Loading...
HomeMy WebLinkAboutContract 50060 Developer and Project Information Cover Sheet: Developer Company Name: HPC Berkshire Development Corporation Address, State,Zip Code: i 3001 Knox St. Ste.207,Dallas,TX 75205 Phone&Email: 214-445-2200,ben@hanoverproperty.com Authorized Signatory,Title: Ben Luedtke,Executive Vice President Project Name: ; Richmond Phase 2 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights - ---------- Project e - Project Location: i South of US 287&west of FM 156 ___._. Plat Case Number: FP-16-043 Plat Name: I Richmound i - ---- -_- -. I i Mapsco: 20X Council District: 7 -- —.._._i—_ CFA Number: 2017-156 City Project Number: 100538 To be completed -staff Received by: O"ICIAIL RECORD CITY SECRETARY City of Fort Worth,Texas IST. WORTH,TX Standard Community Facilities Agreement-Richmond Phase 2 CFA Official Release Date:02.20.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.5 o Q kr Q WHEREAS, HPC Berkshire Development Corporation, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Richmond Phase 2 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement;and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section 1I, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Im e5te. 9 veloper further acknowledges that said acceptance process requires theQ elokr's cont (s) City of Fort Worth,Texas Standard Community Facilities Agreemen -Richmond P ase a p` 2p11 N CFA Official Release Date:02.20.2017 ® I�:IAI. �� �E�1 A SOP Page 2 of 11 CITY SECRETARY OT.WORTH,TX � 99 ' £ti to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) ®, Street Lights & Signs (C) Z. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s),Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent(100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement-Richmond Phase 2 CFA Official Release Date:02.20.2017 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253,Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement-Richmond Phase 2 CFA Official Release Date:02.20.2017 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. I Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever,whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement-Richmond Phase 2 CFA Official Release Date:02.20.2017 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%)for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent(2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (40/0) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement-Richmond Phase 2 CFA Official Release Date:02.20.2017 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2)will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Richmond Phase 2 CFA Official Release Date:02.20.2017 Page 7of11 Cost Summary Sheet Project Name: Richmond Phase 2 CFA No.: 2017-156 City Project No.: 100538 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. A. Water and Sewer Construction 1. Water Construction $ 902,206.62 2.Sewer Construction $ 900,442.70 Water and Sewer Construction Total $ 1,802,649.32 B. TPW Construction 1.Street $ 1,583,516.56 2.Storm Drain $ 2,345,108.88 3.Street Lights Installed by Developer $ 321,617.05 4. Signals $ - TPW Construction Cost Total $ 4,250,242.49 Total Construction Cost(excluding the fees): $ 6,052,891.81 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 36,052.98 D. Water/Sewer Material Testing Fee(2%) $ 36,052.98 Sub-Total for Water Construction Fees $ 72,105.96 E. TPW Inspection Fee(4%) $ 157,145.02 F. TPW Material Testing(2%) $ 78,572.51 G. Street Light Inspsection Cost $ 12,864.68 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 248,582.21 Total Construction Fees: $ 320,688.17 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% Completion Agreement On Site =100%/Holds Plat $ 5,896,224.81 x Escrow Pledge Agreement Off Site Water=125% $ 195,833.75 x Cash Escrow Paving/Storm Drain=125% Letter of Credit=125%w/2yr expiration period City of Fort Worth,Texas Standard Community Facilities Agreement-Richmond Phase 2 CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER HPC Berkshire Development Corporation Jesus J. Chapa Assistant City Manager Date: la - N—/-7 Name: Ben Luedtke Recommended by: Title: Executive Vice President C-') / Date: _ n -17-2t91? % &Lcc Wendy Chi- abulal, EMBA, P.E. ATTEST: (Only if required by Developer) Development Engineering Manager Water Department 1 (,J, Signature Douglas . Wiersig, P.E. Y Name: Director Transportation& Public Works Department Contract Compliance Manager: Approved as to Form &Legality: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting Richard A. McCracken requirements. Assistant City Attorney M&C No. Date: 14_ 4ame: Janie Morales Form 1295: �/_J�- Title: Development Manager ATTEST: OxFORT�,1,© �. a• ..7p �vlaly J. �c City Secre y .j ��► OFFICIAL RECORD City of Fort Worth, Texas CITE`SECRETARY Standard Community Facilities Agreement-Richmond Phase 2 �° WORTHr TX CFA Official Release Date: 02.20.2017 Page 9 of 11 �� „ ° . .' . F . `l .. �� �, Check items associated with the project being undertaken;checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A:Water Improvements ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Richmond Phase 2 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100538 None City of Fort Worth,Texas Standard Community Facilities Agreement-Richmond Phase 2 CFA Official Release Date:02.20.2017 Page 11 of 11 m N o BDND RANCH HICKS n 0 n 0 z 3 ti r w n � o z u N Z J if 4' T � a w w J Q E 3 RICHMOND PHASE 1 PROJEC-r LOCATION a E r z z H � s WER � a m n Z � � VICINITY MAP o � 156 RICHMOND NOT TO SCALE PHASE 2 MAPSCO NO. 20X Bs COUNCIL DISTRICT_ NO. 7 777 MAIN STREET 3 FORT WORTH, TX 76102 3 PHONE 817-735-6000 i �__ C m o SCALE:1" = 500' ro — — o —.---_- ---- h I. NEWBRV DRNE � \�— CwLLM! OFFSrTE WATER .v N IWL-13 - -` <a7E �'B LAI(EMONT DRNE L rr BEDGIN ONSITE WATER 2'WL-1 , w .UNE w - 9 a fi —--—--—--—--—---WL-9l N 1 -x ,ti tido w w O 1 Z t ABWGYON AVENUE r i CONNECT INTO EXISTING WATER IN WKEMONT DRIVE f/ ,\ -- 04 o -` r WATER _A a EXHIBIT 'A' RICHMOND N LEGEND PHASE 2 0 PROPOSED WATER LINE PROPOSED GATE VALVE -►�- Bs $ PROPOSED FIRE HYDRANT _--_ -_--_ 777 MAIN STREET 3 LIMITS OF PROJECT FORT WORTH, TX 76102 5 PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE INDICATED PHONE 817-735-6000 d DAe.nioexrt.�R EXHIBIT D Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Irem Inforrnation Bidd I Prapx.1 SHEET SHEET I ILIEEIJ SHEET I III Bi41ist 11cm No. Deuriprton SpecJutian Smmn No Unit of Me..ure I I I Hid Quamin Unit Price Bid Value Y ,;NII I V4AT FR IMPROVEMENTS 8^Pvc WATERLINE 331110.331112 LF 55 _ 21Q0 3555 9779 $27.23 $26503%.10 u•wc WATERLINE 3311 10,33 11 12 LF 506 � 800 220� _ 2896 $40.G3 5117.056.32 E VALVE s Bax 33 12 20 EA 1 5 16 32 $1.257 32 540,554.24 S' GAT},WE VALVE a BOX 331220 EA 25 3 1 _ 11 $2,276.13 $J503743 ENC—ENT 330517 OV 22 17 39 $254.46 $9,92394 FIRE HYDRANT—EMBLr 331240 EA 1 4 3 5 4 17 $3,797.25, 56455325 33 12 10 EA 23 20 60 67 65 235 $769.15 $180,756.25 DUCTILE ERDN�WATER FITTINGS wr RESTRAINT 331111 TON 0.46 0.65 151 2.05 205 6.92 $5.13691 535,547.41 330510 LF B61 1575 2900 3775 3555 12666 $0.16 $2,026.56 IESTwGSErcLIDUVcr,EnlEnHI ILF 1 8611 15751 2900 3775 3555 12666 $0.32' $4,053.12 TtOVEMENTSI 5745,539.62 STMDctryD LD wDRlri R_Ys+'nAedl3,]Old UN SeEUFlLAI WNt%IUMEMS pEVF1DPEN aWAN1�ED xRDhCrs MMYQUA-ffy--.Od j �! 3 CONNECT WITH EXISTING ALONG LANE / o SCALE:1" = SOON GRAPHITE LANE(FOSSIL CREEK DEVELOPMENT) O 1 I � I i L_.. '• r i F:FlSIT'E WATER ONSITE WATER a I� / 1 a o a` T OFFSITE WATER EXHIBIT 'A-1' 8 RICHMOND LEGEND PHASE 2 O PROPOSED WATER LINE 3 PROPOSED GATE VALVE { 0 0 PROPOSED FIRE HYDRANT 777 MAIN STREET 3 LIMITS OF PROJECT ---------- FORT WORTH, TX 76102 PHONE 817-735-6000 PROPOSED WATER LINES ARE 8° UNLESS OTHERWISE INDICATED i 00 42 43 DAP-BID PROPOSAL EXHIBIT D Page I of7 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Item Information Bidder's Proposal F d:i:: :m No. Description Specification Section No. Unit of Measure SHEET SHEET Bid Quantity Unit Price Bid Value 8 9 UNIT II:OFFSITE WATER IMPROVEMENTS a ,- INE 33 11 10,3311 12 LF 1030 60 1090 $27.23 $29,680.70 Ir'CARRIER PIPE 33 05 24 LF 166 166 $4042 66,709.72 20"STEEL CASING 330522.33 05 24 LF 166 166 $570.2, $94,664.82 8"GATE VALVE&BOX 33 1220 EA 2 1 3 $1.267,32 $3.801.96 8^X 8^TAPPING SLEEVE&VALVE 33 1225 EA 1 1 $4,054.46 $4.054.46 FIRE HYDRANT ASSEMBLY 33 1240 EA 1 1 53,797.25 $3,797.25 DUCTILE IRON WATER FITTINGS W1 RESTRAINT 3311 11 TON 0.66 0.16 0.82 S5. 36.91 $4.212.27 REMOVE AND REPLACE CONCRETE PAVEMENT 32 01 29-D523 SY 50 50 $183,39 59.169.50 TRENCH SAFETY 3305 10 LF 1030 60 1090 $0. C $174.40 TESTING(EXCLUDING GEOTECH) LF 1196 60 1256 $0.32 $401.92 TOTAL UNIT II:OFFSITE WATER IMPROVEMENTS1 $156,667.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 UTILITY QUANTITY(water OFFSITE KLEIN AND ATHLOS PROPERTY),xIs SCALE:1" = 500' m - — -- — —NEWBk/DRIVE U / NSHIRE _�. � � e'55-1 / LANE — _ _ .j. ( •P '- -. UKEMOM DRIVE r o 8"55-1 A a ILL L i g EX Zj+55 a T ` tl I 8`SS-4 ABINGTDN AVENUE L : r EX 21*SS r N t _ I r WASTEWATER m , N EXH I BIT 'A-2' a LEGEND RICHMOND PHASE 2 N PROPOSED SANITARY SEWER PROPOSED MANHOLE i o EXISTING SANITARY SEWER BS' p 0 LIMITS OF PROJECT 777 MAIN STREET 3 FORT WORTH, TX 76102 o PHONE 817-735-6000 N Doan nnr-Rm rxumsu. a z r] EXHIBIT D Developer Award Projects-PROPOSAL FORM UNIT PRICE BID ProJm Item INamalion Hiddci s Prmpmal U6,N-No Dcscriplian G SHEET S11EET SHEET SHEET SHEET SHEET SHEET SHEET SHEET SHEET SHEET SHEET pxifcelivn S<ctioe Na. Unit of Mcasnre 20 21 22 23 24 25 2N 2] 28 29 J11 31 Bid Qu—ryUnil Price Bld Value UNII' EMENTS a soRae Pvc PIPE LF 1801 1098 1351 1170 14971 1341 1269 9527 536.24 $3450258.48 RVICE..ES EA 23 20 61 66 65 235 5932.29 5219,088.15 a'—ETER MANHor_E EA 4 9 8 15 6 42 $3,591.56 5155,x45.52 4'DAMETER—P MANNOLE EA 1 3 3 2 9 $4,352.12 $39,163.08 ADD,- MANHOLE)EPTM 1.61 vF 43.42 865 42.84 14.13 57.88 0.38 3.23 170.53 $35665 $60,819.52 ""_7TEe STOP EA 4 3 2 2 1 12 $250.28 $3,003.36 E—l(MAHN.E TINER VF 17 38 37 32 124 5231.52 $28,70846 CONNE—D EXISTING MANHOLE EA 11 2 $1.933.39 $3,866.72 cONCR—ENCASEMENr CY 22 16 9 21 _ 6 80 $254.46 $20,356.80 E.— LF1801 1098 1351 1170 1497 1341 1269 9527 $0.29 $�T6'2.53 MAMaLE—()-TEST— EA 4 10 11 18 8 51 $156.43 $7,97793 P--INSPEcrmN LF 1801 1098 1351 1170 1497 1341 1269 9527 $1.51 $14,385.77 TOTA N I LVE�MENTS 5900,442.70 IT-1)CON,-11 QM.4rECD1CATION N-1ME.MS-1—I-E'p—XHIJOMECTS Pvm—Avi1.N14 IRllll'Y QUAHTRYImnvlm4mld r I L_ m I h - SCALE:1" = 500' m` NEWBRY m w a W I a' _ I 60'ROW N /r O a '7iiliGTAVENuI v 1 37'B-B 1 ROAD WAY/ 1 K 1 60'ROW a _ LEGEND PAVING PROPOSED 29' B—B EXHIBITS S ROADWAY/50' TYP ROW $ UNLESS OTHERWISE NOTED RICHMOND N PROPOSED 5' SIDEWALK PHASE 2 N (BY DEVELOPER) PROPOSED 5' SIDEWALK B" s (BY HOMEBUILDER) "' PROPOSED ADA RAMPS (BY DEVELOPER) 777 MAIN STREET 3 FORT WORTH, TX 76102 LIMITS OF PROJECT ---------- PHONE 817-735-6000 J w EXHIBIT D Deeelpp,1 AwaMaE Prate -PROPOSPL FORM UNIT PRICE BID B'xOn llem ��� $pua9wa SHBFT LI I 111Lff :T '114I:'f '�111�'kT YIIFET ._ - -- - -' nn o � Nn tlod w'S+.auF HidU�la� UNIT V'PJV 1 _ TT36 ]18) 3t9Z 14U t5d5 i NMON44PH1211. _ 7 ��2 2491 40 $2890 $1,1 A3.7N.W 2 SY 2910 N00 3400 NOH NHO -7 1043 1908 271, -2 2148 1 5 2864 2845 43555 f210 591,488.50 3MEtB4 L89`Da TON 62 61 fit 61 s1 5H f3 20 411, 7N $13680 610726120 1oH 1. �F 623+s xzl". 4 ,oacn€r5 tune•No curry 5 EA 11 p4252 $1,042.52 6 REMOVE BARI-17E4H EAi 1 281 14756 _ SY 287 211 $511 il4 34ZE 18 _ F\ 121. 2 4 - E450 3�at 5P3M 9 Eq 2 28 $1,45400 540:t2C0 tvYE a-I a4Mas a 1P ----- � 5 �Z E1A540H 61'44EW SY 1 fA N1—. R v ME TS RI HMOND PHS _ ' 563.51886 rr YwiNwla IDu IW 9FalnCAna+nn'IRAv1a IKlvnmawao�mi MemR9 nV nd I �I o SCALE:1" = 500' --- __--_ ' - --- —_ � -NEWBRV DRIVE ' n'-7-- L LANE / !X3' C o LANSHIRE' T 1 CALLA N LANE YONT DRNE - \ NE T r p, z r 30 1 21' F A ! IIID f.. O a - ABINGTDN AVENUE- t a `o rc I 7,-9'Xa' I RCB L II v u I i m DRAINAGE EXHIBIT 'B-1' RICHMOND LEGEND PHASE 2 o PROPOSED STORM DRAIN LINE _ PROPOSED INLET T sBS o PROPOSED MANHOLE ■ EXISTING STORM DRAIN LINE T 777 MAIN STREET 3 FORT WORTH, TX 76102 9 LIMITS OF PROJECT ---- PHONE 817-735-6000 8 ❑AP-Blo xxaroRa. xR at EXHIBIT D Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Pmittl ltan Mro '.. 6iddn'e Prn d SHEET SHEP.T SHEET SHEET' SHEET SHEET SHEET SHEEP SHEET SHEET Hid(Nl I—N. Dcsaiptwn Spaifxetian$s[ion No Unit o(Measure fl 63 fiG fi] (.R E ]U 71 72 73 Bid(1nBMn� Unit Pace Bid Vahc UNIT :DRAINA EIMPROVEMENT -RCP LF 146 43 34 411 1 33 55 38 390 $60.52 $23,802.80 -RCP LF 32 36 11 309 l37 176 701 $70.19 $49,203.19 zr RCP LF 193 _ 193 $78.84 $15,216.12 x•RCP LF 8 485 36 529 $88.69 $46,917.01 99-NCP LF 30 199 214 443 $116.91 $51.791.13 I'-Rce LF 240 240 $203.08 $48.739.20 s'X4'NC. LF 310 310 $270.56 $83,87360 YX1'Nce LF 551 551 $43444 $239376.44 2-Rx-6ce L= 50 50 591367 $45663.50 ;19'XR'RCB LF 70 70 $5,036.36 5422545.20 11-e.'RCB LF 75 1 75 57.11176 $533.38200 110 INLET EA 3 2 2 3 3 21 1 4 31 23 54.19211 $9:_.418.53 11-i-ET FA 1 1 $5215.35 $5,31835 aw," INLET EA 1 _ 1 56.194.31 $6,194.31 4-x 4-JUNCTION BOX FA 1 $C 065.97 54.066,97 n^HEADWALL EA 1 52664.77 52.06477 36'HEADWALL EA 1 2 52189.91 $4,379.92 ms HEADWALL EA 1 1 512,200.91 IS12,11091 i2-8'X/'PARALLEL WINGWALL €A 2 2 523.588:42 $47.17584 11-e'Xe W-WALL EA 2 2 $81,339.39 :162678.76 11-9'X8'WING.,Ls FA 2 2 $115,501.92 $231,003.64 (LExatAT SY 790 162 195 208 23 25 121 1415 S7809 $106;252.35 NANDRNL I.F 705 115 30 850 $125.14 $106,369.00 TRENCH—el LF 145 146 125 589 584 562 246 535 192 428 2256 $029 $654.24 TOTAL NIT 'DRAINA QE IMPROVEMENTS $2,345,108.88 cm'ox alar woxTx 1u sl eclNurxlR mcuN£NTs-o¢veawL'.x nwnxnTn xxlvTCTs tv.,x.. ,�z Aura mn.lrTQwwrrrTl,...m:�.w= Z m 0 2 SCALE:1" = 500' _ — --------- - a NEWBRV DRIVE I I _!�__; -�_-- LANSHIRE LANE 7-4- n o o IABINGTON AVENUE v �... :. . IT STREET LIGHTS s LEGEND EXHIBIT 'C' 0 PROPOSED STREET LIGHT POSTE RICHMOND o LIMITS OF PROJECT ---- ----- PHASE 2 3 �BS' 0 777 MAIN 3 FORT WORTH, TX STREET7 102 � PHONE 817-735-6000 00 42 43 DAP-BID PROPOSAL EXHIBIT D Page I ors Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value UNIT VI:STREET LIGHT IMPROVEMENTS 3441.3303 RDWY ILLUM FOUNDATION TY 7 3441 20 EA 64 $750.00 $48.000.00 9999.0012 RDWY ILLUM ASSEMBLY WASHINGTON A 14/20 EA 64 $3,250.00 $208-000.00 2605.3001 1 1/W'CONDT PVC SCH 80J 26 05 33 LF 3138 $6.00 $18,828.00 9999.0013 #6 ALUM CONDUCTOR LF 6276 $0.85 $5,334.60 9999.0014 #10 COPPER CONDUCTOR LF 3138 $0.65 $2,039.70 3441.1502 GROUND BOX TYPE B W1 APRON 3441 10 EA 85 $350.00 $29,750.00 TOTAL UNIT VI:STREET LIGHT IMPROVEMENTS $311,952.30 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 Street Light Quantity.xls o _ o' SCALE:1" = 500' ---- ------ - _... .. EWBRY ERNE A A A N R£1 LANEGLUN LANE f 1 w � ONT DRNE - �I ,-1 '•aft I I e t ABINCTQ AVENUE ® - _ • a � t ----- i 1( m I —E� N STREET SIGNS LEGEND EXHIBIT 'C-1' g PROPOSED STREET SIGN RICHMOND PHASE 2 o LIMITS OF PROJECT -------- — -- 3 JACOBS' a 777 MAIN STREET 3 FORT WORTH, TX 76102 9 PHONE 817-735-6000 STREET SIGN DAP-HID PROPOSAL EXHIBIT D Page I of I Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidlist Item No. Uescripe specification Se SHEET SHEET m No. Unit of Measure Bid Quantity Unit Price Bid Value 107 l08 UNIT VII'STREET SIGN IMPROVEMENTS RICHMOND PH 2 1 STOP SIGN&NAME BLADE PAIR W/POLE EA 3 7 10 $430.55 $4,305.50 2 NAME BLADE PAIR W/POLE EA 1 1 2 $354.25 $708.50 3 NO OUTLET SIGN WI POLE EA 1 1 $354.25 $354.25 4 LEFT TURN&SPEED LIMIT SIGN W/POLE EA 1 3 4 $381.50 $1,526.00 5 RIGHT TURN&SPEED LIMIT SIGN W/POLE EA 1 1 2 $381.50 $763.00 6STOP SIGN &NAME BLADE ON STREET LIGHT EA 1 1 $408.75 $408.75 7 STOP SIGN ON STREET LIGHT EA 1 1 $136.25 $136.25 8 STREET NAME BLADE EA 12 13 25 $58.50 $1,462.50 TOTAL UNIT VII STREET SIGN IMPROVEMENTS RICHMOND PH 2 $9,664.75 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Foran Version ApnI 2,2014 DAP Paving.xls OD12dl f)nP-P N.— EXHIBIT D Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Rgocl 4m W t- Blddd,Pm .[ Bid Summon UNIT I'.WATER IMPROVEMENTS $745,539.62 UNIT IL OFFSITE WATER IMPROVEMENTS $156,667.00 UNIT III:WASTEWATER IMPROVEMENTS $900,44270 UNIT IV'.PAVING IMPROVEMENTS $1,583,516 56 UNIT V.DRAINAGE IMPROVEMENTS $2,345,108.88 UNIT VI:STREET LIGHT IMPROVEMENTS $311,952.30 UNIT VII'.STREET SIGN IMPROVEMENTS $9,664.75 Tara) $6,062,891.81 CITYnFFRT W[1RTx tT ND=-11 NS—IFlCAT4,N oixiMENTS.nEVEumcxnw�Roell PRolEa.TS 1nvnypimm�vc wun.aym