Loading...
HomeMy WebLinkAboutContract 50148 Developer and Project Information Cover Sheet: Developer Company Name: CRP/SCP Southside Owner,L.P.,a Delaware limited partnership Address, State,Zip Code: 2722 Routh Street,Dallas,TX, 75201 Phone&Email: 714-686-7242,bwoidneck@stoehawkcapital.com Authorized Signatory,Title: Brian Woidneck,Vice President of StoneHawk Southside,LLC, authorized member of CRP/SCP Southside Venture,L.L.C.,sole member of CRP/SCP Southside GP,LLC,general partner of CRP/SCP Southside Owner,L.P. Project Name: Stonehawk Addition Brief Description: Water,Sewer, Storm Drain Project Location: East Broadway Avenue at Calhoun Plat Case Number: FS-17-010 Plat Name: Stonehawk Addition Mapsco: 77E Council District: 9 CFA Number: 2017-059 City Project Number: 100933 To be comp by staff.• Received by: Date: / t ,_, A�c� OFFICIAL RECORD CITY SECRETARY City of Fort Worth,Texas �• WORTH, TX Standard Community Facilities Agreement-Stonehawk Addition CFA Oficial Release Date:02.20.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 51c)I 4�,�e WHEREAS, CRP/SCP Southside Owner, L.P., a Delaware limited partnership, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Stonehawk Addition ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS,the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer City of Fort Worth,Texas Standard Community Facilities Agreement-Stonehawk Addition OFFICIAL RECORD CFA Official Release Date:02.20.2017 Page 2 of 11 CITY SECRETARY FT.WORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) ®, Paving (B) ❑, Storm Drain (B-1) ®, Street Lights & Signs(C) ❑. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement-Stonehawk Addition CFA Official Release Date:02.20.2017 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement-Stonehawk Addition CFA Official Release Date:02.20.2017 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. I Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City,its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by thealleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement-Stonehawk Addition CFA Official Release Date:02.20.2017 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy,and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%) for a total of 4%of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent(4%) and material testing fees equal to two percent(2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement-Stonehawk Addition CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and(2)will not boycott Israel during the term of the contract. R. IMMIGRATION AND NATIONALITY ACT Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form(I-9). Upon request by City,Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS,AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Port Worth,Texas Standard Community Facilities Agreement-Stonehawk Addition CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Stonehawk Addition CFA No.: 2017-059 City Project No.: 100933 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 182,605.00 2.Sewer Construction $ 88.470.00 Water and Sewer Construction Total $ 271,075.00 B. TPW Constriction 1.Street $ - 2.Storm Drain $ 43,098.00 3.Street Lights Installed by Developer $ - 4. Signals $ - TPW Construction Cost Total $ 43,098.00 Total Construction Cost(excluding the fees): $ 314,173.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 5,421.50 D. Water/Sewer Material Testing Fee(2%) $ 5,421.50 Sub-Total for Water Construction Fees $ 10,843.00 E. TPW Inspection Fee(4%) $ 1,723.92 F. TPW Material Testing(2%) $ 861.96 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 2,585.88 Total Construction Fees: $ 13,428.88 Choice Financial Guarantee Q tions,choose one ,Amount (Mark one) Bond=100% $ 314,173.00 x Completion A reement=100%/Holds Plat $ 314,173.00 Cash Escrow Water/Sanitary Sewer-125% $ 338,843.75 Cash Escrow Paving/Storm Drain=125% $ 53,872.50 Letter of Credit=125%w/2yr expiration period $ 392,716.25 City of Fort Worth,Texas Standard Community Facilities Agreement-Stonehawk Addition CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER �_.._-. CRP/SCP Southside Owner,L.P.,a Delaware limited partnership Jesus J. Chapa Assistant ty Mana r Date: 1 f Recommended by: Name: Brian Woidneck Title: Vice President of StoneHawk Southside, LLC,authorized member of CRP/SCP Southside Venture,L.L.C., sole Wendy Chi-Babulal, EMBA,P.E. member of CRP/SCP Southside GP, LLC, Development Engineering Manager general partner of CRP/SCP Southside Water Department Owner, L.P. Date: Tcs�/ Douglig, P.E. ATTEST: (Only if required by Developer) Direct r twll�r Transportation&Public Works Department Approved as to Form &Legality: Name: Richard A. McCracken Contract Compliance Manager: Assistant City Attorney M&C No. r.) j4— By signing, I acknowledge that I am the person responsible for the monitoring and Date: administration of this contract, including Form 1295: IV ensuring all performance and reporting sl R T requirements. ATTEST: N e: Janie Morales Mary J. Kays Title: Development Manager City Secretary City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Stonehawk Addition CITY SECRETARY CFA Official Release Date:02.20.2017 FT.WORTH TX Page 9 of 11 f Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A:Water Improvements ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate Q Exhibit B: Paving Improvements ❑ Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate © Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Stonehawk Addition CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. In the event of any payment disputes,in lieu of providing evidence that a contractor or subcontractor has been paid in full,Developer shall provide evidence than any such claim has been bonded against in a manner reasonably satisfactory to the City. City of Fort Worth,Texas Standard Community Facilities Agreement-Stonehawk Addition CFA Official Release Date:02.20.2017 Page 11 of 11 d UP RR E; PRE IDIO EI PASO VICKERY � JAR ISAG TT NAY DAG E T BRODW L -s _ -` I DE IN S A w 3 o T� LA BESSIF � z z - + � I TUCK R J KERS 0 ' �� 7 ANNIEw s s t Y HATTIF 9r C. N ON IICAN J N LEUDA Ij J LEUD,, LIII fitlj L TERRELL V801-)T a m J Q f VICINITY MAP NOT TO SCALE DUNAWAYMAPSCO TAR 077E PROJECT#100933 FILE#X 5M Bailey Menue.Suite 400»Fort Worth,Texas 76107 COUNCIL DISTRICT#9 Te:817.335.1121 WATER PRROJEOJE CT#56008-0600430-100933-001580 (TAR 'F-11141 STONEHAWK ADDITION SEWER PROJECT#56008-0700430-100933-001380 0 g CONNECT TO EXISTING 8" WATER LINE INSTALL 8X6" TAPPING SLEEVE, l 6- GATE VALVE, 6-x4- REDUCER PROPOSED 27 LF CONNECT TO EXISI TING 8"' WATER LINE, 4" FIRE LINE J INSTALL 8"x1.5" TAPPING SLEEVE 1 i III[: al CONNECT TO EXISTING CH 8" WATER UNE ExFo INSTALL 8x6" TAPPING W EX-8 W SLEEVE, 6" GATE VALVE cY.rO _k M H - — PROPOSED 19 LF — — — -- 6„ LEAD LINE BEGIN WATER END WATER PROPOSED STD LINE LOWERING LINE LOWERING FIRE HYDRANT PROPOSED 27 LF 1.5" J �+ EXISTING WA TER UNE SVA TER SERVICE I Vj TO BE LOWERED UNDER B PROPOSED STORM PROPOSED METER BOX DRAIN AND PROPOSED __ _ —_loess SANITARY SEWER l� I - LEGEND I -8'W- PROPOSED WATER LINE PROPOSED FIRE HYDRANT �J PROPOSED GATE VALVE j _ ® PROPOSED WATER METER PROPOSED PLUG PROPOSED DOUBLE CHECK ' DETECTOR ASSEMBLY EXHIBIT 'A' �° 121) DUNAWAy WATER LINE EXHIBIT SW Wiley Avenue•Suft 4W•Fort Wodh Tsxm 76107 STO N E H A W K ADDITION Td:817.335.1121•F=817.735.7437 SCALE: 1"=60 ft. (iX REG.F-1114) 1 OF 4 f INSTALL 8"x8" ANCHOR TEE, PROPOSED 8" C _ 8" GATE VALVE SOLID SLEEVE ��zz����-��� H EX-6 W r 6 PROPOSED 30 LF 6 LEAD LINE _ CONNECT TO EXISTING 6" WATER LINE INSTALL 8" GATE VALVE PROPOSED STD FIRE HYDRANT A CONNECT TO PROPOSED 8" WATER LINE, I INSTALL 8"x6" ANCHOR TEE I I & 6" GATE VALVE ' W IT z I PROPOSED 8" WA TER LINE, l a � r w OIL ( ' g _ LEGEND d - B"W PROPOSED WATER LINE I r J }- PROPOSED FIRE HYDRANT M PROPOSED GATE VALVE PROPOSED WATER METER PROPOSED PLUG I PROPOSED DOUBLE CHECK DETECTOR ASSEMBLY 1 1 0 60 120 EXHIBDUNA AY WATER LINE EXHIBIT 550 Salley Avenue•Suite 400.Fort Worth,Texas 76107 STO N E H A W K ADDITION Tel:817335.1121•Fox:817.335.7437 SCALE: 1"=60 ft. (Tx RLr,F-11141 2 OF 4 -- I I 1 : ALLEY - _ - - I I- � 1 Q J I PROPOSED 8" WA TER LINE, IL ° - �I f PROPOSED I I STD FIRE HYDRANT PROPOSED CLEANING WYE I PROPOSED 30 LF I 6" LEAD LINE CONNECT TO PROPOSED 8" WATER LINE, PROPOSED LEGEND INSTALL 8x6" ANCHOR TEE, I 8" WATER LINE 6" GATE VALVE) -8"W- PROPOSED WATER LINE - } PROPOSED FIRE HYDRANT CONNECT TO EXINTING 4" WATER LINE, a'w N PROPOSED GATE VALVE INSTALL 8" GATE VALVE, CONNECT TO PROPOSED ® PROPOSED WATER METER 8`x4" REDUCER 8"WATER LINE, INSTALL N PROPOSED PLUG PROPOSED DOUBLE CHECK — –EXIS77NG 4" WATER LINE 8"x6" ANCHOR TEE, DETECTOR ASSEMBLY 6" GATE VALVE EXHIBIVA1 0 40 80 DUNAWAY WATER LINE EXHIBIT 5W Ba(IeY Avenue•Suite 400•Fat Worth,Texas 76107 STO N E H A W K ADDITION Tel:617".1121.Fac 817.335.7437 (7%NEG F-1114) 3 OF 4 SCALE: 1"=40 ft. i a I � I YI] o �1 CONNECT TO PROPOSED 8" WATER LINE I INSTALL 8'X1.5" TAPPING SLEEVE, CONNECT TO PROPOSED 8" WATER LINE I PROPOSED STD FIRE HYDRANT INSTALL 8"X6" TEE, 6" GATE VALVE, 6"x4" REDUCER PROPOSED 30 LF t L = 4" FIRE LINE CONNECT TO EXISTING 6" WATER LINE, INSTALL 8"x8" TEE, _ 8" GATE VALVE & 8'x6" REDUCER , PROPOSED 10 LF 6" LEAD LINE PROPOSED 20 LF 4" DOMESTIC _ WATER LINE g w CONNECT TO PROPOSED IIIPROPOSED 4" WATER VAULT a 8" WATER LINE INSTALL 8X6"_ 1,11111 ANCHOR TEE, 6" GATE VALVE •3 PROPOSED PROPOSED 30 LF-1 8" PLUG , LEGEND 1.5" WATER SERVICE CONNECT TO PROPOSED —8,w— PROPOSED WATER LINE PROPOSED METER BOX —8" WATER LINE, INSTALL PROPOSED FIRE HYDRANT �- fPROPOSED 20 LF OF 6" FIRE H PROPOSED GATE VALVE LINE E 6"8"x6" ANCHOR TEE,GATE VALVE & ® PROPOSED WATER METER I' CONNECT TO PROPOSED 8" 6"x4" REDUCER N PROPOSED PLUG WATER LINE, INSTALL 8"X6" 7 _ PROPOSED DOUBLE CHECK DETECTOR ASSEMBLY ANCHOR TEE, 6" GATE VALVE " DUNAWA ER IT 'A' a 40 RB WAT R LINE EXHIBIT SW Baby Avenue•SuBe 400•W Worth,Texas 76107 STO N E H A W K ADDITION Tel:817.335.1121•Fac:817.335.7437 (YX"M'F"11141 4 OF 4 SCALE: 1"=40 ft. 004243 DAP-BID PROPOSAL Page 1 of4 Quantity Matrix Bidliet Item £ Sheet Bid Description Unit Price Bid Value No. 1 4 61 9 1 Quantity UNIT 1:WATER IMPROVEMENTS 1 0241.1011 Remove 4"Water Line u] :; 11 1 F 195 195 $11.99 $2,33290 2070 .11 -,move 6"Water Line ' 1t [,F 814 814 $11.99 $9,759.24 3 0'41 J: i F'rcesure Pluu (1'41 14 EA 1 1 $849.24 $849.24 4 1 k)>.000 `wh aicy inc Loi+rrusp 3305 12 EA 1 1 $2,497.76 $2,497.76 5 ;0;.01 n/ tiaf,:n 3305 10 LF 1,044 1,044 $2.50 $2,607.66 6 +311.0001 DLWNICImu 1V3tcrFiuingew/Restraint 33 11 11 TON 2.15 2.15 $6,194.44 $13,318.04 7. 3311.0041 4"Water F' (Fire 133 11 10,33 11 12 LF 77 77 $54.95 $4,231.20 8 311.0141 6"Water Pik. _ 331110,331112 LF 20 20 $64.94 $1,298.83 9 >;1 Al 8"W I'ike 33 1110,33 11 12 LF 947947 $79.93 $75,692.02 10 2ftv101 Fiir I k,kml 3312 40 EA 55 $4,995.51 $24,977.57 11 3±I n 1 are"Service 331210 EA 2 2 $1,198.92 $2,397.85 12 02 4"Water TV,;,ter and Vault 33 12 11 EA 1 1 $24,977.57 $24,977.57 13 111' 1002 6"Gate VaI,e 331220 EA 6 1 $1,198.92 $1,198.92 14 Valve 331220 EA 5 5 $1,498-651 $7,493.27 15 ?- I'appingSleeve&Valve 331225 EA 313 $1:99B 211 $5,994.62 16 99'19.00o1 ItCIl1CY�2.29'Walert' a 1024114 ILF 248 248 $11.991 $2,973.33 TOTAL UNIT 1.WATER IMPROVEMENTS $182,605.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Forth V—i..September 1,2015 Quantity Matri—Isc n ryX _ ° E%FO CONNECT TO EXISTING 8" PVC Ex<O PROPOSED 4' SSMH PROPOSED 4' SSMH PROPOSED CLEANOUT � — PROPOSED 1 O"x4" TEE -: 1 -- I � II A PROPOSED CLEANOUT , PROPOSED 8 LF 4" SANI TAR Y SEWER SER VICE PROPOSED 4' SSMH PROPOSED 8 LF 8" SANITARY SEWER SERVICE —— les — PROPOSED 4' SSM l_� I H I I j > PROPOSED 4' SSMH II r I� 0 V1 LEGEND - _- -1Cyr'SS PROPOSED SANITARY SEWER LINE * PROPOSED SANITARY SEWER MANHOLE EXISTING SANITARY SEWER MANHOLE 0 60 120 "'DUNA'WA�/ WAST WATER EXHIBIT 550 Borley Avenue•SuRe 100•FW Worth.Teves 76107 STO N E H A W K ADDITION Tel:817.3%.1121•F=817.335.7137 SCALE: 1"=60 ft. OXREG.F-11111 1 OF 2 `I � I i 0 v - PROPOSED 4' DROP SSMH - i ' PROPOSED 13 LF 8" SANITARY SEWER SERVICE PROPOSED CLEANOUT i PROPOSED 4' SSMH N CONNECT TO EXISTING 4' SSMH - LEGEND PROPOSED SANITARY SEWER LINE PROPOSED SANITARY SEWER MANHOLE I EXISTING SANITARY . -- - - SEWER MANHOLE WASTEWATER EX EXHIBIT ' i 120 TEWATER EXHIBIT �-�-� � Bo1leAvemie-Suffe40-Fort W«m.Texas 76107 STONEHAWK ADDITION Tel:917-W.1121-F=817.335.7437 SCALE: 1"=60 ft. (DC HEG F-1114) 2 OF 2 00 42 43 DAP-DID PROPOSAL Page 2 of 4 Quantity Matrix Bidlist Item Specification Section Unit of Sheet Bid No. Description No. 6 9 Measure Unit Price Bid Value 4 Quantity UNIT II:SANITARY SEWER IMPROVEMENTS 1 3301.011113 I'i�.a CY`CV'Inspection ;>01 31- IT 924 924 $0.61 $560.97 2 1"01 W01 Manhnlc ^rl�l;n Ii,tina 3:0130 FA 7 7 $91.07 $637.47 3 3305.0109 Trench S.Ilcly 33 os 10 LF924 924 $1.52 $1,402.44 mm 4 33,11.3101 4"Sewer 3 1 50 LA 2 2 $941.03 $1,882.06 5 3331.3301 S"Sewer S,'nicr i+ I56 ).A 2 2 $1,457.08 $2,914.15 6 3111 4201 10"Sewer Pipe 33 11 10,33 31 12 LF 924 924 $48.57 $44,877.93 7 353-11001 4'Manhole -,Q 10, "r ^ FA 5 6 $3,946.25 $23,677.48 8 i31,91002 4'Drop Manhole 3 39 10. i I'A 1 1 $4,858 92 $4,856.92 9 ,039.1003 4'Extra Depth 3 3Manhole , Q In c,,20 VF 11.6 13.4 $100.17 $1,342.33 10 U_4l 1_013 Remove 6"'Sewer Line 0'_4➢14 I F 746 746 $7.29 $5,434.89 11 02411201 Rcmove 4'Sewer Manhole 02 41 t.4 EA 31 3 $294.45 $883.35 TOTAL UNIT IL SAW RY SEWER IMPROVEMENTS $88,470.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form V—i-Sq—ber I,2015 Quantity Mat iz.,Iu PROPOSED BO LFii 21" STORM DRAIN CONNECT TO EXISTING 5 x 1,5' GRATE INLET �X PROPOSED 4rx4' SDMN 1„ \ PROPOSED 17 LF EX-811 w 21" STORM DRAIN � OH Gx-GC OH PROPOSED 10' CURB INLET N L z F p L --_ I Lf_ — d ' U J LEGEND I PROPOSED STORM DRAIN PROPOSED CURB INLET PROPOSED STORM DRAIN MANHOLE EXHIBIT ' F 0 60 120 DUNAWAY STORM DRAIN EXHIBIT 550 Ballet'Avenua-Suite 400-FortWorth,Texas 76107 STO N E H A W K ADDITION Tel:817%.1121-F'mC 817.335.7437 SCALE: 1"=60 ft. M NEG F-1114) 1 OF 1 00 42 43 DAP-BID PROPOSAL Page 3 oro Quantity Matrix Bidlist Item Specification Section Unit of Sheet Bid No Description No. Measure ? q 6 9 Quantity Unit Price Bid Value UNIT III:DRAINAGE IMPROVEMENTS 1 3305AI09 Trench Safety 33_05 10 LF100 100_ $,,,4.60 $459.56 2 1141 020 i "RCP,Class 111 3341 10 LF 19 19 $147,06 $2,794.15 3 3341 02u5 24"RCP,Class 1I1 334 10 LF 81 81 $174.63 $14,145.41 4 3349,0001 4,Storm Junction Box 3349 10 PA 1 1 $9,191.30 $9,191.30 5 ",49 5001 ➢0'Curb Inlet 33 49 20 EA 1 1 $13,786.95 $13,786.95 6 6241,430; Remove 4'Grate Inlet 0241 14 EA 1 1 $11838.26 $1,838.26 7 Q999.0001 Remove 20"Storm Drain 0241 14 LF 32 32 $27.57 $882.36 TOTAL UNIT III:DRAINAGE IMPROVEMENTS $43,098.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Forth Version SWI..ber 1,2015 Quantity Matrixxlsr 00 42 43 DAP-BID PROPOSAL P.p 4 of 4 Quantity Matrix Bidlist Item Specification SeCtiulc I U-iI of Sheet Bid Description Unit Price Bid Value No. No- Measure 2 4 6 9 Quantity Bid Summary UNIT 1:WATER IMPROVEMENTS $182,605.00 UNIT II:SANITARY SEWER IMPROVEMENTS $88,470.00 UNIT III:DRAINAGE IMPROVEMENTS $4098.00 Total Construction Bid $314,17300 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS I—Version S prember 1,2015 Qumtity Maawxlax