HomeMy WebLinkAboutContract 50024 C�EcE 2p�1 "' INFRASTRUCTURE CONSTRUCTION AGREEMENT
City Secretary
c Contract No.
5 oozy
WHEREAS,The Fort Worth Zoological Association ("Zoo Association's and the City
of Fort Worth, a Texas municipal corporation ("City', desire to enter into this
Infrastructure Construction Agreement ("Agreement's to make certain improvements to
the Fort Worth Zoo ("Zoo's in the City of Fort Worth as further detailed herein; and
WHEREAS, Zoo Association, a 501(c) (3) corporation, is managing_ the Zoo
pursuant to that certain Master Agreement regarding management of the Zoo, City
Secretary No. 40564, between Zoo Association and City CMaster Agreement'; and
WHEREAS, Zoo Association desires to construct a Shop and Warehouse
Project ("Project') to facilitate Zoo Association's maintenance and management
obligations at the Zoo; and
WHEREAS, under the terms of the Master Agreement,certain Basic Utilities(water,
sanitary sewer, electrical, gas and fiber optic) to accommodate construction or
modification at the Zoo are to be constructed by or on behalf of the City. Additionally, the
City has agreed to contribute funds toward storm drainage and associated paving related
to the Project (collectively, the "Improvements') as further depicted on the Exhibits
attached hereto as Attachments A,Al, 131, C and C1 and the Approved Drawings and
Specifications listed on Attachment D; and
WHEREAS, pursuant to the terms of the Master Agreement, Zoo Association
retained the services of Dunaway Associates, L.P. ("Engineer'l to provide the design of
the Improvements; and
WHEREAS, Zoo Association publicly advertised notice for bids for construction of
the Improvements on September 14, 2017 and September 21, 2017; and
WHEREAS, the City has budgeted the cost of the Improvements in an amount not
to exceed $309,169.06 (the "Construction Cost'l (M&C C-28408 as shown on
Attachment E attached hereto; and
WHEREAS, the City intends to retain a portion of those funds in order to fund the
cost of construction inspection;
NOW, THEREFORE, for and in consideration of the above recitals and the covenants and
conditions contained herein, the City and the Zoo Association do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities dated March 2001,
approved by the City Council of the City of Fort Worth and as subsequently
Infrastructure Construction Agreement
CFW-FW Zoological Association (Fort Worth Zoo Shops an OFFICIAL RECORD
Warehouse) Page 1 of 9
C1TOf SEC'RETARId
I T.WORM,TX
amended from time to time, and limited to only the specific sections of the
Policy that are listed in this paragraph ("Policy'D, is hereby incorporated into
this Agreement as if copied herein verbatim. The Policy Sections incorporated
herein are: Section I"Definitions"(all definitions); Section II"Procedures for
Obtaining a Contract for the Installation of Community Facilities"(Paragraph
2, Paragraph 3, Paragraph 7.C, Paragraph 7.D.1-4, Paragraph 8.A, Paragraph
8.B., Paragraph 8.C.1-2, Paragraph 8.C.6-7, Paragraph 8, D. and E.); and
Section III "Water and Wastewater Installation Policy" through Section X
"Policy for Street Name Sign Installations", inclusive. This Agreement shall
be deemed to be a "Community Facilities Agreement" as referenced in that
Policy. Zoo Association agrees to comply with all applicable provisions of those
incorporated sections of the Policy in the performance of its duties and
obligations hereunder and to cause all contractors hired by Zoo Association
to comply with the incorporated sections of the Policy in connection with the
work performed by said contractors, except as otherwise limited by or
provided in this Agreement.
B. Costs for the Improvements shall be paid as set forth in the Master Agreement
and this Agreement as the Improvements are Related Infrastructure as
defined by the Master Agreement. Zoo Association shall not be required to
provide financial security related to the cost of the Improvements.
C. It is understood that the Improvements may be modified as necessary
through the course of construction by written Change Orders prepared by the
Engineer on a form that is acceptable to the City, with the Construction Cost
and the schedule for construction being adjusted accordingly and reflected in
the Change Order. Adjustments to the Construction Cost will be based on the
unit prices in the Contractor's bid when those unit prices are applicable to the
change. The Construction Cost may be modified only by a written Change
Order that has been approved by the City. Final Construction Costs will be
reconciled and based on unit prices.
D. The Improvements will consist of a Water Component, a Sanitary Sewer
Component,a Stormwater Drainage Component,an Electrical Component and
a Communications Component, all as described by the Exhibits attached as
Infrastructure Construction Agreement
CFW-FW Zoological Association (Fort Worth Zoo Shops and
Warehouse) Page 2 of 9
Attachments A, Al, B1, C and C1 hereto.
E. Zoo Association will submit, upon completion of the Improvements, an
Affidavit of Bills paid signed by its General Contractor or Subcontractor(s)
and Consent of Surety signed by appropriate sureties, as well as any lien
waivers from Subcontractor(s) to ensure the General Contractor has paid
all Subcontractor(s) and suppliers in full. Additionally, the General
Contractor or Subcontractor will provide in a written affidavit,
acknowledgement that they have been paid in full by Zoo Association or
General Contractor for all services, labor and materials provided under their
contract.
F. Zoo Association agrees to cause the construction of the Improvements
contemplated by this Agreement and that said construction shall be
completed in a good and workmanlike manner and in accordance with all City
standards and the City-approved construction plans, specifications and cost
estimates provided for the Improvements and the exhibits attached hereto.
G. The following exhibits are made a part hereof:
a. Attachment A— Water Line Exhibit,
b. Attachment Al - Sanitary Sewer Exhibit,
c. Attachment B1 - Storm Drain Exhibit
d. Attachment C - Electric Exhibit
e. Attachment C1 - Communications Exhibit
f. Attachment D — List of Approved Drawings and Specifications
describing the Improvements
g. Attachment E— General Contractor's not to exceed Bid Proposal
H. The Zoo Association or General Contractor shall award all contracts for the
construction of the Improvements in accordance with the incorporated
Sections of the Policy and the contracts shall be administered in conformance
with the incorporated Sections of the Policy.
I. Zoo Association agrees to the following:
i. To retain The Fain Group, Inc., as the General Contractor and City pre-
qualified Subcontractors to construct the Improvements; provided that,
in the event that any of the contractors contemplated herein are unable
Infrastructure Construction Agreement
CFW-FW Zoological Association (Fort Worth Zoo Shops and
Warehouse) Page 3 of 9
to perform the work necessary, any other construction contractor who
is selected as a replacement must first be approved by the public works
department affected by same, said contractor to meet City's
requirements for being insured, licensed and bonded to do work in
public streets and/or prequalified to perform construction as the case
may be, with the understanding that any such replacement
construction contractor must meet all other requirements including
those set forth above in Paragraph H.
ii. To utilize contracts for construction of the Improvements that
incorporate and comply with the City's standard specifications and
contract documents for developer-awarded infrastructure construction
contracts, with any modifications of such specifications and documents
subject to the written approval of the City.
iii. To require General Contractor to furnish to the City a payment bond
and a performance bond in the names of the City and the Zoo
Association for one hundred percent (100%) of its contract price, and
provide a maintenance bond in the name of the City for one hundred
percent (100%) of the cost of the Improvements for a period of two
(2) years from the date of final acceptance insuring the maintenance
and repair of the Improvements during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iv. To maintain and repair, or cause the maintenance and repair of, the
Improvements until final acceptance of the Improvements, at which
time the maintenance/warranty bond shall become effective.
V. To require General Contractor or Subcontractors to provide insurance
equal to or in excess of the amounts required by the City's standard
specifications and contract documents for developer-awarded
infrastructure construction contracts. The City and the Zoo Association
shall be named as additional insureds on all insurance required by said
documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by its insurance provider and bound in the
Infrastructure Construction Agreement
CFW-FW Zoological Association (Fort Worth Zoo Shops and
Warehouse) Page 4 of 9
construction contract book or attached to the respective contract.
vi. To require General Contractor or Subcontractors to give at least 48
hours'advance notice to the City's Construction Services Division of its
intent to commence construction so that City inspection personnel will
be available; to require the General Contractor or Subcontractors to
allow the construction to be subject to inspection at any and all times
by City inspection forces; and to provide an additional 24 hours'
advance notice prior to the installation or relocation of any sanitary
sewer, storm drain, or water pipe to allow the City's inspector to be
present or to give consent to proceed in his/her absence.
vii. To utilize a materials testing lab which has been pre-approved by the
City, and to make such laboratory tests of materials being used as may
be required by the City. No construction will commence without City
approval of the materials testing lab.
viii. To require General Contractor or Subcontractors to have fully executed
contract documents submitted to the City in order to schedule a Pre-
Construction Meeting. The submittal should occur no less than 10
working days prior to the desired date of the meeting. No construction
will commence without a City-issued Notice to Proceed to the General
Contractor.
ix. To delay connections of buildings to service lines of sewer and water
mains constructed under this Agreement until said sewer and water
mains and service lines have been completed to the satisfaction of the
City.
]. If Zoo Association is required to pay the costs of relocating or replacing
franchise utilities(including,without limitation, gas, electric,telephone or other
communications), such costs shall be deemed Project Costs and will be paid
pursuant to the Master Agreement.
K, Zoo Association covenants and agrees to,and by these presents does
hereby, fully indemnify, hold harmless, and defend the City, its
officers, agents, and employees from all suits, actions or claims of
any character,whether real or asserted, brought for or on account of
Infrastructure Construction Agreement
CFW-FW Zoological Association (Fort Worth Zoo Shops and
Warehouse) Page 5 of 9
any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the
construction, design, performance or completion of any work as part
of the Improvements to be performed by Zoo Association, or in
consequence of any failure to properly safeguard the work, but only
to the extent caused by the neglect or misconduct of Zoo Association.
In its agreements with each contractor it engages, Zoo Association
will require the Contractor to indemnify, defend, and hold harmless
the City to the same extent as Zoo Association indemnifies the City
indicated in paragraph K above, except that, as it concerns bodily
injury claims asserted by employees of the Contractor or any
Subcontractor providing work on the Project ("Employee Injury
Claims")and only as to such Employee Injury Claims,Zoo Association
will require the City be indemnified for the City's sole negligence.
Such indemnity agreement may be contained in and made a part of
the construction agreement(s) between Zoo Association and its
contractors.
M. Zoo Association agrees that all contracts with any contractor shall include
provisions granting to the City the right to enforce such contracts as an express
intended third party beneficiary of such contracts. Further, upon completion of
all work associated with the construction of the Improvements, Zoo Association
will assign to the City a non-exclusive right to enforce the contracts entered
into by the Zoo Association with its contractor along with an assignment of all
warranties given by the contractor, whether express or implied.
N. If construction of the Improvements has not commenced within nine months
from the execution of this Agreement, or if construction of the Improvements
has not been substantially completed within three years from the
commencement of construction, the City shall have the right to terminate the
contract, reimburse the Zoo Association for costs incurred up to the time of
termination if provided for by the Master Agreement and shall have the right
to complete the construction of the Improvements. In connection with the
foregoing termination, Zoo Association will assign any construction contracts
Infrastructure Construction Agreement
CFW-FW Zoological Association (Fort Worth Zoo Shops and
Warehouse) Page 6 of 9
to the City that the City has chosen to accept assignment of and/or terminate
all remaining construction contracts, as directed by the City. The City agrees
to accept and assume all responsibilities and liabilities of Zoo Association under
any contracts the City directs to be assigned to the City, except to the extent
such liabilities arise from the negligence or intentional misconduct of Zoo
Association.
Cost Summary Sheet
Project Name: Unit I: Sanitary Sewer & Storm Drain Improvements & Unit
II: Water & Storm Drain Improvements to Serve Zoo: Shops and Warehouse
City Project No.: 101061
Construction Cost:
See Attachment E for itemized schedule of Construction Cost.
Infrastructure Construction Agreement
CFW-FW Zoological Association (Fort Worth Zoo Shops and
Warehouse) Page 7 of 9
ACCORDINGLY,the City of Fort Worth has caused this Agreement to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, with the corporate seal of the City affixed, and said Zoo Association has
executed this instrument in quadruplicate, at Fort Worth,Texas effective as of the date
subscribed by the City's Assistant City Manager.
JW FORT WORTH ZOOLOGICAL ASSOCIATION CITY OF FORT WORTH
Aqa
By: -. By-
Su
y XAl
Su
Assistant City Manager
Date: t74 Date:
Recommended by:
Water Department Trans ortation & Public Works
Dement
Ce
Wendy Chi-Babulal, EMBA, P.E. t'�I Dou sig
Development Engineering Manager Direc
Park& Recreation De nt
ichard Zavala
rector
A proved as to Form & egalily-
P14 C G` YD 8
Douglas W. Black
Sr. Assistant City Attorn 5-
< RT O � -- Z.�L 1($ S
A T: 'py1
ary . Kyer
City Secr
.TEXP
• .t
OFFICIAL RECORD
Infrastructure Construction Agreement CITy y 3ECMARY
CFW-FW Zoological Association (Fort Worth Zoo Shops and �,.�,! 1R" I
Warehouse) ag 8 of 9
List of Attachments to this Agreement
Attachment A— Water Line Exhibit
Attachment Al - Sanitary Sewer Exhibit
Attachment B1 - Storm Drain Exhibit
Attachment C - Electric Exhibit
Attachment C1 - Communications Exhibit
Attachment D — List of Approved Drawings and Specifications
describing the Improvements
Attachment E — General Contractor's not to exceed Bid
Proposal
Infrastructure Construction Agreement
CFW-FW Zoological Association (Fort Worth Zoo Shops and
Warehouse) Page 9 of 9
Y m w RI MO D
O cr— Q
o AR UNG ON
Ln
WINDSOR
w
C]'-' HUNTIN TON
LL- HAWTH RNE--Z� ) MI CHE L
WILSHIREUj
>-
��� GLENCO z z
JE SAMINE
0 0 PRO J cn
.I AB TH
PROJECT J
� P RK HI L LOCATION � (.0 R BE T
O N -� v w m
s w w p 1 w
cy- C)!� Z N
(n m 1 cn
> v w Q Mc H RS N Q o p
o oG!� :3:: _j w w z c~n CA TE
w
CANTY o
CD
PRINCETON o z za
s >
LOWD N wf7 rn
-' U' LO DE
Q ~
VICINITY MAP
ZOO: SHOPS & WAREHOUSE
l" = 1000,
a
m
CITY PROJECT NO. 101061
X-24461
Z%rwDUNAWAY
550 Balley Avenue•Suite 400•Fort Worth,Texas
Tei:817.335.1121
(1X REG.F-1110)
LEGEND
sCONNECT TO EXIST 12" //y/ —— —— PROPERTY BOUNDARY
WATER LINE (X-09607) Ex-W EX15TING WATER LINE
W PROPOSED WATER LINE
PROPOSED GATE VALVE
PROPOSED 1211 `7`J PROPOSED REDUCER
WATER LINE PROPOSED FIRE HYDRANT
PROPOSED
FIRE HYDRANT
CONNECT TO EXIST 8"
\ \ WATER LINE (X-09607)
d
'-PROPOSED 12"
WATER LINE
CONNECT TO EXIST 12"
WATER LINE (X-09607)
DUNAWAv � `` ATTACH M ENT - A 40 80
a 550 Bailey Avenue-Suite 400-Fad Worth,Texas 76107 WATER LINE
Tei:917.335.1121 ��
(7X REG.F-,,,4) r FORT WORTH ZOO SCALE:1` 40 ft.
0
C NN�CT TO EXISTING 18" SANITARY / LEGEND
5 SEWER LINE (L-27140, M73R) f ,�
CONNECT TO EXIST B" \ ---- PROPERTY BOUNDARY
SS LINE (L-1216, M-66) �/ PROPOSED SANITARY
.<: �SS— SEWER LINE
/ EXISTING SANITARY
7 -5S— SEWER LINE
PROPOSED SANITARY
Af I / SEWER MANHOLE
A
PROPOSED 16"
f SDR-26 PVC
PROPOSED SANITARY
qQ7 SEWER MANHOLE (TYP)
l
PROPOSED
4" SS LINE
/ SS /
' PROPOSED 8" a CONNECT TO EXIST 18"
SDR-26 PVC SS LINE (L-27140, M73R)
4�DUNAWA�/ ATTACHMENT —Al o qo 80
3 SANITARY SEWER
g 550 Bailey Avenue•Suite 400•Fort Worth,Texas 76107
r ,81.817.5.,121 FORT WORTH ZOO
p (1X REG.F•11141 SCALE: 1"=40 ft.
0
LEGEND
a
EXISTING BOUNDARY
® I a ®
° PROPOSED OUTFALL
s PROPOSED STD 5' JUNCTION BOX . STRUCTURE
1 ,� —————— EXISTING STORM
i ------ DRAIN
PROPOSED
PROPOSED 36" STORM DRAIN STORM DRAIN PROPOSED
��� ''„✓ AREA DRAIN
CONNECT TO EXIST 12" STORM DRAIN a PROPOSED
/ � �� A � WATER LIN'
PROPOSED 6X6'
s DROP INLET
s PROPOSED/ / I
12'X12 AREA
a 36" SLOPED HEADWALL
GRAIN (TYP)
' PROPOSED 8' WITH SAFETY END
4 / STORM DRAIN TREATMENT
/ '` PROPOSED 12"
TRENCHDRAIN
PROPOSED 8
®�
Q, I STORM DRAIN 8„ SLOPED HEADWALL
W/TH SAFETY END
t TREATMENT
Q / Q �� -` I / •
,� ATTACHMENT-B1 0 60 120
3 DUNAWAY STORM DRAIN
a 550 Bailey Avenue.Suite 100•Fort Worth,Texas 76107
Tel:817.335.1121 FORT WORTH ZOO s ... . .
o ITX REG.F-1114)
o -
i`
LEGEND
1 `V
EXISTING OVERHEAD LuECTRICRIC TO REMAIN
0 \i PROPOSED OVERHEAD
s PROPOSED OVERHEAD ELEC7RICy ` ""` ELECTRIC
EXISTING POWER POLE
® PROPOSED POWER POLE
o OHE PROPERTY BOUNDARY
aEXISTING OVERHEAD ELECTRIC
RECONNECT EXISTING '
E l i OVERHEAD LINES
�s 1 i
d15,
SSh
ATTACH M E NT-C (1 120
3 ~DUNAWAY ELECTRIC LINES
-d
550 Bailey Avenue.Suite 400•Fort Worth,Texas 76107 FORT WORTH ZOO
Tel:817.335.1121 SCALE: 1 60 ft.
(TX REG.F-1114)
a
E i
zu / LEGEND
\\ �-+�••.� Q PROPERTY BOUNDARY
EXISTING COMMUNICATION LINE
��MM
® � m®e e '� a� PROPOSED COMMUNICATION LINE
C3 PROPOSED ELECTRICAL VAULT
PROPOSED PULLBOX
CONNECT TO EXISTING
s / ! VAUL T DEER BARN
PROPOSED COMMUNICATION LINES
PROPOSED PULLBOX
{ / PROPOSED VAUL T
END PROPOSED CONDUIT
5' FROM BUILDING
"~DUNAWAY
ATTACHMENT - C1 0 60 120
3 COMMUNICATION LINES
550 Bailey Avenue•Suite 400•Fort Worth,Texas 76107
Tel:817.335.1121 FORT WORTH ZOO SCALE: V=60 ft.
o (TX REG.F-1114)
O
Attachment D
A. Construction Documents
1) Cover Sheet
2) CFW General Notes
3) General Notes
4) Demolition Plan
5) Overall Existing Drainage Area Map
6) Existing Drainage Area Map
7) Proposed Drainage Area Map
8) Drainage Calculations
9) Unit I: Utility Plan
10) Sanitary Sewer Plan & Profile
11) Sanitary Sewer Plan & Profile
12) Grading and Drainage Plan
13) Storm Drain Plan & Profile
14) Erosion Control Plan
15) Construction Details
16) Construction Details
17) Construction Details
18) General Notes
19) Site and Paving Plan
20) Unit II: Utility Plan
21) Water Plan & Profile
22) Storm Drain Plan & Profile
23) Storm Drain Plan & Profile
24) Construction Details
25) Construction Details
26) Construction Details
27) Standard Retaining Wall Notes & Details
28) Standard Retaining Wall Notes & Details
29) Standard Retaining Wall Notes & Details
30) Standard Retaining Wall Notes & Details
31) Standard Retaining Wall Notes & Details
32) Standard Retaining Wall Notes & Details
B. Specifications
1) 00 11 13 Invitation to Bidders
2) 0021 13 Instructions to Bidders
3) 00 41 00 Bid Form
4) 00 42 43 Proposal Form Unit Price
5) 0043 13 Bid Bond
6) 0045 11 Bidders Prequalification
7) 0045 12 Prequalification Statement
8) 0045 13 Bidder Prequalification Application
9) 00 45 26 Contractor Compliance with Workers' Compensation Law
10)00 52 43 Blanket Agreement
11)00 61 25 Certificate of Insurance
12)00 62 13 Performance Bond
13)00 62 14 Payment Bond
14)00 62 19 Maintenance Bond
15)00 72 00 General Conditions
16)00 73 10 Standard City Conditions of the Construction Contract for
Developer Awarded Projects
17)01 1100 Summary of Work
18)01 31 19 Preconstruction Meeting
19)01 33 00 Submittals
20)01 35 13 Special Project Procedures
21)01 45 23 Testing and Inspection Services
22)01 5000 Temporary Facilities and Controls
23)01 5526 Street Use Permit and Modifications to Traffic Control
24)01 57 13 Storm Water Pollution Prevention Plan
25)01 60 00 Product Requirements
26)01 6600 Product Storage and Handling Requirements
27)01 70 00 Mobilization and Remobilization
28)01 71 23 Construction Staking
29)01 74 23 Cleaning
30)01 77 19 Closeout Requirements
31)01 78 23 Operation and Maintenance Data
32)01 78 39 Project Record Documents
33)02 41 13 Selective Site Demolition
34)02 41 14 Utility Removal/Abandonment
35)02 41 15 Paving Removal
36)31 1000 Site Clearing
37)31 23 23 Borrow
38)31 24 00 Embankments
39)31 25 00 Erosion and Sediment Control
40)31 36 00 Gabions
41)31 37 0:0 Riprap
42)32 01 17 Permanent Asphalt Paving Repair
43)32 01 18 Temporary Asphalt Paving Repair
44)32 01 29 Concrete Paving Repair
45)32 12 16 Asphalt Paving
46)32 13 13 Concrete Paving
47)32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps
48)32 16 13 Concrete Curb and Gutters and Valley Gutters
49)32 31 13 Chain Link Fences and Gates
50)32 32 13 Cast-in-Place Concrete Retaining Walls
51)33 01 30 Sewer and Manhole Testing
52)33 01 31 Closed Circuit Television (CCTV) Inspection
53)33 03 10 Bypass Pumping of Existing Sewer Systems
54)33 04 40 Cleaning and Acceptance Testing of Water Mains
55)33 05 10 Utility Trench Excavation, Embedment, and Backfill
56)33 05 13 Frame, Cover and Grade Rings
57)33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other
Structures to Grade
58)33 05 17 Concrete Collars
59)33 11 11 Ductile Iron Fittings
60)33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe
61)33 12 10 Water Services 1-inch to 2-inch
62)33 1220 Resilient Seated Gate Valve
63)33 1225 Connection to Existing Water Mains
64)33 1260 Blow-off Valves
65)33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe
66)33 31 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary
Sewer Pipe
67)33 31 22 Sanitary Sewer Slip Lining
68)33 31 50 Sanitary Sewer Service Connections and Service Line
69)33 39 10 Cast-in-Place Concrete Manholes
70)33 39 20 Precast Concrete Manholes
71)33 39 60 Epoxy Liners for Sanitary Sewer Structures
72)33 41 10 Reinforced Concrete Storm Sewer Pipe/Culverts
73)33 41 11 HDPE Storm Sewer Pipe
74)33 46 02 Trench Drains
75)33 49 10 Cast-in-Place Manholes and Junction Boxes
76)33 49 20 Curb and Drop Inlets
77)33 49 40 Storm Drainage Headwalls and Wingwalls
ATTACHMENT - E
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Section Unit of Bid Unit Price Bid Value
No. No. Measure Quantity
UNIT 1: SANITARY SEWER IMPROVEMENTS
1 0241.2013 Remove 8"Sewer Line 0241 14 LF 140 $33.00 $4,620.00
2 0241.2018 Remove 18"Sewer Line 0241 14 LF 253 $33.00 $8,349.00
3 0241.2108 18"Sewer Abandonment Plug 0241 14 EA 2 $1,430.00 $2,860.00
4 0241.2201 Remove 4'Sewer Manhole 0241 14 EA 2 $1,610.00 $3,220.00
5 33C1.0001 Pre-CCTV Inspection 33 01 31 LF 440 $1.50 $660.00
6 3301.0002 Post-CCN Inspection 33 01 31 LF 440 $1.50 $660.00
7 3301.0101 Manhole Vacuum Testing 3301 30 EA 6 $160.00 $960.00
8 3303.0001 Bypass Pumping 3303 10 LS 1 58,135.00 $8,135.00
9 3305.0109 Trench Safety 33 05 10 LF 440 $3.00 $1,320.00
10 3305.0112 Concrete Collar 33 05 17 EA 3 $755.00 $2.265.00
11 3305.0113 Trench Water Stops 33 05 15 EA 4 $11570.00 $6,280.00
12 3331.3101 4"Sewer Service 3331 50 EA 1 $3,200.00 $3,200.00
13 3331.4115 8"Sewer Pipe 3311 10,3331 12,33 LF 187
3120 $80.00 $14,960.00
14 3331.4116 8"Sewer Pipe, CSS Backfill 3311 10,3331 12,33 LF 20
3120 $265.00 $5,300.00
15 3332.4225 18"Sewer Pipe 3311 10, 3331 12,33 LF 193
31 20 3331 21 $360.00 $69,480.00
16 3332.4226 18"Sewer Pipe,CSS Backfill 3311 10, 3331 12, 33 LF 40
31 2C 33 31 21 $550.00 $22,0X0C
17 3339.0001 Epoxy Manhole Liner 33 39 60 VF 77 $190.00 $14,630.00
18 13339,1001 4'Manhole 33 39 10, 33 39 20 1 EA 4 $5,100.00 $20,400.00
19 13339.1002 4' Drop Manhole 33 39 10, 33 39 20 1EA 2 $5,700.00 $11,400.00
20 13339,1003 4' Extra Depth Manhole 33 39 10,33 39 20 1 VF 1 40.5 $670.001 $27,135.00
TOTAL UNIT I: SANITARY SEWER IMPROVEMENTS $227,834.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Foran Version September I,2015 00 42 43-Bid Proposal DAP.xlsx
a 47
DAP-BID PROPOSAL
Page'of 5
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Section Unit of Bid Unit Price Bid Value
No. No. Measure Quantity
UNIT I: DRAINAGE IMPROVEMENTS
1 0241.3015 Remove 24"Storm Line 0241 14 LF 64 $30.00 $1,920.00
2 3125.0101 SWPPP >_ 1 acre 31 25 00 LS 1 $10,900.00 $10,900.00
3 3137.0105 Medium Stone Riprap,grouted 31 3700 SY 26 $120.00 $3,120.00
4 3341.0205 24"RCP. Class III 3341 10 LF 11 $100.00 $1,100.00
5 3341.0309 36" RCP, Class Ili 3341 10 LF 312 $185.00 $57,720.00
6 3349.0002 5 Storm Junction Box 3349 10 EA 1 $5,500.00 $5,500.00
7 3349.4109 36"SET, I pipe 33 49 40 EA 1 $8,300.00 $8,300.00
8 3349.7003 6' Drop Inlet 33 49 20 EA 1 $10,800.00 $10,800.00
TOTAL UNIT I: DRAINAGE IMPROVEMENTS $99,360.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Bid Proposal_DAP.xlsx
00 42 43
DAP-BID PROPOSAL
Page 3 of 5
SECTION 00 42 43
Developer Awarded Projects- PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Section Unit of Bid Unit Price Bid Value
No, No. Measure Quantity
UNIT II:WATER IMPROVEMENTS
1 0241 1013 Remove 8"water line 0241 14 LF 72 $27.00 $1,944.00
2 0241 1015 Remove 12"Water Line 0241 14 LF 184 $30.00 $5,520.00
3 0241 1218 4"-12"Water Abandonment Pluc 0241 14 EA 2 $2,500.00 $5,000.00
4 3311.0001 Ductile Iron Water Fittings wl 3311 11 TON 4
Restraint $6,700.00 $26,800.00
5 13311.0141 6"Water Pipe 3311 12 LF 35 $50.00 $1,750.00
6 3311.0241 8"Water Pipe 3311 12 LF 5 $100.00 $500.00
7 3311.0441 12"Water Pipe 3311 12 LF 312 $76.00 $23,712.00
8 3312.0001 Fire Hydrant 33 12 40 EA 1 $3,800.00 $3,800.00
9 3312.0117 Connection to Existing 4"-12" 33 12 25 EA 3
Water Main $1,370.00 $4,110.00
10 13312.2203 2"Water Service 33 12 10 EA 1 $2,900.00 $2,900.00
11 3312.3002 6"Gate Valve 33 12 20 EA 3 $1,200.00 $3,600.00
12 3313.3002 8"Gate Valve 33 12 20 EA 1 $1,620.001 $1,620.00
13 3312.3005 12"Gate Valve 33 12 20 EA 3 $2,900.001 $8,700.00
14 9999.0001 2"Service Tap 331225 EA 1 $550.001 $550.00
TOTAL UNIT II: WATER IMPROVEMENTS $90,506.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 2015 0042 43—Bid Proposal_DAP.xlsx
00 42 43
DAP-BID PROPOSAL
Page 4 of 5
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Section Unit of Bid Unit Price Bid Value
No. No. Measure Quantity
UNIT It: PAVING IMPROVEMENTS
1 10241.0500 Remove Fence 0241 13 LF 252 $4.00 $1,008.00
2 0241.0900 Remove Misc. Ccncrete LS
Structure 0241 13 1 $620.00 $620.00
3 0241.1000 Remove Conc Pvmt 0241 13 Sy 2480 $16.00 $39,680.00
4 0241.1100 Remove Asphalt Pavement 0241 15 Sy 831 $17.00 $14,127.00
5 3110.0101 Site Clearing 31 1000 LS 1 $3,300,001 $3,300,00
6 3231.0114 8'Chain Link, Steel 3231 13 LF 258 $57.00 $14,706.00
7 3441.4108 Remove Sign Panel and Post 3441 30 EA 1 $100.00 $100.00
8 19999.0003 Remove Railroad Tie Wail 00 00 00 LS 1 $500.00 $500.00
9 19999.0004 Remove Wooden Enclosure 00 00 00 LS 1 $600.00 $600.00
TOTAL UNIT It: PAVING IMPROVEMENTS 1 $747641.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September I,2015 00 42 43 Bid Proposal_DAP.xlsx
00 42 43
DAP-BID PROPOSAL
Page 5 of 5
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Section Unit of Bid Unit Price Bid Value
No. No. Measure Quantity
UNIT II: DRAINAGE IMPROVEMENTS
1 3110.0102 6"-12"Tree Removal 31 1000 EA 11 $300.00 $3,300.00
2 3110.0103 12"-18"Tree Removal 31 1000 EA 17 $380.00 $6,460.00
3 3110.0104 18"-24" Tree Removal 31 1000 EA 7 $470.00 $3,290.00
4 3110.0105 24"and Larger Free Removal 31 1000 EA 5 $570.00 $2,850.00
5 3137.0105 Medium Stone Riprap,grouted 31 3700 SY 1 $120.00 $120.00
6 3346.3003 12"Trench Drain 33 46 02 LF 8 $650.00 $5,200.00
7 9999.0007 8"HDPE Pipe 3341 11 LF 405 $50.00 $20,250.00
8 9999.0008 12"x12"Area Drain 33 49 20 EA 3 S370.00 $1,110.00
9 9999.0009 8"SET, 1 pipe 33 49 40 EA 1 $1,650.00 $1,650.00
TOTAL UNIT II: DRAINAGE IMPROVEMENTS $44;230.00
Bid Summary _
UNIT I: SANITARY SEWER IMPROVEMENTS $227,834.00
UNIT I: DRAINAGE IMPROVEMENTS $99,360.00
UNIT II:WATER IMPROVEMENTS $90,506.00
UNIT II: PAVING IMPROVEMENTS $74,641.00
UNIT II: DRAINAGE IMPROVEMENTS $44,230.00
$536,571.00
Total Construction Bid
Contractor agrees to complete WORK for FINAL ACCEPTANCE 90 calendar
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Bid ProposaLDAP.xlsx
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible for
the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Joel McElhany
Name of Employee
Capital Program Manager
Title
El This form is N/A as No City Funds are ass oc-ated with this Contract
i
Printed Name �Siature
OFFICIAL RECORD
CITY SECRETARY
FT.WORTHS TX
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 9/26/2017 - Ordinance 22926-09-2017
DATE: Tuesday, September 26, 2017 REFERENCE NO.: **C-28408
LOG NAME: 80ZOO SHOP AND WAREHOUSE UTILITIES
SUBJECT:
Authorize Transfer in Fiscal Year 2017 from the General Fund to the General Capital Projects Fund,
Authorize Execution of Two Infrastructure Construction Agreements with the Fort Worth Zoological
Association in the Combined Amount Up to $970,152.47 for the Installation and Relocation of Utilities
Associated with the Development of the Shop and Warehouse Building and the Elephant Springs Exhibit
and Adopt Appropriation Ordinance(ALL COUNCIL DISTRICTS)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer from the General Fund to the General Capital Projects Fund in Fiscal Year 2017
in the amount of$56,000.00 for funding of the Infrastructure Construction Agreement with the Fort Worth
Zoological Association for the Shop & Warehouse project;
2.Adopt the attached appropriation ordinance increasing receipts and appropriations in the Fiscal Year
2017 General Capital Projects Fund by $56,000.00 from available funds;
3. Authorize the execution of an Infrastructure Construction Agreement with the Fort Worth Zoological
Association in the amount of$309,169.06 for the installation and relocation of utilities associated with the
development of the Shop & Warehouse project; and
4. Authorize the execution of an Infrastructure Construction Agreement with the Fort Worth Zoological
Association in the amount of$660,983.41 for the installation and relocation of utilities associated with the
development of the Elephant Springs Exhibit.
DISCUSSION:
The purpose of this Mayor and Council Communication (M&C) is to authorize the City Manager to execute
two separate Infrastructure Construction Agreements with the Fort Worth Zoological Association (Zoo
Association)to provide for the installation and relocation of utilities associated with the development of the
Shop and Warehouse project and the Elephant Springs Exhibit project.
On April 27, 2010, (M&C C-24194)the City Council authorized a Management Agreement(Fort Worth
Contract No. 40564) with the Zoo Association for the management, operation and development of the Fort
Worth Zoo. Under the terms of the Management Agreement, Section 8.04, the City has the responsibility
to relocate or alter basic utilities to accommodate any construction or modifications at the Zoo such as
sanitary sewer, water, communications, gas and electricity. In addition, the City, for these projects, has
agreed to fund additional stormwater and related paving improvements.
The Sh p&W ehouse Infrastructure Construction Agreement provides for the City to fund utility work
estima ed min t amount of$309,170.00. The Elephant Springs Exhibit Infrastructure Construction
Logname: 80ZOO—SHOP AND WAREHOUSE UTILITIES Page I of 3
Agreement provides for the City to fund utility work estimated in the amount of$661,000. Funding is
summarized in the table below:
Shop & Warehouse Elephant Springs
FY 2017 GENERAL FUND 56,000.00 -
FY 2017 PAYGO 153,170.00 -
_ -
FY 2018 GENERAL FUND* � 100,000.00
FY 2018 PAYGO* - $661,000.00
ITOTAL $309,170.00 $661,000.00
*Subject to approval of the Fiscal Year 2018 budget.
The Fort Worth Zoo is located in COUNCIL DISTRICT 9 and is classified as a Special-Use Facility that
serves on a City-wide and regional basis.
FISCAL INFORMATION /CERTIFICATION:
The Director of Finance certifies that that upon approval of the above recommendations, and adoption of
the attached Appropriation Ordinance, funds in the amount of$209,170.00 will be available in the General
Capital Projects Fund. Upon adoption of the Fiscal Year 2018 budget, an additional $100,000 is
anticipated to be available in the General Fund and an additional $661,000 is anticipated to be available in
the General Capital Project Fund. The Infrastructure Construction Agreements with the Fort Worth
Zoological Association will include language that allows the City to cancel our obligations to the Zoological
Association should the appropriations not exist to fulfill our funding commitments under the agreements.
The Department has the responsibility to validate the availability of funds prior to an expenditure or
commitment being made.
FUND IDENTIFIERS (FIDs):
TO
Fund Department Account Project Program ctivityj Budget Reference # gmaun
ID ( ID ( Year (Chartfield 2)
FROM
Fund Department ccoun Project Program�`ctivity� Budget Reference # moun
ID ID I YearC( hartfield 2)
CERTIFICATIONS:
Submitted for City Manager's Office by: Susan Alanis (8180)
Originating Department Head: Richard Zavala (5704)
Additional Information Contact: David Creek (5744)
ATTACHMENTS
Logname: 80ZOO—SHOP AND WAREHOUSE UTILITIES Page 2 of 3
1. 80ZOO SHOP AND WAREHOUSE UTILITIES AO17R.docx (Public)
2. Form 1295 Certificate 2017-260123.pdf (Public)
3. Zoo Shop Warehouse MC FID Attachment.xlsx (CFW Internal)
Logname: 80ZOO_SHOP AND WAREHOUSE UTILITIES Page 3 of 3
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
101`1
Complete Nos,1-4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number:
of business. 2017-264185
Fort Worth Zoological Association
Fort Worth,TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for whic t e form is 09/22/2017
being filed.
City of Fort Worth Date Acknowledge
r
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a
description of the services,goods,or other property to be provided under the contract.
101087
Construction of Public&City Utilities-Shop&Warehouse Project
Nature of interest
4 Name of Interested Part Ci State,Count lace of business
Party City, Country(place ) (check applicable)
Controlling I Intermediary
Deen,Megan Fort Worth,TX United States X
5 Check only if there is NO Interested Party. ❑
6 �WV I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct.
KELLEY J ERWIN
Notary ID#7515469
My Commission Expires
o+aorJude 29,2020
Signature of a horized agent of contracting business entity
AFFIX NOTARY STAMP/SEAL ABOVE
Sworn o and subscribed before me,by the said _ " f`t this the ��day of
20J ,to certify which,witness my hand and seal of office.
& M 1w- 1< Poo
G
ign to of o i e ad inistering oath Printed namq of officer administering oath Tide of off er administering oath
Forms provided b exas Ethics Commission www.ethics.state.tx.us Version V1.0.3337