Loading...
HomeMy WebLinkAboutContract 49033-A1 CITY SECRETARYHUaL AMENDMENT No . 1 CONTRACT N0.. A TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 49033, (the CONTRACT) which was authorized by M&C C-28528 on the 18th day of April, 2017 in the amount of $291,579.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Marine Creek Drainage Basin Parallel Interceptor Phase II Improvements at Various Locations Within the Marine Creek Drainage Basin; and WHEREAS, it has become necessary to execute Amendment No.l to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated December 6, 2017, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $133,294.00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $424,873.00 3. All other provisions of the Contract, which are not /1% expressly amended herein, shall remain in full force and Q� effect. a RECEIVED ^' OFFICIAL RECORD N JAN 18 2018 V CITY SECRETARY CfIYOFFORTWORTH ® CITY SECRETARY FT.WORTH,TX Page -1- �6 � g 8 � EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of ort Worth Halff Associates, Inc. Jesus J. Chapa Dennis Haar, P.E. Assistant City Manager Public Works Team Leader DATE: /r l /g DATE: 1- 11- 201% APPROVAL RECOMMENDED: I� dL Christopher Harder, P.E. Assistant Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee Lt rP Title: Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N4*- G - Z SZg Date 4f74 - Tae u argo 9 , 2- Douglas Douglas W. Black Senior Assistant City Attorney ATTEST: Matry 'J. " e r\' ` City Secretary �XA OFFICIAL RECORD CITY SECRETARY FT.WOR'THO TX Page -2- ;;; Hr4,LFF December 6,2017 32654 Mr. Robert Sauceda City of Fort Worth Water Department 200 Texas Street Fort Worth,Texas 76102 RE: Amendment No. 1 —Marine Creek Parallel Sanitary Sewer Interceptor M-365 City Project No. 100274 Dear Mr. Sauceda: Halff Associates is pleased to present this Amendment No. 1 for additional services to City Project No. 100274. Amendment No. 1 shall include the design, survey, flow monitoring, coordination, ROW/easement services, construction support, and reproduction for M-279-A from Station 339+93.5 to 343+54 and M-365 from Station 0+00 to 20+28.19, for a total of approximately 2,390 lf. The interceptor will be replaced with a 36-inch line by open cut. An inverted siphon will also be designed across the tributary to Marine Creek Lake. In order to provide the design for these lines,Attachment A of the original contract shall include the following amendments: • TASK 1.DESIGN MANAGEMENT. 0 1.2. Communications and Reporting - Prepare and submit updated baseline Project Schedule. o ASSUMPTIONS—An additional (1) meeting with city staff to discuss siphon design. • TASK 3. PRELIMINARY DESIGN (60 PERCENT). 0 3.2. Geotechnical Investigation, Subsurface Exploration — An additional three (3) borings will be evaluated. Laboratory Services.—An additional test is recommended: absorption pressure and/or one-point pressure swell tests. Engineering Services. — The engineering report will also address: recommendations for junction box foundation type,depth,and allowable loading; foundation construction requirements; recommended lateral pressures for the design of below-grade walls; and recommendation for box slab support, including an evaluation of the swell characteristics of the subgrade soils. o ASSUMPTIONS—An additional (1) boring at an depth of 25 feet and an additional two (2) borings at a depth of 30 feet. 0 3.9. Parks Coordination—The engineer will coordinate with the Fort Worth Park & Recreation-Department as necessary. 0 3.10.Flow Monitoring—Flow data will be collected at two manholes upstream of the inverted siphon location. This data will be used to determine the initial flow needed HALFF ASSOCIATES,INC. 4000 FOSSIL CREEK BOULEVARD TEL (817)847-1422 W W W.HALFF.COM FORT WORTH,TX 76137-2720 FAX (817)232-9784 ONE Mr. eda MENCity of Fon Worth Water Depamarts nrnt ■E N HALFF January 11,2018 Page 2 for the siphon design. Design flows will be based on the capacity of the gravity sewer line. • TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). o ASSUMPTIONS—The Sheet List will be revised as follows: ■ Cover Sheet ■ Index and Legend ■ General Notes (2) ■ Layout and Survey Control (2) ■ Right of Way Map (4) ■ iSWM Construction Plan (4) ■ Traffic Control Plan (2) ■ Demolition Plan (3) ■ Plan and Profile (17) ■ Special Manhole Detail (4) ■ Standard Details (3) • TASK 7. ROW/EASEMENT SERVICES. ASSUMPTIONS — An additional four (4) temporary construction easement documents will be necessary and an additional four (4) temporary right-o£--entry documents will be necessary. A summary of the proposed budget for this revised amendment is as follows: Project Management $5,718 Conceptual Design (30%) $17,540 Preliminary Design (60%) $22,658 Final Design $22,235 Construction Phase Services $5,918 ROW/Easement Services $14,497 Reproduction $1,880 Survey $20,408 Geotechnical (SBE CMJ Engineering,Inc.) $5,400 Flow Monitoring (SBE DFW Infrastructure,Inc.) $15,000 10% for SBE $2.040 TOTAL PROPOSED AMENDMENT NO. 1 $133,294 The SBE portion of this amendment is $20,400 for additional survey, which is 15.3% of the total amendment. The SBE utilization of the Original Contract and Amendment No.1 combined is 13.2%, which exceeds the City's original SBE goal of 10%. Attached are a Level of Effort Supplement, Estimated Construction Costs and updated Baseline Schedule(formatted in accordance with Exhibits B-2,B-3 and D of the original contract.). Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal and our proposed SBE utilization for the referenced project. Sau da M��MEN De art ent City of Fort Worth Water Department ■N■ HALFF January 11,2018 Page 3 Following is project fee summary: Original Contract $291,579 Amendment No. 1 $133.294 REVISED CONTRACT AMOUNT $424,873 Sincerely, HALFF ASSOCIATES,INC. 4�p wriqL Leah M.Hodge Project Manager C: Tony Sholola, P.E. Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for MARINE CREEK PARALLEL SANITARY SEWER INTERCEPTOR M-365-Amendment 1 City Project No.100274 r..x o..rtlPmD P,ol.n P.gect R�oKt S.r..y s Tom L.bm ........n:.r f s D r wr4.m e.eB.1 3 Mracfor M30.Ber EnBmeer flT RPL3 C—im ♦tlminl.tntl.e Gnt SODconvuB.nt Travel pro0uctl CON s 0 omple4 mvininS 5203 Sim SMS W •IiNi • •r$11 0 0 E]11 f0 >13 0 0 584 f0 3561 SE sSd 0 30 r�ry,D Vnonmly STo+mly';�'ra�ec< 0 z 0 ltns =�P.,.uo,anir.,�smu aePOM,wr, ms rte 1. vm a,.u�-m�ueersee P. � sa m so wE aD o� sD yD L0 Cance xnr n So Percen o 4 41 TS 20 0 tl 0 0 0 D 0 311510 50 f0 So S0 M f1T610 o% $17,541 ] 21 SD 54,B99 201E SP 53044 0 0 0% DyD 20 510188 Sr0 490 0450 f0 EO SD b0 26 �on.truch fe 0% 3.D Prtlmn n00 Percen 01 4 E5 51 20 D 13 32 D 0 0 0 0 322355 520100 So Sp 5100 4—Do s4s lee 0% f4]13D 2, 72 519.2_4. Et GD 300 Sr9380 ID 2i 31 Dib 55900 55100 D% CPnstrutnebUlnvieview PN EO 6430 Pubbc 3Metin f0 0 SD f0 D 1f0 SQ ID 3 f0 D% bD 32344 0 0% f33a 0 EI5 W0 S15 D00 3156D00 0% 1'.S CDO Cm DyPenwnrn,re., nn.u...me-L.y.wm Elan s.PPnme i DMO CrTiri.l R..I..w Wb:&[8,201]n 1 ofJ Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for MARINE CREEK PARALLEL SANITARY SEWER INTERCEPTOR M-365-Amendment 1 City Project No.100274 ahoy M1 Ex Teak Deurlplbn Prgec+ Pr)sl Prdea ctu uctu ructa SurwY 5—y rwY M1hMI TPbI laEd e:pe Pamart BPepe! asKNo. Direcbr Manage En VIUPM SaI PE SaIEITr RRA Tech Crew mn Caa1 0ubcarau0aM Trawl mPdlrc o�IC0s1 nse Task SUE Total Compkh bmelnlrp ner 1 1 1 41 1 1 1PC 5 SBE —E Final Desl n 0 4 52 302 0 1. o0 p 0 30 0 SbD 000 055 OW 522535 Incl Drafl lWl"AI CanetvN.n Plans an0 2 l6 2 Si5E69 $2M §200 E15053 0°a EIS 9GJ 4,2 Sina161L0044ranlaw ends v 55062 5200 §200 152 $6152 ea DeGslon Le s 90%antl'eo0ahl §D g0 a0 D°b 1O - PO:Ld1G0'll 5830 $0 5620 5.11 eitl Phase D D 0 0 0 0 0 0 0 0 0 0 0 f0 So SO fD 51000 51000 §10m 0% ft 000 dShc Gomer Docame�6 and Maintain 11 Plan Holders ur $0 El 000 St 000 $1000 1— 8t 000 sve A1 f0 $o 30 0% Eo Atknd Prabid GOn(erenca f0 $o E0 OX. EO na nd o so §o ie D^A aD 5.1 aEl.la[a Dics and Ret—t—Avmrtl EO ED f0 OY. EO SO EO Eo EO 6.o G.--anon Ph.Services 0 0D 55910 SO W SO S3lp $— 56319 0% 16218 CensVUGi0n Su E1a1 Anand Preconsv�mon.conrerenca so aD sD aD ntl PYUIC McSfin EO §o SO 0 5.1 Ped 3m Visit 14 53192 M §3183 0% $3182 6.1 §WmMeI R— 2 SB9E 0°E 5006 Retueatl0�nkrmaSoChenpe Pticr 0 EO EO E0 Eo 50 60 SO - rd DreKrn s 9 9 E1 M0 g3D0 §300 §2140 D% 5314D clga11ortWOM.7— nmcnmenl B-�..e.a m Ehon saogemerc PIMe ondrc Raleaea ae1e.5o9.zmz 2 013 Level of Effort Spread¢"ncet TASKIHOUR BREAKDOWN Deslgn SeMr.wa, MARINE CREEK PARALLEL SANITARY SEWER INTERCEPTOR M-366-Amendment 1 City Prow Nn,160774 Et L L.w oe. mu n.x D.wnauw _'+gest Prgwt Prelret oo ...wr see^pr seuewr .ti,�rver Tem laser suxo..eew ro6�i Ewwae Tnxsue Tot.i hrewt ewo.t �3_ a ntlnpb.tl � .�. moo.. temptrtr .m.inn T.e No. b:�e �,...., m.��.u., •ienisv, a ,c fes u�`faa,.,..,,m a .. __ ... ;...,..-.,,, B i 1 fYe] tau $150 St Oe Set tfB4 fltl 5116 flat i. su i0 ItoWlEa.ement services_ b b b V b V 0 e 1I u H 44 0 $1¢411 t_o 60 $0 fB0 u0 fta 511 11 1141]] - E3626 $0 3616 _ EIB0d2 fe0 f60 110 i�]. 3828 §0 73 am omr A nt of Sv6mId1 1 B 820 05 t920 a0 surve 0 0 0 0 t0 a 0 0 t 4t — 100 0 fE0 01 $0 §0 f0 f0 $0 {30 0a 0'.: f:.V ibx a0 100 11-16 a0 S 6.Yi 82 Rlh- 1—11 §0 Iu]2 01 1 0 t0 t0 30 _ ft1,3a0 §131,150 _ M- T-1 D6y of Fos WaM,Ten. M1OaWm.m B-Enol of Ef1m Suppl.rt+�M1 FMDOfriul F.pap Dap:B.W3013 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 1/9/2018 - Ordinance No. 23059-01-2018 DATE: Tuesday January 9, 2018 REFERENCE NO.: **C-28528 LOG NAME: 60MCM365P2A1-HALFF SUBJECT: Authorize Execution of Amendment No. 1 in the Amount of$133,294.00 to City Secretary Contract No. 49033, an Engineering Agreement with Halff Associates, Inc. for a Revised Contract Amount of $424,873.00 for Marine Creek Drainage Basin Parallel Interceptor Phase II Improvements at Various Locations Within the Marine Creek Drainage Basin, Engineering and Design Services Provide for Staff Costs, Property Acquisition Utility Coordination and Material Testing and Adopt Appropriation Ordinance (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council: 1 Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Fund in the amount of$173,294.00 from available funds; and 2. Authorize execution of Amendment No.1 to City Secretary Contract No. 49033, an Engineering Agreement with Halff Associates, Inc. in the amount of$133,294.00 for a revised contract in the amount of$424,873.00 for the Marine Creek Drainage Basin Parallel Interceptor Phase II Improvements at various locations within the Marine Creek Drainage Basin (City Project No. 100274). DISCUSSION: On April 18, 2017 Mayor and Council Communication (M&C C-28194)the City Council authorized the execution of an Engineering Agreement with Halff Associates, Inc. in the amount of$291,579.00 for the preparation of plans and specifications for the installation of a parallel sewer main for Marine Creek Drainage Basin Parallel Interceptor(M-365) Phase II within the Marine Creek Basin from Ten Mile Bridge Road to Huffines Boulevard. Amendment No. 1 will provide for the necessary design to replace the severely deteriorated sanitary sewer main located immediately downstream of the project main. In addition, $40,000.00 is required for increased project management costs. Engineering for Marine Creek Drainage Basin Parallel Interceptor Phase II Improvements is one component of the overall project that includes project management, utility coordination water/sanitary sewer material testing, inspection and contingencies. The overall project budget is $5,000,000.00. Design is expected to be completed by July 2018. Construction is anticipated to commence in November 2018 and estimated to be completed by November 2019. This project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. The project will have no impact on the operating budget of the Water Department. M/WBE OFFICE: Halff Associates, Inc. agrees to maintain its initial SBE commitment of 10 percent that it made on the original Agreement and extend and maintain that same SBE commitment of 10 percent to this Amendment No.1 Therefore Halff Associates, Inc., remains In compliance with the City's BDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous SBE Commitment Form executed by an authorized representative of its company. http://apps.cfwnet.org/ecouncil/printmc.asp?id=25480&print—true&DocType=Print 1 0/2018 The project is located in COUNCIL DISTRICT 2. FISCAL INFORMATION /CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Water Capital Fund. The Fiscal Year 2018 Water Operating Fund Budget includes appropriations of $29,022,689.00.00 for the purpose of providing Pay-As-You-Go funding for Sewer Capital Projects. After this transfer for Fiscal Year 2018, the balance will be$22,107,497.00.00. Appropriations for Marine Creek Drainage Basin Parallel Interceptor Phase II Improvements By Funds consist of the following: Fund Existing Additional Project Appropriations Appropriations Total* Water Capital Projects Fund $431,579.00 $173,294.00 $604,873.00 56002 Project Total $431,579.00 $173,294.0011 $604,873.00 *Numbers rounded for presentation purposes. FUND IDENTIFIERS (FIDs): TO Fund; Department Account Project ProgramActivity, Budget Reference # Amount ID ID Year (Chartfield 2) FROM Fund Department ,Account, Project ProgramActivity Budget Reference # Amount ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Kara Shuror (8819) Additional Information Contact: Robert Sauceda (2387) ATTACHMENTS 1. 60MCM365P2A1-HALFF Fid Table (Dan).docx (CFW Internal) 2. 60MCM365P2A1-HALFF SAM.pdf (CFW Internal) 3. 60MCM365P2A1-HALFF SBE Form.pd (CFW Internal) 4. 60MCM365P2A1-HALFF 60 AO 18r.docx (Public) 5. 60MCM365PH2A1-HALFF Form 1295.pdf (Public) 6. 60MCM365PH2A1-HALFF MAP.pdf (Public) http://apps.cfwnet.org/ecouncil/printmc.asp?id=25480&print—true&DocType=Print 1 0/2018 •I • t Table FIDS(KK Journal Entries) Rec1560!02 Acco# 911 11 I -- 11• 1 11 11 /1 1 -- '' 1107070430 I / 1/ /1 / 1 f /I 111 _- FIDS(GL Journal Entries) Rec Fund Dept# Account Project Activity Budget Year CF Program Amount Purpose Xfer Amortize # ID 2 601 0700430 4956001 ff 0017ZZ 9999 $1 3,294.00 11 � 0700430 1 11 100274 001730 9999 $133,294.00 --- 61/ 0700430 I I // 001730 9999 $40,000.00 FIDS(Expense Only-No KK or GL Entries Needed) Rec Fund Dept# Account Project Ac#ivity Budget Year CF Program ;$133P,294.00 911 1 114 1 / 11 0 II 1 999" CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 2 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-290391 Halff Associates, Inc. Richardson,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 12/05/2017 being filed. City of Fort Worth Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. RFQ M-365 Al Survey and design of sanitary sewer interceptor M-365 Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Haar, Dennis Fort Worth,TX United States X Zapalac, Russell Richardson,TX United States X Tanksley, Dan Richardson,TX United States X Skipwith,Walter Richardson,TX United States X Murray, Menton McAllen,TX United States X Plugge,Roman Richardson,TX United States X Maya, Mike Austin,TX United States X Kunz,Pat Richardson,TX United States X Kuhn,Greg Richardson, TX United States X Killen, Russell Fort Worth,TX United States X Ickert,Andrew Fort Worth,TX United States X Jackson,Todd Austin,TX United States X Edwards, Mark Richardson,TX United States X Craig, Matthew Richardson, TX United States X Bargainer,Tim Austin,TX United States X Adams, Bobby Conroe,TX United States X Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.3337 CERTIFICATE OF INTERESTED PARTIES FORM 1295 7-7 Complete - .1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-290391 Halff Associates,Inc. Richardson,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 12/05/2017 being filed. City of Fort Worth Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. RFQ M-365 Al Survey and design of sanitary sewer interceptor M-365 Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear or affirm,under penalty of perjury,that the above disclosure is true and correct. =SARAHMANNlicas CI-20-2018 Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE np �7 Sworn to and subscribed before me,by the said G h(�� Qa this the / day of �e G 20�,to certify which,witness my hand and seal of office. SarAJi Pr fr-ki a 7n Con�rACL 14d&7 1'ri iyn of officer admmistenng oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www,ethics.state.tx.us Version V1.0.3337