Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 33118-A1
AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Lockwood, Andrews & Newnam, Inc., (Engineer) made and entered into City Secretary Contract No. 33118 (the Contract) which was authorized by the City Council by M&C C-21236 on the l0a' day of January 2006; and WHEREAS, the Contract involves engineering services for the following project: East Central Business District Storm Drain Watershed Planning Study (Phase 2), City Project No. 00083. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated May 20, 2010, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $284,400.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$516,200.00. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX EXECUTED on this the day of , 2011, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: CITY OF FORT WORTH: W;�etz;4Fector PE Fernando Costa Assistant City Manager Transportation and Public Works Department ATTEST: o�,,;,:;�.: � R ` A0, 00000 p IP o ` F� o >` Sao a.: U0 Marty Hendrix, ity SecretaryYY0 Uy LOCKWOOD, ANDREWS &NEWNAM, INC. ENGINEER Contract Authorization Thelma F. Sox, PE i Lt� Director of Engineering Date APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Lan ma Lockwood,Andrews &Newman-,11nc. A LEO A DALY COMPANY May 20, 2010 Mr. Steven Eubanks, P.E. Drainage Engineer City of Fort Worth,Texas 1000 Throckmorton Street Fort Worth,Texas 76102 RE: Revised Scope and Fee Proposal for East Central Business District (ECBD)Storm Drain Watershed Planning Study(Phase 2), City Project No. 00083-InfoWorks Model Conversion. Dear Mr. Eubanks: Lockwood, Andrews, & Newnam, Inc. (LAN) has included herein for your consideration our revised proposal to provide the City of Fort Worth professional engineering services. The services provided include converting the SWMM5 models prepared for the City in the planning phase of this project into InfoWorks SD models and modeling the existing closed system as provided by City GIS data in the ECBD basin with the subject model being converted. The proposed services include those outlined in "Attachment A" and as shown in Figure 1, Figure 2 and Exhibit A-1. We propose to provide professional services for a not to exceed lump sum amount of$284,400.00. Twelve (12) months are estimated for design completion inclusive of review. We have included City of Fort Worth standards Attachment A-Scope of Work,Attachment B—Compensation & Payment Schedule with Exhibits 13- 1, B-2, B-3, B-3A and Amendment No. 1. LAN will demonstrate a good faith effort to include at least 6%M/WBE participation for this contract amendment. We appreciate the opportunity to provide this revised proposal and look forward to continuing our relationship. Should you have any questions or comments, please do not hesitate to contact me. Respectfully submitted, Lockwood,Andrews& Newnam, Inc. Jeffrey S. Ground, PE, LEED®AP Infrastructure Manager Enclosures: Attachment A"Scope of Work", (Figure 1, Figure 2, Exhibit A-1) Attachment B Compensation& Payment, (Exhibits B-1, B-2, B-3, 13-3A) Amendment No. 1 1320 South University Drive,Suite 450 • FortWorth,Texas 76107 • 817.820.0420 • Fax 817.820.0441 - www.laninc.com ATTACHMENT "A" EAST CENTRAL BUSINESS DISTRICT STORM DRAIN WATERSHED PLANNING STUDY (PHASE 2) MODEL CONVERSION TO INFOWORKS SD CITY PROJECT NO. 00083 SCOPE OF WORK The purpose of this scope of work is to convert the original SWMM5 model from the original contract into the Wallingford Software InfoWorks SD model, to model the existing storm drain system of primarily 30-in and less diameter which was not included in the original contract scope, to update the Systematic Storm Sewer Study for the East Central Business District (ECBD) and to verify recommended design improvements from the study dated May 26, 2008. The ECBD in the City of Fort Worth (City) watershed planning study included hydraulic modeling using the EPA-SWMM 5 software. The City has requested that the model be upgraded to InfoWorks SD software due to its ability to model complex drainage networks and to include previously unmodeled segments from the watershed. Lockwood, Andrews, and Newnam Inc. (LAN) estimates the conversion of the SWMM 5 models for both existing and proposed conditions involve the following steps. Professional Services 1. InfoWorks Modeling a. Convert existing SWMM 5 model to InfoWorks using the previously created geodatabase for the ECBD study. i. Verification of runoff parameters ii. Verification of storm drainage hydraulics iii. Adaptations/modifications for inlet representations iv. Verification of overland flow elements v. Update storage areas vi. Transfer rainfall values for historical and design events b. Compare the results of the existing SWMM 5 model with the InfoWorks model. i. Investigate modeling discrepancies ii. Delineation of inundation limits c. Model proposed alternatives in InfoWorks. i. Determine the overall applicability of results. d. Develop new alternatives as needed. e. Provide quality control/assurance. f. Field verify by observation existing model conditions through recent as-built plan data as construction activity may have occurred in the ECBD over the past three (3) years. g. Preliminary opinion of probable construction costs. 2. Coordination and Deliverables a. Meet with the City to discuss any major issues with the existing model conversion. b. Meet with the City to discuss the results and revised cost opinions from the InfoWorks modeling of the proposed alternatives. c. Prepare a supplemental notebook report summarizing the findings, recomme.dations, alternatives and models. d. Each report submittal shall include three (3) copies. Final report shall include electronic files and data. ATTACHMENT "A" Page 1 of 2 3. Standardize final report and findings to City provided standard; including participation in three (3) meetings organized by the city to collaborate with other consultants and city staff and to assist in creating/providing standard improvement data sheet packets. 4. Add additional laterals and inlets to the InfoWorks model that were previously not modeled. (Reference Figure 1: SBA Basin, Figure 2: SBB Basin and Exhibit A-1 "Additional Modeling") a. Use same methodologies as previous model (SCS Runoff Method, normal depth for tailwater). b. Execute the calibrated model to develop flood flows, storm drain capacities, ponding depths, and overland flow elevations for the 10-year, 25-year, 50-year and 100-year events. c. Map all identified flood-prone areas and, to the extent practical, identify which or how many structures may be subject to inundation. d. Deliverables shall include electronic versions of the models, as well as summary presentation exhibits to be determined based on the modeling results. Also included will be a report summarizing study methodology and results. 5. Improvement Plan a. After existing conditions are complete, analyze previously proposed alternatives to see if they are still viable. Alternative flooding solutions shall be designed for a 100-year level of protection, as well as for lower levels of protection as may be appropriate based on modeled conditions. b. Prepare proposed conditions computer models for each alternative solution, including any interim and/or multi-phased solutions. c. Develop a cost-effective analysis for each alternative based on estimates of approximate flood damage benefits and probable project (design and construction) costs, with consideration given to easement and right-of-way acquisition and utility relocation requirements. d. Deliverables shall include a report summarizing methodology for developing of the improvement plan, together with a summary of alternatives investigated and recommended improvement plan. Improvement plan shall include proposed prioritization, phasing and a summary of project costs. Electronic deliverables shall irclude final report, alternatives models, and GIS mapping of recommended improvement plan showing preliminary alignment and sizing. Additional Services 1. Field survey data collection. City Responsibilities 1, Provide GIS data for additional modeling with sufficient detail and additional surveying. Schedule The project shall be completed within twelve (12) months after receiving the executed amendment and the notice to proceed from the City. ATTACHMENT "A" Page 2 of 2 SB.13 6BA-,2 6BA.6 - °.. ,- --- FORT WORTH sBa-s 'V a °: 0 o /•�" o- ssa-n SBB-16 Legend -` / , NUJ• i Modeled Conduits SBB-76 \a j SBB-18-i 4 ��•`^MA SBB-42A <30:, Box Manhole t X '� i •'�o e"�� see z,n sae z, sae-oA • a �u ; c• H6li ♦ o Inlet a Not Modeled Conduits r ;: > ,� s©� +, °• ° �v sBB-a -<B'� l Subcatchment SBB y� ;:`, •. ° i sea-a 6BB-z SBA .� • '>' �'� � - sada N ' _ 1✓< \\*. f .._ t 1 °d gz9 r_,^S t'-.• NOTES: 3;.•;; ° ^'�. ••yz ,••. 1.StatePlane NAD 83 North gg 1' y Central Texas FIGURE 2: sse-s. SBB Basin _'�, •I. t,�-- 1� i yf sB0A I��gAl E=c nR� y see ni P0 200 400 800 sane z9 1 inch=400 feet Or .• F y�, ,��.° ..x"tet �,J•� - ..a a•p,� y ,� ».. „ i Lan .:.,.� .• "- 111 � •. _ -, ' ! '" , a FORT WORTH Legend Modeled Conduits � b liy >30" 7 s, Box • Manhole k' .t,., o Inlet Not Modeled Conduits k � Subcatchment SBB /• I � SBA21 Y"� \ �" SBA '�� �' � �( ,. seA.n -• �. NOTES: 83 North w ,fr i s anal 1 Central AD tral Tex s r FIGURE 7: 'p .....; � SBA Basin 3 F . oG ° 0 \t o ° o 0 150 300 600 see.i� j .• „ z'% ` ., ° "', 1 inch=300 feet .. sBB.19La in 9, Wil '✓ C> SBBiaJk Exhibit A-1 Additional Modeling Length of pipe Length of pipe Length of pipe(less Length of pipe Drainage Area Inlets (less than 30") (greater than 30") Drainage Area Inlets than 30") (greater than 30") (LF) (LF) (LF) (LF) SBB-OA 6 300 410 SSA-2 7 1,125 25 S1313-2 3 150 30 SBA-3 2 20 - SBB-3 6 210 440 SBA-4 2 1,765 S1313-4 12 70 260 SBA-5 3 255 - SBB-4-2 8 200 - SBA-8 5 150 85 S1313-5 0 - - SBA-9 8 1,085 - 5BB-6 8 620 70 SBA-10 3 130 SBB-7 7 200 350 SBA-11 8 270 SBB-9 12 600 - SBA-12 4 115 SBB-11 24 2,340 830 SBA-13 4 200 SBB-12A 6 200 2,300 SBA-14 12 1,340 - SBB-12 2 30 25 SBA-16 17 2,365 350 SBB-14 2 100 - SBA-17 6 300 100 SBB-15 6 385 SBA-19 4 315 - SB846 7 510 - SBA-20 0 - - SBB-17 14 1,090 250 SBA-21 8 940 650 SBB-18-17 1 825 - Total: 93 10,375 1,210 SBB-18 15 1,035 830 SBB-19 16 2,225 20 SBB-20 30 2,180 525 SBB-21 13 1,015 65 SBB-21A 12 750 - SBB-22 15 1,230 160 SBB-23 7 725 - SBB-24 11 1,240 270 SBB-27 5 320 - SBB-4-27B 5 190 SBB-28 8 840 - SBB-29 5 400 365 SBOA-629 7 450 835 SBOB-29 14 1,195 400 Total: 287 21,625 8,435 ATTACHMENT "B" ECBD STORM DRAIN WATERSHED PLANNING STUDY (PHASE 2) MODEL CONVERSION TO INFOWORKS SD CITY PROJECT NO. 00083 COMPENSATION AND PAYMENT SCHEDULE I. Compensation A. The Engineer shall be compensated a total lump sum fee of $284,400.00. Payment of the total lump sum fee shall be considered full compensation for the services described in Attachment "A" for all labor materials, supplies and equipment necessary to complete the project. B. The Engineer shall be paid in accordance with "Exhibit B-1", Supplement to Attachment B. Each invoice from the Engineer shall be verified as to its accuracy and compliance with the terms of this contract by an officer of the Engineer. C Additional Tasks that may be assigned, not currently included in the Scope, may be billed and paid on an hourly basis for actual hours worked and expenses irTcurred at an hourly billing rate as provided in Exhibit "B-2'. No additional Tasks will be performed without prior written authorization from the City D. Professional Services Fee summary is provided in Exhibit "B-3" E. Total Project Fees including MWBE participation is provided in Exhibit "B-3A" II. Schedule The intent of the schedule is to complete the effort described in Attachment "A" and deliver a final report within 365 calendar days after the Amendment No. 1 is executed and the "Notice to Proceed" letter is issued. ATTACHMENT"B" Page 1 of 1 EXHIBIT "B-1" (SUPPLEMENT TO ATTACHMENT B) ECBD STORM DRAIN WATERSHED PLANNING STUDY (PHASE 2) MODEL CONVERSION TO INFOWORKS SD CITY PROJECT NO. 00083 METHOD OF PAYMENT 8 PROGRESS REPORT REQUIREMENTS I. Method of Payment Partial payment shall be made to the Engineer monthly upon City's approval of an invoice from the Engineer outlining the current labor and expenses of the total project. The budget does not include revisions to the scope after the NTP. If revisions are requested by the City, a revision of scope and budget will be required. II. Progress Reports A. Th a Engineer shall submit to the designated representative of the Director of the Department of Transportation/Public Works monthly progress reports covering all phases of the analysis in the format required by the City. B. Periodic re ports concerning MWBE participation shall be submitted as required by the MWBE Office. EXHIBIT"B-1" Page 1 of 1 EXHIBIT "B-2" (SUPPLEMENT TO ATTACHMENT B) ECBD STORM DRAIN WATERSHED PLANNING STUDY (PHASE 2) MODEL CONVERSION TO INFOWORKS SD CITY PROJECT NO. 00083 HOURLY RATE SHEDULES Compensation to LAN for approved hourly reimbursable services shall be computed on the basis of: Position Rate Range/Hour Principal $ 200.00 - $ 250.00 Project Manager $ 180.00 - $ 225.00 Sr. Engineer $ 135.00 - $ 220.00 Engineer $ 105.00 - $ 150.00 Technician $ 80.00 - $ 110.00 Administrative $ 75.00 - $ 100.00 Graphic Artist $ 80.00 - $ 110.00 Rates for In-house Services and Printing Description Rate Bond $ 5.00 per plot Vellum $ 8.00 per plot Mylar $ 15.00 per plot Blacklines $ 0.45 per square foot Offset and Xerox Copies $ 0.10 per single side copy Offset and Xerox Copies $ 0.20 per double side copy Binding (Reg. Cover) $ 8.00 per book Mileage Current IRS-Approved Rates Other Direct Expenses Other direct expenses are reimbursed at actual cost times a multiplier of 1.10. They include out sourced printing and reproduction expense, communication expense, and other miscellaneous expenses directly related to the work, including costs of work required to be done by independent persons other than staff members. These rates are effective through December 31, 2011, and are subject to adjustment beginning January 1, 2012, and each January 1 thereafter. EXHIBIT"B-2" Page 1 of 1 EXHIBIT "B-3" (SUPPLEMENT TO ATTACHMENT B) ECBD STORM DRAIN WATERSHED PLANNING STUDY (PHASE 2) MODEL CONVERSION TO INFOWORKS SD CITY PROJECT NO. 00083 PROFESSIONAL SERVICES FEE SUMMARY TASK FEE Task 1: InfoWorks/SWMM Modeling Conversion $54,500.00 Task 2: Meetings & Task 1 Deliverables $24,020.00 Task 3: Report Standardization $12,800.00 Task 4: Additional InfoWorks <30-in $147,230.00 Task 5: Improvement Plan $45,850.00 SERVICE TOTAL $284,400.00 EXHIBIT"B-3" Page 1 of 1 EXHIBIT "13-3A" (SUPPLEMENT TO ATTACHMENT B) ECBD STORM DRAIN WATERSHED PLANNING STUDY (PHASE 2) MODEL CONVERSION TO INFOWORKS SD CITY PROJECT NO. 00083 SUMMARY OF TOTAL PROJECT FEES Consulting Firm Prime Responsibility Amount Percent PRIME ENGINEER: Lockwood, Andrews, & Newnam, Inc. Engineering, Project Management, GIS, H&H Modeling (Tasks 1-5) $267,350.00 94.00% SUB ENGINEER: ANA Consultants, LLC Cost Estimating, Field Verification $5,500.00 1.94% (Task 2) Pacheco-Koch Consulting Engineers GIS, H&H Modeling $11,550.00 4.06% (Task 4) Total for Professional Services $284,400 1000/0 Project Description Scope of Services Total Fee MWBE Fee Percent East Central Business District InfoWorks SD Conversion & Modeling LAN Engineering Services $267,350 94.00% ANA Consultants Engineering Services $5,500 1.94% Pacheco-Koch Engineering Services $11,550 4.06% Consulting Engineers EXHIBIT"B-3A" Page 1 of 1 M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA COUNCIL ACTION: Approved on 12/7/2010 DATE: 12/7/2010 REFERENCE ,C-24624 LOG NAME: 20SWMEASTCBDDRAINPLAN NO.. CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize the Execution of Amendment No. 1 to the City Secretary Contract No. 33118, an Agreement with Lockwood, Andrews & Newnam, Inc., for the East Central Business District Watershed Planning Study in the Amount of$284,400.00 (COUNCIL DISTRICTS 8 and 9) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to the City Secretary Contract No. 33118, an agreement with Lockwood, Andrews & Newnam, Inc., for the East Central Business District Watershed Planning Study in the amount of$284,400.00 for a total contract price of$516,200.00. DISCUSSION: A Request for Qualifications (RFQ) for Watershed Planning Studies was issued by the City in March 2004. Seventeen engineering consultants submitted statements of qualifications, and Lockwood, Andrews & Newnam, Inc., was selected to perform the East Central Business District Watershed Planning Study. Due to budget constraints at the time, the initial study included detailed mapping and inspection, as well as hydraulic modeling, along only the major trunk lines within this storm drain system. A detailed improvement plan for these trunk lines documented both drainage capacity deficiencies and structural deficiencies along the storm drain trunk lines in the existing drainage system. Staff has determined that additional study is required, including conversion of the hydraulic model to a more stable modeling program, developing a hydraulic model for sections of storm drain not previously studied, and expansion of the improvement plan to address deficiencies throughout the entire storm drain system. Lockwood, Andrews & Newnam, Inc., proposes to perform the study for a lump sum fee of $284,400.00. City staff considers this fee to be fair and reasonable for the scope of services proposed. The Stormwater Utility Fund will be used for work under this amendment. Lockwood, Andrews & Newnam, Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional six percent M/WBE participation on Amendment No. 1, This project is located in COUNCIL DISTRICTS 8 and 9. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current operating budget, as appropriated, of the Stormwater Utility Fund. TO Fund/Account/Centers FROM Fund/Account/Centers PE69 531200 0209202 $284.400.00 Submitted for City Manager's Office by: Fernando Costa (6122) http://apps.cfwnet.org/council_packet/mc review.asp?ID=14038&councildate=12/7/2010 4/7/2011 M&C Review Page 2 of 2 Originating Department Head: William Verkest (7801) Additional Information Contact: Steve Eubanks (7857) ATTACHMENTS East CBD Map 2.pdf http://apps.cfwnet.org/council_packet/mc_review.asp?ID=1403 8&counci ldate=12/7/2010 4/7/2011