HomeMy WebLinkAboutContract 26873 CITY SECRETARY CONTRACT NO. AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. (M&C Attached) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and DMJM Aviation, Inc., (Engineer) made and entered into City Secretary Contract No. 26615 (the Contract) which was authorized by the City Council by M&C C-18463 on the 20th day of February, 2001; and WHEREAS,the Contract involves engineering services for the following project: Engineering Contract for the Review of Preliminary Engineering Report and facility recommendation for Runway 16LI34R at the Fort Worth Meacham International Airport. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated April 12, 2001, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $12,910.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$144,282.70: 3. All other provisions of the contract,which are not expressly amended herein, shall remain in full force and effect. ,,L 'u �s APP. 12 101 08:42 FP. TCB—FORT ",TH 8173328979 TO 8178715413 P.02/06 LM' Building Airports Better April 12,2001 Mr. GoPaul Sahu City of Fort Worth 1000 Throckmorton Fort Worth,Texas 76102 Re: _ Meacham International Airport Review of Engineering Report For Runway 16L-34R Dear Mr.Sahu: Attached please find proposals for additional geotechnical services which were requested by Mr.Ed Oshinski at our meeting on March 21,2001 at the Airport. The additional scope includes additional geotechnical testing in order to verify the information provided by Terra-Mar,Inc.in November of 1994.- The total for the additional services.is $12,910. It is important that we receive approval for these additional services as soon as possible so that we can finalize our schedule for the work. If you have any questions or need more information,please do not hesitate to contact our bf'�ice_ Sincerely, c names G.Kirschbaum,P.E. JGK;jgk Cc: Correspondence George'Vittas Frank Wengler Luis Elguezabel - Mrd Mfr_9*rVRji�ND U _ 1200 Summit Avenue o Suite 600 4, Fort Worth,TX 76102-4409'_$ Tek 817.332.8977 Fox:817.332.6979 = '- Planning Design Environmental Program&Construction Management--'Specialty Services W �' APP. 12 '01 08:42 FP, TCB—FORT WORTH 8173328979 TO 8178715413 P.03/06 O G • GEOTFCHMCAL ENGIN£EAING _ OUP • ENVIRONMENTAL CONSULUNG VVi • CONSTAUCTION MATMALS ENGiNeF-Fitt G AND TESTING March 27,2001 Mr. James G. Kirschbaum, P.E. DMJM Aviation 1200 Summit Avenue,Suite 600 Fort Worth,Texas 76102-4409 Phone: (817)335-5812 Fax: (817)332-6979 Re: Proposal for Geotechnical Investigation Runway Pavement Overlay and Extension' Meacham International Airport Fort Worth,Texas AGG Proposal P01-0315E Dear Mr. Kirschbaum: We are pleased to submit this proposal for geotechnical engineering services for the project referenced above. This proposal includes a description of the project, scope of work, estimated fee,Vnd project schedule. PROJECT DESCRIPTION The project consists of overlying the existing runway and extending the runway to the south. The existing runway consists of 10 inches of reinforced concrete pavement. A 200-foot long shoulder currently exist beyond the south end of the runway. We understood that this 200-foot shoulder will be removed and the runway expanded for a length of 500 feet. A new 200-foot long shoulder,will be constructed beyond the runway expansion. SCOPE OF WORK The geotechnical investigation performed for the referenced project will consist of field and - laboratory investigations, engineering analysis, and .a report prepared 6y a Registered. ProfessionalEngineer. Field investigation We understand that the field investigation will have to be performed at night between the hours of 10:00 p.m. and 6:00 a.m. We further understand that no special requirements will be necessary for accessing the runway area. •N•• 10610 Newkirk Street• Suite 202. Oatas.Texas 75220 Il lie a r Tel:972-444-8889•Fax:972-444-8693•E-Mali:alliancs540hotma0.com APP. 12 '01 08:42 FP. TCB-FOP,T WOP,TH 8173328979 TO 8178715413 P.04/'06 10. 6Z , QGEOTE-CMIOnt— _ t CROUP Runway Pavement Overlay and Extension Meacham International Alrport AGG Proposal P01-0315E March 27,2001 Page 2 The field investigation will consist of drilling sixteen (16) test borings along the existing runway and drilling 5 test borings in the vicinity of the proposed 500-foot runway extension. The test borings will be drilled to depths of 10 feet below existing grade. We plan to use Wo drilling rigs in order to complete the field work in one night. . Prior to drilling, the existing runway and shoulder will be cored using an B-inch diameter core barrel and a coring machine. The core samples will be measured for thickness and then given to the client. We anticipate that 18 areas will have to be cored (16 through the runway and 2 through the shoulder). Subsurace soil samples will be secured with thin walled tube and/or split spoon samples depending on soil type and consistency. Roc% encountered.in.the borings will be evaluated using the Texas Department of Transportation Penetrometer(TxDOT Cone).All samples will be properly logged, packaged• sealed, and placed in a core box for transportation to the laboratory. The test borings will be backfilled and the pavement patched upon drilling completion. Alliance Geotechnical Group assumes that we will have the right-of-entry and that the boring locations will be accessible to our conventional truck mounted drilling equipment. Should unusual soil conditions be encountered, we will call you with a recommendation and cost estimate to explore these unusual conditions. We understand Una l:underground utilities present in the subject area will be identified and mark by others prior to beginning the field work. Alliance Geotechnical Group cannot be responsible for damage to underground utility lines that are not identified before mobilization of drilling equipment to the site. ti Laboratory {nvestigation Laboratory tests will be conducted to classify the soil and to evaluate the volume change potential and strength of the soil and rock present at the site. Soil classification tests will consist of Atterberg limits (plasticity Index), moisture content, and dry unit weight. The strength of the soil will be measured using unconfined compression tests and estimated using hand penetrometer test. The volume change potential of the soils will be evaluated by swell tests. Lime series tests will be performed in order to determine the optimum amount of lime required to stabilize the subgrade in the expansion area, Laboratory CBR tests will be performed on representative soil samples obtained in the proposed runway extension area. Engineering Analyses Results of field and laboratory work will be presented in an engineering report. The report will , include the following, 1. Site reconnaissance, field coordination, boring marking; and utility clearan:e. - 2. Plan of borings, boring logs,water level observations, and laboratory test results. 3. Fill placement recommendations for the runway extension area. 4. Subgrade stabilization recommendations for the runway extension area. .. �i.n, � tea.>:•.a �r.•e>mac.. r -n'���r. - - APP. 12 '01 08:43 FP. TCB-FOP,T WOP,TH 8173328979 TO 8178715413 P.05/06 - i�L +a GEvv ed- COtJI'' Runway Pavement Overlay and Extension - Meacham International Airport AGG Proposal P01-0315E March 27, 2001 Page 3 5. Comments on the presence and effect of expansive soils on the proposed new pavement. Estimated differential movements between the existing runway and the proposed extension will also be included. Alternative methods of reducing any anticipated shrink/swell movements associated with expansive clays will be included. 6. Pavement overlay evaluations and design studies for overlays and the proposed runway extension are not within the proposed scope of our services.These studies, evaluations and recommendations are to be provided by others. GEOTECHNICAL FEES AND PROJECT SCHEDULE A specific scope of work and itemized fees are attached herewith. Based on the scope of work detailed herein, the total cost of the investigation will not exceed 512,970.00 without prior authorization, Alliance Geotechnical Group, Inc. is prepared to commence work on this project within a few days of authorization to proceed (weather permitting). We estimate that a final report will be completed within 3 to 4 weeks after receiving authorization to proceed. If this proposed schedule is insufficient to meet your deadlines, please tet us know because we are committed - to meeting your deadlines. TERMS AND CONDITIONS If this proposal meets with your approval, please sign below to authorize Al;iance Geotechnical GrouQ to perform the work. 'We look forward, to working with you on this project. Please contact us a`ter reviewing our proposal if you have any questions, Sincerely, ALLIANCE GEOTECHNICAL. GROUP r Michael D. Roland Mark J. Farrow, P.E. Project Manager Princl-pal Attachments: 'Project Budget Summary ACCEPTED BY: Name Date Title ,p w iW�,E��d,�� �1CC' ---- 1 - Ja.'s:Yrn 7A 10711CO. �- APP. 12 '01 08:43 FP. TCB-FOP,T .LJOP,TH 8173328979 TO 8178715413 P.06/06 ..NJ J�lL.I.J W0Tr-< -nIC1nL_ , t GROW _ Runway Pavement Overlay and Extension - Meacham International Airport AGG Proposal P01-0315E March 27,2001 Page 4 PROJECT BUDGET SUMMARY Estimated Estimated Estimated Units Unit Cost . Cost FIELD INVESTIGATION Site Reconnaissance, Field Coordination,and Boring Layout.hr. 6 565.00 $510.00 Mobilization,LS(Iwo drilling rigs to be used)(overtime 2 $300.00 $600.00 rate will apply due to night drillin Su ort Vehicles,Tri I 6 535.00 $210.00 Generator and Light Rentals, ea for night drillin 2 $250.00 5500.00 Soil and Rock Drilling and Sampling,ft.(at night-O.T.) 210 515.00 S3.150,00 THD Cone Penetration tests,ea. 45 $15.00 $675.00 Locatin Rebar,Coring Pavement,and Patching,ea. 18 S75.00 $1,350.00 Standby Time,rig hours JS1501hr per drill rig) 0 ` S150.00 50.00 FIELD SUBTOTAL 1 $6,995.00 - LABORATORY TESTS Atterber Limits Tests, ea. 10 540.00 5400.00 Unconfined Com ressive Stren 'h Tests,ea. 4 530.00 $120.00 Moisture Content ea. 60 54.60 $270.00 Hand Penetrometer Strength-Swell Prorilina ,ea. 210 51.50 S315.00 Swell Tests,ea 4 560.00 5320.00 Lime Series Tests,ea. 2 5225.00 S450.00 CBR Tests,ea• 2 S450.00 $900.00 Edit Samples,hr. Geotechnical Engineer_ 6 $65.00 5510.00 LABORATORY SUBTOTAL 53,285.00 ENGINEERING ANALYSIS AND REPORT Project Mana er,hr- 16 585.00 S1,360.00 Senior Review hr 6 $105.00 $630.00 AutoCAD Technician. Engineedriq Aide.hr 8 $45.00 $350.00 Clerical,hr 8 535.00 5280.00 ENGINEERING SUBTOTAL S2,630.00 ESTIMATED TOTAL S12,910.00 RIC CNNMY HV GTPA'A .-rz S To To/sz/EO - - - - - W�k-TOTAL PAGE.06 �lok City of Fort Worth, Texas Mayor and Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 6/12/01 **C-18622 1 30RUNWAY 1 of 2 SUBJECT APPROPRIATION ORDINANCE AND AMENDMENT NO. 1 FOR ENGINEERING SERVICES AGREEMENT WITH DMJM AVIATION FOR REVIEW OF PRELIMINARY ENGINEERING REPORT AND FACILITY RECOMMENDATIONS FOR RUNWAY 16U34R AT FORT WORTH MEACHAM INTERNATIONAL AIRPORT RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing the estimated receipts and appropriations in the Capital Projects Reserve Fund in the amount of $12,910.00 from available funds; and 2. Authorize the transfer of $12,910.00 from the Capital Projects Reserve Fund to the Aviation Improvements Capital Projects Fund; and 3. Adopt the attached appropriation ordinance increasing the estimated receipts and appropriations in the Aviation Improvements Capital Projects Fund in the amount of $12,910.00; and 4. Authorize the City Manager to execute Amendment No.1 with DMJM Aviation for an Engineering Report and Facility Recommendation for Runway 16U34R at Fort Worth Meacham International Airport in the amount of $12,910.00. DISCUSSION: On February 20, 2001 (M&C C-18463), the City Council approved a contract with DMJM Aviation for an engineering report and facility recommendation on Runway 16U34R at Fort Worth Meacham International Airport for $131,372.70. This Amendment includes additional geo-technical services that were unanticipated in the original scope of work, and will revise the original contract amount to $144,282.70. The total cost of the project is estimated to be $25 million. The Federal Aviation Administration will fund 90% of the project including preliminary engineering, design, construction, inspection, and testing, with the remaining 10% funded by the City. The $12,910.00 for additional engineering service agreement is an eligible expense and will be credited as a portion of the City's 10% local match when the grant is awarded. City of Fort Worth, Texas Mayor and Council , Communication DATE REFERENCE NUMBER LOG NAME PAGE 6/12/01 **C-1$622 1 30RUNWAY 2 of 2 SUBJECT APPROPRIATION ORDINANCE AND AMENDMENT NO. 1 FOR ENGINEERING SERVICES AGREEMENT WITH DMJM AVIATION FOR REVIEW OF PRELIMINARY ENGINEERING REPORT AND FACILITY RECOMMENDATIONS FOR RUNWAY 16L/34R AT FORT WORTH MEACHAM INTERNATIONAL AIRPORT FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the current capital budget, as appropriated, of the Aviation Improvements Capital Projects Fund. MG:k Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CTI'Y SECRETARY Office by: (to) 1)GC10 441012 013010001000 $12,910.00 Mike Groomer 6140 1)GC10 538070 013010001000 $12,910.00 Originating Department Head: 20)GC24 472010 055240438160 $12,910.00 3)GC24 531200 055240438160 $12,910.00 A.Douglas Rademaker 6157 (from) APPROVED 6-12-01 ORDINANCE NO. 14661 & 14662 2)GC10 538070 013010001000 $12,910.00 Additional Information Contact: 4)GC24 531200 055240438160 $12,910.00 A.Douglas Rademaker 6157 City of Fort Worth, Texas "agar and Council Communieniflon DATE REFERENCE NUMBER LOG NAME PAGE 6/12/01 **C-18622 30RUNWAY 1 of 2 SUBJECT APPROPRIATION ORDINANCE AND AMENDMENT NO. 1 FOR ENGINEERING SERVICES AGREEMENT WITH DMJM AVIATION FOR REVIEW OF PRELIMINARY ENGINEERING REPORT AND FACILITY RECOMMENDATIONS FOR RUNWAY 16U34R AT FORT WORTH MEACHAM INTERNATIONAL AIRPORT RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing the estimated receipts and appropriations in the Capital Projects Reserve Fund in the amount of$12,910.00 from available funds; and 2. Authorize the transfer of $12,910.00 from the Capital Projects Reserve Fund to the Aviation Improvements Capital Projects Fund; and 3. Adopt the attached appropriation ordinance increasing the estimated receipts and appropriations in the Aviation Improvements Capital Projects Fund in the amount of$12,910.00; and 4. Authorize the City Manager to execute Amendment No.1 with DMJM Aviation for an Engineering Report and Facility Recommendation for Runway 16U34R at Fort Worth Meacham International Airport in the amount of $12,910.00. DISCUSSION: On February 20, 2001 (M&C C-18463), the City Council approved a contract with DMJM Aviation for an engineering report and facility recommendation on Runway 16U34R at Fort Worth Meacham International Airport for$131,372.70. This Amendment includes additional geo-technical services that were unanticipated in the original scope of work, and will revise the original contract amount to $144,282.70. The total cost of the project is estimated to be $25 million. The Federal Aviation Administration will fund 90% of the project including preliminary engineering, design, construction, inspection, and testing, with the remaining 10% funded by the City. The $12,910.00 for additional engineering service agreement is an eligible expense and will be credited as a portion of the City's 10% local match when the grant is awarded. C City of Fort Worth, Texas ImAffor And Council communicalflon DATE REFERENCE NUMBER LOG NAME PAGE 6/12/01 **C-18622 30RUNWAY 2 of 2 SUBJECT APPROPRIATION ORDINANCE AND AMENDMENT NO. 1 FOR ENGINEERING SERVICES AGREEMENT WITH DMJM AVIATION FOR REVIEW OF PRELIMINARY ENGINEERING REPORT AND FACILITY RECOMMENDATIONS FOR RUNWAY 16L/34R AT FORT WORTH MEACHAM INTERNATIONAL AIRPORT FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the current capital budget, as appropriated, of the Aviation Improvements Capital Projects Fund. MG:k Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) 1)GC10 441012 013010001000 $12,910.00 APPROVED t Mike Groomer 6140 1)GC10 538070 013010001000 $12,910.00 CITY COUNCIL Originating Department Head: 2&3)GC24 472010 055240438160 $12,910.00 3)GC24 531200 055240438160 $12,910.00 JUN 12 2001 A.Douglas Rademaker 6157 (from) 2)GC10 538070 013010001000 $12,910.00 `la+•tc,.a Additional Information Contact: 4)GC24 531200 055240438160 $12,910.00 City Secretary of the City of Fort Worth,Texas A.Douglas Rademaker 6157 Adopted Ordinance No. A& Adopted Ordinance No./1&911