Loading...
HomeMy WebLinkAboutContract 46599-A1 CITY SECRETARY AMENDMENT N0. 1 CONTRACT N0. S - TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Gresham, Smith & Partners, (ENGINEER) made and entered into City Secretary Contract No. 46599, (the CONTRACT) which was authorized by M&C C-27231 on the 17th day of March, 2015 in the amount of $206,325.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation, Contract 89; and WHEREAS, it has become necessary to execute Amendment No.l to the CONTRACT to include an increased scope of work and revised fee. NOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated January 9, 2018, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $8,640 .00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $214,965 .00 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. _. st taw A�ClAL RECORD �p " t�Y SECRETARY 41-4 ?'1'.WORTH,TX 9� `� Page -1- 0� 1 Wd W�ti EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER r, City of Fort Worth Gresham, Smith Partners Jesus J. Chapa Chris Kaakaty, P.E. Assistant City Manager Senior Vice-President DATE: �'1 DATE: / /Z APPROVAL RECOMMENDED: Christopher Harder, P.E. Assistant Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee A ;ky Title: Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N/A %!� Date N/A Douglas W. Black Senior Assistant City Attorney ATTEST: 0� FORS. ary J Eys City Se 4 etary 'CAS t#FFICIAL RECORD CITY SECRETARY Frr WORTH,TX Page -2- 12 G R E S H A h S M ITH AN E P A R T N F R 5 January 9, 2018 Walter Norwood, P.E. Senior Professional Engineer City of Fort Worth—Water Department 200 Texas Street Fort Worth,TX 76102 Subject: City of Fort Worth Project No. 02381,Sanitary Sewer Rehabilitation, Design Contract 89,Amendment No.1 Walter Herewith is our request for Amendment No.1 for the subject project. The Amendment includes additional scope and fee to prepare drawings for an additional line, Segment L-2421. The line is located.between Park Ridge Boulevard and Mission Street. The line will be rehabilitated or replaced from the manhole (Station 4+30)just west of Lubbock Avenue to the upstream end of the line, approximately 700 lineal feet.The additional scope and fee is as follows: Task No.1 Project Management • Manage the design team, provide quality assurance,coordinate internal meetings, and prepare timely invoicing. Task No.2 Concept Design • Visit the site, collect available data, and prepare base sheets using available aerial base mapping and layout line on plan. Task No.3 Preliminary Design • Prepare preliminary plan and profile sheets and submit to the City for review. Task No.4 Preliminary Final Design • Incorporate City review comments on Preliminary Plans and prepare 90%complete plan and profile sheets and submit for City review. • Finalize 100% plan and profile sheets and submit to City to issue to contractor. Fee Attached, please find the Level of Effort Spreadsheet showing our fee breakdown.We propose to perform this work for a lump sum fee of$8,640.00. Summary: Original Contract$206,325.00 Amendment 8,640.00 Total Contract $214,965:00 Design Services For The Built Environment 2811 McKinney Avenue,Suite 300 / Dallas,Texas 75204 / Phone 214.350.1500 / www.gspnet_com January 9, 2018 Page 2 Assumptions Segment L-2421 will be added to Ark Construction's current construction contract that includes the other segments of Contract 89 and no bidding or construction phase service will be required as part of this Amendment. The City will provide field survey limited to top of rim and invert elevations of the two existing manholes on Segment L-2421.The city will assist the contractor in obtaining access to the site and permission to construct the proposed improvements. Our scope and fee excludes permits and easements. Please let me know if you have any questions or need any clarifications.Thank you for the opportunity to assist you. Sincerely, GRESHAM, SMITH AND PARTNERS Alex Martinez, P.E., Senior Associate Attachments: Level of Effort Spreadsheet t EXHIBIT B-2 Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for Sanitary Sewer Replacement Contract,89,Amendment No 1 City Project No.02381 Labor hours Expense Task Na.. Task Description principal Project Project EIT CADD Administrative Total Labor SuOconsultant Total Expense Task Sub Total Man er Ert ineer Cost Travel Reproduction Cost Ra $250 $240 $125 $100 $1001 U01 MWBE Non-MWSE 1.0Pfa'act M—emant 01 41 01 01 01 0 $960 $D $0 $0 $0 $0 $960 1.1 Mana jng the Team 1.1.1 QAlQC 2 $480 1 1 $0 $480 1.2 Communications and Re orOn 21 1 _ 2.o Conc.Desi n 30-Percent 0 4 4 0 0 0 $1.460 $0 $0 50 SO $60 $1,610 2.1 Data C011e0o0 & i[o VisR 4 4 $1,460 $50 $50 $1.510 3.0 Prslirhma Desi n 60 Percent 0 1 16 0 8 0 $3,040 $0 $0 $0! $30 $30 $3,070 3.1 Prelimm Deaf P=1`3 a $0 $0 3.1.3 Plan and Plan/Profile Sheets 1 lal e $3,040 $$0 $30 $3 070 4.0 Final D-1 g. 01 1 18 0 8 0 $3040 $0 $0 0 $6D $60 $3100 Final Draft(90%)CunstruclP-Plans and 4.1 S eCIfICa!i°ns 0.5 8 41 $1,520 $30 $30 $1,550 4.2 Final"10OV, Plans and Specifications I 0,5'i, 81 4 $1,520 $30_ $30_$1550 5.0 Bid Phase 0 0 _ of 01 0 0 $0 $0 $0 $0 $0 $0 $0 5.1 Bid Su °r 6.0 Construction Phase Services 01 01 0 01 0 $0 $0 $0 $0 $0 $0 $0 7.0 RpVflF.asemant Servioes 0 — 0 0 0 0 0 so $0 YO 0 $0 $0 0 aiahk-e'-Ent Uoouments $D $o $0 S.0— Suvey n D 0 0 D 0 $0 $0 $0 $o $0 $0 $0 _— ex:!,7 r.Sur✓ey 0 $D $0 Totals 01 101 Sri. 01 16 0 $8,500 $0 $0 $50 Y90 $140 $8,640.00 Water Line Footage 60% Project Summary Sewer Line Footage 700 40% Total Hours 62 700 100% Tota{Labor $8,500 Total Expense $140 (A) Total F $8,640 MSE/SBE Subconsultant $0 (B) Survey Feee e $D Wn-MBEISB'c Subconsultant $0 (G) Tatat Fsa r-1 surveyFee $8640 101, Sub Markup $C Water Fee(60%of C) I Sewer Fee(40%of C) MBE/SBE Paaf tion 0 0°1 $6,18?.00 $3,456.00 Total Project C..tl $6,640.00 Cescri;iorj TIp 'Nater Sewer Conce tual Desi n'30k 31 $1,535.00 $1,037.00 Prelimira Desi n 60h 32 ! 1 $2,074.00 Final Desi n 10% 38 $518,00 $348.00 Survey 51 Subtotal $5,193,00 1 $3,457.00 Total. $6,640.00 City of Fort Worth,Texas Attachment B-Level of Effort Supplement Typical Water antl Sewer Replacement FWVVrR Official Release Date:8,09.2012