Loading...
HomeMy WebLinkAboutContract 45582-A3 CITY SECRETARY AMENDMENT No . 3 2 TO CITY SECRETARY CONTRACT V WHEREAS, the City of Fort Worth (CITY) and HDR Engineering, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 45582, (the CONTRACT) which was authorized by M&C C-26731 on the 25th day of March, 2014 in the amount of $502,532.00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $38,420.00 which was Administratively approved on September 22, 2014 and Amendment No. 2 in the amount of $317,004.00 which was approved by M&C C-28045 on December 12, 2016; and WHEREAS, the CONTRACT involves engineering services for the following project: Marine Creek Drainage Basin Parallel Interceptor Improvements; and WHEREAS, it has become necessary to execute Amendment No.3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated October 13, 2017, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $49,911 .00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $907,867 .00. OFF11CIAL RUCORD CITY RECREMA ty FT. WORTH, TX Page -1- 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth HDR EngineeriDg, Inc. Jesus J. Chap- Ramon F. guez, E. Assistant City Manager Vice President DATE: �O DATE 1/4/2018 APPROVAL RECOMMENDED: Christopher Harder, P.E. Assistant Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee Title: Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N/A F4:�w Date N/A Doug W B ac Sen.LoE Assistant-City Attorney ATTES ;�`' 7 Mary J ay r City Secretary OFFICIAL RECORD CITY SECRETARY Page -2- FT.WORTH,TX October 13, 2017 Mr. Robert Sauceda City of Fort Worth, Water Department 1000 Throckmorton Fort Worth, Texas 76102 Reference: Marine Creek Sewer Interceptor Improvements Contract No. 45582 Amendment No. 3 for Additional Services Dear Mr. Sauceda: As requested by the City of Fort Worth Water Department, HDR Engineering, Inc. (HDR)offers to provide additional Professional Engineering Services for this project. Part I: Re-design of project for a new parallel pipe within the existing 15'sanitary sewer easement south of Cromwell Marine Creek Rd. The existing 15"and the existing 18°will be upsized to a 24" inside diameter. Revised drawings will be issued to Contractor for use by the City in negotitating and issuing a contract Change Order. Part II: Delineate the existing easement north and south of and perpendicular to Redeagle Creek Drive as requested by the City to be used as temporary construction easement. Revised drawings will be issued to Contractor for use by the City in negotitating and issuing a contract Change Order. This Amendment, consisting of one page; and the attached Additional Scope of Services and Task/Hour Breakdown, represent the entire amendment to the original agreement between the City of Fort Worth and HDR Engineering, Inc. If the terms of this Amendment are acceptable, please indicate by acknowledging acceptance of the terms of this document. Summary of Contract Authorization for Contract No.45582: Clna".al Contract Amount: Amendment No. 1: S 3 42"" Amendment Nc. 2 $3 i ,004 Current Contract Amount $857,956 A,nendment No 3 $49,911 Proposed Contract Amount $907,867 If you have any questions, or require additional information, please do not hesitate to contact me. Sincerely, HDR Engineering, Inc. Douglas K. Biglen, P.E. Senior Project Manager hdrinc.com 600 West Sixth Street,Suite 100 Fort Worth,TX 76102-3684 (817)333-2800