HomeMy WebLinkAboutContract 26892 CITY OF FORT WORTH, TEXAS
LUMP SUM CONSTRUCTION CONTRACT CITY SECRETARY
EMERGENCY REPAIRS CONTRACT NO. .�o
THE STATE OF TEXAS
KNOW ALL MEN BY THESE PRESENTS:
COUNTY OF TARRANTcQ�
This agreement made and entered into this the 5th day of�arrc AD, 2001 by and between the CITY OF
FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and existing under and by
virtue of a special charter adopted by the qualified voters within said City on the 11th day of December,
A.D. 1924, under the authority (vested in said voters by the "Home Rule" provision) of the Constitution of
Texas, and in accordance with a resolution duly passed at a regular meeting of the City Council of said
city, hereinafter called OWNER, and A-Agape Contracting, Inc. of the City of Gladewater, County of
Gregg , State of Texas hereinafter called CONTRACTOR.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned to
be made and performed by the Owner, and under the conditions expressed in the bond bearing even date
herewith, the said Contractor hereby agrees with the said Owner to commence and complete the
construction of certain improvements described as follows:
Bridge Railing Repairs at Lancaster and Seventh Street Bridges over Clear Fork of Trinity
River
The work herein contemplated shall consist of furnishing as an independent contractor all labor, tools,
appliances and materials necessary for the construction and completion of said project in accordance with
the Scope of Work and the City of Fort Worth Standard Specifications for Street and Storm Drainage
Construction.
The undersigned has thoroughly examined the plans, specifications and the site, understands the amount
of work to be done, and hereby proposes to do all the work and furnish all labor, equipment and materials
necessary to fully complete all the work as provided in the plans and specifications, and subject to the
inspection and approval of the Transportation and Public Works Director of the City of Fort Worth.
The undersigned assures that its employees and applicants for employment and those of any labor
organization, subcontractors or employment agency in either furnishing or referring employee applicants
to the undersigned are not discriminated against as prohibited by the terms of City Ordinance 7278 as
amended by City Ordinance 7400 (Fort Worth City Code Section 13A-21 through 13A-29).
The Contractor hereby agrees and binds himself to commence the construction of said work within ten
(10)days after being notified in writing to do so by the Owner.
The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement
thereof and to fully complete and finish the same ready for the inspection and approval of the
Transportation and Public Works Director of the City of Fort Worth and City Council of the City of Fort
Worth within a period of 10 calendar days.
City agrees and binds itself to pay, and the said contractor agrees to receive, for all of the aforesaid work,
and for all additions thereto or deductions there from, the price shown on the Proposal hereto attached
and made a part hereof. Payment will be made in monthly installments upon actual work completed by
contractor and accepted by the Owner and receipt of invoice from the Contractor. The agreed upon total
contract amount shall be $10,175. If the Contractor should fail to complete the work as set forth in the
Plans and Specifications and Contract Documents within the time so stipulated, plus any additional time
allowed as provided in the General Conditions, there shall be deducted from any monies due or which
may thereafter become due him, the liquidated damages outlined in the General CoRditaons,.n.ot,�IirI�
L
� . uVal
penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for such
deficiency.
IN WITNESS WHEREOF, the City of Fort Worth has caused this instrument to be signed in four
counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the
corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through its
duly authorized officers in five counterparts with its corporate seal attached.
Done in Fort Worth, Texas, this the `��day of e'A.D., 2001.
A-A a e ntractin Inc.
Comp
By: APPROVE[}:
ignature '
Ron Winters, President:
Typed Name, Office Mike Groomer
Assistant City Manager
APPROVAL RECOMl nj , DED: R RDED:
By: �V, J� By:
Tra ortation and Public Works
City Secrete ry
APPROVED AS TO FORM AND LEGALITY:
By: Date
Assistanit4 Attorney
i
k c) EV
Contract Authorization
Date
SCOPE OF WORK
BRIDGE RAILING REPAIRS ON LANCASTER AND 7TH STREET BRIDGES
Work Required
Repair and repaint railing damages shown in attached photos and below:
1. Remove damaged sections, after taking appropriate precautions for protecting
vehicular and pedestrian traffic on and below bridges and deploying necessary
construction traffic control devices.
2. Replace or straighten damaged components components as needed.
3. New steel members shall be covered with 6.0 mils DFT of Sherwin Williams
Recoatable Epoxy primer B67A%/B67V5, and two coats each of 3.0 mils
DFT Sherwin Williams Hi-Solid Polyurethane B65300 Series/1360V30 paint,
or approved equals. Repaired members shall receive two top coats only.
Color shall match existing, Sherwin Williams "Essex Green."
4. Reattach repaired sections to the bridge superstructure, checking for
soundness of connections.
Special Conditions
Contractor shall verify all field conditions. All work shall conform to the City of Fort
Worth Standard Specifications for Street and Storm Drainage Construction. Traffic
control Measures conform to the Manual on Uniform Traffic Control Devices. Work
shall be completed with 10 working days after Notice to Proceed is issued. Since the
value of this contract is less than $25,000, no MWBE requirements are applicable.
7th and Lancaster Bridge Baiting Repairs 06/18/2001 Page 1 of 2
1.
Location: 7th Street bridge over
Clear Fork of Trinity River, 100'
east of west abutment, north
. : side, looking east.
� 9 i
Note: Two (2) columns have
. ►� s been bent and pulled away from
superstructure without damaging
.. connections. Section between
columns are badly bent.
Work Required: Repair posts
re-paint
and section and re-
_ JUIN,.:�18 � ;, P
+its;T x~ • '°t� � .. F } ^•'S , 2.
Location: Same as photo 1,
viewed from opposite direction
010,
di
3.
of `
Location: Lancaster bridge over
Clear Fork of Trinity River, north
- side 500' west of east abutment,
looking ENE
Note: One column bent, one
plus lus three bars of the
ynext section bent.
Work Required: Repair
- � damaged post and section and
repaint as needed (epoxy primer
JUN 18 2001 and two top coats of
polyurethane paint)
7th and Lancaster Bridge Railing Repairs 06/18/2001 Page 2 of 2
,,.. 4.
Location: Same as photo 3,
opposite direction.
4f1
.I
r
ENVIRONMENTAL A-Agape Painting LEAD ABATEMENT
811 @
Ron Winters GLADEWATER, TX 75647
903.845.8119
PROPOSAL SUBMITTED TO PHONE OATS
STREET JOB NAME
CITY,STATE AND ZIP COOSJOe LOFA ION /
"c,�c;Z_ " /�fSJ 71c20Z- 'l"l1 �j, �Gr�caS1�e u , t'ca:?'r,✓or�`�
ma
f w,, e- r•.
/ e-✓.s7 /,
All material Is guaranteed to be as specified, Ail work to be completed In /
worMma I I manner according to standard practices. Any*Iteration or devi• Authorised
cation from above specifications Involving extra costs will be executed only, SlgMture f
upon written orders, and will become an extra charge over and above the Notos' hlalproposal may be
estimate. All agreements contingent upon strikes,accidents or delays beyond withdrawn by us It not accepted within
our control, Owner to carry fire, tornado and other necessary Insurance.
Auglituare of f roposal —The above prices,specifications
end conditions are satisfactory end are hereby accepted. You are authorized Signature
to d0 the work as apeclfied. toyment will be made as outlined above.
Date of Acceptance: Signature
Luttrell, Maribel
From: Petr, Jean
Sent: Thursday, July 05, 2001 8:52 AM
To: Luttrell, Maribel
Subject: Emergency Contract
Maribel-
We will be preparing and processing the M&C for the 7th Street Bridge railing emergency repair contract as soon as we
receive a final cost from the contractor. Thanks for your help with this contract.
Jean
1