Loading...
HomeMy WebLinkAboutContract 49862-FP1 FORTWORTH. ' r%RET CT ARy TRANSPORTATION AND PUBLIC WORKS NOTICE OF PROJECT COMPLETION ((,Developer Projects) �I26bg City Project Ns: 101063 Regarding contract 101063 for BLUE LAGOON COURT ADDITION as required by the TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the assistant Director of the Transportation&Public Works Department bas accepted the project as complete. Original Contract Price: $58,356.46 Amount of Approved Change Orders: Ns Revised Contract Amount: Total Cost Work Completed: $58,356.46 4 4C Recommecceptance Date Asst. D' e T W - Development Services U. 1-J Accepted Date Director, TRANSPORTATION & PUBLIC WORKS sst. City Manager Date Department of TP&W Const.Services CPN# �Q(AO a Date Project Manager — 11 Risk Management Canad OFFICIAL RECORD Comments: D.O.E. Brotherton CFA Morales/Scanned CITY SECRETARY Gutzler/Scanned FT.*WORTH TX The Proceeding people have been Contacted s concerning the request for final payment&have used this project for such payment. t� Rev.9/22/1 clearance Conducted By /wno(a FORTWQRTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name BLUE LAGOON COURT ADDITION Contract Limits Project Type STORM DRAIN City Project Numbers 101063 DOE Number 1063 Estimate Number 1 Payment Number 1 For Period Ending 1/17/2018 CD City Secretary Contract Number Contract Time 3aD Contract Date Days Charged to Date 30 Project Manager NA Contract is 100.00 Complete Contractor PENNINGTON UTILITY CONSTRUCTION,LLC 13350 EULESS ST EULESS, TX 76040 Inspectors DICKINSON / WATSON i I d I' �I i+ !i Wednesday,January 17,2018 Page 1 of 4 i City Project Numbers 101063 DOE Number 1063 Contract Name BLUE LAGOON COURT ADDITION Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN For Period Ending 1/17/2018 Project Funding STORM DRAIN Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 REMOVE CONCRETE DRIVEWAY 100 SF $2.90 $290.00 100 $290.00 2 REMOVE ASPHALT PAVEMENT 20 SF $17.50 $350.00 20 $350.00 3 CONNECT 24"RCP TO EXIST CONCRETE Y 1 EA $1,000.00 $1,000.00 1 $1,000.00 INLET 4 24"CL III RCP 118 LF $202.55 $23,900.90 118 $23,900.90 5 18"CL III RCP 54 LF $221.30 $11,950.20 54 $11,950.20 6 4'STORM DRAIN JUNCTION BOX 1 EA $6,500.00 $6,500.00 1 $6,500.00 7 18"SLOPED END TREATMENT 1 EA $1,500.00 $1,500.00 1 $1,500.00 8 12"WATER MAIN LOWERING 1 EA 1 9 CONCRETE DRIVEWAY 100 SF $36.00 $3,600.00 100 $3,600.00 10 ASPHALT STREET PAVEMENT REPAIR 20 SY $131.25 $2,625.00 20 $2,625.00 11 SEEDING,HYDROMULCH 80 SY $2.50 $200.00 80 $200.00 12 TRENCH SAFETY 172 LF $11.63 $2,000.36 172 $2,000.36 13 EROSION CONTROL 1 LS $200.00 $200.00 1 $200.00 14 TRAFFIC CONTROL 1 MO $4,240.00 $4,240.00 1 $4,240.00 Sub-Total of Previous Unit $58,356.46 $58,356.46 Wednesday,January 17,2018 Page 2 of 4 City Project Numbers 101063 DOE Number 1063 Contract Name BLUE LAGOON COURT ADDITION Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN For Period Ending 1/17/2018 Project Funding Contract Information Summary Original Contract Amount $58,356.46 Chance Orders Total Contract Price $58,356.46 Date /� S �(� Total Cost of Work Completed $58,356.46 Contrac ' Less %Retained $0.00 ;, / �/� Net Earned $58,356.46 Date `" Inspection Supervisor Earned This Period $58,356.46 Retainage This Period $0.00 I , 14 Date i Z� I Less Liquidated Damages Projet anag �.} v Days @ /Day $0.00 t� Date ` LessPavement Deficiency $0.00 Asst.D W-Iufrasmte 1 4-- Less Penalty $0.00 Less Previous Payment $0.00 Director/Contractin Department Plus Material on Hand Less 15% $0.00 Balance Due This Payment $58,356.46 Wednesday,January 17,2018 Page 3 of 4 City Project Numbers 101063 DOE Number 1063 Contract Name BLUE LAGOON COURT ADDITION Estimate Number I Contract Limits Payment Number 1 Project Type STORM DRAIN For Period Ending 1/17/2018 Project Funding Project Manager NA City Secretary Contract Number Inspectors DICKINSON / WATSON Contract Date Contractor PENNINGTON UTILITY CONSTRUCTION,LLC Contract Time 30 CD 13350 EULESS ST Days Charged to Date 30 CD EULESS, TX 76040 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $58,356.46 Less %Retained $0.00 Net Earned $58,356.46 Earned This Period $58,356.46 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $58,356.46 Wednesday,January 17,2018 Page 4 of 4 FORTWORTH rev 03/05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Blue Lagoon Court Addition PROJECT NO.: 101063 CONTRACTOR: Pennington Utility Constructi DOE NO.: 1063 PERIOD FROM:11/27/17 TO: 01/16/18 FINAL INSPECTION DATE: 16-Jan WORK ORDER EFFECTIVE:1/16/2018 CONTRACT TIME: 30/CD O WC* CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS 0 0 0 21 30 51 PERIOD PREVIOUS 0 0 0 0 0 0 PERIOD TOTALS 0 0 0 21 30 51 TO DATE *REMARKS: .s CONTRACTOR DATE INSPECTOR DATE ENGINEERING DEPART-2\IENT r The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TZ 76012-6311 (817)392-7941 •Fat: (817) 392-7845 r , FORTWORTHREV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA Name of Contractor Project Name Pennington Utility Construction Storm Drainge DOE Inspector DOE Number Donald Watson 101063 DOEInspector Project Manager ❑ Water❑ Waste Water❑✓ Storm Drainage[] Pavement Khal Jaafari Initial Contract Amount ProjectDiffzculty $58,356.46 0 Simple Routine 0 Complex Final Contract Amount Date $58,356.46 1/17/2018 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 428 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 428 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS] *100%) 428 / 448 = 96% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) f i W Signature DOE Inspector Signature Contract Signature DOE Inspector's Supervisor CONTRACTOR'S COMMENTS 'I _ TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845 FORTWORTHREV:02'22'07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 1/17/2018 Name of Contractor Project Name Pennington Utility Construction Blue Lagoon Court Addition DOE Inspector Project Manager Donald Watson Khal Jaafari DOE Number Project Dculty T)pe of Contract 101063 O Simple QQ Routine Q Complex ❑ Fina $58water E] Waste Water❑ StormDrainag� Pavement Initial Contract Amount l Contract Amount $58,356.46 ,356.46 II)PERFORMANCE EVALUATION 0 -Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING JELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity& Sufficiency of Details 3 Accuracy of Measured Quantities 4(' 3 Applicability of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Payments 4 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS& SIGNATURES COMMENTS i Signature Contractor Signature DOE Inspector �-- Signature DOE Inspector's Supervisor r INSPECTOR'S COMMENTS i TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 0 i (817)392-7941 •Fax:(817)392-7845 ii �I CNB-25293-00 CONSENT OF OWNER ❑x ARCHITECT ❑ SURETY COMPANY CONTRACTORSURETY ❑ TO FINAL PAYMENT OTHER ❑ AIA DOCUMENT G707 PROJECT: (name,address) TO (Owner) (—Blue Lagoon Properties and City of Ft.Worth --j ARCHITECT'S PROJECT NO: 4148 Slick Road Chase CnNTRACT FOR-, Court Storm Improvements Euless,TX 76040 (_ CONTRACT DATE: 9/27/17 CONTRACTOR: Pennington Utility Construction, LLC 13350 Euless Street Euless,TX 76040 In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the there insert name and address of Surety Company) Insurors Indemnity Company, PO Box 2683,Waco,TX 76702-2683 , SURETY COMPANY, on bond of (here insert name and address of Contractor) Pennington Utility Construction, LLC CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to(here Insert name and address of owner) Blue Lagoon Properties and City of Fort Worth , OWNER, as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this 22nd day of January, 2018 Insurors Indemnity Company Surety Company Signature of Autho I d iepresentativ Attest: (Seal): Attorney-in-Fact Title NOTE: This form is to be used as a companion document to AIA DOCUMENT G706,CONTRACTOR'S AFFIDAVIT OF PAYMENT 0,; DEBTS AND CLAIMS,Current Edition AIA DOCUMENT C707•CONSENT OF SURETY COMPANY TO FINAL PAYMENT•APRIL 9970 EDITION•ALAS ONE PACE to 1970•THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 tiOE MNIti I.UM PANIIS POWER OF ATTORNEY of INSURORS INDEMNITY COMPANY Waco, Texas KNOW ALL PERSONS BY THESE PRESENTS: Number: CNB-25293-00 That INSURORS INDEMNITY COMPANY, Waco, Texas, organized and existing under the laws of the State of Texas, and authorized and licensed to do business in the State of Texas and the United States of America, does hereby make, constitute and appoint Monica Hernandez of the City of Waco, State of TX as Attorney in Fact, with full power and authority hereby conferred upon him to sign, execute, acknowledge and deliver for and on its behalf as Surety and as its act and deed, all of the following classes of document, to-wit: Indemnify, Surety and Undertakings that may be desired by contract, or may be given in any action or proceeding in any court of law or equity: Indemnity in all cases where indemnity may be lawfully given and with full power and authority to execute consents and waivers to modify or change or extend any bond or document executed for this Company. INSURORS INDEMNITY COMPANY Attest: ;: Tammy Tiepe'rmO , Secretary`' Dave:ETalbert, President State of Texas County of McLennan On the 11th day of November, 2014, before me a Notary Public in the State of Texas, personally appeared Dave E. Talbert and Tammy Tieperman,who being by me duly sworn, acknowledged that they executed the above Power of Attorney in their capacities as President, and Corporate Secretary, respectively, of Insurors Indemnity Company, and acknowledged said Power of Attomey to be the voluntary act and deed of the �o pany. �C,� ymy c*"M EV.52 rLlu.� — tPAft sum of e otary Public, State of Texas nomryr°z?as�� Insurors Indemnity Company certifies that this Power of Attorney is granted under and by authority of the following resolutions of the Company adopted by the Board of Directors on November 11, 2014: RESOLVED, that all bonds, undertakings, contracts or other obligations may be executed in the narne of the Company by persons appointed as Attorney in Fact pursuant to a Power of Attorney issued in accordance with these Resolutions. Said Power of Attorney shall be executed in the name and on behalf of the Company either by the Chairman and CEO or the President, under their respective designation. The signature of such officer and the seal of the Company may be affixed by facsimile to any Power of Attorney, and, unless subsequently revoked and subject to any limitation set forth therein, any such Power of Attorney or certificate bearing such facsimile signature and seal shall be valid and binding upon the Company and any such power so executed and certified by facsimile signature and seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is validly attached. RESOLVED, that Attorneys in Fact shall have the power and authority, subject to the terms and limitations of the Power of Attorney issued to them, to execute and deliver on behalf of the Company and to attach the seal of the Company to any and all bonds and undertakings, and any such instrument executed by such Attorneys in Fact shall be binding upon the Company as if signed by an Executive Officer and sealed and attested to by the Secretary or Assistant Secretary of the Company. I, Tammy Tieperman, Secretary of Insurors Indemnity Company, do hereby certify that the foregoing is a true excerpt from the Resolutions of the said Company as adopted by lis Burn'd of Directors on November 11, 2014, and that this Resolution is in full force and effect. I certify that the foregoing Power of Attorney is iii full force and effect and has not been revoked. In Witness Whereof, I have set my hand and the seal of INSURORS INDEMNITY COMPANY on this 22nd day of January Tarrtrfly Tieperman, Secre a NOTE: IF YOU HAVE ANY QUESTION REGARDING THE VALIDITY OR WORDING OF THIS POWER OF ATTORNEY, PLEASE CALL 800 933 7444 OR WRITE TO US AT P, O. BOX 2683,WACO,TEXAS 76702-21383 OR EMAIL US AT CON FIRMA TION&INS� 0.010, AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Jeff Maddox, Co- Owner Of Pennington Utility Construction, LLC, known to me to be a credible person, who being by me duly sworn,upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Counci`I`in=the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract-described-as; Blue Lagoon BY Name or Title Subscribed and sworn before me on this date of p , )3 ao I 'I Ii Notary Public Tarrant, Texas I [E� "� COLIN WARREN 4Ii UB'44Notary Public, State of TexasComm.Expires 08 23 2020Notary ID 130791099s I