HomeMy WebLinkAboutContract 47874-CO3FOR Cit of Fort Worth CITY SECRETARY � -7q �. CCI Change Order Request Breakdown mTRACTNO. _�_ ProjectNamel 2016 CIP YEAR 2 CONTRACT 4 STREET REHAB I City Sec # 47874 Client PrcJect#(s)l CPN100181 Contractorl Advance Paving PM Kristian Surgrim Inspector Roy Scharfenberg Change Order Submittal # Date 10/6/2017 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) T/PW Totals Contract Time CD $3,771,301.80 $3,771,301.80 310 $174,642.39 $174,642.39 20 $3,945,944,19 1 $3,945,944.19 330 66,988.00 $766,988.00 130 712,93219 $4,712,932.19 460 $U.UU CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 24,97% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $4,714,127.25 This change order is to request additional funding for the installation of new sidewalks and the repair of existing sidewalk at various locations, in order to allow for safe travels for foot pedestrians in and around schools, businesses, parks and churches. This change order will also provide funding for the installation of ADA compliant wheelchair ramps in the areas where sidewalks are being installed. Also included in this change order is funding for the rehabilitation of deteriorated existing storm drain inlets tops. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth Change Order Additions Project Name 2016 CIP YEAR 2 CONTRACT 4 STREET REHAB City Sec # 47874 Client Project # CPN 100181 Contractor Advance Paving PM Kristian Surgrim Inspector Roy Scharfenberg Change Order Submittal # 0 Date 10/6/2017 ADDITIONS ITEM DESCRIPTION DEPT Oty Unit total Remove Sidewalk 7 4" Concrete,Sidewalk T/PW 70,0 0. 00 F 0 Remove ADA Ramps T/PW 40.00000000 EA R1485 11 Install ADA Ramp T/PW 4 . 0 00000 EA34 Block D T/PW 10,000.00000000 SY35 Concrete Retaining Wall W/Sidewalk,Face TIPW 1, 00 SF 38 -New Rehab Existing Inlet Tops and Face T/PW 7.00000000 EA $3,174.00 Change Order Additions Page 1 of 1 T/PW $766,988.00 Sub Total Additions $166,98 .00 Foa�:H City of Fort Worth Change Order Deletions Project Name 2016 CIP YEAR 2 CONTRACT 4 STREET REHAB City Sec # 47874 Client Project# CPN 100181 Contractor Advance Paving PM Kristian Surgrim Inspector Roy Scharfenberg Change Order Submittal # 0 Date 10/6/2017 DELETIONS ty Unit Unit Cost Total T/PW $0.00 ub Total Deletions $0.001 Change Order Deletions Page 1 of 1 MISBE Breakdown for this Chanqe Order MISBE Sub I Tvge of Service I Amount for this CO Total 1 $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 CFW Change Order Approval St-COApp04 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 2 fortworthaov/Infrastructure Proiects/100181 - 2014 CIP Year 2 - Contract 4/Contractor/Chance Orders/Chance Order Breakdown #3 - 100181 10-06-2017.xism fortworthaov/Infrastructure Proiects/100181 - 2014 CIP Year 2 - Contract 4/Contractor/Chance Orders/100181 M&C- CO.Ddf I No Attachments have been added to this form. I https://projectpoint.buzzsaw.coml bz web/FormsIFonnPrint.aspx?SiteId=51500&ProcessI... 1/19/2018 CFW Change Order Approval St-COApp04 Page 2 of 3 RT WORTH, C'ty of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: C3 Change Order No.: St-COApp04�Date Started: 2017-12-13 City Sec. No.: 147874 Date Due: 2018-02-01 Project Name: 100181 - 2014 CIP Year 2 - Contract 4 Street Rehabilitation Project Numbers: 100181 IDOE Numbers: Project Description: Removal and replacement of nonfunctional curb & gutter, driveways and sidewalks; pulverization and stabilization of the existing pavement, followed by a 3" HMAC overlay. Project Manager: JKristian Sugrim �� City Inspector: lRoy Scharfenberg Contractor: Advanced Paving COUNCIL ACTION (If Required): M&C Log Name: 202014 CIP Yr 2 - Contract 4 Street Rehabilitation CO#2 & 3 M&C Number: C-28503 M&C Date: 2017-12-12 COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 766,988.00j 34014-0200431-5740010-100181-0; 1130 Total Cost: L_766,988. Total Requested Days: 130 Approval Status: https://projectpoint.buzzsaw.com/ bz web/FormsIForniPrint.aspx?SiteId=51500&Processl... 1/19/2018 Contract Compliance Manager Re: Change Order No. 3 ($766988.00) Contractor: Advanced Paving Project Name: 2014 CIP Year 2 — Contract 4 City Secretary No.: 47874 Project No.: 1004181 By signing, I administration requirements. acknowledge that I am the person responsible for the monitoring and of this contract including ensuring all performance and reporting Kristian Sugrim Name of Employee Project Manager Title 1/1 8 CFW Change Order Approval St-COApp04 Page 3 of 3 Approved: Yes Comments: User: Matt Monedero ;Date: 2018-01-02 10:57 AM ,Approved: Yes =Comments: ,User: Becky Garrett Date: 2018-01-02 11:38 AM ,Approved: Yes ;Comments: `User: Kristian Sugrim ;Date: 2018-01-02 1:00 PM ;Approved: Yes Comments: User: Najib Fares Date: 2018-01-04 2:19 PM ,Approved: Yes 'Comments: User: Kim Arnold Date: 2018-01-18 3:54 PM Approved: Yes 'Comments: ,User: Doug Wiersig Date: 2018-01-19 12:06 AM FORS. -\.0� p 'Approved: Yes Aby� ' •: � U Comments: _ ;User: )ay Chapa ' Date: 2018-01-19 3:51 PM Nj J. a ,City Secretary Action Required: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX https://projectpoint.buzzsaw.coml bz webIFormsIFonnPrint.aspx?SiteId=51500&ProcessI... 1/19/2018