HomeMy WebLinkAboutContract 33116 CITY :AIGINALCONTRACT IVO�, 3 County: Tarrant CSJ: 0902-48-502 Project: BR 2003 (355) Road/Street/Highway: East 1" Street 15 Digit NBI Structure No.: 02220OZZ0075002 Local Designation No.: East 1St Street Feature Crossed: West Fork of Trinily River STATE OF TEXAS § COUNTY OF TRAVIS § CONSTRUCTION AND MAINTENANCE AGREEMENT For Bridge Replacement or Rehabilitation Off the State System AMENDMENT No. 1 THIS AMENDMENT IS MADE BY AND BETWEEN the State of Texas, acting through the Texas Department of Transportation,hereinafter called the State, and the City of Fort Worth, acting by and through it's City Council,hereinafter called the Local Government. WITNESSETH WHEREAS,the State and the Local Government executed a contract on the 22"d of November 2002 to effectuate their agreement to replace the East 1" Street Bridge over the West Fork of the Trinity River; and, WHEREAS, it has become necessary to amend that contract to recognize the increase in the cost of the equivalent-match projects and the increase in the construction cost of the project; and, WHEREAS, the Governing Body of the Local Government has approved entering into Amendment No. 1 by resolution or ordinance dated 8/9/05 r%C C20896 , which is attached hereto and made a part hereof as Exhibit A; and, NOW THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the parties hereto, the State and the Local Government do agree as follows: AGREEMENT Article 1. Description of Amended Items Amendment Item A. —Attachment C. List of District Engineer Approved Equivalent-Match Project(s) (EMP)is hereby superseded by Exhibit B. Amendment Item B. —Attachment D. Estimate of Direct Costs is hereby superseded by Exhibit C. Please note that the $2,910,063 listed in Line 6 of Attachment D has been deleted and Line 6 is now zero. All costs for roadway construction outside the limits of the bridge project will be included in a separate agreement. Page 1 of 5 Article 2. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under the contract or indirectly through a subcontract under the contract. Acceptance of funds directly under the contract or indirectly through a subcontract under this contract acts as acceptance of the authority of the state auditor,under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. Article 3. All other provisions of the original contract are unchanged and remain in full force and effect. Article 4. Signatory Warranty The signatories to this amendment warrant that each has the authority to enter into this agreement on behalf of the organization they represent. IN WITNESS WHEREOF, THE STATE AND THE LOCAL GOVERNMENT have executed duplicate counterparts to effectuate this agreement. THE LOCAL GOVERNMENT THE STATE OF TEXAS Executed for the Executive Director and orT approved for the Texas Transportation er ale o al Go ent Commission for the purpose and effect of activating and/or carrying out the orders, By: established policies or work programs Signature heretofore approved and authorized by the Marc A. Ott Texas Transportation Commission. Assistant City Manager Printed Name By:_ Z2'cz'�' William R. Cox,P.E. Title Director,Bridge Division Title Date Date Contract Authorization Attested. By: A i0 FC�rh1 A LLGALIT"i: Dlarty HcndrLx City Secrctary Page 2 of 5 p EXHIBIT A Resolution r i T i Page 3 of County: Tarrant CSJ: 0902-48-502 Road/Street/Highway: East 1 st Street Feature Crossed: West Fork of Trinity River 15 Digit NBI Structure No.: 022200ZZ0075002 Local Designation No.: East 1St Street EXHIBIT B (See Note **) LIST OF DISTRICT ENGINEER APPROVED EQUIVALENT-MATCH PROJECT(S) (EMP) Location(and structure On School Historic Description of Structural Estimated Cost identification number, Bus Route? Bridge? or Safety Improvement if applicable) (Yes/No) Yes/No Work Pipeline Road South at Yes No Replace Bridge $625,000 Post Oak Channel Hurst- NBI# Euless- 022200ZP5420003 Bedford ISD Chapin Road at Santa No No Replace Bridge $1,004,000 Clara Channel NBI# 022200ZC3475001 Total $1,629,000 EMP work credited to this PWP (See Note * $1,116,700 Balance of EMP work available to associated PWP(s) $512,300 Associated PWP(s) Control-Section-Job CSJ Amount to be Credited to Associated PWP s) 0902-48-539 1LO9 000 Note *: This total should typically equal the"Balance of Local Government Participation"that is waived as shown in Attachment D. Note**: This attachment not applicable for non-Participation-Waived Projects (PWP) Page 4 of 5 County: Tan—it CSJ: 0902-48-502 Road/Street/Highway: East 1 s` Street Feature Crossed: West Fork of Trinity River 15 Digit NBI Structure No.: 022200ZZ0075002 Local Designation No.: East 1 s` Street EXHIBIT C ESTIMATE OF DIRECT COSTS Local Government Estimated Cost Participation Preliminary Engineering (PE) (1) $1,081,000 Ten(10) Percent or EDC Adjusted Percent of PE for Local Government Participation (3) $108,100 Construction $9,005,000 Engineering and Contingency(E&C) $1,081,000 The Sum of Construction and E&C (2)$10,086,000 Ten(10) Percent or EDC Adjusted Percent of the Sum of Construction and E&C for Local Government Participation (4) $1,008,600 Amount of Advance Funds Paid by Local Government * (5) $0.00 Amount of Advance Funds to be Paid by Local Government for Roadway Work (6) $0.00 outside the limits of the Bridge project * Balance of Local Government Participation which is to be Waived where the Project is a PWP (3+4-5-6) $1,116,700 Total Project Direct Cost (1+2) $11, 167,000 * Credited Against Local Government Participation Amount If this Project is to be a PWP, Amount of EMP Work Being Credited to this PWP as Shown on Attachment C. $1,116,700 ------�., L s�t t�J • f Page 5 of 5 EXHIBIT A Page 1 of 2 City of Fort Worth, 7 exas Mayor and Council Communication COUNCIL ACTION: Approved on 8/9/2005 DATE: Tuesday, August 09, 2005 LOG NAME: 201 STSTBRIDGE2 REFERENCE NO.: **C-20896 SUBJECT: Authorization to Execute an Amendment to the Advance Funding Agreement with the Texas Department of Transportation for the Replacement of the East First Street Bridge, the South Pipeline Road Bridge and the Chapin Road Bridge RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 of the Advance Funding Agreement with the Texas Department of Transportation (TxDOT) for the replacement of the East First Street Bridge over the Trinity River, the replacement of the South Pipeline Road Bridge over a tributary of the West Fork of the Trinity River and the replacement of the Chapin Road Bridge over Santa Clara Channel. DISCUSSION: On October 22, 2002, (M&C C-19303) the City Council approved an Advance Funding Agreement with TxDOT for the reconstruction of East First Street Bridge over the Trinity River (Bridge ID 02220ZZ0075002). Under the terms of that agreement, the City is responsible for 10% of cost of eligible work on this project, plus 100% of costs that are deemed ineligible by TxDOT, including right-of-way acquisition, utility relocation, environmental mitigation and any non-standard construction. TxDOT agreed to waive the normal 10% cost participation in lieu of the City's agreement to replace, at its sole cost the two minor bridges on South Pipeline Road (Bridge ID 022200ZP542003) and Chapin Road (Bridge ID 022200AC3475001). The cost estimate for the East First Street Bridge has increased from $6,880,000 to $11,167,000 due to increased structure size as determined by hydraulic studies unavailable at the time of the original estimates. Cost estimates for the two minor bridges have shown a corresponding increase for the same reason. On July 26, 2005, (M&C C-20868) Council adopted an Ordinance finding that the 2004 Capital Improvement Program funds for the Precinct Line Road over Walkers Branch Bridge be reprogrammed in the amount of $775,000.00 for two minor bridges. These two minor bridges (South Pipeline Road Bridge and Chapin Road Bridge) are being used as the City's local match for both the Precinct Line Road Bridge and the East First Street Bridge. This M&C authorizes the City Manager to amend this Advance Funding Agreement to add the $775,000.00 to cover the increased cost of the two minor bridges. These projects are located in Council Districts 3, 4 and 5. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvements Fund. TO Fund/Account/Centers FROM Fund/Account/Centers http://www.cfwnet.org/council_packet/Reports/mc_print.asp 8/12/2005 Page 2 of 2 Submitted for City Manager's Office by. Marc Ott (8476) Originating Department Head: Robert Goode (7804) Additional Information Contact: George Behmanesh (7914) http://www.cfwnet.org/council_packet/Reports/mc_print.asp 8/12/2005