HomeMy WebLinkAboutContract 26898 CITY SECRETARY
CONTRACTNO.
AMENDMENT NO. 1_
STATE OF TEXAS 3 CITY SECRETARY CONTRACT
(No M&C Needed)
COUNTY OF TARRANT 3
WHEREAS, the City of Fort Worth (City) and Deltatek Engineering,
(Engineer) made and entered into City Secretary Contract No. 26048,
(the Contract) which was authorized by the City Council by M&C C-18044,
May 30, 2000; and
WHEREAS, the Contract involves engineering services for the
following project:
Additional services for improvements requested by the City. These
services are Design and inspection work for Modification to the
inlet/outlet and the wet riser of the tank to improve taste and odor
problems and Drainage Improvement for the Chlorine Building at Rolling
Hill Water Treatment Pant of Timberline Elevated Storage Tank, project No.
PW77-060770180170
WHEREAS, it has become necessary to execute Amendment No. 1 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their
duly authorized representatives, enter into the following agreement which
amends the Contract :
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated March 29, 2001,
a copy of which is attached hereto and incorporated herein. The cost to
City for the additional services to be performed by Engineer total
$14, 145 .
2 .
Article II of the Contract is amended to provide for an increase in
the maximum fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid by
the City for all work and services shall not exceed the sum of $143, 925 .
CCuPD
0
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the 7 day of June 2001, in Fort
Worth, Tarrant County, Texas .
APPROVAL RECOMMENDED: APPROVE .
Dale A. Fisse r, P.E. Mike Groomer
Director, Water Department Assistant City Manager
Deltatek Engineering. ATTEST:
ENGINEER
loria Pear n, City Secretary
-. -C I
By: 4WP*41
Name: Bahram Niknam, P.E.
14114 Dallas Parkway, Suite 480
Dallas, Tx. 75240
Contract Authorization
APPROVED AS TO FORM AND LEGALITY: Date
Gary Steinberger
Assistant City Attorney
2e
Ol �MET
Civil
Structural O `T q T F4-
Electrical
environmental
Water/Wastewater Plant
Water Storage Facilities
Construction Management
Coating Evaluations
March 29, 2001 Deltatek Engineering
Mr. Seiavash Mir
Project Engineer
City of Fort Worth Water Department
1000 Throckmorton Street
Fort Worth,Texas 76102
Reference: Additional Engineering Services
For Timberline 2.0 MG Elevated Tank
Dear Mr.Mir:
In response to your request,Deltatek Engineering is pleased to provide you with additional
engineering and quality assurance services for the referenced storage facility.The scope of
service and cost associated with this task is described below for your approval.
Scope of Services
Part 1: Taste and Odor Improvements
Deltatek Engineering shall modify the existing storage facility to improve taste and odor
problems. This shall include modifications of the existing wet riser and associated piping.
Part 2: Rolling Hills Plant Drainage Improvement
Deltatek Engineering shall provide grading plan to improve drainage problem in the vicinity of
Chemical Building.
Cost Proposal:
Part 1: Taste and Odor improvements: $8,475.00
Part2: Rolling Hilis Diainage Improvements: $5,670.00
Total additional services: $14,145.00
Should you have any questions,please call me at 469-374-9800.
Sincerely,
DELTATEK ENGINEERING
BahrainNiknam, P.E.
�� ��
6424 Lone Grove Court,Frisco,Texas 75034,Phone(214)232-5040,FAX(972)712-6395