Loading...
HomeMy WebLinkAboutContract 26898 CITY SECRETARY CONTRACTNO. AMENDMENT NO. 1_ STATE OF TEXAS 3 CITY SECRETARY CONTRACT (No M&C Needed) COUNTY OF TARRANT 3 WHEREAS, the City of Fort Worth (City) and Deltatek Engineering, (Engineer) made and entered into City Secretary Contract No. 26048, (the Contract) which was authorized by the City Council by M&C C-18044, May 30, 2000; and WHEREAS, the Contract involves engineering services for the following project: Additional services for improvements requested by the City. These services are Design and inspection work for Modification to the inlet/outlet and the wet riser of the tank to improve taste and odor problems and Drainage Improvement for the Chlorine Building at Rolling Hill Water Treatment Pant of Timberline Elevated Storage Tank, project No. PW77-060770180170 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract : 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated March 29, 2001, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $14, 145 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $143, 925 . CCuPD 0 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the 7 day of June 2001, in Fort Worth, Tarrant County, Texas . APPROVAL RECOMMENDED: APPROVE . Dale A. Fisse r, P.E. Mike Groomer Director, Water Department Assistant City Manager Deltatek Engineering. ATTEST: ENGINEER loria Pear n, City Secretary -. -C I By: 4WP*41 Name: Bahram Niknam, P.E. 14114 Dallas Parkway, Suite 480 Dallas, Tx. 75240 Contract Authorization APPROVED AS TO FORM AND LEGALITY: Date Gary Steinberger Assistant City Attorney 2e Ol �MET Civil Structural O `T q T F4- Electrical environmental Water/Wastewater Plant Water Storage Facilities Construction Management Coating Evaluations March 29, 2001 Deltatek Engineering Mr. Seiavash Mir Project Engineer City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth,Texas 76102 Reference: Additional Engineering Services For Timberline 2.0 MG Elevated Tank Dear Mr.Mir: In response to your request,Deltatek Engineering is pleased to provide you with additional engineering and quality assurance services for the referenced storage facility.The scope of service and cost associated with this task is described below for your approval. Scope of Services Part 1: Taste and Odor Improvements Deltatek Engineering shall modify the existing storage facility to improve taste and odor problems. This shall include modifications of the existing wet riser and associated piping. Part 2: Rolling Hills Plant Drainage Improvement Deltatek Engineering shall provide grading plan to improve drainage problem in the vicinity of Chemical Building. Cost Proposal: Part 1: Taste and Odor improvements: $8,475.00 Part2: Rolling Hilis Diainage Improvements: $5,670.00 Total additional services: $14,145.00 Should you have any questions,please call me at 469-374-9800. Sincerely, DELTATEK ENGINEERING BahrainNiknam, P.E. �� �� 6424 Lone Grove Court,Frisco,Texas 75034,Phone(214)232-5040,FAX(972)712-6395 email:deltatek@airmail.net