.5 REPAIR/RESTORATION [NOT USED]
10 3.6 RE-INSTALLATION [NOT USED]
11 3.7 FIELD [OR] SITE QUALITY CONTROL
12 A. Tests and Inspections
13 1. Inspect all products or equipment delivered to the site prior to unloading.
14 B. Non-Conforming Work
15 1. Reject all products or equipment that are damaged,used or in any other way
16 unsatisfactory for use on the project.
17 3.8 SYSTEM STARTUP [NOT USED]
18 3.9 ADJUSTING [NOT USED]
19 3.10 CLEANING [NOT USED]
20 3.11 CLOSEOUT ACTIVITIES[NOT USED]
21 3.12 PROTECTION
22 A. Protect all products or equipment in accordance with manufacturer's written directions.
23 B. Store products or equipment in location to avoid physical damage to items while in
24 storage.
25 C. Protect equipment from exposure to elements and keep thoroughly dry if required by
26 the manufacturer.
27 3.13 MAINTENANCE [NOT USED]
28 3.14 ATTACHMENTS [NOT USED]
29 END OF SECTION
30
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
016600-4
PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 4 of 4
Revision Log
DATE NAME SUMMARY OF CHANGE
1
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
01 70 00-1
MOBILIZATION AND REMOBILIZATION
Page 1 of 4
1 SECTION 0170 00
2 MOBILIZATION AND REMOBILIZATION
3 PART1 - GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Mobilization and Demobilization
7 a. Mobilization
8 1) Transportation of Contractor's personnel,equipment, and operating supplies
9 to the Site
10 2) Establishment of necessary general facilities for the Contractor's operation
11 at the Site
12 3) Premiums paid for performance and payment bonds
13 4) Transportation of Contractor's personnel,equipment,and operating supplies
14 to another location within the designated Site
15 5) Relocation of necessary general facilities for the Contractor's operation
16 from 1 location to another location on the Site.
17 b. Demobilization
18 1) Transportation of Contractor's personnel,equipment,and operating supplies
19 away from the Site including disassembly
20 2) Site Clean-up
21 3) Removal of all buildings and/or other facilities assembled at the Site for this
22 Contract
23 c. Mobilization and Demobilization do not include activities for specific items of
24 work that are for which payment is provided elsewhere in the contract.
25 2. Remobilization
26 a. Remobilization for Suspension of Work specifically required in the Contract
27 Documents or as required by City includes:
28 1) Demobilization
29 a) Transportation of Contractor's personnel,equipment,and operating
30 supplies from the Site including disassembly or temporarily securing
31 equipment,supplies,and other facilities as designated by the Contract
32 Documents necessary to suspend the Work.
33 b) Site Clean-up as designated in the Contract Documents
34 2) Remobilization
35 a) Transportation of Contractor's personnel,equipment,and operating
36 supplies to the Site necessary to resume the Work.
37 b) Establishment of necessary general facilities for the Contractor's
38 operation at the Site necessary to resume the Work.
39 3) No Payments will be made for:
40 a) Mobilization and Demobilization from one location to another on the
41 Site in the normal progress of performing the Work.
42 b) Stand-by or idle time
43 c) Lost profits
44 3. Mobilizations and Demobilization for Miscellaneous Projects
45 a. Mobilization and Demobilization
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised November 22,2016
017000-2
MOBILIZATION AND REMOBILIZATION
Page 2 of 4
1 1) Mobilization shall consist of the activities and cost on a Work Order basis
2 necessary for:
3 a) Transportation of Contractor's personnel,equipment,and operating
4 supplies to the Site for the issued Work Order.
5 b) Establishment of necessary general facilities for the Contractor's
6 operation at the Site for the issued Work Order
7 2) Demobilization shall consist of the activities and cost necessary for:
8 a) Transportation of Contractor's personnel,equipment,and operating
9 supplies from the Site including disassembly for each issued Work
10 Order
11 b) Site Clean-up for each issued Work Order
12 c) Removal of all buildings or other facilities assembled at the Site for
13 each Work Oder
14 b. Mobilization and Demobilization do not include activities for specific items of
15 work for which payment is provided elsewhere in the contract.
16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects
17 a. A Mobilization for Miscellaneous Projects when directed by the City and the
18 mobilization occurs within 24 hours of the issuance of the Work Order.
19 B. Deviations from this City of Fort Worth Standard Specification
20 1. None.
21 C. Related Specification Sections include,but are not necessarily limited to:
22 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
23 2. Division 1 —General Requirements
24 1.2 PRICE AND PAYMENT PROCEDURES
25 A. Measurement and Payment[Consult City Department/Division for direction on if
26 Mobilization pay item to be included or the item should be subsidiary. Include the
27 appropriate Section 1.2 A. 1.]
28 Mobilization and Demobilization
29 a. Measurement
30 1) This Item is considered subsidiary to the various Items bid.
31 b. Payment
32 1) The work performed and materials furnished in accordance with this Item
33 are subsidiary to the various Items bid and no other compensation will be
34 allowed.
35 2. Remobilization for suspension of Work as specifically required in the Contract
36 Documents
37 a. Measurement
38 1) Measurement for this Item shall be per each remobilization performed.
39 b. Payment
40 1) The work performed and materials furnished in accordance with this Item
41 and measured as provided under"Measurement"will be paid for at the unit
42 price per each"Specified Remobilization"in accordance with Contract
43 Documents
44 c. The price shall include:
45 1) Demobilization as described in Section 1.1.A.2.a.1)
46 2) Remobilization as described in Section 1.1.A.2.a.2)
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised November 22,2016
017000-3
MOBILIZATION AND REMOBILIZATION
Page 3 of 4
1 d. No payments will be made for standby,idle time,or lost profits associated this
2 Item.
3 3. Remobilization for suspension of Work as required by City
4 a. Measurement and Payment
5 1) This shall be submitted as a Contract Claim in accordance with Article 10
6 of Section 00 72 00.
7 2) No payments will be made for standby,idle time,or lost profits associated
8 with this Item.
9 4. Mobilizations and Demobilizations for Miscellaneous Projects
10 a. Measurement
11 1) Measurement for this Item shall be for each Mobilization and
12 Demobilization required by the Contract Documents
13 b. Payment
14 1) The Work performed and materials furnished in accordance with this Item
15 and measured as provided under"Measurement"will be paid for at the unit
16 price per each"Work Order Mobilization"in accordance with Contract
17 Documents. Demobilization shall be considered subsidiary to mobilization
18 and shall not be paid for separately.
19 c. The price shall include:
20 1) Mobilization as described in Section 1.1.A.3.a.1)
21 2) Demobilization as described in Section 1.I.A.3.a.2)
22 d. No payments will be made for standby,idle time,or lost profits associated this
23 Item.
24 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects
25 a. Measurement
26 1) Measurement for this Item shall be for each Mobilization and
27 Demobilization required by the Contract Documents
28 b. Payment
29 1) The Work performed and materials furnished in accordance with this Item
30 and measured as provided under"Measurement"will be paid for at the unit
31 price per each"Work Order Emergency Mobilization'in accordance with
32 Contract Documents. Demobilization shall be considered subsidiary to
33 mobilization and shall not be paid for separately.
34 c. The price shall include
35 1) Mobilization as described in Section I.1.A.4.a)
36 2) Demobilization as described in Section 1.1.A.3.a.2)
37 d. No payments will be made for standby,idle time,or lost profits associated this
38 Item.
39 1.3 REFERENCES [NOT USED]
40 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
41 1.5 SUBMITTALS [NOT USED]
42 1.6 INFORMATIONAL SUBMITTALS [NOT USED]
43 1.7 CLOSEOUT SUBMITTALS [NOT USED]
44 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised November 22,2016
017000-4
MOBILIZATION AND REMOBIIJZATION
Page 4 of 4
i 1.9 QUALITY ASSURANCE [NOT USED]
2 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED]
3 1.11 FIELD [SITE] CONDITIONS [NOT USED]
4 1.12 WARRANTY[NOT USED]
5 PART 2- PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
8
Revision Log
DATE NAME SUMMARY OF CHANGE
11/22/16 Michael Owen 1.2 Price and Payment Procedures-Rev isct1 spec ificatit) ,nicl.uding Flue c'K
make specification flexible for either or paid bid hear 5 '04obi'imi6oi).
9
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised November 22,2016
017123-1
CONSTRUCTION STAKING AND SURVEY
Page 1 of 4
SECTION 017123
CONSTRUCTION STAKING AND SURVEY
PART1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Requirements for construction staking and construction survey to be provided by
the Contractor
B. Deviations from this City of Fort Worth Standard Specification
1. 1. I.1A.I-Survey to be provided by the Contractor.
2. 1.2.A.l.a.1-Item paid by lump sum.
3. 1.2.A.a.b.1-Item paid by lump sum price bid for "Construction Staking".
4. 1.2.A.2.a.1-Item paid by lump sum.
5. 1.2.A.2.b.1-Item paid by lump sum price bid for "Construction Survey".
6. 1.9.A.1—Construction Staking performed by Contractor.
7. 1.9.A.3.a-Contractor responsible for preserving and maintaining staking.
8. 1.9.11.1-Construction Survey performed by Contractor.
9. 1.9.11.2A-Contractor responsible for replacing damaged control data.
10. 1.9.11.3.b-Contractor responsible for construction survey.
11. 1.9.11.3.d-Contractor shall be responsible for verifying control data.
12. 1.9.B.3.d.I-5-Clarified language for contractor to be responsible for verifying
benchmark and control data.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
2. Division 1 —General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
I. Construction Staking
a. Measurement
1) Measurement for this item will be by lump sum.
b. Payment
1) The work performed and the materials furnished in accordance withthis
Item will be paid for at the lump sum price bid for"Construction
Staking".
2. Construction Survey
a. Measurement
1) Measurement for this item will be by lump sum.
b. Payment
1)The work performed and the materials furnished in accordance with this
Item will be paid for at the lump sum price bid for"Construction
Survey".
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
017123-2
CONSTRUCTION STAKING AND SURVEY
Page 2 of 4
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS
A. Submittals,if required,shall be in accordance with Section 0133 00.
B. All submittals shall be approved by the City prior to delivery.
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS
A. Certificates
1. Provide certificate certifying that elevations and locations of improvements are in
conformance or non-conformance with requirements of the Contract Documents.
a. Certificate must be sealed by a registered professional land surveyor in the
State of Texas.
B. Field Quality Control Submittals
1. Documentation verifying accuracy of field engineering work.
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Construction Staking
1. Construction staking will be performed by the Contractor.
2. Coordination
a. It is the Contractor's responsibility to coordinate staking such that construction
activities are not delayed or negatively impacted.
3. General
a. Contractor is responsible for Preserving and maintaining staking.
B. Construction Survey
1. Construction Survey will be performed by the Contractor.
2. Coordination
a. Contractor to verify that control data established in the design survey remains
intact.
b. Coordinate with the City prior to field investigation to determine which
horizontal and vertical control data will be required for construction survey.
c. It is the Contractor's responsibility to coordinate Construction Survey suchthat
construction activities are not delayed or negatively impacted.
d. Contractor shall restore or replace all necessary control datadamaged
during construction operations.
1) Contractor shall perform replacements and/or restorations.
3. General
a. Construction survey will be performed in order to maintain complete and
accurate logs of control and survey work as it progresses for Project Records.
b. The Contractor shall Perform construction survey to obtain construction
features including,but not limited to,the following:
1) All Water and Sanitary Sewer Lines installed for the project
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
017123-3
CONSTRUCTION STAKING AND SURVEY
Page 3 of 4
a) Rim and flowline elevations and coordinates for each manhole or
junction structure
2) Water Lines
a) Top of pipe elevations and coordinates for waterlines at the following
locations:
(1) Every 250 linear feet
(2) Horizontal and vertical points of inflection,curvature, etc.(All
Fittings)
(3) Cathodic protection test stations
(4) Sampling stations
(5) Meter boxes/vaults(All sizes)
(6) Fire lines
(7) Fire hydrants
(8) Gate valves
(9) Plugs,stubouts,dead-end lines
(10) Air Release valves(Manhole rim and vent pipe)
(11) Blow off valves(Manhole rim and valve lid)
(12) Pressure plane valves
(13) Cleaning wyes
(14) Casing pipe(each end)
b) Storm Sewer
(1) Top of pipe elevations and coordinates at the following locations:
(a) Every 250 linear feet
(b) Horizontal and vertical points of inflection,curvature,etc.
(c) Rim and flowline elevations and coordinates for each manhole
or junction structure
c) Sanitary Sewer
(1) Top of pipe elevations and coordinates for sanitary sewer lines at
the following locations:
(a) Every 250 linear feet
(b) Horizontal and vertical points of inflection,curvature,etc.
(c) Cleanouts
(d) Rim and flowline elevations and coordinates for each manhole
or junction structure
c. Construction survey will be performed in order to maintain complete and
accurate logs of control and survey work associated with meeting or exceeding
the line and grade required by these Specifications.
d. The Contractor shall perform construction survey and verify control data
including,but not limited to,the following:
1) Verification that established benchmarks and control are accurate.
2) Use of Benchmarks to furnish and maintain all reference linesand
grades for tunneling. Lines and grades were used to establish the
location of the pipe
3) Use of lines and grades to establish the location of the pipe.
4) Submit to the City copies of field notes, if requested,used to establishall
lines and grades and allow the City to check guidance system setup prior to
beginning each tunneling drive.
5) Provide access for the City,when requested,to verify the guidance system
and the line and grade of the carrier pipe on a daily basis.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
017123-4
CONSTRUCTION STAKING AND SURVEY
Page 4 of 4
6) The Contractor remains fully responsible for the accuracy of the workand
the correction of it,as required.
7) Monitor line and grade continuously during construction.
8) Record deviation with respect to design line and grade once at eachpipe
joint and submit daily records to City.
9) If the installation does not meet the specified tolerances,immediately notify
the City and correct the installation in accordance with the Contract
Documents.
1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2-PRODUCTS [NOT USED]
PART 3- EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 APPLICATION
3.5 REPAIR!RESTORATION [NOT USED]
3.6 RE-INSTALLATION [NOT USED]
3.7 FIELD[OR] SITE QUALITY CONTROL
A. It is the Contractor's responsibility to maintain all stakes and control data placed by the
City in accordance with this Specification.
B. Do not change or relocate stakes or control data without approval from the City.
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
8/31/2012 D.Johnson
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
017423-1
CLEANING
Pagel of 4
SECTION 0174 23
CLEANING
PART1 - GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Intermediate and final cleaning for Work not including special cleaning of closed
7 systems specified elsewhere
8 B. Deviations from this City of Fort Worth Standard Specification
9 1. None.
10 C. Related Specification Sections include,but are not necessarily limited to:
11 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
12 2. Division 1 —General Requirements
13 3. Section 32 92 13—Hydro-Mulching,Seeding and Sodding
14 1.2 PRICE AND PAYMENT PROCEDURES
15 A. Measurement and Payment
16 1. Work associated with this Item is considered subsidiary to the various Items bid.
17 No separate payment will be allowed for this Item.
18 1.3 REFERENCES [NOT USED]
19 1.4 ADMINISTRATIVE REQUIREMENTS
20 A. Scheduling
21 1. Schedule cleaning operations so that dust and other contaminants disturbed by
22 cleaning process will not fall on newly painted surfaces.
23 2. Schedule final cleaning upon completion of Work and immediately prior to final
24 inspection.
25 1.5 SUBMITTALS [NOT USED]
26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
27 1.7 CLOSEOUT SUBMITTALS [NOT USED]
28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
29 1.9 QUALITY ASSURANCE [NOT USED]
30 1.10 STORAGE,AND HANDLING
31 A. Storage and Handling Requirements
32 1. Store cleaning products and cleaning wastes in containers specifically designed for
33 those materials.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
017423-2
CLEANING
Page 2 of 4
1 1.11 FIELD [SITE] CONDITIONS [NOT USED]
2 1.12 WARRANTY [NOT USED]
3 PART2- PRODUCTS
4 2.1 OWNER-FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED]
5 2.2 MATERIALS
6 A. Cleaning Agents
7 1. Compatible with surface being cleaned
8 2. New and uncontaminated
9 3. For manufactured surfaces
10 a. Material recommended by manufacturer
11 2.3 ACCESSORIES [NOT USED]
12 2.4 SOURCE QUALITY CONTROL [NOT USED]
13 PART 3- EXECUTION
14 3.1 INSTALLERS [NOT USED]
15 3.2 EXAMINATION [NOT USED]
16 3.3 PREPARATION [NOT USED]
17 3.4 APPLICATION [NOT USED]
18 3.5 REPAIR r RESTORATION [NOT USED]
19 3.6 RE-INSTALLATION [NOT USED]
20 3.7 FIELD [OR] SITE QUALITY CONTROL[NOT USED]
21 3.8 SYSTEM STARTUP[NOT USED]
22 3.9 ADJUSTING [NOT USED]
23 3.10 CLEANING
24 A. General
25 1. Prevent accumulation of wastes that create hazardous conditions.
26 2. Conduct cleaning and disposal operations to comply with laws and safety orders of
27 governing authorities.
28 3. Do not dispose of volatile wastes such as mineral spirits,oil or paint thinner in
29 storm or sanitary drains or sewers.
30 4. Dispose of degradable debris at an approved solid waste disposal site.
31 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an
32 alternate manner approved by City and regulatory agencies.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
017423-3
CLEANING
Page 3 of 4
1 6. Handle materials in a controlled manner with as few handlings as possible.
2 7. Thoroughly clean,sweep,wash and polish all Work and equipment associated with
3 this project.
4 8. Remove all signs of temporary construction and activities incidental to construction
5 of required permanent Work.
6 9. If project is not cleaned to the satisfaction of the City,the City reserves the right to
7 have the cleaning completed at the expense of the Contractor.
8 10. Do not burn on-site.
9 B. Intermediate Cleaning during Construction
10 1. Keep Work areas clean so as not to hinder health,safety or convenience of
11 personnel in existing facility operations.
12 2. At maximum weekly intervals,dispose of waste materials,debris and rubbish.
13 3. Confine construction debris daily in strategically located container(s):
14 a. Cover to prevent blowing by wind
15 b. Store debris away from construction or operational activities
16 c. Haul from site at a minimum of once per week
17 4. Vacuum clean interior areas when ready to receive finish painting.
18 a. Continue vacuum cleaning on an as-needed basis,until Final Acceptance.
19 5. Prior to storm events,thoroughly clean site of all loose or unsecured items,which
20 may become airborne or transported by flowing water during the storm.
21 C. Interior Final Cleaning
22 1. Remove grease,mastic,adhesives,dust,dirt,stains,fingerprints,labels and other
23 foreign materials from sight-exposed surfaces.
24 2. Wipe all lighting fixture reflectors,lenses,lamps and trims clean.
25 3. Wash and shine glazing and mirrors.
26 4. Polish glossy surfaces to a clear shine.
27 5. Ventilating systems
28 a. Clean permanent filters and replace disposable filters if units were operated
29 during construction.
30 b. Clean ducts,blowers and coils if units were operated without filters during
31 construction.
32 6. Replace all burned out lamps.
33 7. Broom clean process area floors.
34 8. Mop office and control room floors.
35 D. Exterior(Site or Right of Way)Final Cleaning
36 1. Remove trash and debris containers from site.
37 a. Re-seed areas disturbed by location of trash and debris containers in accordance
38 with Section 32 92 13.
39 2. Sweep roadway to remove all rocks,pieces of asphalt,concrete or any other object
40 that may hinder or disrupt the flow of traffic along the roadway.
41 3. Clean any interior areas including,but not limited to,vaults,manholes,structures,
42 junction boxes and inlets.
CITY OF FORT WORTH 2014 CIP,YEAR 3-CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
017423-4
CLEANING
Page 4 of 4
1 4. If no longer required for maintenance of erosion facilities,and upon approval by
2 City,remove erosion control from site.
3 5. Clean signs,lights,signals,etc.
4 3.11 CLOSEOUT ACTIVITIES [NOT USED]
5 3.12 PROTECTION [NOT USED]
6 3.13 MAINTENANCE [NOT USED]
7 3.14 ATTACHMENTS [NOT USED]
8 END OF SECTION
9
Revision Log
DATE NAME SUN04ARY OF CHANGE
10
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
017719-1
CLOSEOUT REQUIREMENTS
Pagel of 3
1 SECTION 017719
2 CLOSEOUT REQUIREMENTS
3 PART1 - GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. The procedure for closing out a contract
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include,but are not necessarily limited to:
10 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
11 2. Division 1 —General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Work associated with this Item is considered subsidiary to the various Items bid.
15 No separate payment will be allowed for this Item.
16 1.3 REFERENCES [NOT USED]
17 1.4 ADMINISTRATIVE REQUIREMENTS
18 A. Guarantees,Bonds and Affidavits
19 1. No application for final payment will be accepted until all guarantees,bonds,
20 certificates,licenses and affidavits required for Work or equipment as specified are
21 satisfactorily filed with the City.
22 B. Release of Liens or Claims
23 1. No application for final payment will be accepted until satisfactory evidence of
24 release of liens has been submitted to the City.
25 1.5 SUBMITTALS
26 A. Submit all required documentation to City's Project Representative.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
017719-2
CLOSEOUT REQUIREMENTS
Page 2 of 3
1 1.6 INFORMATIONAL SUBMITTALS [NOT USED]
2 1.7 CLOSEOUT SUBMITTALS [NOT USED]
3 PART 2- PRODUCTS [NOT USED]
4 PART 3- EXECUTION
5 3.1 INSTALLERS [NOT USED]
6 3.2 EXAMINATION [NOT USED]
7 3.3 PREPARATION [NOT USED]
8 3.4 CLOSEOUT PROCEDURE
9 A. Prior to requesting Final Inspection,submit:
10 1. Project Record Documents in accordance with Section 0178 39
11 2. Operation and Maintenance Data,if required,in accordance with Section 01 78 23
12 B. Prior to requesting Final Inspection,perform final cleaning in accordance with Section
13 01 74 23.
14 C. Final Inspection
15 1. After final cleaning,provide notice to the City Project Representative that the Work
16 is completed.
17 a. The City will make an initial Final Inspection with the Contractor present.
18 b. Upon completion of this inspection,the City will notify the Contractor,in
19 writing within 10 business days,of any particulars in which this inspection
20 reveals that the Work is defective or incomplete.
21 2. Upon receiving written notice from the City,immediately undertake the Work
22 required to remedy deficiencies and complete the Work to the satisfaction of the
23 City.
24 3. Upon completion of Work associated with the items listed in the City's written
25 notice,inform the City,that the required Work has been completed. Upon receipt
26 of this notice,the City,in the presence of the Contractor,will make a subsequent
27 Final Inspection of the project.
28 4. Provide all special accessories required to place each item of equipment in full
29 operation. These special accessory items include,but are not limited to:
30 a. Specified spare parts
31 b. Adequate oil and grease as required for the first lubrication of the equipment
32 c. Initial fill up of all chemical tanks and fuel tanks
33 d. Light bulbs
34 e. Fuses
35 f. Vault keys
36 g. Handwheels
37 h. Other expendable items as required for initial start-up and operation of all
38 equipment
39 D. Notice of Project Completion
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
017719-3
CLOSEOUT REQUIREMENTS
Page 3 of 3
1 1. Once the City Project Representative finds the Work subsequent to Final Inspection
2 to be satisfactory,the City will issue a Notice of Project Completion(Green Sheet).
3 E. Supporting Documentation
4 1. Coordinate with the City Project Representative to complete the following
5 additional forms:
6 a. Final Payment Request
7 b. Statement of Contract Time
8 c. Affidavit of Payment and Release of Liens
9 d. Consent of Surety to Final Payment
10 e. Pipe Report(if required)
11 f. Contractor's Evaluation of City
12 g. Performance Evaluation of Contractor
13 F. Letter of Final Acceptance
14 1. Upon review and acceptance of Notice of Project Completion and Supporting
15 Documentation,in accordance with General Conditions,City will issue Letter of
16 Final Acceptance and release the Final Payment Request for payment.
17 3.5 REPAIR/RESTORATION [NOT USED]
18 3.6 RE-INSTALLATION [NOT USED]
19 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED]
20 3.8 SYSTEM STARTUP [NOT USED]
21 3.9 ADJUSTING [NOT USED]
22 3.10 CLEANING [NOT USED]
23 3.11 CLOSEOUT ACTIVITIES [NOT USED]
24 3.12 PROTECTION [NOT USED]
25 3.13 MAINTENANCE [NOT USED]
26 3.14 ATTACHMENTS [NOT USED]
27 END OF SECTION
28
Revision Log
DATE NAME SUMMARY OF CHANGE
29
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
017823-1
OPERATION AND MAINTENANCE DATA
Pagel of 5
SECTION 0178 23
2 OPERATION AND MAINTENANCE DATA
31 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Product data and related information appropriate for City's maintenance and
7 operation of products furnished under Contract
8 2. Such products may include,but are not limited to:
9 a. Traffic Controllers
10 b. Irrigation Controllers(to be operated by the City)
11 c. Butterfly Valves
12 B. Deviations from this City of Fort Worth Standard Specification
13 1. None.
14 C. Related Specification Sections include,but are not necessarily limited to:
15 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
16 2. Division 1 —General Requirements
17 1.2 PRICE AND PAYMENT PROCEDURES
18 A. Measurement and Payment
19 1. Work associated with this Item is considered subsidiary to the various Items bid.
20 No separate payment will be allowed for this Item.
21 1.3 REFERENCES [NOT USED]
22 1.4 ADMINISTRATIVE REQUIREMENTS
23 A. Schedule
24 1. Submit manuals in final form to the City within 30 calendar days of product
25 shipment to the project site.
26 1.5 SUBMITTALS
27 A. Submittals shall be in accordance with Section 0133 00. All submittals shall be
28 approved by the City prior to delivery.
29 1.6 INFORMATIONAL SUBMITTALS
30 A. Submittal Form
31 1. Prepare data in form of an instructional manual for use by City personnel.
32 2. Format
33 a. Size: 8 '/2 inches x 11 inches
34 b. Paper
35 1) 40 pound minimum,white,for typed pages
36 2) Holes reinforced with plastic,cloth or metal
37 c. Text: Manufacturer's printed data,or neatly typewritten
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
017823-2
OPERATION AND MAINTENANCE DATA
Page 2 of 5
1 d. Drawings
2 1) Provide reinforced punched binder tab,bind in with text
3 2) Reduce larger drawings and fold to size of text pages.
4 e. Provide fly-leaf for each separate product,or each piece of operating
5 equipment.
6 1) Provide typed description of product,and major component parts of
7 equipment.
8 2) Provide indexed tabs.
9 £ Cover
10 1) Identify each volume with typed or printed title"OPERATING AND
11 MAINTENANCE INSTRUCTIONS".
12 2) List:
13 a) Title of Project
14 b) Identity of separate structure as applicable
15 c) Identity of general subject matter covered in the manual
16 3. Binders
17 a. Commercial quality 3-ring binders with durable and cleanable plastic covers
18 b. When multiple binders are used,correlate the data into related consistent
19 groupings.
20 4. If available,provide an electronic form of the O&M Manual.
21 B. Manual Content
22 1. Neatly typewritten table of contents for each volume,arranged in systematic order
23 a. Contractor,name of responsible principal,address and telephone number
24 b. A list of each product required to be included,indexed to content of the volume
25 c. List,with each product:
26 1) The name,address and telephone number of the subcontractor or installer
27 2) A list of each product required to be included,indexed to content of the
28 volume
29 3) Identify area of responsibility of each
30 4) Local source of supply for parts and replacement
31 d. Identify each product by product name and other identifying symbols as set
32 forth in Contract Documents.
33 2. Product Data
34 a. Include only those sheets which are pertinent to the specific product.
35 b. Annotate each sheet to:
36 1) Clearly identify specific product or part installed
37 2) Clearly identify data applicable to installation
38 3) Delete references to inapplicable information
39 3. Drawings
40 a. Supplement product data with drawings as necessary to clearly illustrate:
41 1) Relations of component parts of equipment and systems
42 2) Control and flow diagrams
43 b. Coordinate drawings with information in Project Record Documents to assure
44 correct illustration of completed installation.
45 c. Do not use Project Record Drawings as maintenance drawings.
46 4. Written text,as required to supplement product data for the particular installation:
47 a. Organize in consistent format under separate headings for different procedures.
48 b. Provide logical sequence of instructions of each procedure.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
017823-3
OPERATION AND MAINTENANCE DATA
Page 3 of 5
1 5. Copy of each warranty,bond and service contract issued
2 a. Provide information sheet for City personnel giving:
3 1) Proper procedures in event of failure
4 2) Instances which might affect validity of warranties or bonds
5 C. Manual for Materials and Finishes
6 1. Submit 5 copies of complete manual in final form.
7 2. Content,for architectural products,applied materials and finishes:
8 a. Manufacturer's data,giving full information on products
9 1) Catalog number,size,composition
10 2) Color and texture designations
11 3) Information required for reordering special manufactured products
12 b. Instructions for care and maintenance
13 1) Manufacturer's recommendation for types of cleaning agents and methods
14 2) Cautions against cleaning agents and methods which are detrimental to
15 product
16 3) Recommended schedule for cleaning and maintenance
17 3. Content,for moisture protection and weather exposure products:
18 a. Manufacturer's data,giving full information on products
19 1) Applicable standards
20 2) Chemical composition
21 3) Details of installation
22 b. Instructions for inspection,maintenance and repair
23 D. Manual for Equipment and Systems
24 1. Submit 5 copies of complete manual in final form.
25 2. Content,for each unit of equipment and system,as appropriate:
26 a. Description of unit and component parts
27 1) Function,normal operating characteristics and limiting conditions
28 2) Performance curves,engineering data and tests
29 3) Complete nomenclature and commercial number of replaceable parts
30 b. Operating procedures
31 1) Start-up,break-in,routine and normal operating instructions
32 2) Regulation,control,stopping,shut-down and emergency instructions
33 3) Summer and winter operating instructions
34 4) Special operating instructions
35 c. Maintenance procedures
36 1) Routine operations
37 2) Guide to"trouble shooting"
38 3) Disassembly,repair and reassembly
39 4) Alignment,adjusting and checking
40 d. Servicing and lubrication schedule
41 1) List of lubricants required
42 e. Manufacturer's printed operating and maintenance instructions
43 f. Description of sequence of operation by control manufacturer
44 1) Predicted life of parts subject to wear
45 2) Items recommended to be stocked as spare parts
46 g. As installed control diagrams by controls manufacturer
47 h. Each contractor's coordination drawings
48 1) As installed color coded piping diagrams
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
017823-4
OPERATION AND MAINTENANCE DATA
Page 4 of 5
1 i. Charts of valve tag numbers,with location and function of each valve
2 j. List of original manufacturer's spare parts,manufacturer's current prices,and
3 recommended quantities to be maintained in storage
4 k. Other data as required under pertinent Sections of Specifications
5 3. Content,for each electric and electronic system,as appropriate:
6 a. Description of system and component parts
7 1) Function,normal operating characteristics,and limiting conditions
8 2) Performance curves,engineering data and tests
9 3) Complete nomenclature and commercial number of replaceable parts
10 b. Circuit directories of panelboards
11 1) Electrical service
12 2) Controls
13 3) Communications
14 c. As installed color coded wiring diagrams
15 d. Operating procedures
16 1) Routine and normal operating instructions
17 2) Sequences required
18 3) Special operating instructions
19 e. Maintenance procedures
20 1) Routine operations
21 2) Guide to"trouble shooting"
22 3) Disassembly,repair and reassembly
23 4) Adjustment and checking
24 f. Manufacturer's printed operating and maintenance instructions
25 g. List of original manufacturer's spare parts,manufacturer's current prices,and
26 recommended quantities to be maintained in storage
27 h. Other data as required under pertinent Sections of Specifications
28 4. Prepare and include additional data when the need for such data becomes apparent
29 during instruction of City's personnel.
30 1.7 CLOSEOUT SUBMITTALS [NOT USED]
31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
32 1.9 QUALITY ASSURANCE
33 A. Provide operation and maintenance data by personnel with the following criteria:
34 1. Trained and experienced in maintenance and operation of described products
35 2. Skilled as technical writer to the extent required to communicate essential data
36 3. Skilled as draftsman competent to prepare required drawings
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
017823-5
OPERATION AND MAINTENANCE DATA
Page 5 of 5
1 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED]
2 1.11 FIELD [SITE] CONDITIONS [NOT USED]
3 1.12 WARRANTY [NOT USED]
4 PART 2- PRODUCTS [NOT USED]
5 PART 3- EXECUTION [NOT USED]
6 END OF SECTION
7
Revision Log
DATE NAME SUMMARY OF CHANGE
8/31/2012 D.Johnson 1.5.A.1—title of section removed
8
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
017839-1
PROJECT RECORD DOCUMENTS
Page 1 of 4
1 SECTION 0178 39
2 PROJECT RECORD DOCUMENTS
3 PART 1 - GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Work associated with the documenting the project and recording changes to project
7 documents,including:
8 a. Record Drawings
9 b. Water Meter Service Reports
10 c. Sanitary Sewer Service Reports
11 d. Large Water Meter Reports
12 B. Deviations from this City of Fort Worth Standard Specification
13 1. None.
14 C. Related Specification Sections include,but are not necessarily limited to:
15 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract
16 2. Division 1 —General Requirements
17 1.2 PRICE AND PAYMENT PROCEDURES
18 A. Measurement and Payment
19 1. Work associated with this Item is considered subsidiary to the various Items bid.
20 No separate payment will be allowed for this Item.
21 1.3 REFERENCES [NOT USED]
22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
23 1.5 SUBMITTALS
24 A. Prior to submitting a request for Final Inspection,deliver Project Record Documents to
25 City's Project Representative.
26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
27 1.7 CLOSEOUT SUBMITTALS [NOT USED]
28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
29 1.9 QUALITY ASSURANCE
30 A. Accuracy of Records
31 1. Thoroughly coordinate changes within the Record Documents,making adequate
32 and proper entries on each page of Specifications and each sheet of Drawings and
33 other Documents where such entry is required to show the change properly.
34 2. Accuracy of records shall be such that future search for items shown in the Contract
35 Documents may rely reasonably on information obtained from the approved Project
36 Record Documents.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
017839-2
PROJECT RECORD DOCUMENTS
Page 2 of 4
1 3. To facilitate accuracy of records,make entries within 24 hours after receipt of
2 information that the change has occurred.
3 4. Provide factual information regarding all aspects of the Work,both concealed and
4 visible,to enable future modification of the Work to proceed without lengthy and
5 expensive site measurement,investigation and examination.
6 1.10 STORAGE AND HANDLING
7 A. Storage and Handling Requirements
8 1. Maintain the job set of Record Documents completely protected from deterioration
9 and from loss and damage until completion of the Work and transfer of all recorded
10 data to the final Project Record Documents.
11 2. In the event of loss of recorded data,use means necessary to again secure the data
12 to the City's approval.
13 a. In such case,provide replacements to the standards originally required by the
14 Contract Documents.
15 1.11 FIELD [SITE] CONDITIONS [NOT USED]
16 1.12 WARRANTY [NOT USED]
17 PART 2- PRODUCTS
18 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED]
19 2.2 RECORD DOCUMENTS
20 A. Job set
21 1. Promptly following receipt of the Notice to Proceed,secure from the City,at no
22 charge to the Contractor, 1 complete set of all Documents comprising the Contract.
23 B. Final Record Documents
24 1. At a time nearing the completion of the Work and prior to Final Inspection,provide
25 the City 1 complete set of all Final Record Drawings in the Contract.
26 2.3 ACCESSORIES [NOT USED]
27 2.4 SOURCE QUALITY CONTROL [NOT USED]
28 PART 3- EXECUTION
29 3.1 INSTALLERS [NOT USED]
30 3.2 EXAMINATION [NOT USED]
31 3.3 PREPARATION [NOT USED]
32 3.4 MAINTENANCE DOCUMENTS
33 A. Maintenance of Job Set
34 1. Immediately upon receipt of the job set,identify each of the Documents with the
35 title,"RECORD DOCUMENTS-JOB SET".
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
017839-3
PROJECT RECORD DOCUMENTS
Page 3 of 4
1 2. Preservation
2 a. Considering the Contract completion time,the probable number of occasions
3 upon which the job set must be taken out for new entries and for examination,
4 and the conditions under which these activities will be performed,devise a
5 suitable method for protecting the job set.
6 b. Do not use the job set for any purpose except entry of new data and for review
7 by the City,until start of transfer of data to final Project Record Documents.
8 c. Maintain the job set at the site of work.
9 3. Coordination with Construction Survey
10 a. At a minimum,in accordance with the intervals set forth in Section 01 71 23,
11 clearly mark any deviations from Contract Documents associated with
12 installation of the infrastructure.
13 4. Making entries on Drawings
14 a. Record any deviations from Contract Documents.
15 b. Use an erasable colored pencil(not ink or indelible pencil),clearly describe the
16 change by graphic line and note as required.
17 c. Date all entries.
18 d. Call attention to the entry by a"cloud" drawn around the area or areas affected.
19 e. In the event of overlapping changes,use different colors for the overlapping
20 changes.
21 5. Conversion of schematic layouts
22 a. In some cases on the Drawings,arrangements of conduits,circuits,piping,
23 ducts,and similar items,are shown schematically and are not intended to
24 portray precise physical layout.
25 1) Final physical arrangement is determined by the Contractor,subject to the
26 City's approval.
27 2) However,design of future modifications of the facility may require
28 accurate information as to the final physical layout of items which are
29 shown only schematically on the Drawings.
30 b. Show on the job set of Record Drawings,by dimension accurate to within 1
31 inch,the centerline of each run of items.
32 1) Final physical arrangement is determined by the Contractor,subject to the
33 City's approval.
34 2) Show,by symbol or note,the vertical location of the Item("under slab","in
35 ceiling plenum","exposed",and the like).
36 3) Make all identification sufficiently descriptive that it may be related
37 reliably to the Specifications.
38 c. The City may waive the requirements for conversion of schematic layouts
39 where,in the City's judgment,conversion serves no useful purpose. However,
40 do not rely upon waivers being issued except as specifically issued in writing
41 by the City.
42 B. Final Project Record Documents
43 1. Transfer of data to Drawings
44 a. Carefully transfer change data shown on the job set of Record Drawings to the
45 corresponding final documents,coordinating the changes as required.
46 b. Clearly indicate at each affected detail and other Drawing a full description of
47 changes made during construction,and the actual location of items.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
017839-4
PROJECT RECORD DOCUMENTS
Page 4 of 4
1 c. Call attention to each entry by drawing a"cloud" around the area or areas
2 affected.
3 d. Make changes neatly,consistently and with the proper media to assure
4 longevity and clear reproduction.
5 2. Transfer of data to other Documents
6 a. If the Documents,other than Drawings,have been kept clean during progress of
7 the Work,and if entries thereon have been orderly to the approval of the City,
8 the job set of those Documents,other than Drawings,will be accepted as final
9 Record Documents.
10 b. If any such Document is not so approved by the City,secure a new copy of that
11 Document from the City at the City's usual charge for reproduction and
12 handling,and carefully transfer the change data to the new copy to the approval
13 of the City.
14 3.5 REPAIR/RESTORATION [NOT USED]
15 3.6 RE-INSTALLATION [NOT USED]
16 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
17 3.8 SYSTEM STARTUP [NOT USED]
18 3.9 ADJUSTING [NOT USED]
19 3.10 CLEANING [NOT USED]
20 3.11 CLOSEOUT ACTIVITIES [NOT USED]
21 3.12 PROTECTION [NOT USED]
22 3.13 MAINTENANCE [NOT USED]
23 3.14 ATTACHMENTS [NOT USED]
24 END OF SECTION
25
Revision Log
DATE NAME SUNB4ARY OF CHANGE
26
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
024115-1
PAVING REMOVAL
Page 1 of 6
1 SECTION 02 4115
2 PAVING REMOVAL
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Removing concrete paving,asphalt paving and brick paving
7 2. Removing concrete curb and gutter
8 3. Removing concrete valley gutter
9 4. Milling roadway paving
10 5. Pulverization of existing pavement
11 6. Disposal of removed materials
12 B. Deviations from this City of Fort Worth Standard Specification
13 1. None.
14 C. Related Specification Sections include,but are not necessarily limited to:
15 1. Division 0-Bidding Requirements,Contract Forms,and Conditions of the Contract
16 2. Division 1 -General Requirements
17 3. Section 32 1133 -Cement Treated Base Courses
18 1.2 PRICE AND PAYMENT PROCEDURES
19 A. Measurement and Payment
20 1. Measurement
21 a. Remove Concrete Paving:measure by the square yard from back-to-back of
22 curbs.
23 b. Remove Asphalt Paving:measure by the square yard between the lips of
24 gutters.
25 c. Remove Brick Paving:measure by the square yard.
26 d. Remove Concrete Curb and Gutter:measure by the linear foot.
27 e. Remove Concrete Valley Gutter:measure by the square yard
28 f. Wedge Milling:measure by the square yard for varying thickness.
29 g. Surface Milling:measure by the square yard for varying thickness.
30 h. Butt Milling:measured by the linear foot.
31 i. Pavement Pulverization:measure by the square yard.
32 j. Remove Speed Cushion: measure by each.
33 2. Payment
34 a. Remove Concrete Paving: full compensation for saw cutting,removal,hauling,
35 disposal,tools,equipment,labor and incidentals needed to execute work.For
36 utility projects,this Item shall be considered subsidiary to the trench and no
37 other compensation will be allowed.
38 b. Remove Asphalt Paving: full compensation for saw cutting,removal,hauling,
39 disposal,tools,equipment,labor and incidentals needed to execute work.For
40 utility projects,this Item shall be considered subsidiary to the trench and no
41 other compensation will be allowed.For utility projects,this Item shall be
42 considered subsidiary to the trench and no other compensation will be allowed.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
024115-2
PAVING REMOVAL
Page 2 of 6
1 c. Remove Brick Paving: full compensation for saw cutting,removal,salvaging,
2 cleaning,hauling,disposal,tools,equipment,labor and incidentals needed to
3 execute work.For utility projects,this Item shall be considered subsidiary to
4 the trench and no other compensation will be allowed.
5 d. Remove Concrete Curb and Gutter: full compensation for saw cutting,removal,
6 hauling,disposal,tools,equipment,labor and incidentals needed to execute
7 work.For utility projects,this Item shall be considered subsidiary to the trench
8 and no other compensation will be allowed.
9 e. Remove Concrete Valley Gutter: full compensation for saw cutting,removal,
10 hauling,disposal,tools,equipment,labor and incidentals needed to execute
11 work.
12 f. Wedge Milling: full compensation for all milling,hauling milled material to
13 salvage stockpile or disposal,tools,labor,equipment and incidentals necessary
14 to execute the work.
15 g. Surface Milling: full compensation for all milling,hauling milled material to
16 salvage stockpile or disposal,tools,labor,equipment and incidentals necessary
17 to execute the work.
18 h. Butt Milling:full compensation for all milling,hauling milled material to
19 salvage stockpile or disposal,tools,labor,equipment and incidentals necessary
20 to execute the work.
21 i. Pavement Pulverization: full compensation for all labor,material,equipment,
22 tools and incidentals necessary to pulverize,remove and store the pulverized
23 material,undercut the base,mixing,compaction,haul off,sweep,and dispose
24 of the undercut material.
25 j. Remove speed cushion: full compensation for removal,hauling,disposal,
26 tools,equipment,labor,and incidentals needed to execute the work.For utility
27 projects,this Item shall be considered subsidiary to the trench and no other
28 compensation will be allowed.
29 k. No payment for saw cutting of pavement or curbs and gutters will be made
30 under this section.Include cost of such work in unit prices for items listed in
31 bid form requiring saw cutting.
32 1. No payment will be made for work outside maximum payment limits indicated
33 on plans,or for pavements or structures removed for CONTRACTOR'S
34 convenience.
35 1.3 REFERENCES
36 A. ASTM International(ASTM):
37 a. D698, Standard Test Methods for Laboratory Compaction Characteristics of
38 Soil Using Standard Effort(12 400 ft-lbf/ft3 (600 kN-m/m3))
39 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
40 1.5 SUBMITTALS [NOT USED]
41 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
42 1.7 CLOSEOUT SUBMITTALS [NOT USED]
43 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
44 1.9 QUALITY ASSURANCE [NOT USED]
45 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED]
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
024115-3
PAVING REMOVAL
Page 3 of 6
1 1.11 FIELD CONDITIONS [NOT USED]
2 1.12 WARRANTY [NOT USED]
3 PART 2- PRODUCTS
4 2.1 OWNER-FURNISHED PRODUCTS [NOT USED]
5 2.2 EQUIPMENT [NOT USED]
6 2.3 ACCESSORIES [NOT USED]
7 2.4 SOURCE QUALITY CONTROL [NOT USED]
8 PART 3- EXECUTION
9 3.1 EXAMINATION [NOT USED]
10 3.2 INSTALLERS [NOT USED]
11 3.3 PREPARATION
12 A. General:
13 1. Mark paving removal limits for City approval prior to beginning removal.
14 2. Identify known utilities below grade- Stake and flag locations.
15 3.4 PAVEMENT REMOVAL
16 A. General.
17 1. Exercise caution to minimize damage to underground utilities.
18 2. Minimize amount of earth removed.
19 3. Remove paving to neatly sawed joints.
20 4. Use care to prevent fracturing adjacent,existing pavement.
21 B. Sawing
22 1. Sawing Equipment.
23 a. Power-driven.
24 b. Manufactured for the purpose of sawing pavement.
25 c. In good operating condition.
26 d. Shall not spall or fracture the pavement structure adjacent to the removal area.
27 2. Sawcut perpendicular to the surface to full pavement depth,parallel and
28 perpendicular to existing joint.
29 3. Sawcut parallel to the original sawcut in square or rectangular fashion.
30 4. If a sawcut falls within 5 feet of an en existing dummy joint,construction joint,saw
31 joint,cold joint,expansion joint,edge of paving or gutter lip,remove paving to that
32 joint,edge or lip.
33 5. If a pavement edge of a cut is damaged subsequent to saw cutting,saw to a new,
34 neat,straight line for the purpose of removing the damaged area.
35 C. Remove Concrete Paving and Concrete Valley Gutter
36 1. Sawcut: See 3.4.13.
37 2. Remove concrete to the nearest expansion joint or vertical saw cut.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
024115-4
PAVING REMOVAL
Page 4 of 6
1 D. Remove Concrete Curb and Gutter
2 1. Sawcut: See 3.4.13.
3 2. Minimum limits of removal: 30 inches in length.
4 E. Remove Asphalt Paving
5 1. Sawcut: See 3.4.B.
6 2. Remove pavement without disturbing the base material.
7 3. When shown on the plans or as directed,stockpile materials designated as
8 salvageable at designated sites.
9 4. Prepare stockpile area by removing vegetation and trash and by providing for
10 proper drainage.
11 F. Milling
12 1. General
13 a. Mill surfaces to the depth shown in the plans or as directed.
14 b. Do not damage or disfigure adjacent work or existing surface improvements.
15 c. If milling exposes smooth underlying pavement surfaces,mill the smooth
16 surface to make rough.
17 d. Provide safe temporary transition where vehicles or pedestrians must pass over
18 the milled edges.
19 e. Remove excess material and clean milled surfaces.
20 f. Stockpiling of planed material will not be permitted within the right of way
21 unless approved by the City.
22 g. If the existing base is brick and cannot be milled,remove a 5 foot width of the
23 existing brick base. See 3.3.G.for brick paving removal.
24 2. Milling Equipment
25 a. Power operated milling machine capable of removing,in one pass or two
26 passes,the necessary pavement thickness in a five-foot minimum width.
27 b. Self-propelled with sufficient power,traction and stability to maintain accurate
28 depth of cut and slope.
29 c. Equipped with an integral loading and reclaiming means to immediately
30 remove material cut from the surface of the roadway and discharge the cuttings
31 into a truck,all in one operation.
32 d. Equipped with means to control dust created by the cutting action.
33 e. Equipped with a manual system providing for uniformly varying the depth of
34 cut while the machine is in motion making it possible to cut flush to all inlets,
35 manholes,or other obstructions within the paved area.
36 f. Variable Speed in order to leave the specified grid pattern.
37 g. Equipped to minimize air pollution.
38 3. Wedge Milling and Surface Milling
39 a. Wedge Mill existing asphalt,concrete or brick pavement from the lip of gutter
40 at a depth of 2 inches and transitioning to match the existing pavement(0-inch
41 cut)at a minimum width of 5 feet.
42 b. Surface Mill existing asphalt pavement to the depth specified,
43 c. Provide a milled surface that provides a uniform surface free from gouges,
44 ridges,oil film,and other imperfections of workmanship with a uniform
45 textured appearance.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
024115-5
PAVING REMOVAL
Page 5 of 6
1 d. In all situations where the existing H.M.A.C. surface contacts the curb face,the
2 wedge milling includes the removal of the existing asphalt covering the gutter
3 up to and along the face of curb.
4 e. Perform wedge or surface milling operation in a continuous manner along both
5 sides of the street or as directed.
6 4. Butt Joint Milling
7 a. Mill butt joints into the existing surface,in association with the wedge milling
8 operation.
9 b. Butt joint will provide a full width transition section and a constant depth at the
10 point where the new overlay is terminated.
11 c. Typical locations for butt joints are at all beginning and ending points of streets
12 where paving material is removed. Prior to the milling of the butt joints,
13 consult with the City for proper location and limits of these joints.
14 d. Butt Milled joints are required on both sides of all railroad tracks and concrete
15 valley gutters,bridge decks and culverts and all other items which transverse
16 the street and end the continuity of the asphalt surface.
17 e. Make each butt joint 20 feet long and milled out across the full width of the
18 street section to a tapered depth of 2 inch.
19 f. Taper the milled area within the 20-feet to a depth from 0-inch to 2-inch at a
20 line adjacent to the beginning and ending points or intermediate transverse
21 items.
22 g. Provide a temporary wedge of asphalt at all butt joints to provide a smooth ride
23 over the bump.
24 G. Remove Brick Paving
25 1. Remove masonry paving units to the limits specified in the plans or as directed by
26 the City.
27 2. Salvage existing bricks for re-use,clean,palletize,and deliver to the City Stock pile
28 yard at 3300 Yuma Street or as directed.
29 H. Pavement Pulverization
30 1. Pulverization
31 a. Pulverize the existing pavement to depth of 9 inches. See Section 32 1133.
32 b. Temporarily remove and store the 9-inch deep pulverized material,then cut the
33 base 2 inches.
34 c. Start 2-inch base cut at a depth of 9 inches from the existing pulverized surface.
35 2. Cement Application
36 a. Use 20%Portland cement.
37 b. See Section 32 1133.
38 3. Mixing: see Section 32 1133.
39 4. Compaction: see Section 32 1133.
40 5. Finishing: see Section 32 1133.
41 6. Curing: see Section 32 1133.
42 7. If the existing pavement has a combination of 11 inches of H.M.A.C.and crushed
43 stone/gravel:
44 a. Undercut not required
45 b. Pulverize 11 inches deep.
46 c. Remove 3-inch the total pulverized amount.
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
024115-6
PAVING REMOVAL
Page 6 of 6
1 I. Remove speed cushion
2 1. Scrape or sawcut speed cushion from existing pavement without damaging existing
3 pavement.
4 3.5 REPAIR[NOT USED]
5 3.6 RE-INSTALLATION [NOT USED]
6 3.7 FIELD QUALITY CONTROL [NOT USED]
7 3.8 SYSTEM STARTUP[NOT USED]
8 3.9 ADJUSTING [NOT USED]
9 3.10 CLEANING [NOT USED]
10 3.11 CLOSEOUT ACTIVITIES [NOT USED]
11 3.12 PROTECTION [NOT USED]
12 3.13 MAINTENANCE [NOT USED]
13 3.14 ATTACHMENTS [NOT USED]
14 END OF SECTION
15
Revision Log
DATE NAME SUN04ARY OF CHANGE
12/20/2012 D.Johnson 1.2.A modified payment requirements on utility projects
16
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised December 20,2012
APPENDIX
GC-4.01 Availability of Lands
NONE
GC-4.02 Subsurface and Physical Conditions
REPORTS OF TEST HOLE AND PLASTICITY INDEX
• Geddes Avenue
• Houghton Avenue
• Wellesley Avenue
• Fletcher Avenue
• Goodman Avenue
• Farnsworth Avenue
GC-4.04 Underground Facilities
NONE
GC-4.06 Hazardous Environmental Condition at Site
NONE
GC-6.06.1)Minority and Women Owned Business Enterprise Compliance
• MBE Special Instructions for Offerors
• MBE Subcontractors/Suppliers Utilization Form
• MBE Prime Contractor Waiver Form
• MBE Good Faith Effort Form
• MBE Joint Venture Eligibility Form
GC-6.07 Wage Rates
• 2013 PREVAILING WAGE RATES(HEAVY AND HIGHWAY CONSTRUCTION PROJECTS)
GC-6.09 Permits and Utilities
NONE
GC-6.24 Nondiscrimination
NONE
GR-01 60 00 Product Requirements
• CITY OF FORT WORTH WATER DEPARTMENT'S STANDARD PRODUCT LIST
• CITY OF FORT WORTH CITY-WIDE STANDARD PRODUCT LIST
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
GC-4.02 Subsurface and Physical Conditions
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
7473 Airport Freeway Ft.Worth,Tx 76118
T I Tel.(817)589-9933; Fax(817)590-4433
4,r.+i.�r....
2111 Century Center Blvd.Suite 101 Irving,Tx 75062
Tel.(972)573-6083; Fax(972)573-6088
REPORT OF TEST HOLE AND PLASTICITY INDEX
Project No.: 161424F-SS Report No: 16923046
Project: City Streets Forencic Phase 2 Water&Sanitary Sewer Contract 2016,WSM-A
Client: City of Fort Worth Report Date: 10/08/16
Contact: Zelalem Arega Technician: Shane Breen
Street: Geddes
Test No. 1
Location: 5629 Geddes
HMAC: 1.75 "
Base: 7.00 " Tan sandy clay w/gravel
Atterberg Limits: LL 28 PI 8 Shrinkage:
Munsell Color Chart:
Subgrade: 11.0+ Tan clay
Atterberg Limits: LL 48 PI 25 Shrinkage:
Munsell Color Chart:
Test No. 2
Location: 5531 Geddes
HMAC: 2.50 "
Base: 7.50 " Tan sandy clay w/gravel
Atterberg Limits: LL 26 PI 6 Shrinkage:
Munsell Color Chart:
Subgrade: 11.0+ Tan clay
Atterberg Limits: LL 48 PI 25 Shrinkage:
Munsell Color Chart:
Test No. 3
Location: 5505 Geddes
HMAC: 2.00 "
Base: 6.50 " Tan sandy clay w/gravel
Atterberg Limits: LL 26 PI 8 Shrinkage:
Munsell Color Chart:
Subgrade: 10.0+ Tan clay
Atterberg Limits: LL 48 PI 25 Shrinkage:
Munsell Color Chart:
Test No.
Location:
HMAC: "
Base: "
Atterberg Limits: LL Pl Shrinkage:
Munsell Color Chart:
Subgrade: 9.0+ toDark brown&tan sandy clay w/gravel
Atterberg Limits: LL P1 Shrinkage:
Munsell Color Chart:
Page 1 of 2
7473 AiW1 Freeway Ft Worth,Tz 76118
TI�,YrvO` .o: Tel.(817)589-9933; Fax(817)590-4433
2211 Century Cerner Blvd Suite 101 Irving,Ik 75062
Ad Tel.(972)573-6083; Fax(972)573-6088
PORT OF TEST HOLE AND PLASTICITY INDEX
Project No.: 161424F-SS Report No: 16923046
Project: City Streets Forencic Phase 2 Water&Sanitary Sewer Contract 2016,WSM-A
Client: City of Fort Worth Report Date: 10/08/16
Contact: Zelalem Arega Technician: Shane Breen
Test No.
Location:
HMAC: "
Base: "
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Subgrade: "
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Respectfully Submitted,
Note:This report is for the exclusive use of the Client addressed. T.SMITH INSPECTION&TESTING,LLC
This report may not be reproduced except in its entirety,without 7
the written consent of IT. Results apply only to above tests.
Texas Firm Registration No.:F5278 Tefty Lice,CEO
Page 2 of 2
7473 Afrport Freeway Ft.Worth,Tx. 76118
TS I Mr`..G.. Frye'* Tel.(817)589-9933; Fax(817)590-4433
2211 Century Center Blvd.Suite 101 Irving,Tx. 75062
Tel.(972)573-6083; Fax(972)573-6088
REPORT OF TEST HOLE AND PLASTICITY INDE
Project No.: 161424F-SS Report No: 160923046
Project: City Streets Forencic Phase 2 Water&Sanitary Sewer Contract 2016,WSM-A
Client: City of Fort Worth Report Date: 10/08/16
Contact: Zelalem Arega Technician: Shane Breen
Street: Houghton Ave.
Test No. 1
Location: 5637 Houghton Ave.
HMAC: 1.07 "
Base: 6.00 " Recycle asphalt/5.0"tan sandy clay w/gravel
Atterberg Limits: LL 22 PI 7 Shrinkage:
Munsell Color Chart:
Subgrade: 7 " Tan clay w/gravel
Atterberg Limits: LL 49 PI 25 Shrinkage:
Munsell Color Chart:
Vest No. 2
ocation: 5613 Houghton Ave.
HMAC: 2.31 "
Base: 6.50 " Tan sandy clay w/gravle
Atterberg Limits: LL 22 PI 7 Shrinkage:
Munsell Color Chart:
Subgrade: 8.5+ " Tan&brown sandy clay w/gravel
Atterberg Limits: LL 23 PI 6 Shrinkage:
Munsell Color Chart:
VTest No. 3
ocation: 5513 Houghton Ave
HMAC: 2.00 "
Base: 6.50 " Tan sandy clay w/gravel
Atterberg Limits: LL 26 PI 13 Shrinkage:
Munsell Color Chart:
Subgrade: 10.5+ Brown clay
Atterberg Limits: LL 46 PI 25 Shrinkage:
Munsell Color Chart:
VTest No. 4
ocation: 5421 Houghton Ave
HMAC: 1.75 "
Base: 6.50 " Tan sandy clay w/gravel
Atterberg Limits: LL 31 PI 14 Shrinkage:
Munsell Color Chart:
Subgrade: 10.5+ Brown clay
Atterberg Limits: LL 46 PI 25 Shrinkage:
Munsell Color Chart:
Page 1 of 2
7473 Airport Freeway Ft.Worth,Tz, 76118
Tel.(817)589-9933, Fax(817)590-4433
2211 Century Center Blvd.Suite 101 Irvin&Tx 75062
Tel.(9 72)573-6083; Fax(9 72)573-6088
PORT OF TEST HOLE AND PLASTICITY INDE
Project No.: 161424E-SS Report No: 160923046
Project: City Streets Forencic Phase 2 Water&Sanitary Sewer Contract 2016,WSM-A
Client: City of Fort Worth Report Date: 10/08/16
Contact: Zelalem Arega Technician: Shane Breen
Test No. 5
Location: 5329 Houghton Ave.
HMAC: 1.56 "
Base: 7.00 " Tan sandy clay w/gravel
Atterberg Limits: LL 26 PI 11 Shrinkage:
Munsell Color Chart:
Subgrade: 10.0+ Brown clay
Atterberg Limits: LL 46 PI 25 Shrinkage:
Munsell Color Chart:
Test No. 6
Location. Houghton Ave.@ Lake Como Dr.
HNIAC: 7.10 "
Base: 5.00 " Tan sandy clay w/gravel
Atterberg Limits: LL 22 PI 6 Shrinkage:
Munsell Color Chart:
Subgrade: 10.0+ Brown clay
Atterberg Limits: LL 46 PI 25 Shrinkage:
Munsell Color Chart:
Vest No.
ocation:
Respectfully Submitted,
Note:This report is for the exclusive use of the Client addressed. T.SMITH INSPECTION&TESTING,LLC
This report may not be reproduced excW in its entirety,without
the written consent of TSM Results apply only to above tests.
Texas Firm Registration No.:F5278 L.Smith,CEO
Page 2 of 2
7473 Airport Freeway Ft.Worth,Tx 76118
Tel.(817)589-9933; Fax(817)5904433
2211 Century Center Blvd.Suite 101 Irving,Tx 75062
Tel.(972)573-6083; Fax(972)573-6088
REPORT OF TEST HOLE AND PLASTICITY INDEX
Project No.: 161424F-SS Report No: 160923046
Project: City Streets Forencic Phase 2 Water&Sanitary Sewer Contract 2016,WSM-A
Client: City of Fort Worth Report Date: 10/08/16
Contact: Zelalem Arega Technician: Shane Breen
Street: Wellesley Ave.
Test No. 1
Location: 5201 Wellesley Ave.
HMAC: 2.00 "
Base: 7.00 " Brown&tan sandy clay
Atterberg Limits: LL 30 PI 12 Shrinkage:
Munsell Color Chart:
Subgrade: 10.0+ Brown&tan sandy clay w/gravel
Atterberg Limits: LL 31 PI 20 Shrinkage:
Munsell Color Chart:
Test No. 2
Location: 5224 Wellesley Ave.
HMAC: 4.26 "
Base: 12.0+ Tan clay
Atterberg Limits: LL 42 PI 24 Shrinkage:
Munsell Color Chart:
,Subgrade: to
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Test No.
Location:
HMAC: rl
Base: to
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Subgrade: "
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Kest No.
ocation:
Respectfully Submitted,
Note:This repW is for the exclusive use of the Client addressed. T.SMITH INSPECTION&TESTING,LLC
This report may not be reproduced except in its entirety,without
the written consent ofTSIT. Results apply only to above tests.
Texas Firm Registration No..F5278 A-elry�m tty CEO
Page 1 of 1
7473 Airport Freeway Ft.Worth,Tx 76118
a Tel.(817)589-9933; Fax(817)590-4433
2211 Century Center Blvd.Suite 101 Ivin&Tx 75062
Tel.(972)573-6083; Fax(972)573-6088
REPORT OF TEST HOLE AND PLASTICITY INDE
Project No.: 161424F-SS Report No: 160923046
Project: City Streets Forencic Phase 2 Water&Sanitary Sewer Contract 2016,WSM-A
Client: City of Fort Worth Report Date: 10/08/16
Contact: Zelalem Arega Technician: Shane Breen
Street: Fletcher Ave.
Test No. 1
Location: 5400 Fletcher
HMAC: 1.66 "
Base: 8.00 " Brown&tan sandy clay w/gravel
Atterberg Limits: LL 36 PI 17 Shrinkage:
Munsell Color Chart:
Subgrade: 11+ it Dark brown clay
Atterberg Limits: LL 66 PI 36 Shrinkage:
Munsell Color Chart:
Test No. 2
Location: 5435 Fletcher
HMAC: 2.07 "
Base: 7.00 " Brown&tan sandy clay
Atterberg Limits: LL 28 PI 12 Shrinkage:
Munsell Color Chart:
Subgrade: 10+ it Dark brown clay
Atterberg Limits: LL 66 PI 36 Shrinkage:
Munsell Color Chart:
Vest No. 3
ocation: 5511 Fletcher
HMAC: 1.07 "
Base: 8.50 " Recycle base
Atterberg Limits: LL 25 PI 6 Shrinkage:
Munsell Color Chart:
Subgrade: 8 " Tan sandy clay w/gravel
Atterberg Limits: LL 27 PI 13 Shrinkage:
Munsell Color Chart:
Test No. 4
Location: 5535 Fletcher
HMAC: 1.56 "
Base: 7.50 " Tan sandy clay w/gravel
Atterberg Limits: LL 33 P1 15 Shrinkage:
Munsell Color Chart:
Subgrade: 9.0+ Dark brown&tan sandy clay w/gravel
Atterberg Limits: LL 34 PI 18 Shrinkage:
Munsell Color Chart:
Page 1 of 2
7473 Airport Freetray Ft.Worth,Tx. 76118
Tel.(817)589-9933; Fax(817)590-4433
T I� ;::; 2211 Century Center Blvd.Suite 101 Irving,Tx. 75062
Tel.(972)573-6083; Fax(972)573-6088
_REPORT OF TEST HOLE AND PLASTICITY MEX
Project No.: 161424F-SS Report No: 160923046
Project: City Streets Forencic Phase 2 Water&Sanitary Sewer Contract 2016,WSM-A
Client: City of Fort Worth Report Date: 10/08/16
Contact: Zelalem Arega Technician: Shane Breen
Test No.
Location:
HMAC: "
Base: "
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Subgrade: "
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Test No.
Location:
HMAC: "
Base: "
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Subgrade: "
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Vest No.
ocation:
HMAC:
Base: "
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Subgrade: of
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Respectfully Submitted,
Note:This report is for the exclusive use of the Client addressed. T.SMITH INSPECTION&TESTING,LLC
This report may not be reproduced except in its entirety,without
the written consent ofTSrr. Results apply only to above tests.
Texas Firm Registration No.:F5278 T &niK CEO
Page 2 of 2
7473A irport Fimiw Ft.Worth,Tip 76118
TCI d Tel.(817)589-9933; Fax(817)590-4433
2211 Century Center Blvd.Suite 101 Irving,Tx 75062
Tet(972)573-6083; Fax(972)573-6088
PORT OF TEST HOLE AND PLASTICITY INDE
Project No.: 161424F-SS Report No: 160923046
Project: City Streets Forencic Phase 2 Water&Sanitary Sewer Contract 2016,WSM-A
Client: City of Fort Worth Report Date: 10/08/16
Contact: Zelalem Arega Technician: Shane Breen
Street: Goodman Avenue
Test No. 1
Location: 5233 Goodman Ave
HMAC: 2.50 "
Base: 7.50 " Brown&tan sandy clay
Atterberg Limits: LL 30 PI 11 Shrinkage:
Munsell Color Chart:
Subgrade: 11.0+ Tan clay
Atterberg Limits: LL 42 PI 23 Shrinkage:
Munsell Color Chart:
Test No. 2
Location: 5201 Goodman Ave
HMAC: 2.50 " 2
Base: 7.50 " Tan sandy clay w/gravel
'Atterberg Limits: LL 26 PI 6 Shrinkage:
Munsell Color Chart:
Subgrade: 11.0+ Tan clay
Atterberg Limits: LL 42 PI 23 Shrinkage:
Munsell Color Chart:
Test No. 3
Location: 5129 Goodman Ave
HMAC: 2.00 "
'Base: 7.00 " Tan sandy clay w/gravel
Atterberg Limits: LL 26 PI 7 Shrinkage:
Munsell Color Chart:
Subgrade: 10.0+ Tan clay
Atterberg Limits: LL 42 PI 23 Shrinkage:
Munsell Color Chart:
VTst Noc . 4
ocation: 5039 Goodman Ave
I HMAC: 1.591,
Base: 6.00 " Tan sandy clay w/gravel
Atterberg Limits: LL 25 PI 7 Shrinkage:
Munsell Color Chart:
Subgrade: 10.+ Tan clay
Atterberg Limits: LL 42 PI 23 Shrinkage:
Munsell Color Chart:
Page 1 of 2
7473 Airport Freeway Ft.Worth,Tx 76118
Tel.(817)589-9933; Fox(817)590-4433
T S I :
2211 Century Center Blvd.Suite 101 Irving,Tx 75062
Tel.(972)573-6083; Fax(972)573-6088
REPORT OF TEST HOLE AND PLASTICITY INDEX
Project No.: 161424F-SS Report No: 160923046
Project: City Streets Forencic Phase 2 Water&Sanitary Sewer Contract 2016,WSM-A
Client: City of Fort Worth Report Date: 10/08/16
Contact: Zelalem Arega Technician: Shane Breen
Test No.
Location:
HMAC: "
Base: "
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Subgrade: to
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Test No.
Location:
HMAC: '
Base: u
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Subgrade: "
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Respectfully Submitted,
Noic:This report is for the exclusive use of dw Client addressed. T.SMITH INSPECTION&TESTING,LLC
This report may not be reproduced except in its crairety.without
the written consent of TSM Results apply only to above tests.
Texas Firm Registration No.:F5278 Terry L.Smith,CEO
Page 2 of 2
74 73Airport Freeway Ft.Worth,Tx. 76118
Tel.(817)589-9933; Fax(817)590-4433
2111 Century Center Blvd.Suite 101 Irving,Tx. 73062
Tel.(972)573-6083; Fax(972)573-6088
REPORT OFT ST HOLE AND PL•ASTiOIX MEX
Project No.: 161424F-SS Report No: 160923046
Project: City Streets Forencic Phase 2 Water&Sanitary Sewer Contract 2016,WSM-A
Client: City of Fort Worth Report Date: 10/08/16
Contact: Zelalem Arega Technician: Shane Breen
Street: Farnsworth Avenue
Test No. l
l,acation: 5600 Famsworth Ave.
HMAC: 2.96 "
Base: 7.00 " Tan&brown sandy clay w/gravel
Atterberg Limits: LL 33 PI 18 Shrinkage:
Munsell Color Chart:
Subgrade: 10.5+ Dark brown clay
Atterberg Limits: LL 75 PI 46 Shrinkage:
Munsell Color Chart:
Test No.
Location:
HMAC: "
Base: "
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
'Subgrade: to
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
11'est No.
I-ocation:
HMAC: "
Base: "
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Subgrade:
Atterberg Limits: LL PI Shrinkage:
Munsell Color Chart:
Respectfully Submitted,
Note:This report is for the exclusive use of the Client addressed. T.SMITH INSPECTION&TESTING,LLC
This report may not be reproduced except in its entirety,without 0Q4-
the written consent ofTSrr. Results apply only to above tests.
Texas Firm Registration No..F5278 Terry L.SmWE
Page 1 of 1
GC-4.04 Underground Facilities
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
GC-4.06 Hazardous Environmental Condition at Site
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
GC-6.06.1) Minority and Women Owned Business
Enterprise Compliance
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
FORT WORTH
City of Fort Worth
Minority Business Enterprise Specifications
SPECIAL INSTRUCTIONS FOR OFFERORS
APPLICATION OF POLICY
If the total dollar value of the contract is$50,000 or more,then a MBE subcontracting goal is applicable.
POLICY STATEMENT
It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority Business Enterprises
(MBE) in the procurement of all goods and services. All requirements and regulations stated in the City's current
Business Diversity Enterprise Ordinance applies to this bid.
MBE PROJECT GOALS
The City's MBE goal on this project is 7 %of the base bid value of the contract.
Note: If both MBE and SBE subcontracting goals are established for this project,then an Offeror must submit both a
MBE Utilization Form and a SBE Utilization Form to be deemed responsive.
COMPLIANCE TO BID SPECIFICATIONS
On City contracts $50,000 or more where a MBE subcontracting goal is applied, Offerors are required to comply with
the intent of the City's Business Diversity Enterprise Ordinance by one of the following:
1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or
2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or;
3. Good Faith Effort documentation, or;
4. Prime Waiver documentation.
SUBMITTAL OF REQUIRED DOCUMENTATION
The applicable documents must be received by the Purchasing Division, within the following times allocated, in order
for the entire bid to be considered responsive to the specifications. The Offeror shall deliver the MBE documentation in
person to the appropriate employee of the purchasing division and obtain a date/time receipt. Such receipt shall be
evidence that the City received the documentation in the time allocated. A faxed and/or emailed copy will not be
accepted.
1. Subcontractor Utilization Form, if goal is received no later than 2:00 p.m., on the second City business day
met or exceeded: after the bid opening date, exclusive of the bid opening date.
2. Good Faith Effort and Subcontractor received no later than 2:00 p.m., on the second City business day
Utilization Form, if participation is less than after the bid opening date, exclusive of the bid opening date.
statedgoal:
3. Good Faith Effort and Subcontractor received no later than 2:00 p.m., on the second City business day
Utilization Form, if no MBEparticipation: after the bid opening date, exclusive of the bid opening date.
4. Prime Contractor Waiver Form, if you will received no later than 2:00 p.m., on the second City business day
perform all subcontracting/supplier work: after the bid opening date, exclusive of the bid opening date.
5. Joint Venture Form, if goal is met or received no later than 2:00 p.m., on the second City business day
exceeded: after the bid opening date, exclusive of the bid opening date.
FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE, WILL RESULT IN
THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS.
FAILURE TO SUBMIT THE REQUIRED MBE DOCUMENTATION WILL RESULT IN THE BID BEING CONSIDERED
NON-RESPONSIVE. A SECOND FAILURE WILL RESULT IN THE OFFEROR BEING DISQUALIFIED FOR A
PERIOD OF ONE YEAR. THREE FAILURES IN A FIVE YEAR PERIOD WILL RESULT IN A DISQUALIFICATION
PERIOD OF THREE YEARS.
Any questions, please contact the MIWBE Office at(817)212-2674.
Rev.2/10/15
ATTACHMENT 1A
Page 1 of 4
FORT WORTH City of Fort Worth
_ Minority Business Enterprise
MBE Subcontractors/Suppliers Utilization Form
OFFEROR COMPANY NAME: Check applicable block to describe
Offeror
PROJECT NAME: �:,1 El NONJ �V:rDR_
2014 CIP, YEAR 3 - CONTRACT 2 BID DATE
City's MBE Project Goal: Offeror's MBE Project Commitment: PROJECT NUMBER
7 % Bio 102693
Identify all subcontractors/suppliers you will use on this project
Failure to complete this form, in its entirety with requested documentation, and received by the Purchasing
Division no later than 2:00 p.m. on the second City business day after bid opening, exclusive of bid opening date,
will result in the bid being considered non-responsive to bid specifications.
The undersigned Offeror agrees to enter into a formal agreement with the MBE firm(s) listed in this utilization
schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing
misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being
considered non-responsive to bid specifications.
MBEs listed toward meeting the project goal must be located in the six (6) county marketplace at the time of
bid or the business has a Significant Business Presence in the Marketplace. Marketplace is the geographic
area of Tarrant, Dallas, Denton, Johnson, Parker, and Wise counties.
Prime contractors must identify by tier level of all subcontractors/suppliers. Tier: means the level of
subcontracting below the prime contractor/consultant i.e. a direct payment from the prime contractor to a
subcontractor is considered 1 st tier, a payment by a subcontractor to its supplier is considered 2nd tier. The prime
contractor is responsible to provide proof of payment of all tiered subcontractors identified as a MBE and
counting those dollars towards meeting the contract committed goal.
ALL MBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD.
Certification means those firms, located within the Marketplace, that have been determined to be a bondafide minority
business enterprise by the North Central Texas Regional Certification Agency(NCTRCA)or other certifying agencies that
the City may deem appropriate and accepted by the City of Fort Worth.
If hauling services are utilized, the Offeror will be given credit as long as the MBE listed owns and
operates at least one fully licensed and operational truck to be used on the contract. The MBE may lease
trucks from another MBE firm, including MBE owner-operated, and receive full MBE credit. The MBE may
lease trucks from non-MBEs, including owner-operated, but will only receive credit for the fees and
commissions earned by the MBE as outlined in the lease agreement.
Rev.2/10/15
FORT WORT H ATTACHMENT 1A
Page 2 of 4
Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non-MBEs. MBE firms are to be
listed first,use additional sheets if necessary. Please note that only certified MBEs will be counted to meet an MBE goal.
NCTRCA N
SUBCONTRACTOR/SUPPLIER 0
Company Name T n Detail Detail
Address i M W Subcontracting Supplies. Dollar Amount
Telephone/Fax e B B M Work Purchased
Email r E E B
Contact Person E
El
El
F-I El
I,
El
Rev.2110115
17ORT Wt)It'd'H
ATTACHMENT 1A
Page 3 of 4
Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non-MBEs. MBE firms are to be
listed first, use additional sheets if necessary. Please note that only certified MBEs will be counted to meet an MBE goal.
NCTRCA N
SUBCONTRACTORISUPPLIER
Company Name T n Detail Detail
Address i Subcontracting Supplies
M W Dollar Amount
Telephone/Fax e B B M Work Purchased
Email r E E B
Contact Person E
9� El
D
Rev.2110115
FORT WORTH ATTACHMENT 1A
Page 4 of 4
Total Dollar Amount of MBE Subcontractors/Suppliers $
Total Dollar Amount of Non-MBE Subcontractors/Suppliers $
TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $
The Offeror will not make additions, deletions, or substitutions to this certified list without the prior approval of the
Minority and Women Business Enterprise Office through the submittal of a Request for Approval o
Change/Addition form. Any unjustified change or deletion shall be a material breach of contract and may result
in debarment in accord with the procedures outlined in the ordinance. The Offeror shall submit a detailed
explanation of how the requested change/addition or deletion will affect the committed MBE goal. If the detail
explanation is not submitted, it will affect the final compliance determination.
By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request,
complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and
any special arrangements with MBEs. The Offeror also agrees to allow an audit and/or examination of any
books, records and files held by their company. The Offeror agrees to allow the transmission of interviews with
owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contract that
will substantiate the actual work performed by the MBE(s) on this contract, by an authorized officer or employee
of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract
or debarment from City work for a period of not less than three (3) years and for initiating action under Federal,
State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material
breach of the contract and may result in a determination of an irresponsible Offeror and debarment from
participating in City work for a period of time not less than one (1)year.
Authorized Signature Printed Signature
Tide -- - Contact Namerritle(if different)
Company Name Telephone and/or Fax
Address E-mail Address
City/staterzip Date
Rev.2/10/15
ATTACHMENT IB
FORT W0 RT H Page 1 of 1
City of Fort Worth
Minority Business Enterprise Specifications
Prime Contractor Waiver Form
OFFEROR COMPANY NAME: Check applicable block to describe prime
PROJECT NAME:
M,,%?!DBE NON-MNV/DBE
2014 C I P, YEAR 3 - CONTRACT 2 BID DATE
City's MBE Project Goal: Offeror's MBE Project Commitment: PROJECT NUMBER
7 Bio Bio 102693
If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form). All questions on
this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is
NO, then you must complete ATTACHMENT 1 C. This form is only applicable if both answers are yes.
Failure to complete this form in its entirety and be received by the Purchasing Division no later than 2:00
p.m., on the second City business day after bid opening,exclusive of the bid opening date,will result in
the bid being considered non-responsive to bid specifications.
Will you perform this entire contract without subcontractors? YES
If yes, please provide a detailed explanation that proves based on the size and scope of this NO
project, this is your normal business practice and provide an operational profile of your business.
Will you perform this entire contract without suppliers? YES
If yes, please provide a detailed explanation that proves based on the size and scope of this
project, this is your normal business practice and provide an inventory profile of your business. NO
The Offeror further agrees to provide, directly to the City upon request, complete and accurate information
regarding actual work performed by all subcontractors, including MBE(s)on this contract, the payment thereof and
any proposed changes to the original MBE(s) arrangements submitted with this bid. The Offeror also agrees to
allow an audit and/or examination of any books, records and files held by their company that will substantiate the
actual work performed by the MBEs on this contract, by an authorized officer or employee of the City. Any
intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment
from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local
laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract
and may result in a determination of an irresponsible Offeror and barred from participating in City work for a
period of time not less than one(1)Year.
■� II VIII IIIA II 111 -,�
Authorized'Signature Printed Signature
Title Contact Name(if different)
Company Name Phone Number Fax Number
Address Email,Address
City/State/Zip Date
Rev.2/10/15
ATTACHMENT 1C
Page 1 of 4
FORT WORTH
City of Fort Worth
Minority Business Enterprise
MBE Good Faith Effort Form
OFFEROR COMPANY NAME: Check applicable block to describe
Offeror
PROJECT NAME: _ `
NON-MNV/DBE
2014 C I P, YEAR 3 -- CONTRACT 2 BID DATE
City's MBE Project Goal: Offeror's MBE Project Commitment: PROJECT NUMBER
? % % 02693
If the Offeror did not meet or exceed the MBE subcontracting goal for this project, the Offeror roust complete this
form.
If the Offeror's method of compliance with the MBE goal is based upon demonstration of a
"good faith effort", the Offeror will have the burden of correctly and accurately preparing and
submitting the documentation required by the City. Compliance with each item, 1 thru 11 below,
shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or Knowing
misrepresentation of the facts or intentional discrimination by the Offeror.
Failure to complete this form, in its entirety with supporting documentation, and received by the
Purchasing Division no later than 2:00 p.m. on the second City business day after bid opening, exclusive
of bid opening date,will result in the bid being considered non-responsive to bid specifications.
1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this
project, regardless of whether it is to be provided by a MBE or non-MBE. (DO NOT 'LIST NAMES OF
FIRIVIS1 On all projects, the Offeror must list each subcontracting and or supplier opportunity
regardless of tier.
(Use additional sheets, if necessary)
List of Subcontracting Opportunities List of Supplier Opportunities
Rev.2110115
ATTACHMENT 1C
Page 2 of 4
2.) Obtain a current(not more than two (2) months old from the bid open date) list of MBE subcontractors
and/or suppliers from the City's MIWBE Office.
Yes Date of Listing 1 I
No
3.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed,
at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened?
Yes (if yes,attach MBE mail listing to include name of firm and address and a dated copy of letter mailed.)
No
4.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed,
at least ten calendar days prior to bid opening by telephone,exclusive of the day the bids are
opened?
Yes (If yes,attach list to include name of MBE firm,person contacted,phone number and date and time of contact.)
No
5.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed,
at least ten calendar days prior to bid opening by facsimile(fax), exclusive of the day the bids are
opened?
Yes (if yes,attach list to include name of MBE firm,fax number and date and time of contact. In addition,if the fax is
returned as undeliverable,then that"undeliverable confirmation"received must be printed directly from the
facsimile for proper documentation. Failure to submit confirmation and/or"undeliverable confirmation"
documentation may render the GFE non-responsive.)
No
6.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed,
at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened?
Yes (if yes,attach email confirmation to include name of MBE firm,date and time.In addition,if an email is returned
as undeliverable,then that"undeliverable message"receipt must be printed directly from the email system for
proper documentation. Failure to submit confirmation and/or"undeliverable message"documentation may
render the GFE non-responsive.)
No
NOTE: The four methods identified above are acceptable for soliciting bids, and each selected method
must be applied to the applicable contract. The Offeror must document that either at least two attempts
were made using two of the four methods or that at least one successful contact was made using one of
the four methods in order to be deemed responsive to the Good Faith Effort requirement.
NOTE: The Offeror must contact the entire MBE list specific to each subcontracting and supplier
opportunity to be in compliance with questions 3 through 6.
7.) Did you provide plans and specifications to potential MBEs?
Yes
No
8.) Did you provide the information regarding the location of plans and specifications in order to assist
the MBEs?
Yes
No
Rev.2110115
ATTACHMENT 1C
Page 3of4
9.) Did you prepare a quotation for the MBEs to bid on goods/services specific to their skill set?
Yes (if yes,attach all copies of quotations.)
No
10.) Was the contact information on any of the listings not valid?
Yes (if yes,attach the information that was not valid in order for the MlWBE Office to address the corrections
needed.)
No
11.)Submit documentation if MBE quotes were rejected. The documentation submitted should be in the
forms of an affidavit, include a detailed explanation of why the MBE was rejected and any supporting
documentation the Offeror wishes to be considered by the City. In the event of a bona fide dispute
concerning quotes, the Offeror will provide for confidential in-camera access to an inspection of any
relevant documentation by City personnel.
Please use additional sheets, if necessary,and attach.
Company Name Telephone Contact Person Scope of Work Reason for Rejection
ADDITIONAL INFORMATION:
Please provide additional information you feel will further explain your good and honest efforts to obtain
MBE participation on this project.
The Offeror further agrees to provide, directly to the City upon request, complete and
accurate information regarding actual work performed on this contract, the payment
thereof and any proposed changes to the original arrangements submitted with this bid.
The Offeror also agrees to allow an audit and/or examination of any books, records and
files held by their company that will substantiate the actual work performed on this
contract, by an authorized officer or employee of the City.
Any intentional and/or knowing misrepresentation of facts will be grounds for
terminating the contract or debarment from City work for a period of not less than three
(3) years and for initiating action under Federal, State or Local laws concerning false
statements. Any failure to comply with this ordinance shall create a material breach of
contract and may result in a determination of an irresponsible Offeror and debarment
from participating in City work for a period of time not less than one (1) year.
Rev.2/10115
ATTACHMENT 1C
Page 4 of 4
The undersigned certifies that the information provided and the MBE(s) listed was/were
contacted in good faith. It is understood that any MBE(s) listed in Attachment 1C will be
contacted and the reasons for not using them will be verified by the City's M/WBE
Office.
Authorized Signature Printed Signature
Title Contact Name and Title(if different)
Company Name Phone Number Fax Number
Address Email Address
City/State/Zip Date
Rev.2110115
Joint Venture
Page 1 of 3
FORT WORTH
CITY OF FORT WORTH
MBE Joint Venture Eligibility Form
All questions must be answered;use"N/A"ff not applicable.
Name of City project: 2014 CIP,YEAR 3—CONTRACT 2,City Project No.02693
A joint venture form must be completed on each project
RFP/Bid/Purchasing Number:
1.Joint venture information:
Joint Venture Name:
Joint Venture Address:
(Lfapplicable)
Telephone: Facsimile: E-mail address:
Cellular:
Identify the firms that comprise the joint venture:
Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the
joint venture
MBE firm Non-MBE firm
name: name:
Business Address: Business Address:
City,State,Zip: City,State,Zip:
Telephone Facsimile E-mail Telephone Facsimile
Cellular Cellular
Certification Status: E-mail address
Name of Certifying Agency:
2.Scope of work performed by the Joint Venture:
Describe the scope of work of the MBE: Describe the scope of work of the non-MBE:
Rev.2/10/15
Joint Venture
Page 2 of 3
3.What is the percentage of MBE participation on this joint venture that you wish to be counted toward
meeting the project goal?
4.Attach a copy of the joint venture agreement.
5.List components of ownership of joint venture: (Do not complete if this information is described in joint venture agreement)
Profit and loss sharing:
Capital contributions,including
equipment:
Other applicable ownership interests:
6.Identify by name,race,sex and firm those individuals(with titles)who are responsible for the day-to-day
management and decision making of the joint venture:
Financial decisions
(to include Account Payable and Receivable):
Management decisions:
a. Estimating
-------------------------------------------------------------
b. Marketing and Sales
-------------------------------------------------------------
c. Hiring and Firing of management
personnel
------------------------------------------—----------------
d. Purchasing of major equipment
and/or supplies
Supervision of field operations
The City's Minority and Women Business Enterprise Office will review your joint venture submission and
will have final approval of the MBE percentage applied toward the goal for the project listed on this form.
NOTE:
From and after the date of project award, if any of the participants, the individually defined scopes of work or
the dollar amounts/percentages change from the originally approved information, then the participants must
inform the City's M/WBE Office immediately for approval. Any unjustified change or deletion shall be a
material breach of contract and may result in debarment in accord with the procedures outlined in the City's
BDE Ordinance.
Rev.2/10/15
Joint Venture
Page 3 of 3
AFFIDAVIT
The undersigned affirms that the foregoing statements are true and correct and include all material information
necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall
agree to provide to the joint venture the stated scope of work, decision-making responsibilities and payments
herein.
The City also reserves the right to request any additional information deemed necessary to determine if the joint
venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds
for termination of the eligibility process.
The undersigned agree to permit audits, interviews with owners and examination of the books,records and files
of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this
provision shall result in the termination of any contract, which may be awarded under the provisions of this joint
venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false
statements or willful misrepresentation of facts.
Name of MBE firm Name of non-MBE firm
Printed Name of Owner Printed Name of Owner
Signature of Owner Signature of Owner
Printed Name of Owner Printed Name of Owner
Signature of Owner Signature of Owner
Title Title
Date Date
Notarization
State of County of
On this day of ,20 ,before me appeared
and
to me personally known and who,being duly sworn, did execute the foregoing affidavit and did state that they were
properly authorized to execute this affidavit and did so as their free act and deed.
Notary Public
Print Name
Notary Public
Signature
Commission Expires (seat)
Rev.2/10/15
ATTACHMENT 1A
Page 1 of 4
FORT WO _' City of Fort worth
MBE Subcontractors/Suppliers Utilization Form
PRIME COMPANY NAME: Check applicable block to escrihe prime
JLB Contracting,LLC
PROJECT NAME: M/W/DBE X� NON-M/W/DBE
2014 CIP Year 3,Contract 2 BID,DATE
August 24,2017
City's MBE Project Goal: Prime's MBE Project Utilization: PROJECT NUMBER
02693
7% 7.03%
Identify all subcontractors/suppliers you will use on this project
Failure to complete this form, in its entirety with requested documentation, and received by the Managing
Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date,
will result in the bid being considered non-responsive to bid specifications.
The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this
utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional
and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the
bid being considered non-responsive to bid specifications
MBEs listed toward meeting the project goal must be located in the six (6) county marketplace at the time of
bid. Marketplace is the geographic area of Tarrant, Dallas, Denton,Johnson, Parker, and Wise counties.
Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct
payment from the prime contractor to a subcontractor is considered 1 st tier, a payment by a subcontractor to
its supplier is considered 2nd tier
ALL MBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD.
Certification means those firms, located within the Marketplace, that have been determined to be bonafide minority
business enterprise by the North Central Texas Regional Certification Agency (NCTRCA), or other certifying agencies
that the City may deem appropriate and accepted by the City of Fort Worth.
If hauling services are utilized, the prime will be given credit as long as the MBE listed owns and operates
at least one fully licensed and operational truck to be used on the contract. The MBE may lease trucks from
another MBE firm, including MBE owner-operators, and receive full MBE credit. The MBE may lease trucks
from non-MBEs, including owner-operators, but will only receive credit for the fees and commissions earned
by the MBE as outlined in the lease agreement.
Rev.5/30/12
FORT WORTH ATTACHMENT 1A
s Page 2 of 4
Primes are required to identify ALL subcontractors/suppliers, regardless of status;i.e.,Minority and non-MIWBEs.
MBE firms are to be listed first,use additional sheets if necessary. If a subcontractor/supplier is identified as an SBE, please attach a
copy of the firm's SBE certification if they have not previously registered with the City's M/WBE Office,which may be contacted for
verification. Please note that ly certified MBEs will be counted to meet an MBE goal.
Certification N Detail Detail
(check one) o Subcontracting Work Supplies Purchased Dollar Amount
SUBCONTRACTOR/SUPPLIER T n
Company Name l
Address e M w S M
Telephone/Fax r B B B B
E E E B
E
Atco Construction, Inc. 1 X Haul HMAC to $185,770
119 Conona Ct project
Fort Worth, TX 76108
817-448-8007
817-448-8256
Banda Trucking 1 X Haul raw $51,622
1911 Menefee material to plant
Fort Worth, TX 76106 site
(817) 903-1862
Ash Grove Cement 1 X Raw Cement $54,375
900 Gifco Rd., Supplier
Midlothian, Texas 76065
Martin Marietta 1 X Raw Aggregate $32,990
1503 LBJ Frwy, Ste 400 Supplier
Dallas, Texas 75234
972-647-3377
Rookers Asphalt 1 X Liquid Asphalt $107,502
3632 Lawnwood Street Supplier
Fort Worth, TX 76111
Cowtown Redi-Mix X Concrete $207,422
3401 Bethlehem Avenue Supplier
Fort Worth, TX 76111
(817) 759-1919
Rev.5/30/12
JLB CONTRACTING,LLC vATRACTING, LLC
ATTACHMENT 1A
Page 3 of 4
Woody Contractors X Water sub $1,271,573
650 Tower Drive
Kennedale, Texas 76060
(817) 483-4787
Total Dollar Amount of MBE Subcontractors/Suppliers $237,392
Total Dollar Amount of Non-MBE Subcontractors/Suppliers $1,673,862
TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $1,9119254
The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval
of the Minority and Women Business Enterprise Office through the submittal of a Request for Approval o
Change/Addition. Any unjustified change or deletion shall be a material breach of contract and may result in
debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed
explanation of how the requested change/addition or deletion will affect the committed MBE goal. If the detail
explanation is not submitted, it will affect the final compliance determination.
By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request,
complete and accurate information regarding actual work performed by all subcontractors, including MBE(s)
and any special arrangements submitted with MBEs. The Offeror also agrees to allow an audit and/or
examination of any books, records and files held by their company. The bidder agrees to allow the transmission
of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers participating
on the contract that will substantiate the actual work performed by the MBE(s) on this contract, by an authorized
officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for
Rev.5/30/12
JIB CONTRACTING. LLC
ATTACHMENT 1A
Page 4 of 4
terminating the contract or debarment from City work for a period of not less than three (3) years and for
initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this
ordinance creates a material breach of the contract and may result in a determination of an irresponsible Offeror
and debarment from participating in City work for a period of time not less than one (1) year.
Ronald D Stinson, Jr
Authorized Signature Printed Signature
Vice-President of Business Development
Title Contact Name/Title(if different)
JLB Contracting,LLC 817-261-2991 817-261-3044
Company Name Telephone and/or Fax
PO Box 24131 rstinson@jlbcontracting.com
Address E-mail Address
Fort Worth,Texas 76124 August 25,2017
City/Stateop Date
JLB CONTRACTING, LLC
Rev.5/30/12
GC-6.07 Wage Rates
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
2013 PREVAILING WAGE RATES
(Heavy and Highway Construction Projects)
CLASSIFICATION DESCRIPTION Wage Rate
Asphalt Distributor Operator $ 15.32
Asphalt Paving Machine Operator $ 13.99
Asphalt Raker $ 12.69
Broom or Sweeper Operator $ 11.74
Concrete Finisher,Paving and Structures $ 14.12
Concrete Pavement Finishing Machine Operator $ 16.05
Concrete Saw Operator $ 14.48
Crane Operator,Hydraulic 80 tons or less $ 18.12
Crane Operator,Lattice Boom 80 Tons or Less $ 17.27
Crane Operator,Lattice Boom Over 80 Tons $ 20.52
Crawler Tractor Operator $ 14.07
Electrician $ 19.80
Excavator Operator,50,000 pounds or less $ 17.19
Excavator Operator,Over 50,000 pounds $ 16.99
Flagger $ 10.06
Form Builder/Setter,Structures $ 13.84
Form Setter,Paving&Curb $ 13.16
Foundation Drill Operator,Crawler Mounted $ 17.99
Foundation Drill Operator,Truck Mounted $ 21.07
Front End Loader Operator,3 CY or Less $ 13.69
Front End Loader Operator,Over 3 CY $ 14.72
Laborer,Common $ 10.72
Laborer,Utility $ 12.32
Loader/Backhoe Operator $ 15.18
Mechanic $ 17.68
Milling Machine Operator $ 14.32
Motor Grader Operator,Fine Grade $ 17.19
Motor Grader Operator,Rough $ 16.02
Off Road Hauler $ 12.25
Pavement Marking Machine Operator $ 13.63
Pipeiayer $ 13.24
Reclaimer/Pulverizer Operator $ 11.01
Reinforcing Steel Worker $ 16.18
Roller Operator,Asphalt $ 13.08
Roller Operator,Other $ 11.51
Scraper Operator $ 12.96
Servicer $ 14.58
Small Slipform Machine Operator $ 15.96
Spreader Box Operator $ 14.73
Truck Driver Lowboy-Float $ 16.24
Truck Driver Transit-Mix $ 14.14
Truck Driver,Single Axle $ 12.31
Truck Driver,Single or Tandem Axle Dump Truck $ 12.62
Truck Driver,Tandem Axle Tractor with Semi Trailer $ 12.86
Welder $ 14.84
Work Zone Barricade Servicer $ 11.68
The Davis-Bacon Ad prevailing wage rates shown for Heavy and Highway construction projects were determined by
the United States Department of labor and current as of September 2013. The titles and descriptions for the
classifications listed are detailed in the AGC of Texas'Standard Job Classifications and Descriptions for Highway,
Heavy,Utilities,and Industrial Construction in Texas.
Page 1 of 1
GR-01 60 00 Product Requirements
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH 2014 CIP,YEAR 3—CONTRACT 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02693
Revised July 1,2011
CITY
OF
FORT WORTH WATER DEPARTMENTS UPDATED:2-29-2012
STANDARD PRODUCTS LIST
Approval Spec No, Classsifcation Manufacturer Model No. National Spec Size
WASTEWATER
11 anhole Inserts —
+ I I ;4..____ tl h.,�. A 1:vi1•,;.,, Made to Order-Plaaw ASTMD 1248 For 24-di.
L South western Pw erg Madewosder-pbadc ASTMD 1248 For 24^dW
Noflow-10 Made to Order-Pliatio ASTM D 1248 For 24"du
09/13/96 El--14 I,- Southwestem PackinS A ti-K.inc. Lifesaver-suimlera steel For 24"dix
09/23/96 EI.14 Manhole lmrn Soulhwestc-nI Lioir,L t..,S I... T.d-Lok-St..*.Steel For 24"di.
Manhnl s&Bases/Fr,,tI II CS,E((I1 c s:Rc c t:i!,.-u far
Manhole Fr,cri. ,, _ ...� Western hon w-k'.Asws d Ha 1001 24^x40"WD
Manhole H.• 1„rand 6780 24"x40'111i'D
h9aulrnlrl ti f3a r}ferule tL Coors/$tandanl tRtAiri l) _
• __..
LI 1.: N1 h I r r,rn..„1[ .,��. .__. _r..--- Wesu:ro Iron W4,r t,.I[,,,R Has F 3!1029_ 24"Dia.
• LI 1: 71eri:oh hi.r.:c,.ant t'..;,I,. . __
Mcli>nlr:h..,�K'nrka Inc.lrtc24^Du.
'---1,1•, me 24"Dia.n
• EI-14_.. .W ne,
1 er ( •,-r• VarkI " --.._ -_ _. ASTM A48 24"Dia.
Jnr,
EI-14 hl-h,,I,ITanres I L+,err,_ Sr nui[-rrlavaLirr= NtH I- `.
EI-14 M anhole Frames and Cavrn Si—c tion MH 14: _
E1-14 tl anhole Francs and Covin Pont-A-Marsssrm GTS-STD 24"dim.
Ft-'.t M+nhole Frames and Covers Neenah C.ti 24"dia.
7/25/03 El 1.1 .Manhole Frames and Covers Saint-Gobain Pi lines(Pamrer/rexus) RE32-REFS 30"Du.
01!31106 F.1-14 aU W 1 llt k:r.c:oJ Cmer _ hau jn lira,is,,,A. V1432-2 and V1483 Dcsi,n, AASHTO M3(16-04 30"Dw
11/02110 EI-14 30"DI MH Ring and Cover Sigma C'.J—wion MH1651FWN&MH16502 30"Dia
07/19/11 EId4 30"1)!.}:H Ring and Cover tiru f:r p1`—ducts MH32FTWSS-DC 30"Dia
08/10/11 EI-14 3i - t I!Riot and Cover -- - .._,v 220700 Heavy Duty with Gasket Ring 30"Du
Manhnlc< K R9.C,iI--M11e. Cot er...114'aterTighl&Pro SSurC I i0ht
• k I 11 M h I.I �-•.��. �,:�. .. _ I :t�ti:..�n=ry1 - P 24"Di.
LI 14 %1-h.1,1, --_ 24"Du.
• EI�1. _._. -.. _ ._.. 2342 ASTM A48 24"Dix
E1-14 .`,Lroh.L I r•r:e..:nJ r'.•,;n•. _ -_--- westca•. He„I�,.Ird 300-24P 24"Dia.
• 16144 .. .Al:mti.,Ir rn�n: .,rel[..;.:,. M,K,11 Ilr.m 11 t•.I, WPA24AM 14"Dia.
03109M EI-14 ]I .-I-1:.����:.:,[�,�„„ _ Aaucast RC-2100 ASTM A48 24”Di..
04@0/01 EI-14 t1,rP.L f r.m.:......ir.,�.r., s,-,pore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A49 24"Dim.
Manholes 13a—le�' ct+�CnnrPn1111111
0723197 __ 1.Iethanc H,I-pfuhi N.,,i .;.,P Auto Kogno R.R. Adele Ultra-Seal P-201 ASTM D2240ID4121D792
0426/0 ;d,ct Joint fm 4'Dam%1.1 Harare Camcrote Products Drawing No.35-0048-001
0426/00 Ga,kel.fur,'Dw,n MH. Press-Seal Ga Corp. 250-443 Gasket ASTM C-443/C-361 SS MH
126199 1111Th Manholeadjustocm king LaMech,1. HDPE Ad' —Ring Non-traffic erre
5/13/05 j.OLx.;,„1-F......d Wra, Can—,-CPS wra nIs.lMunhalc Enr u0ueion S�,tem
Manhole&Baset/Rew/Precast Concretes
E. 1.: Mar.hr•1. rl:..�.r('a —e H Conduit CorpSPI-Item e49 ASTM C 478 48^
_..k f',:..I,,Conerece _ Wall C..m. ' Co.Inc. ASTM C-443 48"
EI I'l,..,v Concrctc Hrtaomffartmerl Gifford-HID) ASTM C478 48"
04/26/00 F 11MH•Srn Ir 011 Seat Joint Hammon Type F Dg 35-0048-001 ASTM C 478 48"Dian MH
0923196 Ef t Madok,Precast(:'oncrete _ Concrete Produet Inn. _ 48-I.D.Manhole w/32"Corte ASTM C 478 48"w/32^come
(n'-:0A)h I \I I'i...•m Th, .I t. v.,: !I: , '�..&u!'ar.,n. .ASTM C 478 48"
III/27106 Ft-14 11.. ,n•, OI1'. 1' Iii. I� I 1 I li,'Ih" ASTM C 478 4x Dium w 24"Ring
06/09/10 EI-14 Manhole,Prean!(Rcinforce Pol )(Conerete US Co—"n'Pi er Rend Pot Concrete ASTM C-76 48"to 72"
Manholes&Bases/New/FiberYlass _
126199 F Manhole Fluid Corm munem•Inc. Fk wute ASTM 3753 Noo-naf0e rtes
UAI;(ty l6 111111
L:,.M,inh1lc LF.Manar,,w,, N,w--i'll arca
Manholes&Bases/Rehab Systems/Cementitious
EI-I4 IMariblile Rehabs lama Quadex
0423/01 EI-14 Manhole Rdub System Standard Cement Materials,Inc. Regmer MSP
EI-14 Manhole Rehab Symemis AP/M Per maform
420/01 EI-14 Manhole Rehab Sysitern Sumg-Seal Sysicant S Seal MS2A Rehab System_
5/12/03 EI-14 Manhole Rehab System Poly-triplex Technalogm MH rqWr prodw to stop infiltration ASTM D5813
08/301116 General C.xxrctc Rea l-k K,,,7:.hnal,,, V-1 RI—w,Re am Pnxiud Mix.U.c
Manholej&Bases/Rehab onCementitious
0520196 EI-14 Manhole Rehab Systemas Spyq. Spray Wag Pcdyvrdhm Cloating ASTM D639/D790
E144 Manhole Rehab Systimma Sun Coast
01/31/06 Contin„t�,r Comu.iun I"w"Iiuo C'h,,Ie,lan Arc 791.S lHB.S I.S_' Acid R,,is(ance Tell S—,Applu,atian.
8/28/2(X16 Ceratin,1,,r Car...iun PnlLL no. Wurrcn Envinlnmcnwl 5-301 and N1-101 Scwcr A licatium
08/30/06 Cuminy,fi"Crrcn..iun Pnacdion 0-Id SLS-31)Solid,Er—, Scurf A Iicatiom
Pipe/New/Centrifu¢aDy Cast Fiberidass Reinforced Pipe/Polvmer Modified Concrete
721197 Cern.Cast Fiberglass Berbers Pip.USA,Inc. Hobas Pipe(Nom-P--) ASTM D3262ID3754
10/30/03 Fbwtite A-.i h USA
Prepared 2/29/2012 Page 1
CITY
OF
FORT WORTH WATER DEPARTMENTS UPDATED:2.29-2012
STANDARD PRODUCTS LIST
M No. INIB3ma1 S"ppe dime
7. EI-04
Fi lana ' _._ _ - Bor[dslrand RPMP Ppe .ASTM D3262/D3754
R„n
Pdrnxv MMifmd Cnne—Pi __. _. \I,.r I'. it!^., A .:' 2.76,F477 8'eo 111_''.Cla„S
9 Reioformd Pd Co-ac ' - ,n.,,,na Pi Reinfrxmd Po[v=r Com-rde .ASTM C-76
PigcaN—w[Qopercte
C—. Rrinflttmd ASTM C76
• EI-04 Ceoc.Pipe.Remfarmd - _ 1roui C clro.,w., Clan M T&G,SPL Item N77 ASTM C 76
• EI-04 Cattc.Pim Remf.=d i�,.r,.,r.1.,nrram Pterdtteu SPL dem 095-Manhole.098-Pipe ASTM C 76
E144 ICaoc, Rekfarmd C,r.:cct.pr w A.Products fn.Inc. ASTM C76
Pi -le Iron
EI-06 Dwile Imo Pips Griffin Pipe Prodocb,Co, Super Bell-Tim Doak dm Pi—t—PRx, AW WA CL50,CI51 3"d-24*h
EI-06 Dum&trap ' _ A�Duclik lrm Pipe Co. Ails—Fasti a Poe AW W A C150,C151 4",8"&10-
EI-06 Ducdk Iran Pipe U.S.Pipe and Foundry Co. AW WA C150,C151
EI-06 Doctik Iran Pipe Mcwaoe Cat Iron Pi Co. AW WA C150,CI51
PiwsNcAT—vg
12=11 EI-24 DR-14 PVC Preaure Pipe Pipefife Jctalrcam PVC Prwum Pipe AW WA C900 4"d12"
ew IPF rPijk'Rur�linclSli linin
• _. II r r.,,,h.,l ,:pq. _ Ph I:1. I'......p„pre,Inc. Dooik Polyethyiew Pipe ASTMD 1248 8”
Iloa:.drr.n,p•d.,,,n.h:m pro _ I•.,,. ASTMD 1248 S"
in
• li rch-.ki>.i,I,..Inrn 1.,psi: ,11,P I:r Inc. ASTMD 1248 8"
II h ,:.i,p.•I t. .I,r,.: CSF I.--h-S-w— McCo 11 Pipe Enkgamm ASTMD 1248
Pi ne.t•'\L•'A'f'�C�'
I/04;91: I l l I 111 r o �c:,t„'. ,,,;•Pqe_ Coma'h Im. Cmiech A-2000 Se AS I LI I_.949 8”d-36"
VIP, r L:1 Cain an Udn Im AC'1Ii•u,r 24*6D 36'Only
05/04/09 E I pi lo—w Phic"w,Cars«anon CORR 21 _. .'�;'r 1 24'to 36" rd
• EI-'.5 Pl ..•,rvIe• -- f:ur-Tex.IMu.ax•. ItiIMI,Jg34 4-d-12"
• EI-25 PA c ti ,,,vpw c:rtmm-Tad Pndu'I,r'..•�I _ t5l M U 3034 4"dun 15"
EI.25 VNI P,,IxS,gx Man fnur ,.p ASTM D 3034,D 1784 4",48"
i
• EI-25 P\1 sr.,,i 1'r(k• ,hl,Ala+wfapTM D3034 4"-15"
17/23/97• EI-27 I'v(.-w—11,1,, l n.i,u,,d plipli..r SDR-26 and SDR-15 ASTM F789.ASTM D 3034 4"thm 15"
• EI-27 .PFC5—PIP, _ _.._. 1mtsum t,6m F' _.. ... ASTM F789 4'thru 15"
• EL.'S PIC Sew of hr t.•.„ T c,,1, In ASTM D3034 8',10'
11/1198 FI '• —PtCS ,�r.pu. .'.,.,,,. fi.,.n...r. iH..,._ ^S'°C,.,.,:. ,I".P,.... ASTM F679 18"In27"
• i I _..11% r L,hw.. :.t1 L'".,:. .,'n:t'.• p c:..1rn ASTM F 679 18'-27'
11/1299 I:I Pte Ir......t•I.;._. r:::,•c. .,,,i ^.I a.,lnc _ [ cx.I I^tit-T'.�...I^,I _ ASTM D2680 8'tMmh 15"
09/2691 EW I.,1.111'ii*e I,q, C Inl yinrr fi.C.0 1—11-114, ASTM F794 19"t.48"
11/17/99 EI.i• I I n.l,i:l",r Iqx _. :•,.,,,... Vl.,.i,.,t'. -„,,nam _ __. ASTM t803/1794 18'm48”
01/116/05 PS 4h+ti3,',I 18'w48"
n
SDR-26and SDR-75 G.,kr,Fining, ASTM D-i.''. ;r,c 4".15"
•
EI-25 PV! S.u c,I Phuk Ttemb.int Gaketed PVC Sewer Main Fitt gs ASTM D 3034
Ptllr \c wrfZ lhh4J C1jn`I;!rnlilc Lar .lJidnluler
0)/2691^ LI:n, ['tr 1 -I'.:,:k..I,,.:. _ . .... - .._.
._ __. Lam.Mo V2iim Pi rlt° ('.,rt t,h,,:R r' I :.I,.,.:d, ASM F 679 l8'm 48"
09/26/91 EF„ Pip;kd,...:. Ext—,-T.b.0,p,mc. tl: k11 l S. PI. ASTM F679 9,-to 48"
EI[H:•-` Pl i'S :r I'n•,'F'I••'.:.: — U xETICn r
11(10/10 lE101 _-P� �. .'. r, Rp,,Nuhlswall Advanced Drain v'i-cm.lADS1 Smit, 1!'I,...I, ASTM F2736 24--30"
11/10/10 (E100'tP,.Ip I.1,m,.r' _:� P:I„.Tn rIe Wall Ad—d Dn,m cSrskms(ADSL S. �;; p I'�r.. ASTM F2764 30-w60
05/16/11 St-1 R f rrred P. n1,,, _..., Ccx,Tcxh Cun�[nrrlinn FmdurL. I!,! . _ ASTM F 2562 24”m 72"
P1De6/Rehab/CIDP
Cored w Place Pi n.,�,;,rm Tuark,Inc ASTM F 1216
0510399 Cured in Place ..-I hrrimmdt Gro Sa,i.r.,l l io;'•SPL Irca'.a,7 ASTM F-1216245813
05/2996 .Cured.Plain Pke RqricJc,Iu-Inittxr Tedrol (inhrcr USA) I.I.-`. I:.•b„•v ASTMF 1216
Pipes/Rehab/Fold&Form
• Fdd and Fix.Rpe __ Cd"um Pw.S ,I— _.
11/0398 Fdd-dFarmPip, laituram Twhndogm,loo. I wl,.•rm"NaP! ASTM h SOa
Fold-dFrxm Amekart Pipe dt Platias,Inc. I,.::>.,1•n.rtv,,,:,rolr
12/04A0 Fdd-A F—Pip� Uk fi.. 1 V�,.,I,,,:i r•�(-�I I.l,clieier AST 1!1._I1i'-I t I,:.,. _•
06/09/03 Fdd end F.xm Pipe .. Miller Pi C I.N tr,h,. AS I NI f-,si14,F-.14.17._..LL L• W IS”drenxx'».ea
Pie �Nlethod)
-plm 5,.Iem PiMCxation I'..I,.:d I,a,•. PM1(Lr p_ We.,NJ, ed Preto A,
?is:Ccar>Ucll S:Iona MdAl Con�tructi,vs Y•I,:,h,Icnc H-.I-,T.— red Previounl
TRS S term Ttettchlna Replwemeat S Ma ah!,. coty,C&m& red Prey ly
Pigg Casing Spacers
11/04/02 SIM Band CalmSp— ......_____.___.. ._ ,_.._....,_._
gAdv—mi Rachet and Systema,la. Madel SI
0 3 SniNew Sttxl Casing SPaCLr Advaa:cd Feadueta and Sywmma,lrc. Si':.�ii,�..Si,rl SI,,,:, McMel SSI
7 Casing SpamrsCeseadnwetm4'cr,kx Manafxaanlg .,C a.ocv.Sp—,
09114/10 5taidcaa Sree♦Casing Sparer Ytpelax Sur amt Irtwal;u,x S[aimles>Staa Cdiing Sp;u-n UP to 48"<I>e2>
09/14/10 Coated 5tcc1 Caen St—, pird Sul are!1-6w C�Wj Stee.1 Cssrn spnoers Up to 48"<I><L>
05/10/11 St."—SIM 7—+ FSpa- P„v rr,cal arc In Pvwx,H—k Up to 48"<1>2>
Coannes
02/25/02 x-[.inm S atom Saaueiam Inc SewaGard 210RS LAC 0220.Y.33
Prepared 2/29/2012 Pape 2
CITY
OF
FORT WORTH WATER DEPARTMENTS UPDATED:2-28-2012
STANDARD PRODUCTS LIST
Approval Spec No. Classification Manufacturer Model No. National Spec Size
12114/01 x Sated _ R.ui.::71.ur�i.+l. I;�:..I:.'
04/14/15 Int,r Ductdc Iron Pr •Coattn -- - - - ASTM B-117 Duculc In,.Pipc Only
WATER
_. oe,VaI%C•n I illulcJ(•.all I;IaU,:;!Air itcfease �.
F:I 11 l it `.11 h .d, GA Indn_Ir. - 1 Valve,Modrl 935 AST'+1 t I:"t .a...H,:S,S'rM A 1"&2"
• Elu [, •.�1,r.1 �.,I.e _- \SIIiPLt Al rrt l,.+r rrr f'., ['r1.I1r,� .:I\-uum Valvea,M"0_19_.1 1/2",1"&2"
• E 1,e V 1 .I I'n-r1•r[. I,--- AN 1 1a1cl-(.4145Cand4I47C 1",2"&3"
PiDesNalve &1'utine.11lurtilc[run Fittings
07/2392 EI-07 __.. .I: 1 t r:111111a. ._ - _ Stas Pipe Prodac(s,lue. �L l.,rt.1 11 n:1-c., AµWAC153&C1I0
• EI-07 bimile! nFm,, Gnrfin Pt Prodwte,Ca. nl+chamcal I.nr.c• AWWAC 110
• E1,07 Duade Iron Fim.n} _ McWmtc?vler PipJ Um-Ulrinie.t5visioo J d t Int c.uk a I.1.. Ap M 1 C 153,C-1 10.C:_1
05/14198 El-07 Ductile lmn hlmn,,• Uni•FIa a 5u1,r•i11 EarleL r.P11 "1-1
08/10198 E1-07 MJFinii. Si ma.Co. [I,.,140 C-1 M.I I u1 mr- AW'\c 11;s 1 -24"
_.._.. __ -. _.- ..
05/14198 EI-07 Ductile Innn In1n It .warms _ Ford Me(n Box Co. Un 11 ,cc Serial vl('war l,.t _ AWWA t'I'l a •; _ a 12"
11/09/04 E1.07 Dudi{e hnnJalrr kc•11 Otte",BOIL.Inc. On,11 dt Resoral 1-a k.nln; .AWWA C I;.:C I n.<i.: i C '
-...:1,._ l ..1., I1 . r,. ...
0289/12 33-I I-1l Ductile Imo Pic\1 I�,1:al..nr.1 k.�,traint EB AA Iron.Inc. ",rn '::I_ M� �P: AWWA CI-1- ,.. ,1 ._
0289/12 33-1141 PVC Pipe Nimh-alJrrnt ReAramt EBAA Irm Inc. -T `•!. ti.acs 2m)(1, Npe) AWWA Cl LIM3 f53 4"W24"
08/05/04 EI-07 Mxhanical Joint Retainer Glands Si ,Co. 11gn.,ir:1.4 Mcahaaicat Jemr Reeuai- AWWA Cl l 1K 153 4"to 24"
Bulle.y•• ,.(Dv-ndL k21&JM
UA 2/6) E)-24 Interior Restrained Joint Sc>L- S&B Tmhmiel Products E.O.L.900) ASTM F-1624 4"to 12"
61-07 Meeh n[cal hunt Fittin,. SIP Ind-f-, AI_ehanical Join,hmiigs AWM"A C153 4"w24"
Pi sNalves&Fittings/Resilient ted Gate Valve*
Rmilimt Wedged Gaze Valve w/no Gears An+ a 494-20247 16"
12113/02 Resiiirnt Wed eGme Valve An::..-I;.. -- ti '=:n and Smie.2136 AWWA C515 30"and 36"
08!31/99 Resilient Wed c Gate Valve Aaa: : ,I Scnr,'-':.n.1524(SE)91:,,155) AWWA C515 20"aid 24"
05118x99 Resilient W Catc valve AT"! ,- I.+ 1 I• p•cp 9a.7:17 111 AWWA C515 16"
I0/24100 EI-26 RmilimWedge,Gwe Valve Am:1...1:16,.1 ,.' S,11.:.''.1.. AWWA C509 4"to 12"
08/05/04 1 Rmilient WedgcCate Valve _ n:1:.�:,.::11.:.1 ,•I �.".�c:i+ nk AWWA C515 42"sod 48"
0523191 EI:'e _ Resd cCalt Valve :tt. -- A.-rn.,.t�t,H 1�..:.i•d GV AWWA C5W 4"to 12"
0184/02 FI I IRs Veru wldlcC rtv t'alvr A -n nA`kt,.n anv __ _ _ 20"std smaller
• EI �k.,m_r15„rl ca l;.c:\.1111. Keened _ 4"•12"
EI 1r Rc 11v:cl Saaod r.r.:\.r.+, M&H 4"•12"
I r k;.1'::1'I ti:.11,1!:;,11:\.11•r - Mueller Co. _. __. -_. V-12' _.
11r(18,99 k. 1 M:,r: sJ. : --- - Mueller Co. Sees A23o f D 6647) AWWA C515 16"
0183It13 k:,lhna Wedge('.o. +..n. MuellerCo. Series A1360 Fw 1a 241SIr 6709) AWWA C515 24"aidsmdkr
05/13/15 ---- Muellet Co. AWWA C515 30"and 36"
01 3I o,, _ -....- Mueller Cu. RLalla i_"'t te',C a 15 AWWA 0515 42'and Oft"
01/28/88 Ll-, R: I M SME,( c,t.1 -.. Clow Valve Co. AWWA C509 4"-12"
10/04/94 h""l , 'AMd,,(:.1:,c,',. Clow Valve Co. 16-RS GV(SD D-20995) AWWAC515 16"
11/08/99 EI-26 k_-.1 h.•r.:15 olp 1Ln:tA,, Clow Valve Co. Ch-RW Valve(So D-21652) AWWA C515 24"and smaller
4499,94 _H.`wtrr.l+-4t.k+ 4:r.rr-Ve4- N.L.c3> 61ewi+M5v6a. _..f�vx.36e-&M,GEIS AWWAGNS ,QL_&w
06/21/10 Clow Valve Co. C9o-w Valve htaic12638 AW W A C515 N'to 48"
8/9
05/01 EI-26 'Rc,::1:-1 ti..:r::'.t;.,t;t.d.:: Stockhem Valves&FabW _......_ AWWA C 509.ANS1420--m ASTM 4"-12"
EI-2U.S.Pipeand Foundry Co. Meumcal 250.rc airrmems SPL 474 3"to 16"
CO V iIv�es&-f utin'+_Kut[ r S e i L t e J Ftat.tc-rfl\ t'tI%c
PI '1 IR�h S ,i:r an,t.,!,• _-.. _ Hwy Pra11 Ca. AWWA C-504
24'
EIk1h t. r..!d 1 '„ MueOer Co. AWWA C-MM 'a
c
1/1099 EI 1 Rahp_r ti.;:ac!dn::n11.1.1 D-1Valves Co. AWWA C-504 24'srxr
06/12103 EF \. 1, 11nu„ is ,.1:1,1,1+: Valmazic Valve and Mmufacturin C ValmticAmencun BuuerfIValve. AWWA C-504 U 1884"d
04/06/07 I I �._
I%\.d,e M&.H Valve M&H S!,11 tsUO R.1.450 AWWAC-50424"to41,'
3/1296 M 1 5.-I=,::�.,11�r W'atcr Plus E.nµ.J1: 5. .S,mo,1
Drr'Ha1Tel Fire H%drant•
10101m7 1 I_ rl.• II rr::Ir.,11.11.1 -_ American- Valve Dr Fh r.Is 560 AWWA C-502
03/31188 E-1-12
ion 0 nJ 1:r II.,I-.11,1 Amecan DIg Valve 4 [ •1rc w I.''S} AWWA C-502
-- __-- _-
09/30/87 1 E-1-12 Dry H.rr'llnr ll.l':11n Clow C anon 511-I+1aH11.F`, I)I'1")s AWWA C•502
01/12193 E-1-12 BamBFlrc llAmeripo AVK Co st.�Ja'_-Ls1 _ AWWA C-502
0884188 E-1-12 Band Phf+�I;,1p .--..__ CIowC ation u,-. t'.''.r:3;.0 •1 19.1.1..!, -. AWWA C-502 -_
Ed-12 Dry Bartel Fin H_J.1,mt rrr Kenwdy ValvetiI„q 11 r1.r.,11 s>.,_-%•:1 z'1 M AWWA C-502
0984/87 E-1-12 Barrel Fire H,d.ram M&H Valve ai _ tir l lr1....1 eti: AWWA C•502
10/14/87 E-1-12 Dy Barrel F-H dram Mue9er \-I'i f nNr�:r, AWWA C-502
.I...n-.f ng FH-L'.
01/15189 EI-12 IDy Barrel Fue Hvdram MaC a 1 '.1"Ccnuaion 2011 AWWA C-502
10109/87 E•1.12 Dry Barrel F-Hy*am _ US.Pipe&F tik p L)mwmg No.960250 AWWA C-502
09/16/87 E-1-12 Dry Barrel Fim Hydi,ini Waterous Compmy S}.1,,Drawing No.SK740803 AWWA C-502
Water AoDurtenances
08/08/02 EI-1 A Plastic Morar Boxes Ent Jordm Imo Works,Inc. Meru 9nv(PIa.5Ik1 w/CI Jid Class A,B,C
08/28/02 D b4h S. Saddle SmithBWr 4dl-[.,..«„I I..,h 1,q,,,p Saddle
Q18600 SS T.pp,ng SaMk _ JCM Ind¢sviea,lrc. 1:13,,c1! 5 Saddle 1"to 12"
01/30/01 TpMj Saddle JCM lndmtries.Ire. ., ["to 12"
05/10/11 T n Sk-v tStmnlrss 9r 1) Powerseal 'dJ 4"-8"aid 16"
02/29/12 33-12-25 Tappig Sleeve tC,wted Smell Romac Its:..1 AWWA C-223 U 1842"w84"Out
0289/!2 33-12-25 Tppi.g SL- I Stmnle.,.5nv11 Roma. QST Stainless Slee) AWWA CG223 Up to 24"w812"Out
Prepared 2/29/2012 Page 3
CITY
OF
FORT WORTH WATER DEPARTMENTS UPDATED:2-29-2012
STANDARD PRODUCTS LIST
Approval Spec No. Classification Manufacturer Model No. National Spec Size
02!29.12 ii '1'a o Sk..,St.n,w..Sls<h h•,...._ aI II M. .S1"] AIA 19AAC-'_23 UPI-1 ..'I_
05/10/11 ljifflR Cl. I• k:p—
()$/2it/IK, PIa11.Meta Box w CI Ltd CI Lid
08/30/06 Pla,lic Matt Box w/Pla.tie bd D1 51 Pla,bs,Ine Cla.•.\'I'L,•:..B—tsr Plasbe Ld Cla.. A
Unftbem Focasement
05/12M5 EI-13 Pvlvethvlcnc Enca,nnnt I1--1 l'a,Wg PuOrm Ent rise. AWWA 0105 :;LLD
05112A)5 EI-13 JPnkycth,lcw Encasacm Mauntam St,a,I'losur.I MSPI and AEP lnd. Standard Hard.are AWWA 0105 nulllD
05/12/05 EI-13 PM ahvlcnc Encastrcm \I PIndu.t, Bullstron by Cnwtomn Bolt d Casket AAV.%0105 and LLD
07105193 Ll I I ...k Meta A—,Cmpmy Mudd 100013MMr Ch.*Valve AWWA C550 4',10'
08/05/01 .M.I�.�i i.:11...r Verf dTabme H—v NapeticDrive Venal AWWA C701.C1asa 1, 3/4' 6"
NO'T'ESI From tlrrF..r..,t vl L.mI.1... _....
<1� Carrier Py,r I I? _
<3a Pnrd tSn.lxn,l,I s •.' _.
Cf[�f-�$7C1�C6Ta'kLi'. .t r.•lad,I I I ,.wrd i)i�f1�1'ii( It:.ih :r, rchu.I p•<I tiiTf w rc�Gm B14 FlH1W pm¢ IM5 ng t.yCaos mn Pr(!1 ..
Spaificanms for spceific pnaliKu,are rn.ladrd a.Pur r,1 nt-�, ,n tion r ntran 1 ..r...,n,n s rc I ih T'ecMird Spxif'Wkm will ovenkk Orr Fort Worth Wats Drpan fs Standard Specifwattons and ttr Fort Wmm Wats Departm is
Standard Produ Ys list e�approval at the speayfis prtdixt.a:i hr-.a.gid,�+rl,:r::.....-..�
-h: +.-....I Y" ,I,,"u'm wf th.or—the seem prodw rrcde tM Fort Worth Wath Dgwtmcm's Standard Speciftcatran a ism the Fat Worm Water
anmera's Standard Pnaducts Lim.
Prepared 2/29/2012 Paye 4
Division 03-Concrete City of Fort Worth
City-Wide Standard Products List
5',oratifwrfnn Fxpinuion
.Vo. Spxgtcatlon Name a^raa+'acr TypeManafacrurcr AoducY Narnr/be rlpflonModd No. Apprnva!Darr D" LLntradons
038000 n.ton�ti„ar,..... existing Concrete w. .n.��.
038000 %I°Jificauons to Existing Conrete 1,q�c Yenetrzti alants
Citiclu ee
Page 1 of 9
Division 26-Electrical City of Fort Worth
City-Wide Standard Products List
Spvifirurrnn Spedfkaden Now Product Type Manufadrrrer FmdudNam&DeserlpdowModd Na ra(DWe EVpb O° LI ft deer
DO,
ICa.exae?.uul nox,.fnr I I«triad f iquvioehi ..,.'Iexible Metal(onduit
ti��cnu
260533 Pene,—,mud H—,Ibr FI l Rrp,,d%1,A G,Iv ized Schedule 80
S,v111,
snrd lf,rr(.inr I l, RY g,d 11r(al PVC Coated Schedule 80
260531 Ita,�xa, ari?1+r,�e-for Flczvrcnl i,1.(. "•+1e 80 Conduit
c,.ra nx
260533 Fl""1 Ilielr t Ju,.u, (HDPE)
ti,«�c urs t r+ndun
2605�: N.T..xa.:snd Ifr..�f„r f Icctn.ai H�t,:cway Boxes
tir,rc in.
Page 2 of 9
Division 31-Earthwork City of Fort Worth
City-Wide Standard Products List
Sperirallon f'rp7.arton
SperlJkatton Name Product Type Manufacturer Product NmndDescr7pR n/Mndel No. .ipprn-V Darr l�ufr Lfnllfadons
37?tIlp Gebiirns (i�h�nn, _._
31 36 NI Gabions [�ahuxi blanrecsrs
313600 Gabions I ilia I"bnc
Page 3 of 9
Division 32-Exterior Improvements City of Fort Worth
City-Wide Standard Products List
SpecN.adan SpeciJkadon Name Product Type Mawfactarer Product N..WD-4pdow/MadA. pprovaf Date n Liatimdona
Dare
32 12 10 Asphalt Pavin; "I"ack Coal
32 12 16 Asphalt Paving As halt Lmul,,aas wbacks
321273 Asphalt Paving Crack Sealants P"IYmer Modified Asphalt Fmulsinn
Crar*Scaler
32 12 73 Asphalt Paving Crack Sealants Rubber Asphah Crack Sealer
12 It 13 Cnnerde P-me Admixtures
12 13 13 Concrete Paving LEon for Dawel and Tie Bars
12 13 13 Conc-Pavin• Rem fixcemcnt liar Chairs
12 13 11 Concrele Pavin y Canal;Com unl
32 13 13 Concrete Paving Jntnt Filler
32 1373 Concrele Paving Joan Sealanes Jnuv Sealant
32 1723 Pavement Markings Thermopla>nc Hot Applied Spray
321723 Pavement Markings i hennoplanic Hot Applied Extruded
[11 1723 Pavemml Mali, 1,111,Beads
32 1723 Pavement Markings Prelbrmed Polvmer Tape
32 L'23 Pavcmcnt Markings Preformed Heat-.Activated
"rimiam lactic Tape
32 17 23 Pavement Marking, Iraflic Paint
32 17 23 Pavement Markin gs Raised Markers
32 17 23 Pavement Markini Work Zone Tabs
32 17 23 Pavement Markings %k rk 7one Raised Mark-
32 1723
arkers321723 Pavement Msrkmn, Wor4 Zone Striin•
32 31 13 Chain Link Feae and Gates Chain Link F-
3231
onoa3231 13 Chain Link Frn and Gates Wrought Iron F-
3231
ence3231 13 Chain Link Fences and Gates Steel Tube Fence
32 31 26 Wire Ferices and Get. M dal Pasts and Braces
3231 26 Wire Fences and Gals Wand Pnsts and Braces
3231 26 Wire Fences anal Gates Gates and(jampoa,
3231 26 Wire Fences and Gales Barbed and Smooth Wire
32.11 26 Wire Fences and Gates W ac M'lt
32 31 26 W uc Feuces and Gal.. Miscdlaneoua
32 31 29 Wood Fences and Gates Wood Fences and Gales
32 32 13 Cast-In-Pince Retairdig Watts jFiherFabric
Page 4 of 9
Division 33-Utilities City of Fort Worth
City-Wide Standard Products List
Spec s Span n Naaae Product 7}'pe Manufactum is-duet Nam&Dm fpdo Model No. Approval Daho F�prHaasn m 6Mrlmdoas
330410 loins Bonding and Flemnal Flange Isolation Assembly Products
Isolation
33 05 13 Frame,Cova and Grade Rings Standard Frame and C-
330513
over330513 Frame,Cover and Grade Rings Hinged Frame and Cover
330513 Frame,Cova and Grade Rings Joint Sealant
33 05 16 Conerete Water Vaults Vault
33 05 16 Concrete Water Vaults Vault Fall Protection Gratin
330524 Installation ofCanier Pipe in Cas®g End Seals
or Tunnel Lina Plate
33 05 24 Installation of Carrier Pipe in Casing Casing Spacas1randators
or Tunnel Lina Plate
110526 Iuhty Markcrv'loan", Delcclablo Tape
11%1c ter, 1"ho"I.nk', l" 1,,il %1,.rkcr
I; iii NI—Belts and 11,1k," I '"o"
3311115 Nul,-Bell,goes 1Lr4FIa„r B„11nndNuts
33 11(13 Nuts,Iloll':artd(;iskatI I hn:rdcd Rods
33 11 I, Nuts+h:e:n 1611kIts 1 h(1n!',a+kety
33 11'1ti ti w`II.+Its ann 11,kets ',k,3ne,cal limn Gaskets
;311115 Nits.BA-lo ,'r.lskets F1.,n"e
13 11 W \yrs,Bolls 111,11 askets Peirnl:nu,n l a,—1,1,
1 I Irl D-ns•In,n
33 I Ill II-I le Iron I'1 k I Lsny,tl lrrn[
i t 11 111 Iluililo:ileo I"', f.. ]""1, 1 V,Ir.9n„�ri Jnrnt
33 I 1 I,7 )n'tdIron l'r Ic V,',ldud An.bar P,p,
3311 t11 Dalile lrtn l'ew I'i,lrerhvirn�I-ncascmonr
?111:� Dncl Ile Inm NIN L, ,I n
+ nr un.�
l l l D-tio Inv"111'.anr< 11.v`Iran'a17:,ut,I ittm s --
11u.:nlc u,6 Ieint Fittings
ti I I I Dulnlc 11m I 1-aim s
531111 Duenlc ilio _;s Mechanical Jowl Retainer Glands(DIP)
131111 Dncnh'.^:<. - Slcchanical Joint Retainer Glands(PVC)
33 11 12 Polyvinyl(')dundc j",C)Pressure Push On Joint
33 11 12 Polyvinyl Chkeide(PVC)Pressure push On Restrained Joint
PIP,
33 11 13 (-,-gene Pro--PI,,Isar- Pipe
N rapped.Stool('v Iin I"I Ype
c'eneren:Pr.s.an�Pope.liar- S
1 1l rapped,Sro:E t''1"0 r 1 1e1n[wrappers
<'rn�rcre Pr:s:un I'q„.liar- Soap Rings
11"r x•1.titt'I I,In I" 'pe
11 i1 is Barkd Simrl P11and I hi,:Fittin s
311113 honed Slrcl hi—ndFittings 1 srmnr Poh orcr".1111 natio
i)1 i 13 Buried Snrl Pi x rand Fittin s i leal sm„"k I
3i 1'li� 1\'nler C,�ry i;:,:l.lnclt rn�-ince Cirvr-,;I.in�.
13121(1 Wk;' Servrce5 l-II'k tn?-Inco 11 en at',w,lrut_. -..
Page S of 9
Division 33-Utilities City of Fort Worth
City-Wide Standard Products List
.cparwrerlas Sp-90.0i..
_` Sp-90.0i..Nose Product Type Masujacturer Product NmndDescrlpdan/Madr{Na ppravalAerc Llrslladons
33 12 10 Yialo Sery l-Inch i,2-I n,:c ('orxn'ahion\wp,
33 12 10 Watt,Sm'rcca l-Inch to 2-ince
33 l2 10 Water S-,I-hsh w 24nce Slcai Thr Ada iters
33 12 10 Water Senates I Inch to 2-Ina Ihr Part c n ler Unions
33 12 10 Water Schihees 1-Inch to 2-Ince Straight Meter Couplings
33 12 10 \k el, I-hwh w 2-Ince Branch Connexions
331210 Ma-SLI-1l-Inch n,'Alloe Service Saddles
33 12 In A5 aw,1--,M-h to 2.Ince Brass Flan edAs le,Valves
33 1210 2-Ince ?ichor Boxes
131210 Wall,Scrv•icls l-Inch to?-Inca 31crcr Bow l.id
33 12 Ill 11'aur S"iccs 14"'h 10 24nca Hen[hnn,ll Ch,vk 1'sh,
331220 Rr hvlo eA"1al',
33 1220 Kevl t aaatem, arc 1 ah t sIv,I;ares
331221 ,111uA R"hher Sv°s1rd PWterEly Valves
1's Ives
331230 f ombinannn1n 3alvc h ssemblies Air Release&Vacuum Valves
(or Poluhlc >
(-nhvbmutaar .ssemblies
311230 for l'olsblr , Enclosures
331230 Con+bohal P'awt
t3 1:40 1?rvAW.'11-I,,I1=hre Ilvdr:nts
13 12 an D..-Uane1 ore u.-N1nt. Party
131_2 ill H arr!Sam,l,,g Stalin,,. 1V a,,,SPllug Stations
;312 irl 311111 Sanedlnc Slwnms 1-'nckrsares
33 12`0 Presnne Reducrn,\'slye< Pressure Rmudg Valves
333112 C-11n1 I'l.—Pi Nl(IPPI Liners
33 31 12 fared ah Place 1'i c it I PP) Resin
H ibcrglar�alinfv,r,d Pipe for
333113 c Ira.it,Bandar.sewer' Fbergh,Reinforced Pipe
3331 13 Ihhcralls.kcurfnrcrd PIN for Couplings
,l".03rh'S,T,
33 31 l3 yibergl—Revhfan-1d hp,,f., Fulling
Gravity Santa,,S,:wers
3331 15 High Dans, l'l,I thyleue OWE) Pipe
P.P,I,,Sah-unar.Sewer
313111) (hi de(PVC)Gravity P
S-0,Sewer," Ve
33 31 21 Polyvinyl Chloride(PVC)Closed
Profile Crravity Sanitary Sewer Pipe Pipe
3331 50 Sanitary Sewer Serviee Connections Service Pipe
and Service Line
333150 Sanitary ewer Ss—,Connections Service Fittiags/Couplings
and Service Line
333150 Sandnn'SzuaT S—."L naeenors Service Saddles
and Servhre I.Ine
Canhmnuon An Valve for Sanitary Air Valves
S1wer fora•Ytains
Page 6 of 9
Division 33 Utilities City of Fort Worth
City-Wide Standard Products List
S rljrrarina pint,Na SPectJkadon Name Product 1,yPe Manafactarer Prodaar NaardDtscrtpdoa/Modrl Na yproval!)are !)aft Llarltadans
333420 Precast Cone rrm Vanhole vfunliolr,
3139 30 Fiber lass�1anL,ile :�Innitolzs
.1 rl astewawr At ('h.uuIn,(WAC)wastewater Access Gamboa
Slanhc]e Insert odor Cnmrol
13 OdorControl Devices
Devices
333960 I Liner.G.,ti,nu.,,l Sewer Ikep,ur and Resurfacing Products
333960 1'p"x ISewer
—11-
334110Rs in ti e-nn:r—Sronv Drain P, nst Kermrced Concrete Pipe
'Pip;:.I nI,.
3341 10 kcn,for,ed Concrete Storrs Drain Precut Reinforced Concrete Box
I'i eY'ul�',ai* Culvert
R TIfIl—d("I I en.em Drain
r;pc Cen��m P, 3ointing Materials
l it II kf111'1-S1�rm 17rnn � Pi.
3141 It (IDYL 51,1111, PI• linin
3346 sl icdi:::•_.. Drain,coned Drain Pipe and Outfall Pipe
33 0 tiloucrl Wrnr rm ., n Drains Trench System
ti1,1n.d Cn,a Drninti tan,-h -.
Page 7 of 9
Division 34-Transportation City of Fort Worth
City-Wide Standard Products List
dsp_#1104Ban SPst'/JfMfiMMame Product Type Menulamm, Product N—.DescrfN06pd#.Mo&I Na App—1 Date E pran-on Umaadans
ate
344110 Traffic Signals Ira0i:li,nal 11,1b1i,�
344110 Traffic Signals 1.10 Coumdnwn Sier A ll,yd
Assemblies
3441 10 Traffic Signals Pedestrian Push Butter,
344110 Ini0i:.S,p.ls R,rda,I la,li„n t,srcin
!'Idea Imagm);\'chief,I)ern'tie0
344110 Ga0i: ,finals
Systems
344110 Ir,01-_ rials Fmergency Vehiclet' iptirm Sy>tci„�
144110 [,,i: Winery Back-[1,1,nano
,44110 [r,ttic si$nnls 11-1.r cables
14nl In 1,,I, A%11, oid,etor Cables
�4 41 It1 I,R,.tie^n,l.. P,, r I .,d.Cables
;141 10 f rd0ic tie•rale (Ir urJ h-,
ll 41 I!. rilrti 1,-A± Iral3i,tie r:�l ern,:runt
3441 1b I c;Ih,M1 pals Hardl,v4re'.0 os[m s)
S.
344 fr.nlAc —Is v ,x—d 'ammg Flasher.',,
344110 1rall%lic sk P,d,,I,,11,r—,
344110 IrofYi::tiicnal, Is,��
fi i,ad,,,,� aan�c'rl:il dle9
44120 e,,.ulu« a;bunc ix�taves
344120 Assemblies I_mnmuvus
344120 Roadway Illumination Assemblies Strmt Light Poles
344120 Roadway Illumination Assemblies Street Light Arms
Roadway Illumination Assemblies Lamps
IEoadway Illumination Assemblies Photo Cells
1-onum Signs and Sign Posts Sign Blanks
l luminum Signs and Sign Posts Acrylic Overlay Film
344130 Alummum Signs and Sign Post Non-Reflc.Nc vinyl Film
Engineering Grade Retroreflective Sign
34 41 30 Ahmmum Signs and Sign Posts Sheeting with Pressine Sensitive
Adhesive Backing
very-High-Intensity Retoreflective Sign
34 41 30 Aluminum Signs and Sign Posts Sheeting with Pressure Sensitive
Adhesive Backing in Florescent Colors
34 41 30 Aluminum Signs and Sign Posts High-Intensity Prismatic Remoretlective
Sheeting with Adhesive Backing
Page 8 of 9
Division 33-Utilities City of Fort Worth
City-Wide Standard Products List
Syrrrjrrm;nw £ w
.4a Spectjlcudon Nome ProduM Type Moaujecrarcr ProduM NaardDesrrtpdon/ModdNa ApprowlfHrebatt LiiwlmNaws
33 l9 21l 1 \lanholei
�i ti)N, I-,Ir�rEla.•\lalh.�la 17 aarlt��tc,
11 a4tuatN ('I�anihr�"i l(114's,nt,ai�r xis
\I:mlinit 1-,tndir Cmurol Odor Control Devices
Fpoxv 1 n i.1: Sanitary Sewn
13960 Ste IC Repair and Resurfacing Products
39 60 Bpoxy I.ince t':,r Sanitary Sewer Coating Products
Stn O."
7s 4t rc It-rf:",d i"n..rcte Storm Drain 1'recast Remfonxd Concrete Pipe
No,(Cat...1,
3341 10 %ado-4('�.nirrele 9l,rm Drain Precast Reinforced Concrete Box
I�r 'al"', t'ulvert
3341 10 ltnnjo—d t o,a to Storm Drain 3 ming Materials
Pipe�nl.irc�
334111 11 DPI.Sloan iSrin Pipe Pi.
3341 11 NDPIFi".ga
334601102 ti Ikq,d rat Drains/Trench Drains Slotted Drain Pipe and Outfall Pipe
3346 01!02 ti to r.ed Sn,rm Drains/Trench Drains Trench System
334601/02 Sinnn Dr'ns lTrweh Drains Trench Drains
Page 7 of 9
Division 34-Transportation City of Fort Worth
City-Wide Standard Products List
.Spe,if"Ni"un S sdon Name Pratap8don
W. Pa'Uk 7ypr Af�a�aeprer PYarAertcaipdot✓Madel Na,No. Rape Llnrlmdens
14 4110 1r.,0i,:S,anal, I'iltic"pal ll'ad,1s:�,nblios
344110 I,ar'ii_ , LPIS t'oum;A4n cna111.ad
' l..n,hlic•
344110 InitSc -Is
3441 111 I'sill.tqnals D....n....c..le,ns
E idn,Imacw,C,-h isle Nta,aon ..__
344110 Traffic Signals
344110 Ttl Signals rncrecm:. Preemption Systems
1441 Its hall):G'..Is halt B"k 1 1,��,tcn,,�
1411 IU I'Mli,Samals Daw,—Cables
14 41 10 1"195,S-wk Multi-Conductor Cables
14 41 I I'. _1,in-, Power Lead-in Cables
14 41 11 (round Boxes
14 41 10 l rd Y9i::SS+als nirc Signal Strul
14 41 10 T"A'Sigrial, uardware(Coatings)
n,tfic Signals Wcanced Warning Flasher Assemblies
x441 11: ',aif;S�nal. P�d..tal�enices
1441 10 I r.11i'ic ti,p oaf, I UO Sealant
344120 1 Ornamental Assemblies
344120 P,adun, tummatia_ seal I,pMmp'ixtures
344120 Roadway Illumination Assemblies ll,,-
344120
ra,rr;344120 Roadway Illumination Assemblies Stn•,, Poles
344120 Roadway Illumination Assemblies W,—,I,Qt,l vin.
344120 Roadway Illumination Assemblies I amp>
344120 Roadway Illumination Assemblies I'],,to Cell,
344130 Aluminum Signs and Sip Posts ti�An isrrrts
34 41 30 Aluminum Signs and Sign Posts Film
344130 Aluminum Signs and Sip Posts Non-Reilrvttvc Vinyl Film
Engineermg Gmde RetrweBective Sign
34 41 30 Aluminum Signs and Sign Posts Sheeting with Pressure Sensitive
Adhesive Backing
Very-High-Intensity Retromilective Sign
34 41 30 Aluminum Signs and Sign Posts Sheeting with Pressure Sensitive
Adhesive Backing in Florescent Colors
34 41 30 Aluminum Signs and Sign Posts High-Intensity Prismatic RetroreBective
Sheeting with Adhesive Backing
Page 8 of 9
Division 34-Transportation City of Fort Worth
City-Wide Standard Products List
Sprctffradoa SperlJkaHoa Naw ProJuM Ezylrmina
7ypr Alaaafaetarer ProdswNauUUearr(ponlModel Na Appnr,-al fthl Dore Limilaglow
tiufx'r-H,gh I.IT—y Pua Cube
344130 Aluminum Signs and Sign Posts "3ngwi1h Pressure
Sin.un'�\dh�ivc
34 41 30 Sign Posts _
3441 30Aluminum Signs and Sign Posts Hardware
Page 9 d 9