CONTRACT
Ga V V
J� �o CITY OF FORT WORTH, TEXAS
u' oFF tp
STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL
�,_...- ^� SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home-rule
municipality (the "CITY"), and Baird, Hampton & Brown, Inc., authorized to do business in
Texas, (the "ENGINEER"), for a PROJECT generally described as: Watercress Low
Pressure Sanitary Sewer Improvements
Article I
Scope of Services
The Scope of Services is set forth in Attachment A.
Article II
Compensation
The ENGINEER's compensation shall be in the amount of $467,935.00 as
set forth in Attachment B.
Article III
Terms of Payment
Payments to the ENGINEER will be made as follows:
A. Invoice and Payment
(1) The Engineer shall provide the City sufficient documentation, including but
not limited to meeting the requirements set forth in Attachment D to this
AGREEMENT, to reasonably substantiate the invoices.
(2) The ENGINEER will issue monthly invoices for all work performed under this
AGREEMENT. Invoices are due and payable within 30 days of receipt.
(3) Upon completion of services enumerated in Article I, the final payment of
any balance will be due within 30 days of receipt of the final invoice.
(4) In the event of a disputed or contested billing, only that portion so contested
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016 OFFICIAL RECORD
Page 1 of 16
CITY SECRETARY
FT.WORTH,TX
will be withheld from payment, and the undisputed portion will be paid. The
CITY will exercise reasonableness in contesting any bill or portion thereof.
No interest will accrue on any contested portion of the billing until mutually
resolved.
(5) If the CITY fails to make payment in full to ENGINEER for billings contested
in good faith within 60 days of the amount due, the ENGINEER may, after
giving 7 days' written notice to CITY, suspend services under this
AGREEMENT until paid in full. In the event of suspension of services, the
ENGINEER shall have no liability to CITY for delays or damages caused the
CITY because of such suspension of services.
Article IV
Obligations of the Engineer
Amendments to Article IV, if any, are included in Attachment C.
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental
thereto.
B. Standard of Care
The ENGINEER shall perform its services:
(1) with the professional skill and care ordinarily provided by competent
engineers practicing in the same or similar locality and under the same or
similar circumstances and professional license; and
(2) as expeditiously as is prudent considering the ordinary professional
skill and care of a competent engineer.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise
the CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 2 of 16
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that
could affect the total PROJECT cost and/or execution. These
conditions and cost/execution effects are not the responsibility of the
ENGINEER.
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in .pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on-site representatives or otherwise, do not make the
ENGINEER or its personnel in any way responsible for those duties that
belong to the CITY and/or the CITY's construction contractors or other
entities, and do not relieve the construction contractors or any other entity of
their obligations, duties, and responsibilities, including, but not limited to, all
construction methods, means, techniques, sequences, and procedures
necessary for coordinating and completing all portions of the construction
work in accordance with the Contract Documents and any health or safety
precautions required by such construction work. The ENGINEER and its
personnel have no authority to exercise any control over any construction
contractor or other entity or their employees in connection with their work or
any health or safety precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the
progress or quality of the completed work on the PROJECT or to determine,
in general, if the work on the PROJECT is being performed in a manner
indicating that the PROJECT, when completed, will be in accordance with
the Contract Documents, nor shall anything in the Contract Documents or
the agreement between CITY and ENGINEER be construed as requiring
ENGINEER to make exhaustive or continuous on-site inspections to
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 3 of 16
discover latent defects in the work or otherwise check the quality or quantity
of the work on the PROJECT. If the ENGINEER makes on-site
observation(s) of a deviation from the Contract Documents, the ENGINEER
shall inform the CITY.
(3) When professional certification of performance or characteristics of
materials, systems or equipment is reasonably required to perform the
services set forth in the Scope of Services, the ENGINEER shall be entitled
to rely upon such certification to establish materials, systems or equipment
and performance criteria to be required in the Contract Documents.
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate
PROJECT cost or schedule. Therefore, the ENGINEER makes no
warranty that the CITY's actual PROJECT costs, financial aspects,
economic feasibility, or schedules will not vary from the ENGINEER's
opinions, analyses, projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling
and observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the Contract
Documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are not other
matters at issue between the CITY and the construction contractor that
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 4 of 16
affect the amount that should be paid
H. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for
any errors or omissions in the information from others that is incorporated
into the record drawings.
I. Minority Business and Small Business Enterprise (MBE)(SBE)
Participation
In accord with the City of Fort Worth Business Diversity Ordinance No.
20020-12-2011, as amended, the City has goals for the participation of
minority business enterprises and/or small business enterprises in City
contracts. Engineer acknowledges the MBE and SBE goals established for
this contract and its accepted written commitment to MBE and SBE
participation. Any misrepresentation of facts (other than a negligent
misrepresentation) and/or the commission of fraud by the Engineer may
result in the termination of this Agreement and debarment from participating
in City contracts for a period of time of not less than three (3) years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers
and records of the ENGINEER involving transactions relating to this
contract. ENGINEER agrees that the CITY shall have access during normal
working hours to all necessary ENGINEER facilities and shall be provided
adequate and appropriate work space in order to conduct audits in
compliance with the provisions of this section. The CITY shall give
ENGINEER reasonable advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the
CITY shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in
order to conduct audits in compliance with the provisions of this article
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 5 of 16
together with subsection (3) hereof. CITY shall give subconsultant
reasonable advance notice of intended audits.
(3) ENGINEER and subconsultant agree to photocopy such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for
the cost of copies at the rate published in the Texas Administrative Code in
effect as of the time copying is performed.
K. INSURANCE
(1) ENGINEER'S INSURANCE
a. Commercial General Liability — the ENGINEER shall maintain
commercial general liability (CGL) and, if necessary, commercial
umbrella insurance with a limit of not less than $1,000,000.00 per each
occurrence with a $2,000,000.00 aggregate. If such Commercial General
Liability insurance contains a general aggregate limit, it shall apply
separately to this PROJECT or location.
i. The CITY shall be included as an insured with all rights of defense
under the CGL, using ISO additional insured endorsement or a
substitute providing equivalent coverage, and under the
commercial umbrella, if any. This insurance shall apply as
primary insurance with respect to any other insurance or self-
insurance programs afforded to the CITY. The Commercial
General Liability insurance policy shall have no exclusions or
endorsements that would alter or nullify: premises/operations,
products/completed operations, contractual, personal injury, or
advertising injury, which are normally contained within the policy,
unless the CITY specifically approves such exclusions in writing.
ii. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the commercial general
liability or commercial umbrella liability insurance maintained in
accordance with this agreement.
b. Business Auto — the ENGINEER shall maintain business auto liability
and, if necessary, commercial umbrella liability insurance with a limit of
not less than $1,000,000 each accident. Such insurance shall cover
liability arising out of "any auto", including owned, hired, and non-owned
autos, when said vehicle is used in the course of the PROJECT. If the
engineer owns no vehicles, coverage for hired or non-owned is
acceptable.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 6 of 16
i. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the business auto liability or
commercial umbrella liability insurance obtained by ENGINEER
pursuant to this agreement or under any applicable auto physical
damage coverage.
c. Workers' Compensation —ENGINEER shall maintain workers
compensation and employers liability insurance and, if necessary,
commercial umbrella liability insurance with a limit of not less than
$100,000.00 each accident for bodily injury by accident or $100,000.00
each employee for bodily injury by disease, with $500,000.00 policy limit.
i. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by workers compensation and
employer's liability or commercial umbrella insurance obtained by
ENGINEER pursuant to this agreement.
d. Professional Liability — the ENGINEER shall maintain professional
liability, a claims-made policy, with a minimum of $1,000,000.00 per
claim and aggregate. The policy shall contain a retroactive date prior to
the date of the contract or the first date of services to be performed,
whichever is earlier. Coverage shall be maintained for a period of 5 years
following the completion of the contract. An annual certificate of
insurance specifically referencing this project shall be submitted to the
CITY for each year following completion of the contract.
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that the ENGINEER has obtained all
required insurance shall be attached to this AGREEMENT prior to its
execution.
b. Applicable policies shall be endorsed to name the CITY an Additional
Insured thereon, subject to any defense provided by the policy, as its
interests may appear. The term CITY shall include its employees,
officers, officials, agents, and volunteers as respects the contracted
services.
c. Certificate(s) of insurance shall document that insurance coverage
specified in this agreement are provided under applicable policies
documented thereon.
d. Any failure on part of the CITY to attach the required insurance
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 7 of 16
documentation hereto shall not constitute a waiver of the insurance
requirements.
e. A minimum of thirty (30) days notice of cancellation or material change in
coverage shall be provided to the CITY. A ten (10) days notice shall be
acceptable in the event of non-payment of premium. Notice shall be sent
to the respective Department Director (by name), City of Fort Worth,
1000 Throckmorton, Fort Worth, Texas 76102.
f. Insurers for all policies must be authorized to do business in the State of
Texas and have a minimum rating of A:V or greater, in the current A.M.
Best Key Rating Guide or have reasonably equivalent financial strength
and solvency to the satisfaction of Risk Management.
g. Any deductible or self insured retention in excess of $25,000.00 that
would change or alter the requirements herein is subject to approval by
the CITY in writing, if coverage is not provided on a first-dollar basis. The
CITY, at it sole discretion, may consent to alternative coverage
maintained through insurance pools or risk retention groups. Dedicated
financial resources or letters of credit may also be acceptable to the
CITY.
h. Applicable policies shall each be endorsed with a waiver of subrogation
in favor of the CITY as respects the PROJECT.
i. The CITY shall be entitled, upon its request and without incurring
expense, to review the ENGINEER's insurance policies including
endorsements thereto and, at the CITY's discretion; the ENGINEER may
be required to provide proof of insurance premium payments.
j. Lines of coverage, other than Professional Liability, underwritten on a
claims-made basis, shall contain a retroactive date coincident with or
prior to the date of the contractual agreement. The certificate of
insurance shall state both the retroactive date and that the coverage is
claims-made.
k. Coverages, whether written on an occurrence or claims-made basis,
shall be maintained without interruption nor restrictive modification or
changes from date of commencement of the PROJECT until final
payment and termination of any coverage required to be maintained after
final payments.
I. The CITY shall not be responsible for the direct payment of any
insurance premiums required by this agreement.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 8 of 16
m. Sub consultants and subcontractors to/of the ENGINEER shall be
required by the ENGINEER to maintain the same or reasonably
equivalent insurance coverage as required for the ENGINEER. When
sub consultants/subcontractors maintain insurance coverage,
ENGINEER shall provide CITY with documentation thereof on a
certificate of insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent
consultant and not as a subcontractor, agent, or employee of the CITY.
The doctrine of respondeat superior shall not apply.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure
in writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing
of any conflicts of interest that develop subsequent to the signing of this
contract and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with
published design criteria and/or current engineering practice standards
which the ENGINEER should have been aware of at the time this
Agreement was executed, the ENGINEER shall revise plans and
specifications, as required, at its own cost and expense. However, if design
changes are required due to the changes in the permitting authorities'
published design criteria and/or practice standards criteria which are
published after the date of this Agreement which the ENGINEER could not
have been reasonably aware of, the ENGINEER shall notify the CITY of
such changes and an adjustment in compensation will be made through an
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 9 of 16
amendment to this AGREEMENT.
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
Amendments to Article V, if any, are included in Attachment C.
A. City-Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of
the information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of
the CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses
required by local, state, or federal authorities; and land, easements, rights-
of-way, and access necessary for the ENGINEER's services or PROJECT
construction.
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches,
drawings, specifications, proposals, and other documents; obtain advice of
an attorney, insurance counselor, accountant, auditor, bond and financial
advisors, and other consultants as the CITY deems appropriate; and render
in writing decisions required by the CITY in a timely manner in accordance
with the project schedule prepared in accordance with Attachment D.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 10 of 16
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
claims by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of
such materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos
is a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification and Claims
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and
provisions providing for contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third-Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering
services performed. Only the CITY will be the beneficiary
of any undertaking by the ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third-party beneficiaries.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 11 of 16
(3) The CITY will include in each agreement it enters into with any other entity
or person regarding the PROJECT a provision that such entity or person
shall have no third-party beneficiary rights under this Agreement.
(4) Nothing contained in this section H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
I. CITY's Insurance
(1) The CITY may maintain property insurance on certain pre-existing structures
associated with the PROJECT.
(2) The CITY will ensure that Builders Risk/installation insurance is maintained
at the replacement cost value of the PROJECT. The CITY may provide
ENGINEER a copy of the policy or documentation of such on a certificate of
insurance.
(3) The CITY will specify that the Builders Risk/[nsta I lation insurance shall be
comprehensive in coverage appropriate to the PROJECT risks.
J. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
K. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
Article VI
General Legal Provisions
Amendments to Article VI, if any, are included in Attachment C.
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 12 of 16
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
The ENGINEER is not responsible for damages or delay in performance
caused by acts of God, strikes, lockouts, accidents, or other events beyond
the control of the ENGINEER that prevent ENGINEER's performance of its
obligations hereunder.
D. Termination
(1) a.) This AGREEMENT may be terminated for convenience only by the
City on 30 days' written notice.
b.) This AGREEMENT may be terminated by either the CITY or the
ENGINEER for cause if either party fails substantially to perform
through no fault of the other and the nonperforming party does not
commence correction of such nonperformance within 5 days of
written notice or thereafter fails to diligently complete the correction.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Cost of reproduction of partial or complete studies, plans,
specifications or other forms of ENGINEER'S work product;
b.) Out-of-pocket expenses for purchasing electronic data files and other
data storage supplies or services;
c.) The time requirements for the ENGINEER'S personnel to document
the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all termination expenses. The
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 13 of 16
CITY'S approval will be obtained in writing prior to proceeding with
termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER
for the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors,
and ENGINEER's compensation will be made.
F. Indemnification
In accordance with Texas Local Government Code Section 271.904, the
ENGINEER shall indemnify or hold harmless the CITY against liability
for any damage committed by the ENGINEER or ENGINEER's agent,
consultant under contract, or another entity over which the ENGINEER
exercises control, other than liability for damage to the extent caused
by or resulting from an act of negligence, intentional tort, intellectual
property infringement, or failure to pay a subcontractor or supplier.
CITY is entitled to recover its reasonable attorney's fees in proportion
to the ENGINEER's liability.
G. Assignment
Neither party shall assign all or any part of this AGREEMENT without the
prior written consent of the other party.
H. Interpretation
Limitations on liability and indemnities in this AGREEMENT are business
understandings between the parties and shall apply to all the different
theories of recovery, including breach of contract or warranty, tort including
negligence, strict or statutory liability, or any other cause of action, except for
willful misconduct or gross negligence for limitations of liability and sole
negligence for indemnification. Parties mean the CITY and the ENGINEER,
and their officers, employees, agents, and subcontractors.
I. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 14 of 16
J. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any
reason to be invalid, illegal, or unenforceable in any respect, such invalidity,
illegality, or unenforceability will not affect any other provision, and this
AGREEMENT shall be construed as if such invalid, illegal, or unenforceable
provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F.,
VI.H., and VI.1. shall survive termination of this AGREEMENT for any cause.
K. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in
any way affect this AGREEMENT and the work hereunder, and shall
observe and comply with all orders, laws ordinances and regulations which
may exist or may be enacted later by governing bodies having jurisdiction or
authority for such enactment. No plea of misunderstanding or ignorance
thereof shall be considered. ENGINEER agrees to defend, indemnify and
hold harmless CITY and all of its officers, agents and employees from and
against all claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itself or its employees.
Article VII
Attachments, Schedules and Counterparts
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, which supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. This Agreement may be
executed in one or more counterparts and each counterpart shall, for all purposes, be
deemed an original, but all such counterparts shall together constitute but one and the
same instrument. The following attachments and schedules are hereby made a part of
this AGREEMENT:
Attachment A - Scope of Services
Attachment B —Compensation
Attachment C -Amendments to Standard Agreement for Engineering Services
Duly executed by each party's designated representative to be effective on the date
subscribed by the City's designated Assistant City Manager.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 15 of 16
BY: BY:
CITY OF FORT WORTH ENGINEER
Baird, Hampton & Drown, Inc.,
< ;74w
2r:
esus J. Chapa �Austin Baird, P. E.
Assistant City Manager Senior Associate
Date: 1i '6'-l7
Date:
APPROVAL RECOMMENDED:
By: ( On !J 0
Chris Harder, P. E.
Assistant Director, Water Department
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Name of Employee
/Czz
Title: Project Manager
APPROVED AS TO FORM AND LEGALITY
B
Douglas W. Black
Senior Assistant City Attorney
ATTEST: ' •T� Form 1295 No. 2017-265843
M&C No. C -28476
Mary J. er C)
City Secretary *`. :' * M&C Date: November 14, 2017
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services OFFICIAL RECORD
Revised Date:
Page 16 of 16 12.22.2016 CITY SECRETARY
FT.WORTH,TX
ATTACHMENTA
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
ATTACHMENT A
Scope for Engineering Desiqn Related Services for Sanitary Sewer Improvements
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.: 101002
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
PROJECT DESCRIPTION
This project consists of the extension of a low pressure sanitary sewer system to provide
access to public sewer system to the existing homes along the northem bank of Lake Worth
generally along Watercress drive and the connecting cul-de-sacs. The public infrastructure
generally consists of the extension of approximately 23,000 LF of sanitary sewer force main
ranging in size from 2-inch to 4-inch, as well as the installation of approximately 150 grinder
pump stations to serve the existing homes in the area. The general limits of works is
summarized in the table below.
Street From To
Watercress Drive 9857 Watercress Drive Surfside Drive
Peninsula Club Circle (CCN) Watercress Drive Watercress Drive
Sunrise Point(CCN) Peninsula Club Drive Dead-End
North Lake Drive (CCN) Watercress Drive Watercress Drive
Island View Drive (CCN) Watercress Drive Watercress Drive
WORK TO BE PERFORMED
Task 1. Design Management
Task 2. Conceptual Design
Task 3. Preliminary Design
Task 4. Final Design
Task 5. Bid Phase Services
Task 6. Construction Phase Services
Task 7. ROW/Easement Services
Task 8. Survey Services
Task 9. City Services
TASK 1. DESIGN MANAGEMENT,
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.2!7
Page 1 of 17
ATTACHMENTA
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and
resources.
ENGINEER shall manage change,
• communicate effectively,
• coordinate internally and externally as needed, and
■ proactively address issues with the CITY's Project Manager and others as
necessary to make progress on the work.
1.1. Managing the Team
• Lead, manage and direct design team activities
• Ensure quality control is practiced in performance of the work
• Communicate internally among team members
• Task and allocate team resources
1.2. Communications and Reporting
• Attend a pre-design project kickoff/chartering meeting with CITY staff to confirm and
clarify scope, understand CITY objectives, and ensure economical and functional
designs that meet CITY requirements
• Conduct review meetings with the CITY at the end of each design phase
• Prepare invoices and submit monthly in the format requested by the CITY. Monthly
invoices to include and updated Level-of-Effort spreadsheet with percent complete
per task showing fee earned, fee remaining and current amount due.
• Prepare and submit bi-monthly progress reports in the format provided by the Water
Department.
• Prepare and submit baseline Project Schedule initially, and Project Schedule updates
with a schedule narrative monthly, as required in Attachment D to this Standard
Agreement and according to the City of Fort Worth's Schedule Guidance Document.
• Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at
the end of the project
• Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare the
design
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements are
appropriately reflected in the designs. ENGINEER shall work with regulatory
authorities to obtain approval of the designs, and make changes necessary to meet
their requirements, as part of the design scope.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 2 of 17
ATTACHMENTA
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
• Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub-consultants shall carry readily visible
information identifying the name of the company and the company representative.
ASSUMPTIONS
• 24 MWBE reports will be prepared
8 meetings with city staff
• 12 bi-monthly water department progress reports will be prepared
• 12 bi-monthly project schedule updates will be prepared
DELIVERABLES
A. Meeting summaries with action items
B. Monthly invoices
C. Monthly progress reports
D. Baseline design schedule
E. Bi-Monthly schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Monthly M/WBE Report Form and Final Summary Payment Report Form
G. Plan Submittal Checklists (See Task 9)
TASK 2. CONCEPTUAL DESIGN (30 PERCENT).
The Conceptual Design shall be submitted to CITY per the approved Project Schedule.
The purpose of the conceptual design is for the ENGINEER to
■ Study the project,
■ Identify and develop alternatives that enhance the system,
■ Engage the community and begin the property owner coordination for the sewer
service conversions
■ Present (through the defined deliverables)these alternatives to the CITY
■ Recommend the alternatives that successfully addresses the design problem, and
■ Obtain the CITY's endorsement of this concept.
ENGINEER will develop the conceptual design of the infrastructure as follows.
2.1. Data Collection
• In addition to data obtained from the CITY, ENGINEER will research proposed
improvements in conjunction with any other planned future improvements that
may influence the project.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1 2014
Page 3 of 17
ATTACHMENT
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
• The ENGINEER will also identify and seek to obtain data for existing conditions
that may impact the project including but not limited to; utilities, agencies (TxDOT
and railroads), City Master Plans, and property ownership as available from the
Tax Assessor's office.
• The data collection efforts will also include conducting special coordination
meetings with affected property owners and businesses as necessary to develop
sewer re-routing plans.
• The ENGINEER shall visit the project site and obtain the meter numbers and sizes
on all existing meters to be replaced on the project and shall identify existing
sample stations and fire line locations.
2.2. Geotechnical Investigation Coordination
• ENGINEER shall review existing geotechnical investigations that were performed
within the projects area as part of other recent and ongoing projects and advise
the CITY of test borings and other subsurface investigations that may be needed
for the project. If the CITY determines that such borings or investigations are
needed, then the ENGINEER shall work with the CITY and CITY's geotechnical
consultant to draw up specifications for such testing program. The cost of such
testing will be paid for by the CITY.
2.3. Route Study
• Engineer shall work with the existing publicly available data; existing surveys,
record drawings, TAD parcel ownership information, etc., to developed the
proposed route for the new force mains.
2.4 Public Meetings
• Engineer shall attend a public meeting for the residents of the area to discuss the
forth coming project and assess public interest for the conversion of homes to the
public sewer system, and to begin the owner coordination that will be required.
• Engineer shall consider the input from the public when developing the final
design of the project.
2.5. The Conceptual Design Package shall include the following:
• Cover Sheet
• Graphic exhibits and written summary of alternative design concepts considered,
strengths,weaknesses and costs of each alternative, and the rationale for
selecting the recommended design concept.
• Proposed phasing of sanitary sewer work that is included in this project
documented in both the project schedule and narrative form.
• Documentation of key design decisions.
• Estimates of probable construction cost.
ASSUMPTIONS
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 4 of 17
ATTACHMENT A
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
• 2 copies of the conceptual design package (30% design)will be delivered.
Report shall be letter sized and comb-bound with a clear plastic cover. Drawings
will be 11x17 size fold outs bound in the report
• PDF files created from design CAD drawings will be uploaded to the designated
project folder in Buzzsaw
• 1 public meeting will be conducted or attended during the concept design
phase.
1 Concept Design Review meeting will be conducted and attended at the
completion of the concept design phase with City Staff.
• ENGINEER shall prepare the meeting minutes of the Concept Review meeting
and revise the report, if needed.
• ENGINEER shall not proceed with Preliminary Design activities without obtaining
written approval by the CITY of the Conceptual Design Package.
DELIVERABLES
A. Conceptual Design Package
TASK 3. PRELIMINARY DESIGN (60 PERCENT).
Preliminary plans and specifications shall be submitted to CITY per the approved Project
Schedule.
ENGINEER will develop the preliminary design of the infrastructure as follows.
3.1. Development of Preliminary Design Drawings and Specifications shall include the
following:
• Cover Sheet
• A Project Control Sheet, showing all Control Points, used or set while gathering
data. Generally on a scale of not less than 1:400. The following information shall
be indicated for each Control Point: Identified (existing City Monument#8901, PK
Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system,
and a referred bearing base. Z coordinate on City Datum only; descriptive location
(i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the
East end of radius at the Southeast corner of North Side Drive and North Main
Street).
• Overall project easement layout sheet(s)with property owner information.
• Overall project sanitary sewer layout sheets. The sewer layout sheet shall
identify the proposed sewer main improvement/existing sewer mains and all
sewer appurtenances in the vicinity, including lateral and/or main; size and
designations.
• Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc.,
in the same coordinate system as the Control Points.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 6 of 17
ATTACHMENTA
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
• Bench marks per 1,000 ft of plan sheet—two or more.
• Bearings given on all proposed centerlines, or baselines.
• Station equations relating utilities to paving, when appropriate.
• Plan sheets which show the following: proposed sanitary sewer plan and
recommended pipe size, flush points, sanitary sewer service lines, service valve
boxes, existing utilities and utility easements, and all pertinent information
needed to construct the project. Legal description (Lot Nos., Block Nos., and
Addition Names) along with property ownership shall be provided on the plan
view. A table with property owner names and addresses will be provided if
necessary.
• The following shall be applicable at all locations where it is necessary to reroute
the existing private sanitary sewer service line to connect to the new sanitary
sewer force main: The CITY shall coordinate the location of the proposed grinder
pump and routing of the service force main for each lot and furnish ENGINEER
with the location of the proposed service valve vault adjacent to the right-of-way.
With the private gravity sewer service reroute to be performed by the homeowner.
• Provide map showing location of flushing ports at the end of proposed sewer
segments, 90 degree bends, or tee connections. Site survey or specific design
plans for manhole construction is not included as part of the scope. The contract
documents shall specify that it is the Contractor's responsibility to coordinate utility
location, etc. manhole construction.
• The ENGINEER will prepare standard and special detail sheets for sanitary sewer
line installation that are not already included in the D-section of the CITY's
specifications.These may include connection details between various parts of the
project, boring and jacking details,waterline relocations, details unique to the
construction of the project,trenchless details, and special service lateral
reconnections. The Engineer will provide typical details for the installation of the
grinder pump station, service force main and service valve vault to be installed by
the general contractor
3.2 Public Meetings
• Engineer shall attend a public meeting for the residents of the area to discuss the
forth coming project and to begin the owner coordination that will be required.
3.3 Constructability Review
• Prior to the 60 percent review meeting with the CITY, the ENGINEER shall
schedule and attend a project site visit with the CITY Project Manager and
Construction personnel to walk the project. The ENGINEER shall summarize the
CITY's comments from the field visit and submit this information to the CITY in
writing.
3.4. Utility Clearance
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 6 of 17
ATTACHMENT A
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
• The ENGINEER will consult with the CITY's Transportation and Public Works
Department, Water Department, and other CITY departments, public utilities,
private utilities, private utilities and government agencies to determine the
approximate location of above and underground utilities, and other facilities
(current and future)that have an impact or influence on the project. ENGINEER
will design CITY facilities to avoid or minimize conflicts with existing utilities, and
where known and possible consider potential future utilities in designs.
• The ENGINEER shall upload a PDF file of the approved preliminary plan set to the
designated project folder in Buzzsaw for forwarding to all utility companies which
have facilities within the limits of the project. DWF files shall be created directly
from the CAD files as opposed to PDF files, if required by the City.
3.5. Traffic Control Plan
• Develop a traffic control plan utilizing standard traffic reroute configurations
posted as "Typicals"on the CITY's Buzzsaw website. The typicals need not be
sealed individually, if included in the sealed contract documents.
• Develop supplemental traffic control drawings as needed for review and approval
by the Traffic Division of the Transportation and Public Works Department.
These drawings shall be sealed by a professional engineer registered in the
State of Texas.
• Develop a contact list for the project including all affected owners/businesses.
The list shall include both the physical address and owner address for each
property, as well as all affected stakeholders including Home Owners
Associations, etc.. The list shall be formatted as required by the City.
ASSUMPTIONS
• 1 public meeting(s)will be conducted or attended during the preliminary design
phase.
• 1 Preliminary Design Review meeting will be conducted and attended at the
completion of the concept design phase with City Staff.
• 1 Utility Clearance Design Review meeting will be conducted and attended at
the completion of the concept design phase with City Staff.
• Traffic Control "Typicals"will be utilized to the extent possible. It is assumed an
additional 3 project specific traffic control sheets will be developed for roadway
intersection and detours should they become necessary.
• 3 sets of 11x17 size plans will be delivered for the Preliminary Design (60%)
Review.
• 2 sets of specifications will be delivered for the Preliminary Design (60%
design) Review.
• DWF files created from design CAD drawings will be uploaded to the designated
project folder in Buzzsaw.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 7 of 17
ATTACHMENT A
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
• The CITY's front end and technical specifications will be used. The ENGINEER
shall supplement the technical specifications if needed.
• 1 PDF set of drawings will be posted to Buzzsaw for Utility Clearance.
Engineer shall provide a cost estimate for construction separated by each sheet
in the plan set.
• Engineer shall not proceed with Final Design activities without written approval
by the CITY of the Preliminary Design plans.
DELIVERABLES
A. Preliminary Design drawings and specifications
B. Utility Clearance drawings
C. Traffic Control Plan
D. Storm Water Pollution Prevention Plan
E. Estimates of probable construction cost
F. Data Base listing names and addresses of residents and businesses affected by
the project.
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
4.1 Home Owner Coordination
• During the Final design phase of the project it is our understanding that the City will
take the lead on the homeowner coordination and will be conducting meetings with
some homeowners on an individual basis. However, based on preliminary discussions
with city staff it is our expectations that we will need to be involved and present at
several of those homeowner coordination meetings prior to construction. At this time,
we are including attendance at 5 meetings with affected homeowner.
• For the home owner coordination we will prepare exhibits of the individual lots for the
City's use in discussing the location and routing of the sanitary sewer grinder pump and
service force main with the homeowners. The exhibits will include the property
information from the R.O.W. survey and a current aerial image of the property for a
graphical depiction of the lot. Please note that this will not include a full topographic
survey of the property.
4.2 Development of Final Construction Plan and Specifications
Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as
follows:
• Draft Final plans (90%) and specifications shall be submitted to CITY per the approved
Project Schedule.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 8 of 17
ATTACHMENT
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
• Following a 90% construction plan review meeting with the CITY, the ENGINEER shall
submit Construction Documents (100%)to the CITY per the approved Project Schedule.
Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in
State of Texas.
• The ENGINEER shall submit a final design estimate of probable construction cost with
both the 90% and 100% design packages. This estimate shall use standard CITY bid
items, as much as possible.
4.3 Permitting
• For projects that disturb an area greater than one (1)acre, the Contractor will be
responsible for preparing and submitting the Storm Water Pollution Prevention Plan
(SWPPP)with appropriate regulatory agencies. The Engineer will prepare the iSWM
Construction Plan according to the current CITY iSWM Criteria Manual for Site
Development and Construction which will be incorporated into the SWPPP by the
contractor
• Pursuant to TCEQ criteria for alternative collections systems the required applications,
notification letters and plan submittals will be prepared and submitted for review and
approval.
ASSUMPTIONS
• 5 homeowner meetings will be conducted or attended during the final design phase.
1 Design Review meetings will be conducted and attended at the completion of the
90% design phase with City Staff.
• 1 Design Review meetings will be conducted and attended at the completion of the
100% design phase with City Staff.
2 sets of 11x17 size drawings and 2 sets of 22x34 size drawings and 2
specifications will be delivered for the 90% Design package.
• A PDF file for the 90% Design will be created from design CAD drawings and will be
uploaded to the project folder in Buzzsaw DWF files shall be provided if necessary.
• 2 sets of 22x34 size drawings and 2 specifications will be delivered for the 100%
Design package.
• A PDF file for the 100% Design will be created from design CAD drawings and will be
uploaded to the project folder in Buzzsaw. DWF files shall be provided if necessary.
DELIVERABLES
A. 90% construction plans and specifications.
B. 100% construction plans and specifications.
C. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's standard bid items and format.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 9 of 17
ATTACHMENTA
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
D. Original cover mylar for the signatures of authorized CITY officials.
TASK 5. BID PHASE SERVICES.
ENGINEER will support the bid phase of the project as follows.
5.1 Bid Support
• The ENGINEER shall upload all plans and contract documents onto Buzzsaw for
access to potential bidders.
• Contract documents shall be uploaded in a .xis file.
• Unit Price Proposal documents are to be created utilizing CFW Bidtools only
and combined in a specified spreadsheet workbook, Bid Proposal Worksheet
Template, and will be populated and configured so that all pages are
complete and the Summary Worksheet(s) in the workbook detail and
automatically summarize the totals from the inserted Unit Price Proposal
document worksheets.
• Plan Sets are to be uploaded to Buzzsaw in two formats, .pdf and Awf files.
The .pdf will consist of one file of the entire plan set. The Awf will consist of
one file and will be numbered and named in a manner similar to that of the
plan set index.
• The ENGINEER shall sell contract documents and maintain a plan holders list on
Buzzsaw from documents sold and from Contractor's uploaded Plan Holder
Registrations in Buzzsaw.
• The ENGINEER will develop and implement procedures for receiving and
answering bidders' questions and requests for additional information. The
procedures shall include a log of all significant bidders questions and requests
and the response thereto. The log shall be housed and maintained in the
project's Buzzsaw folder titled Request for Information. The ENGINEER will
provide technical interpretation of the contract bid documents and will prepare
proposed responses to all bidders questions and requests, in the form of
addenda. The ENGINEER shall upload all approved addenda onto Buzzsaw and
mail addenda to all plan holders.
• Attend the prebid conference in support of the CITY.
• Assist the CITY in determining the qualifications and acceptability of prospective
contractors, subcontractors, and suppliers.
• When substitution prior to award of contracts is allowed in the contract
documents, the ENGINEER will advise the CITY as to the acceptability of
alternate materials and equipment proposed by bidders.
• Attend the bid opening in support of the CITY.
• Tabulate and review all bids received for the construction project, assist the CITY
in evaluating bids, and recommend award of the contract. A copy of the Bid
Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only
are to be uploaded into the project's Bid Results folder on Buzzsaw.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 10 of 17
ATTACHMENT A
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
• Incorporate all addenda into the contract documents and issue conformed sets.
5.2 Final Design Drawings
1) Final Design Drawings shall be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher)format and DWF format. There shall be one (1) PDF file
and one (1) DWF file for Water plan set. Each PDF and DWF file shall be
created from the original CAD drawing files and shall contain all associated
sheets of the particular plan set. Singular PDF and DWF files for each sheet
of a plan set will not be accepted. PDF and DWF files shall conform to naming
conventions as follows:
I. Water and Sewer file name example — "X-35667—org36.pdf" where 11X-
35667" is the assigned file number obtained from the CITY, "—org"
designating the file is of an original plan set, "36" shall be the total number
of sheets in this file.
Example: X-12755—org18.pdf
Both PDF and DWF files shall be uploaded to the project's Final Drawing folder in
Buzzsaw
2) In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet
as an individual DWG file with all reference files integrated into the sheet. If the
plans were prepared in DGN format, they shall be converted to DWG prior to
uploading. The naming convention to be used for the DWG files shall be as
follows:
II.Water and Sewer file names shall use the X number as for PDF and DWF
files, but shall include the sheet number in the name—"X-12155 SHT01.dwg",
"X-12755 SHT02.dwg", etc.
For information on the proper manner to submit files and to obtain a file number for
the project, contact the Department of Transportation and Public Works Vault at
telephone number(817)392-8426. File numbers will not be issued to a project
unless the appropriate project numbers and fund codes have been assigned and
are in the Department of Transportation and Public Works database.
ASSUMPTIONS
• The project will be bid only once and awarded to one contractor.
• 5 sets of construction documents will be sold and made available on Buzzsaw
for plan holders and/or given to plan viewing rooms.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 11 of 17
ATTACHMENTA
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
• 1 Pre-Bid conference will be attended during the bidding phase of the project
in support of the City Staff.
• 1 Bid Opening be attended during the bidding phase of the project in support
of the City Staff.
• 2 sets of 11x17 size and 2 sets of 22x34 size drawings plans and 2
specifications (conformed, if applicable)will be delivered to the CITY.
• PDF, DWF and DWG files will be uploaded to Buzzsaw.
DELIVERABLES
A. Addenda
B. Bid tabulations
C. CFW Data Spreadsheet
D. Recommendation of award
E. Construction documents (conformed, if applicable)
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1 Construction Support
• The ENGINEER shall attend the preconstruction conference.
• After the pre-construction conference, the ENGINEER shall provide project
exhibits and attend public meeting to help explain the proposed project to
residents. The CITY shall select a suitable location and mail the invitation letters
to the affected customers.
• The ENGINEER shall visit the project site at requested intervals as construction
proceeds to observe and report on progress.
• As requested by the CITY, the ENGINEER shall provide necessary interpretations
and clarifications of contract documents, review change orders, and make
recommendations as to the acceptability of the work.
• The ENGINEER shall assist the City Staff with Construction Shop Drawing review
on a limited basis. It is our expectation that the city staff will be reviewing the
majority of the submitted items, however we are including the review of items not
included in the sections of the City's standard specifications.
• The ENGINEER shall attend the"Final" project walk through and assist with
preparation of final punch list
6.2 Record Drawings
• The ENGINEER shall prepare Record Drawings from information provided by
the CITY depicting any changes made to the Final Drawings during construction.
The following information shall be provided by the CITY:
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 12 of 17
ATTACHMENT A
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
o As-Built Survey
o Red-Line Markups from Contractor
o Red-Line Markups from City Inspector
o Copies of Approved Change Orders
o Approved Substitutions
• The ENGINEER shall modify the Final Drawings electronically and shall place a
stamp on the plans indicating that they represent Record Drawings of the project
as constructed. The stamp shall be signed and dated by the ENGINEER and
shall be placed on each plan sheet, whether there are any revisions on the sheet
or not. Each sheet shall clearly indicate all changes which apply to that sheet by
clouding and numbering, or other suitable means.
• The following disclaimer shall be included with the Record Drawing stamp:
o These Record Drawings were prepared using information provided by
others and represent the as constructed conditions to the extent that
documented changes were provided for recording. The ENGINEER
assumes no liability for undocumented changes and certifies only that the
documented changes are accurately depicted on these drawings.
• The ENGINEER shall submit a set of sealed Final Drawings, modified and
stamped as Record Drawings, on mylar for record storage. The ENGINEER may
keep copies of the information provided by the CITY for their files, but all original
red-lined drawings shall be returned to the CITY with the mylars.
2) Record Drawings shall also be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher)format and DWF format. There shall be one (1) PDF file
and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall contain all associated sheets
of the particular plan set. Singular PDF and DWF files for each sheet of a
plan set will not be accepted. PDF and DWF files shall conform to naming
conventions as follows:
I. Water and Sewer file name example — "X-35667_rec36.pdf' where "X-
35667" is the assigned file number obtained from the CITY, "_rec"
designating the file is of a record drawing plan set, "36" shall be the total
number of sheets in this file.
Example: X-12755_recl8.pdf
Both PDF and DWF files shall be uploaded to the project's Record Drawings folder
in Buzzsaw
ASSUMPTIONS
• 1 Pre-Construction Meeting will be attended prior to beginning construction of
the project in support of the City Staff and the selected Contractor.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 13 of 17
ATTACHMENTA
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
• 3 RFI's are assumed.
• 3 Construction Shop Drawing submittal package reviews are assumed.
• 2 Change Orders are assumed
• One copy of full size (22"x34") mylars will be delivered to the CITY.
DELIVERABLES
A. Public meeting exhibits
B. Response to Contractor's Request for Information
C. Review of Change Orders
D. Review of shop drawings
E. Final Punch List items
F. Record Drawings on Mylar
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and land as outlined below,
per scoping direction and guidance from the CITY's Project Manager.
7.1. Right-of-Way Research
• The ENGINEER shall determine rights-of-way, easements needs for construction of
the project. Required temporary and permanent easements will be identified based
on available information and recommendations will be made for approval by the
CITY.
7.2. Temporary Right of Entry/Right-of-Way/Easement Preparation and Submittal.
• Prior to construction, survey, SUE, Geotechnical Exploration on private property, the
ENGINEER shall prepare and mail Temporary Right of Entry documents to all
affected landowners, copies will be provided to the CITY PM for real property
records. It is assumed that letters will only be required for land owners adjacent to
temporary construction easements or who are directly affected by the project and no
easement is required to enter their property. The documentation shall be provided in
conformance with the checklists and templates available on the CITY's Buzzsaw site.
• The ENGINEER shall prepare documents based on the as-built locations of the
grinder pumps and associated public appurtenances to be used to obtain right-of-
way and permanent easements required for the public improvements.
• The ENGINEER shall submit the right-of-way and/or easement documents to CITY
PM for real property acquisition
• The documentation shall be provided in conformance with the checklists and
templates available on the CITY's Buzzsaw site.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 14 of 17
ATTACHMENT A
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
ASSUMPTIONS
• 150 Easements or right-of-way documents will be necessary.
• 150 Temporary right-of-entry documents will be necessary.
• Right-of-Way research and mapping includes review of property/right-of-way records
based on current internet based Tarrant Appraisal District (TAD) information available at
the start of the project and available on-ground property information (i.e. iron rods,
fences, stakes, etc.). It does not include effort for chain of title research, parent track
research, additional research for easements not included in the TAD, right-of-way
takings, easement vacations and abandonments, right-of-way vacations, and street
closures.
DELIVERABLES
A. Easement exhibits and meets and bounds provided on CITY forms.
B. Temporary Right of Entry Letters
TASK 8. SURVEY SERVICES.
ENGINEER will provide survey support as follows.
8.1. Design Survey
• Prior to design survey, SUE, Geotechnical Exploration on private property, the
ENGINEER shall prepare and mail Temporary Right of Entry documents to all affected
landowners, copies will be provided to the CITY PM for real property records. It is
assumed that letters will only be required for land owners adjacent to temporary
construction easements or who are directly affected by the project and no easement is
required to enter their property. The documentation shall be provided in conformance
with the checklists and templates available on the CITY's Buzzsaw site.
• The design survey for this project will be accomplished with a composite survey of
design surveys from other recent City of Fort Worth Water Department projects in the
area that will encompass the majority of the work area as well as supplemental surveys
for areas not recently surveyed. The ENGINEER will perform supplemental field surveys
to collect horizontal and vertical elevations and other information needed by ENGINEER
in design and preparation of plans for the project. Information gathered during the survey
shall include topographic data, elevations of all sanitary and adjacent storm sewers,
rim/invert elevations, location of buried utilities, structures, trees (measure caliper,
identify overall canopy, and have qualified arborist identify species of trees), and other
features relevant to the final plan sheets. Existing drainage at intersections will be
verified by field surveys. Spot elevations will be shown on intersection layouts with cross
slope to fit intersecting grade lines.
• The minimum survey information to be provided on the plans shall include the following:
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 15 of 17
ATTACHMENTA
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
a) A Project Control Sheet, showing ALL Control Points, used or set while gathering
data. Generally on a scale of not less than 1:400:
b) The following information about each Control Point;
c) Identified (Existing. CITY Monument#8901, PK Nail, 5/8" Iron Rod)
d) X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing
base. Z coordinate on CITY Datum only.
e) Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of
North Side Drive at the East end of radius at the Southeast corner of North Side Drive
and North Main Street).
f) Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same
coordinate system, as the Control.
g) No less than two horizontal bench marks, per line or location.
h) Bearings given on all proposed centerlines, or baselines.
i) Station equations relating utilities to paving, when appropriate.
ASSUMPTIONS
• Design survey will include the full R.O.W. throughout the new sanitary sewer force main
route.
DELIVERABLES
A. Copies of field survey data and notes signed and sealed by a licensed surveyor.
B. Drawing of the project layout with dimensions and coordinate list.
C. Temporary Right of Entry Letters
TASK 9. CITY SERVICES
ENGINEER will provide project support as follows.
9.1 Miscellaneous City Services
• This task establishes a budgetary item for additional services should they
become necessary either due to additional efforts on tasks defined within the
scope that exceed the project assumptions or items that are defined as additional
services not currently included but which may become necessary during the
course of the project. Prior to beginning any efforts within this budgetary item a
sub-task scope and fee will be prepared and submitted to the city for review and
approval.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 16 of 17
ATTACHMENTA
DESIGN SERVICES FOR
WATERCRESS LOW PRESSURE SEWER EXTENSION
CITY PROJECT NO.:101002
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existing Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Negotiation of easements and right-of-way property acquisition including temporary
right-of-entries.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre-qualification, bid protests, bid rejection and re-
bidding of the contract for construction.
• Construction management and inspection services
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of God.
• Services related to warranty claims, enforcement and inspection after final completion.
• Services related to submitting for permits other than those specifically listed above (ie.
TxDOT, railroad, etc.. )
• Services related to Subsurface Utility Engineering Levels A, B, C or D
• Services related to Survey Construction Staking
• Services to support, prepare, document, bring, defend, or assist in litigation undertaken
or defended by the CITY.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 17 of 17
ATTACHMENT B
COMPENSATION
Design Services for
Watercress Low Pressure Sewer Extension
City Project No. 101002
Lump Sum Project
1. Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $ 467,935
as summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of
Total Project Fees. The total lump sum fee shall be considered full
compensation for the services described in Attachment A, including all labor
materials, supplies, and equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section 11 -
Method of Payment.
II. Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item III. of
this Attachment B, and Schedule as required in Attachment D to this Agreement.
B. The estimated current physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Document.
C. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Water Department monthly progress reports and schedules in the format
required by the City.
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.092012
Page 1 of 3
B-1
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm -7Primary Responsibility Fee Amount
Prime Consultant
Baird, Hampton & Civil Engineering & Easement $351,235 75.1%
Brown, Inc. ; Services
Proposed MBE/SBE Sub-Consultants
Spooner& Associates Surveying $34,200 7.3%
Spooner&Associates ROW/Easements Services $82,500 17.6%
I
Non-MBE/SBE Consultants
TOTAL $ 467,935 100%
Project Number& Name Total Fee MBE/SBE Fee MBE/SBE
Watercress Low Pressure Sewer $ 467,935 $ 116,700 24.9%
Extension
City MBE/SBE Goal = 10% Consultant Committed Goal = 24.9 %
City of Fort Worth,Texas
Attachment 8
PMO Official Release Date:8.09.2012
Page 2 of 3
B-2
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across work types and work phases.
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 3 of 3
B-3
Professional Services Pa ment Re uest P.ulact Maung. W.U.r Nnwtnd Summary LOCK
Project: Watercress Low Pressure Sewer Extension uNLucic
City Project#: 1101002
City Sec Number: IcoMwl.nl In.bueliau:
Fill in gran call.including Invota Number,Fran.M To D...-d the mclud.d work.he.t..
Company Name: aexd.H IVWa0mvn,Inc. Wh.n your Mvalc.I.compi.la,nava end clo.e,.t.d Su..—.nd Add your iavoiee to th.
C...ulr.M/olds W.Pral.cra.rolda.
consultant's PM: Austin Baled PE email: abair bahYRC.tUm _
vendor Invoice#: DNice Address E300 lee F'lec.,Sgi[e M.Fwi YrtlNh T%76116
Payment Request 0: Telephone: 817.338-1277
From Date: Fax: 149�*
To Date:
Invoice Date: Remit Address
Agreement
Agreement Amendment Amountto Completed Percent J$)Invoiced Current Remaining
Sheet FAC and Work Type Descri tlon Amount Amount Date Amount Completed Previously Invoice Balance
30-Deign Sewer $467,935 001 $467.935. $667,935 GC
11
Totals This Payment Requesl $46793500 $46793500 $467.935.00
Overall Percentage Complete:
Professional Services Payment Request Project Men.gt Wah.r Norwood
Project: Watercress Low Pressure Sewer Extension
City Project M 101002
Work Type Desc: sewer c...uimm mtvuchont�
FfAIC:
City Sec Number: Fin in green cent including Perc.nt Lomp—ma 11.oi-d P,-iomiy ou.oiri.t
Purchase Order: whin yew.mvoic,is compbw,save and time, In eurzt.w end Add your invoice W 1M
con..1M.1 mm.r within Proitc9•t under.
Company Name: B.ire,H.mpton a Brown.mc.
Consultant's PM: Au:un Baird,Pe email: .bairdedmmc.wrn
Vendor Invoice#: Ofhce Address 6300 Rldgie.Place.sun.7M,FW worm,Tx 7011.
Payment Request M Telephone: 817-330-1277
From Date: Fax: 817-338-9245
To Date:
Invoice Date: Remit
Pay Items Agreement
Agreement Amendment Amendment Amount to Completed Percent (S)Invoiced Current Remaining
Description Amount Number Amount Date Amount Completed Previously Invoice Balance
30-Design $467,935.0 $967,935. $467,935A
Totals This Unit: "67.935 06 546].93s.00 $4.7 935.00
Overall Percentage Complete:
Exhibit 8-2:Level of Effort Spreadsheet
TASKMOUR BREAKDOWN
Design ServIets for
W.—ress Low Pressure Sewer Extension
CftyPr,JeetNo. 01002
iWo�,pxe„ n 1 v.a:d Hoµt sn
—T—
NI. ¢r n+nianu e.xo,,.,,n.in
tC T C k¢u0 id.l C I"�°bro
ad ,.rw muctl en .emo vrtwe,ery xrmlu a.
w1a i1¢¢ row {n
ml
0m do
I.1221z w2eo i<a It fO1 wm wm
0rewt.,R.—
w, a w.m wm. wm !?zmm
,cpess aryintx rnln
_. k wm 5000 w.m
ss.eao - w wm snm wm `;az00m:
s ss 0r.0 I, 0z o.¢1
i eo wm wm
as wzro w wm om sum
c.utaka¢..n. ¢w.,u..orevn� z 1 1 a0w m
z3 ao... , a u I, oleo 01 001 _ oo w.m sam ti,lw.
001
sham n as1 w: s0:omo uas�om
z
08 wm W.m f?Ow.
15 Cm9m9,n.s4nnlc a a em OG1 m
2. 112 9 Io0 3o w {Iw On
wI sl w m
.,I ilu.sdK m ao m m a xe om sr not a0 ma no
w.a
xz v�al�
M12
x+w a cltde.. m1 e a a0 I ¢01 e
—
i00 0 {22{ oaA w.w w.w tta,{u.m
e�z
1 x,m 1
01 xc w.m wm szim.a�xwm txa ie iu szxs onx wm woo wm w,0¢s.
Is
22i
�I ware sm ro0 s, sz0 .. wm wm
z wm isi sw..
MI—IMC-1.
a�+�Ied«nd�. z 1 1 e s¢o .... 0.01 m m
Fr,nllvoo+l rwls ele isteam Ta. wre0 a w,o1 wm w.m lom ss 01¢
� Gim w tom wm
3 wm wm
1.]1 Tw 1 0.01 w
❑hef FlT1 Wdfi,Trott
ABVItrY e.lsv al Eeu1 N.{InetlG
netoal{a,1�r>w•:sssa¢Iz
Exhibit B-2:L.-I of Effort SPresBsheet
TASKINOUR BREAKDOWN
Design Sem-.ft.
Watercress Low Pressum Sewer Extension
chvproimtNo. 101002
Taf Rrergxm +"� Mewow argiwr Elr R � I weewzufva taunt fvrc.n+ In.el�ea
50
ew+ trawl wwuc+ cwl cwaMe nelerM •�.� e.ew•
iN0 I.]e Hb I+•e NO i+b ftb i+ii
U N H]w��ia��w b i] H.f00 it Nf b.w fo.ao f0.w {ITev0.o0
z wm tbmwiii 3 5+050 L3. F wro is f0..0U H,05000
3b 2.
51]'izwe0. 1 a o0ti 'm &P0 0W x5a0
513 aaem vre-dacaaewrce a + r]M w H.z o0+s w to woo il,n0
woo w ww fl un
515 aids ma Rammmene neem 2 H1weo f0.w wan f1�w.
z u 110
w�
xi m
24 HSM H5M wm ww H51U.
814 12 1
14
H teo wm H Im.
Repiasl b AfrmMim'Lhxge __
uNa az w0o w ww sz Ball.
LET 4H3 31.1 wm sl iso
100 H7
s+ w w 11.OaD so sw ww {o.w
16+ f0 oo
ewn R�aRr+ai�.n�a,wea-
d u seo f+•I vo.
11 m SN]00 HIM SOw Mt oH.w
Y .12.- "M {`• H7,0+ 1- woo 1.—
law H w0 04 l, iH 000
530.000 b, fltN wad f30.000w
�� 1LGN
N1 iws Fw faar,ob rda{uooc
1334 1b
00 avwrFw /Nl.ma
031124
$
0tcWFwIX
bees Fee lWKaIL f11 d'i
212
m ,fu.00
ass Fmwan.lwr
swoa+da RwH.o•s:awamz
Concept EOPCC.xis EXHIBIT B-3 9/26/2017
BHB Engineering Surveying
6300 Ridglea Place,Suite 700,Fort Worth,Tx 76116
Tel(817)338-1277,Fax(817)338-9245
Watercress Low Pressure Sewer Extension
PAY TOTAL UNIT TOTAL
ITEM QUANTITY UNIT ITEM DESCRIPTION PRICE AMOUNT
1 2 EA Project Designation Sin $ 500.00 $ 1,000.00
2 12 MO Traffic Control $ 2,500.00 $ 30,000.00
3 12 MO SWPPP>1 Acre $ 1,000.00 $ 12,000.00
4 25 EA I Standard Head Grinder Pump Station w/controller $ 7,200.00 $ 180,000.00
5 125 EA IlHigh Head Grinder Pump Station wl controller $ 8,000.00 $ 1,000,000.00
6 150 EA Iservice Valve vault $ 450.00 $ 67,500.00
7 1 11,250 LF 1.25"Sanitary Sewer Service Force Main $ 22.00 $ 247,500.00
8 150 EA Connect Service to Force Main $ 200.00 $ 30,000.00
9 6,800 LF 2"Sanitary Sewer Force Main $ 28.00 $ 190,400.00
10 1,800 LF 2.5" Sanitary Sewer Force Main $ 30.00 $ 54,000.00
11 5,800 LF 3"Sanitary Sewer Force Main $ 32.00 $ 185,600.00
12 7,900 LF 4"Sanitary Sewer Force Main $ 35.00 $ 276,500.00
13 4 EA Connect to Existing SSMH $ 1,500.00 $ 6,000.00
14 8 EA Cleaning Wye/Flush Ports $ 1,000.00 $ 8,000.00
15 22,300 LF Temporary Asphalt Trench Repair $ 16.00 $ 356,800.00
16 500 LF Concrete Pavement Trench Repair $ 50.00 $ 25,000.00
17 22,300 LF Ed emill and Overla 2" HMAC $ 4.50 $ 100,350.00
18 22,300 LF Milling Spoils Haul-Off $ 1.50 $ 33,450.00
19 59,000 SY Overlay 2"Type D HMAC $ 15.00 $ 885,000.00
20 7,500 SY Utility Service Surface Restoration Sodding $ 12.001 $ 90,000.00
21 1 LS Construction Staking $ 5,000.001 $ 5,000.00
22 1 LS Construction Survey $_5,000.00 $ 5,000.00
Subtotal= $ 3,789,100.00
Contingency(20%) $ 760,900.00
Total= $ 4,550,000.00
Page 1 of i
ATTACHMENT `VY
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
Watercress Low Pressure Sewer System Extension
City Project No. 101002
<List any changes to the Standard Agreement>
• No Changes
City of Fort Worth,Texas
Attachment C
PMO Release Date:05.19.2010
Page 1 of 1
Attachment"D" Baird,Hampton&Brown Tue 9/26/17
Schedule 6300 RdVea Piece,Suite 700
Fort Worth,TX 76116
Camplata uk NameDendron Start FNash Nab 3617 IYa m Iu8 tea 101 FNM 3619
26 Submit 100%Design Package 0 days Mon 5/28/18 Mon 5/28/19 5/19
27 ReWew 100%Design Package 10 days Tue 5129/18 Mcm 6/11/18
2a Bid Phase 60 days Tue 6/12/19 Mon 9/3118
29 Sell Contract Documents 20 days Tue 6/12/18 Man 7/9/18
30 Bid Opening 0 days Mon 7/16/18 Mon 7/16/18 7/16
31 Sid Tabulation 4 days Tue 7/17118 Fri 7120/18
32A Issue Conformed Contract Documents 5 days Tue 7/24/18 Mon 7/30/18
i
33 A Execute Contract Documents 5 days Tue 7131/19 Mon 8/6/19
34 M&C for Construction 10 days Tue 8/21118 Mon9/3/18
35 Construction Phase 260 days Most 9/10118 Mon 9/9/19
36 Preconstrvctlon Conference 0 days Mon 9/10118 Mon 9/10118 9110
37 PublicMeeting 0 days Mon 9/24118 Mon 9/24/18 9(24
38 Project Construction 240 days Tue 9/25/18 Mon 8/26/19
39 Final Walkthrough S days Tue 8127/19 Mon 9/2/19 t�
40 Record Drawings 5 days Tue 9/3/19 Mon 9/9/19
41 ROW/Easement Services 523 days Yue 11/7117 Tue 11/17/19
42 Right-of-Way Research 10 days Tue 11/7/17 Tue 11/21117
43 Temporary Right of Entry 1 day Tue 9/4/18 Tue 9/4/18
44 Right-of-Way/Easement Preparation 25 days Tue 9/10/19 Mon 10/14/19
45 Right-of-Way/Easement Submittal 0 days Mon 10/34/19 Mon 10/14/19 �10r14
46 Easement Execution(CFW) 20 days Tue 10/15/19 Mon 11/11/19
47 Easement Filing(CFW) 1 day Tue 11/12/19 Tue 11/12/19 i
48 WA Survey 51 days Wed 11/22/17 Fri 2/2/19
49 0% Temporary Right of Entry Preparation 1 day Wed 11/22/17 Wed 11/22/17 Imo,
50 Design Survey 40 days Fri 1218117 Fd 2/2/18 Iiiiiiiiiiiiiiiiiia
T.0 I Project k--7 Manual T.A snm-aay C Naoane 4
Project:Watercress.Low Pressu spot Task N-*—ey nooa-aay ] r y...
Date:Tue 9126/17 M&-- ♦ sv,iwa Main— wren Summary aarbp E0.r14 Tarks t4rwal Pr.narnc
Suatmey r-------I Ioxdw 5umaury _ MawW Summary 1--1 Fa—1 Ma.— d
Page 2 of 2
Attachment'D' Baird.Hampton&Brown Toe 9/26117
Schedule 6300 Ridgiea Place,Suite 700
Fort Worth,TX 76116
ID Competeask Name daatbn 5iM Fkash itW 1017 IWI M WR 202 FINr ZQ Hag A39
5 101 N
1 Watercress Low Pressure 5ewer 591 days Tue 8/1/17 Tue 11/12/19
Extension
2 Project Agreement 69 days Tue B/1/17 Mon 1316/17
3 Scope&Fee Development 40 days Tue 8/1/17 Tue 9126/17
4 M&C Process 28 days Wed 9127/17 Mon 11/6/17
S Issue Notice to Proceed 0 days Mon 11/6/17 M-1116117 11/6
6 De911n 151 days Wed 11/11/17 Mon 6/11/18
7 Conceptual Design(30%) 41 days Wed 1118/17 Mon 1/8/18 7
11 Conceptual Design Package 25 days Wed 11/8117 Thu 12114/17
9 Data Collection 15 days Wed 1118117 Thu 11/30/17
30 Geotechnical Investigation Coordination 15 days Wed 1118117 Thu 11/30/17
it Routs Study 25 days Wed 1118/17 Thu 12/14/17
12 'Submit Concept Package 0 days ,Thu 12/14/17 Thu 12/14/17 12/14
13 Review Concept Package(CFW) 10 days Fri 12115/17 Fri 12/29/17 -
14 Hold Public Meeting I day Mon 1/8118 Mon 118/18
15 Preliminary Design 45 days Tue 1/9/18 Mon 3/12/18
16 Prepare 60%Design Package 30 days Tue 1/9118 Mon 2/19/18
17 0% Submit 60%Design Package 0 days Mon 2/19/18 Mon 2/19/18 2/19
is ft Review 60%Design Package(CFW) 10 days Tue 2/20/18 Mon 3/5/18
19 Hold Public Meeting 0 days Mon 3/12/18 Mon 3/12/18 3/12
20 Final Design 65 days Tue 3/13/18 Mon 6/11/18
21 0% Homeowner Coordination 30 days Tue 3/13/18 Mon 4/23/18
22 0% Prepare 90%Design Package 30 days Tue 3/13/19 Mon 4/23/18
J2523 Submit 90%Design Package 0 days Mon 4123/18 Mon 4123/18 j *4/23
i
24 Review 9D%Design Package 10 days Tue 4/24/18 Mon 5/7/18
Prepare 100%Design Package 15 days Tue 5/8/18 Mon 5/28/18
T.A Project Sumenry r— k W-A Talk Start-Doer E ceadlim 4
Project Watercress Low Pressu spit ma<tare Task Dvrar—a , Ewwa-any i Prro
Date:Tue 9/26/17 mky Inaciire MgeO— Manual Summary Mkp EdmW Tnh Marwat hcgren
summry 1n—e Summary Manual Summery r-----1 E—r.W M4nme.
Page 1 of 2
se ,.
�i.�.r�i ai "� � •
��Mrr� •
�•it� � -
es■er� rr ,r,.:
w rerr m��e,r,�® •� �.,,�.
MWIF
Ulm
�����RR.is� � y�yti • a
r�IMrll Mw ` ~
ei iC CI ,
>4�
s fie.� � w s�� :µ�,��'�• .e�
-
� rrr..ILI rrrer rrrr '
•a r�3r�t MIA adr1 IE �ti�ki s,. pars .rNl►�r*
a "ii► � e
11�lih °♦ it`���r� M17
Ira,
it s
l
lih
' FORTWORTY
a �
••
PROHIBITION ON CONTRACTS WITH COMPANIES BOYCOTTING
ISRAEL
Contractor acknowledges that in accordance with Chapter 2270 of the Texas
Government Code, the City is prohibited from entering into a contract with a
company for goods or services unless the contract contains a written verification
from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel
during the term of the contract. The terms "boycott Israel" and "company" shall
have the meanings ascribed to those terms in Section 808.001 of the Texas
Government Code. By signing this contract, Contractor certifies that
Contractor's signature provides written verification to the City that Contractor:
(1) does not boycott Israel; and (2) will not boycott Israel during the term of the
contract.
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, November 14, 2017 REFERENCE NO.: **C-28476
LOG NAME: 60WCRESSLPSSI-BHB
SUBJECT:
Authorize Execution of an Engineering Agreement with Baird, Hampton & Brown, Inc., in the Amount of
$467,935.00 for Watercress Low Pressure Sanitary Sewer Improvements Located in the South Lake Worth
Neighborhood, Provide for Additional Project Costs for a Project Total in the Amount of$577,935.00 and
Adopt Appropriation Ordinance (COUNCIL DISTRICT 7)
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Lake Worth Gas Lease Capital Projects Fund in the amount of$577,935.00; and
2. Authorize the execution of an Engineering Agreement with Baird, Hampton & Brown, Inc., in the
amount of$467,935.00 for Watercress Low Pressure Sanitary Sewer Improvements (City Project No.
101002)
DISCUSSION:
In January 2007 the City Council adopted the Lake Worth Capital Improvements Implementation Plan.
The plan included a number of water and sewer projects designed to provide Fort Worth Water
Department services to areas around Lake Worth previously served by wells and septic systems. To date,
projects have been completed to provide water/sewer service to the Landmark/Quebec and Woodvale
areas and water service has been provided along Watercress Drive.The Casino Beach Lift Station along
with water and sewer improvements in Love Circle are in the final stages of construction. M&C C-28352
was approved by the City Council on August 29, 2017 for the design of water line extensions into streets
previously held in the City of Lakeside's Certificate of Convenience and Necessity.
This project will provide for the future installation of a low pressure sanitary sewer system and individual
grinder pumps as indicated on the follow streets:
iStreet From To
Watercress Drive 9857
ve Watercress Surfside Drive
Peninsula Club Circle Watercress
(CCN) Watercress Drive Drive _
Sunrise Point (CCN) Peninsula Club Drive 11'Dead-End
North Lake Drive (CCN) Watercress Drive Watercress
Derive
Island View Drive (CCN) Watercress Drive Watercress
Drive
In addition to the contract amount, $110,000.00 is required for project management, real property
acquisition, utility coordination and material testing
This project will have no impact on the Water Department's operating budget when completed.
http://apps.cfwnet.org/ecouncil/printmc.asp?id=25333&print=true&DocType=Print 11/15/2017
M/WBE OFFICE: Baird, Hampton and Brown, Inc., is in compliance with the City's BDE Ordinance by
committing to 25 percent SBE participation. The City's SBE goal on this project is 10 percent.
Design for Watercress Drive Low Pressure Sewer will commence in December 2017 and be completed by
July 2018. Construction will commence in November 2018 and to be completed by November 2019.
The project is located in COUNCIL DISTRICT 7.
FISCAL INFORMATION /CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendations and adoption of the
attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of
the Lake Worth Gas Lease Capital Projects Fund. The Lake Worth Gas Lease Capital Projects Fund will
have an available balance of$3,410,496.00 for future capital projects after this transfer.
Appropriations for the Watercress Low Pressure Sanitary Sewer Improvements project are depicted
below:
Fund Existing Additional Project
Appropriations Appropriations Total*
Lake Worth Gas $0.00
Lease Capital Fund $577,935.00 $577,935.00
33001
Project Tota:l:=l $0.00 $577,935.00 $577,935.00
Numbers rounded for presentation purposes.
FUND IDENTIFIERS (FIDs):
TO
1Fund! Department Account Project Program ctivity Budget Reference# mount
ID ID Year ( (Chartfield 2)
FROM
Fund Department ccoun Project JProgram ctivity Budget Reference# moun
ID ID Year ChartfieId 2
CERTIFICATIONS:
Submitted for City Manager's Office by: Jay Chapa (5804)
Originating Department Head: Kara Shuror (8819)
Additional Information Contact: Walter Norwood (5026)
ATTACHMENTS
1. 60WCRESSLPSSI BHB 1295 Form.pdf (Public)
2. 60WCRESSLPSSI BHB FID Table (002).pdf (CFW Internal)
3. 60WCRESSLPSSI BHBCompliance Memo.pd (CFW Internal)
4. 60WCRESSLPSSI-BHB Map01.pdf (Public)
5. 60WCRESSLPSSI-BHB 60 AO 18.docx (Public)
6. SAM Baird Hampton Brown Inc (2).pdf (CFW Internal)
http://apps.cfwnet.org/ecouncil/printme.asp?id=25333&print=true&DocType=Print 11/15/2017
FID Table for 60WCRESSLPSSI-BHB
D: (KK Journal Entries)
o- e
1 33001 0700430 4923001 101002 2018 $ 577,935.00
1 33001 0700430 5110101 101002 001730 2018 $ 40,000.00
1 33001 0700430 5330500 101002 001730 2018 $ 467,935.00
1 33001 0700430 5740010 101002 001740 2018 $ 5,000.00
1 33001 0700430 5710010 101002 001740 2018 $ 26,000.00
1 33001 0700430 5310350 101002 001740 2018 S 5,000.00
1 33001 0700430 5310350 101002 001784 2018 $ 15,000.00
1 33001 0700430 531050 101002 001780 2018 1
2,000.00
33001 0700430 5540101 101002 001780 2018 $ 2,000.00
1 33001 107004301 5310350 101002 001784 2018 $ 10,000.00
1 33001 107004301 5330500 1 101002 1 001784 2018 1 1 1 $ 5,000.00
FIDs(GL Journal Entries)
Reci� FUrid-Dept Account i Pr*4 10 Acti v--AyBud et;Y� Purpose i X-fer :1 AmorthEe
- g-- -ar CF Program Amount
1 33001 0700430 4923001 101002 9999 1 $ 577,935.00
1 33001 0700430 5110101 101002 001730 9999 $ 40,000.00
1 33001 0700430 5330500 101002 001730 9999 $ 467,935.00
1 33001 0700430 5740010 101002 001740 9999 $ 5,000.00
1 33001 0700430 5710010 101002 001740 9999 $ 26,000.00
1 33001 0700430 5330500 101002 001740 9999 $ 5,000.00
1 33001 0700430 5310350 101002 001784 9999 $ 15,000.00
1 33 001071) 0 5330500 101002 001780 9999 $ 2,000.00
1 33001 0700430 5540101 1 101002 1 001780 9999 $ 2,000.00
1 33001 0700430 5310350 101002 001784 9999 $ 10.000.00 _
1 33001 107004301 5330500 1 101002 001784 9999 $ 5,000.00
D: Only-No KK or GL Entries Needed)
Rec Fund Dept# Account Project ID Activity Budget Year CF 2 Program Amount Purpose
21 1 33001 07004301 5330500 101002 1 001730 9999 $ 467,935.00
C,-
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1 of
Complete Nos.1 4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos,1,2,3 5,and 6 if there are no mtt;r �r , ,^n�. x. CERTIFICATION OF FILING
1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number:
of business. 2017-265843
Baird,Hampton&Brown, Inc.
Fort Worth,TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 09/27/2017
being filed.
Fort Worth Water Department Date Ackn led ed:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a
description of the services,goods,or other property to be provided under the contract.
CPN 101002
Watercress Low Pressure Sewer Extension
Nature ofinterest
4
Name of Interested Party City,State,Country(place of business) (check applicable)
Controlling Intermediary
Baird,John Fort Worth,TX United States X
Bakintas,Konstantine Grapevine,TX United States X
Mcllraith,Michael Fort Worth,TX United States X
Randall,Kenneth Fort Worth,TX United States X
Strevey,Tracy Fort Worth,TX United States X
Nave,Shannon Weatherford,TX United States X
Walters,Richard Fort Worth,TX United States X
Bost,Ian Fort Worth,TX United States X
5 Check only if there is NO interested Parry. ❑
6 AFFIDAVIT I swear,cr affirm,under penalty of perjury,that the above disclosure is true and correct.
S natureu iorized agent of contracting business entity
i
AFFIX NOTARY STAMP J SEAL ABOVE �T� J L
Swom to and subscribed before me,by the said E 1 Q ✓l ���` this the day ofIf
20 '7 ,to certify which,witness my hand and sea!of office.
` ICENN£1 y XA0b AL- C?
Signature of officer administering oath Printed name of officer administering oath Title of officer admiNstering oath
Forms provided by Texas Ethics Commission www.ethics.state.tx,us Version V1.0.3337