NOTICE OF PROJECT COMPLETION
(Developer Projects)
Or �Maflck 41&0 9 C' ct'N� 0573
Regarding contract 100573 for GLENWYCK as required by the TRANSPORTATION&PUBILVI-5C WORKS as
approved by City Council on N/A through M&C N/A the director of the
TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
Original Contract Price: $390,429.50
Amount of Approved Change Orders: $48,863.00 N/s l
Revised Contract Amount: $439,292.50 #
Total Cost Work Coinpleted: $439,292.50 `
FL/ i
RecommenIM
Acceptance Date
Asst. Direct - I
AcceptedQate �
Director, TRANSPORTATION PUBLIC WORKS
140
Asst. City Manager Date
Department of TP&W Const.Services
CPN# � Date
Project Manager
Risk Management Canadv
Comments: D.O.E. Brotherton
CFA Morales/Scanned 1 Z --1tayry F ° WI!
Gutzler/Scanned -L-�l `1'1
RECEIVED FEB _ g yp� The Proceeding people have been Contacted
concerning the request for final payment&have a '=� � � T
released this project for such payment,
1-- Rev.9/22/16 Clearance Conducted Bya
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name GLENWYCK
Contract Limits
Project Type STORM DRAIN
City Project Numbers 100573
DOE Number 0573
Estimate Number 1 Payment Number 1 For Period Ending 12/26/2017
CD
i
City Secretary Contract Number Contract Time 18aD
Contract Date Days Charged to Date 262
Project Manager NA Contract is 100.00 Complete
Contractor BURNSCO CONSTRUCTION,INC.
6331 SOUTHWEST BLVD
I
FORT WORTH, TX 76132
Inspectors LAYER / SMITH
l
I
i
. . I
i
i'
fl
Tuesday,December 26,2017 Page I of 4
City Project Numbers 100573 DOE Number 0573
Contract Name GLENWYCK Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN For Period Ending 12/26/2017
Project Funding
STORM DRAIN
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 21"RCP co#1 186 F $53.00 $9,858.00 186 $9,858.00
2 24"RCP co#1 1458 LF $57.00 $83,106.00 1458 $83,106.00
3 27"RCP I I LF $68.00 $748.00 11 $748.00
4 30"RCP 286 LF $73.00 $20,878.00 286 $20,878.00
6 36"RCP co#1 831 LF $95.00 $78,945.00 831 $78,945.00
8 42"RCP co#1 176 LF $139.00 $24,464.00 176 $24,464.00
9 4'X2'BOX CULVERT co#1 41 LF $200.00 $8,200.00 41 $8,200.00
10 24"SLOPING HEADWALL 4 EA $1,700.00 $6,800.00 4 $6,800.00
13 4'X2'BOX PARALLEL WING HEADWALL I EA $5,800.00 $5,800.00 1 $5,800.00
14 10'CURB INLET co#1 12 EA $4,100.00 $49,200.00 12 $49,200.00
15 15'CURB INLET co#1 3 EA $5,100.00 $15,300.00 3 $15,300.00
16 20'CURB INLET co#1 3 EA $6,700.00 $20,100.00 3 $20,100.00
17 T STORM JUNCTION BOX co#1 6 EA $4,000.00 $24,000.00 6 $24,000.00
18 5'STORM JUNCTION BOX I EA $4,500.00 $4,500.00 1 $4,500.00
19 6'STORM JUNCTION BOX I EA $5,200.00 $5,200.00 1 $5,200.00
21 TRENCH SAFETY 2871 LF $0.50 $1,435.50 2871 $1,435.50
22 CONCRETE LINED CHANNEL 730 SY $85.00 $62,050.00 730 $62,050.00
23 24"STORM ABANDONMENT PLUG I EA $200.00 $200.00 1 $200.00
24 CONCRETE COLLAR I EA $300.00 $300.00 1 $300.00
25 REMOVE&REPLACE HMAC 35 SY $130.00 $4,550.00 35 $4,550.00
26 42"RCP(CLASS IV)CO#1 32 LF $159.00 $5,088.00 32 $5,088.00
27 5'X5'DROP INLET CO#I 1 EA $5,600.00 $5,600.00 1 $5,600.00
28 42"SLOPING HEADWALL CO#I 1 EA $2,900.00 $2,900.00 1 $2,900.00
29 TRENCH SAFETY CO#1 140 LF $0.50 $70.00 140 $70.00
Sub-Total of Previous Unit $439,292.50 $439,292.50
Tuesday,December 26,2017 Page 2 of 4
City Project Numbers 100573 DOE Number 0573
Contract Name GLENWYCK Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN For Period Ending 12/26/2017
Project Funding
Contract Information Summary
Original Contract Amount $390,429.50
Chance Orders
Change Order Number 1 $48,863.00
Total Contract Price $439,292.50
Total Cost of Work Completed $439,292.50
Contrac r Less %Retained $0.00
®W'11 C— l r..� Date Net Earned $439,292.50
®v6 (}`? �Z– -7l
Inspection Supervis Earned This Period $439,292.50
0 0,01
Retainage This Period $0.00
� t
Date Less Liquidated Damages
Project a ager
Days @ /Day $0.00
Date LessPavement Deficiency $0.00
As t.Dire t W-I ructure cs ggn an 4:�e4v\C01 Less Penalty $0.00
Date Z Less Previous Payment $0.00
Direct /Contracting Depart ent Plus Material on Hand Less 15% $0.00
Balance Due This Payment $439,292.50
r
i
ii
I
I
Tuesday,December 26,2017 Page 3 of 4
City Project Numbers 100573 DOE Number 0573
Contract Name GLENWYCK Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN For Period Ending 12/26/2017
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors LAYER / SMITH Contract Date
Contractor BURNSCO CONSTRUCTION,INC. Contract Time 180 CD
6331 SOUTHWEST BLVD Days Charged to Date 262 CD
FORT WORTH, TX 76132 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $439,292.50
Less %Retained $0.00
Net Earned $439,292.50
Earned This Period $439,292.50
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $439,292.50
Tuesday,December 26,2017 Page 4 of 4
: � qj� \ \jitmjjm§ { \ r' \§ /] { -u )/ § §\ � e =\ \ \\ m� > \ \ o >m \ )k
` m\
[ e
0
! 0 0 \
® m
/ \ ; $
} � \ .
4 2
_ + %
\ \
\ T � g / m
) a) a
{ \ / \ )
.. .. e f m
0.0 \ \ j
C)
_
§C. { co
m
§ ) - o
as m
\ // { / / I
, §
_ °/
/ § ( }/
/
U .
° G
N A W�I W N>is N r p W W V M In a w N•+
< m
mc
n p
m
z a
O N -
c'o
C? A < Dt < n
3n o
y 2 3 x
O x m
m
O m
A o
O —
3 ID
0 3
..www w {
a,
O o w w w+
= n C m� m ^ m (T tD tDd�!Cm��W++...+ W N m N(T•++i0 W m. W H
m m j• �'•C V () O Or Sp�1
o g wOw w W N�Np O VO U-NN
pI W A O.'.�aaocv.�w NNO pN#O -.00 p0000+#� 3
9 = W m NC a d m SSOoo o 't011
Oit 2 fyS fy�1 00i top bg w 0+ m
+ g+N
m m � 2
C] j O m N a o
3 � yz ASS D O O 3
Cy 6O �• C �+ ->N+.�a.'.��ONSw S w. w OND.N W W Nw W q n
M m
O m
=0
mz
n-I -m m H
-�= a �a >Tm M> m m fmit fmnrrrrrrr� mc rr m�17rC
<n m =m 'n D D D D D D D D D T T T m T T T y D y 'n T D T T D D T y
m mS y 0 m m r r r
o' 0 O y o^-•
cmm O
m cm m
m N
r ma �
'4 i d D
-1O
m
m —om i
z Ss b
pN
CA mon ;! N <
mm �o z d o m
A m o xx gtngmmr:;p m
r m a w OY 3 o p a n w N N 0 d P C7 O ro m O
m SOO<-CT A Cl-._.ID
055 cccc3� x w -m m W S�cm,�G.-f mm0
p a m ID a o v�v nA ;LIAAAA �n n
A n o a d m �' 3 m m c W my v'<v'OD
O~
c
05 m ^o^ ...m chi }G v z aZ moom AZ
s C m p m N
Z >> W
T m m 4 �
^� y m n _ c
m a 'U m X33
On c m
< b 'm <
MR
z m m-
P O o m
�+ m n a
V p
ac
1 w zm
�u
0
1 b O m• NINA m[�l1AN�HH&16t z W z 61 N MNN Z
` 2 N- N+++6t b1 fAM
P -p�C OOOO pQ Vp..�...�A NQS�fwCO�OV l•�iY� V� V H.a����lN-i
z' O 000 POSSO g 9 O'O (TSO 000. •p
p m m 0 0 C o 0 0 o o d o
a,4 v o 0 0 0 0 0 0 o m m o o m
nS
N+O NP5No-owj NP
OaO0NiOOOy DrOOboo ,yy -NOoSV li o 0 SSp p Sp p wo HN Nw�00�N4m'OOnWNN y-ODi
l b
1 1
S O O o p r
V
O
m
N
FORTWORTH rev 03/05/07
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO. 1
NAME OF PROJECT: Glenwyck
PROJECT NO.: 100573 CONTRACTOR: Burnsco Construction
DOE NO. N/A
PERIOD FROM 04/10/17 TO: 12/20/17 FINAL INSPECTION DATE: 20-Dec-17
WORK ORDER EFFECTIVE 4/10/2017 CONTRACT TIME —*G /$y O WD o CD ;WV-
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28•
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS 0 0 0 0 262 262
PERIOD
PREVIOUS 0 0 0 0 0 0
PERIOD
TOTALS 0 0 0 0 262 262
TO DATE
*REMARKS
CONWACTOR DATE IN PECTOR DA E
ENGINEERING DEPARTMENT
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
FORTWORTHREV:8/20/16
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Name of Contractor Project Naine
Burnsco Construction Inc. Glenwyck
Inspector City Project Number
Kedric Smith 100573
Construction Components Project Manager
❑ Water ❑ Waste Water 10 Storm Drainage ❑ Pavement Fred Ehia
Initial Contract Aniount ProjectDiculty
$390,429.50 D Simple o Routine O Complex
Final Contract Amount Date
$439,292.50 12/19/2017
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 20 1 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 448
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 448
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums W 448
Rating([TS/MS] * 100%) 448 ! 448 = 100%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=FAcellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Inspector Signature Contractor Signature
Inspector's Supervisor Signature
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 8851 Camp Bowie West Blvd. •Fort Worth,TX 76116• (817)392-8306
FORTWORTHREV:0212210'
s
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 12/19/2017
Name of Contractor Project Name
Bumsco Construction Inc. Glenwyck
DOE Inspector Project Manager
Kedric Smith Fred Ehia
DOE Number Project Difficulty T}pe of Contract
100573 Simple o Routine o Complex ❑ Water ❑ Waste Water o Storm Drainage ❑ Pavement
Initial ConbactAmount Final Contract Amount
$390,429.50
1$439,292.00
H)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector (4 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
_4_Display Of Professionalism 4 Accuracy of Plan Quantities C)
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
_6_Performance-Setting up Valve Crews,Labs L 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe q
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throclinorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT ❑
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
Conforms with the American Institute of OTHER
Architects, AIA Document G707
Bond No 022056815
PROJECT: Glenwyck-Water, Sanitary Sewer& Drainage Improvements
(name, address) Fort Worth Texas
TO (Owner)
ID.R.HORTON-TEXAS,LTD AND CITY OF FORT ARCHITECT'S PROJECT NO:
WORTH CONTRACT FOR:
6751 North Freeway Glenwyck-Water,Sanitary Sewer& Drainage Improvements
Fort Worth TX 76131 CONTRACT DATE:
CONTRACTOR: BURNSCO CONSTRUCTION, INC.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here insert name and address of Surety Company)
LIBERTY MUTUAL INSURANCE COMPANY
175 Berkeley Street
Boston MA 02116 , SURETY COMPANY
on bond of (here insert name and address of Contractor)
BURNSCO CONSTRUCTION, INC.
6331 Southwest Boulevard
Benbrook TX 76132 , CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
D.R. HORTON -TEXAS, LTD AND CITY OF FORT WORTH
6751 North Freeway
Fort Worth TX 76131 , OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS,WHEREOF,
the Surety Company has hereunto set its hand this 15th day of December,2017
LIBERTY MUTUAL INSURANCE COMPANY
Swety C77pany r
�x ,
Attest:Robbi Morales . \� c '
(Seal)• ,� ���� Signature of Authorized Representative
V. DeLene Marshall Attorney-in-Fact
Title
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
r
THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND.
This Power of Attorney limitstheacts of those named herein,and they have no authority to bind the Company except in the manner and to the extent herein stated.
Certificate No.7877110
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company West American Insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS:That The Ohio Casualty insurance Company is a corporation duly organized under the laws of the State of New Hampshire,that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly
organized under(fie laws of the State of Indiana(herein collectively called the'Companies"),pursuant to and by authority herein set forth,does hereby name,constitute and appoint,
Don E.Cornell;Kelly A.Westbrook Ricardo-1.Reyna;Robbi Morales Sophinie Hunter Trna-McEwV V DeLenf Marshall
all of the city of.Dallas state
rof�each igdiu'rdually if there be morelhari.one named;its true olid lawful attorney itt:fact"to make;execute;seal,acknowledge
and.deliver,forand on its behalf as surety and asits ac€666"eed any�hd all undertakings,bonds recognizances and other surety obligations-inpursuance of these presents and shall
be as-binding upon the Companies as if theytiaye=been dbly signed by#le.president and attested by:the secrelary-of the Companies in their own proper persons.
IN WITNESS WHEREOF,this Power of Attorney has butt subscribed aiy an authorized o ver or:bfficial of the 6ompanies and the corporate seats of the Companies have been affixed
thereto this 25th'= day of August -2017
The Ohio Casualty Insurance Company N
y; r Liberty Mutual Insurance Company a)
c 9a? T" �1L 1FT 1991 C
WestAmericann Insurance Company S
CD
David M.Carey;Assistant Secretary C
STATE OF PENNSYLVANIA ss tQ
-COUNTY OF MONTGOMERY _ !_
� O
p) On this 25th day of August 2017 before me personally appeared David M.Carey,who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance v F-
L) a) Company.The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do,execute the foregoing instrument for the purposes >.,�
I_Z: therein contained bysigning on behalf of the corporations by himself as a duly authorized officer. CEO
tC L
y-> :-1N WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at King of Prussia,Pennsylvania;on the day and year first above written. O CL
y gR
PAS, COMMONWEALTH OF PENNSYLVANIA
Note«I Seal t3.. ,�� 4—
Teresa Pastella,Notary Public Y O
4 °F
Upper 4larionTwp..MontgomeyCounty Teresa Pastella,Notary Public
3 vd >�• My Commission Exnires March 28.2021yI
rlS
p�6S��' Member.Pennsylvania Association of Notaries 0 E0-
Cc
Cc This Power of Attorney is made andexecutedpursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company,liberty Mutual in O
v Insurance Company,and West American Insurance Company which resolutions are now in full force and effect reading as follows:
rn
a L ARTICLE IV-OFFICERS=Section 12,Power of Attorney.Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President,and subject O C
�2 to such limitation as the Chairman or the President may prescribe,shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Corporation to make,execute,seal;_ >CD
acknowledge and deliver as surety any and ail undertakings,bonds,recognizances and other surety obligations. Such attorneys-in-fact,subject to the limitations set forth in their respective
ar powers of attorney,shall have full power to bind the Corporation.by their signature and.execution of any such instruments and to attach thereto the seal of the Corporation: When so '�
`a executed,such instruments shall be as binding as if signed b the President and attested-to b the Secretary,An ower or authority ranted to an representative orattorne in-fact under >e
co- - 9 9 Y _ Y Y- Y P Y 9 9 P Y
'�- the-provisionsof this article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such power or.authority. N
3 ?+" =N
ARTICLE XIII Execution of Contracts-SECTION 5.Surety Bonds and Undertakings.Any officer of the Company authorized for that purpose in writing by the chairman or the president, 00
(D and subject to such limitations as the chairman or the president may prescribe,shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Company to make,execute, M
seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attorneys-in-fact subject to the limitations set forth in their o 0
= v respective powers of attorney,shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so V r
executed such instruments shall be as binding as if signed by ih:e president and attested by:the secretary: - O
Certificate of Designation-The President of the Company;aeting pursuant#o the Bylaws of the-Company authorizes David M.Carey,=Assistant Secretary to appoint such attorneys-in-
fact as may be necessary to act on behalfdjaiie Company to make execcrte,seal;acknowledge aljd deliver as surety any and all undertakings,bonds;recognizances and other surety
obligations.
Authorization-By unanimous consent of the Company s Beard of Directors;the Company consentsthat facsimile or mechanically reproduced signature of any assistant secretary of the
Company;avhereyerappearing upon a certrfied- opy of any power of:attomey issued by the Company n conttecfronwlthsgFefy bonds,shall be valid'and binding upon the Company with
the-same-force and effect as though manuaffy affixed; r
-
1, Renee C. Llewellyn, the undersigned. Assistant:Secretary;The Ohio Casualty Insurance Company, Liberty-Mutual Insurance Company, and:,West American Insurance Company do
`hereby certify that the original power of attorney of filch_lihe foregoing is=a full tri e and o nbct:copy of the Power of Attomey executed by said:Companies, is in full force and:effect and
has not been revoked. -- _
IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this day of_ �' I.C, y; 20J__^.
/ r g
of -�"�° _, > 191 T991 � Y� —
Renee C.Llewe' ssistant Secretary
6
245 of 400
-LITS '12873022017 - - -
i
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Ab Grantges,
Contract Mgr, Of Burnsco construction, Inc., known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as-,
Glenwyck-Water, Sanitary Sewer and Storm Drai
BY
Ab Grantges on act Manager
Subscribed and sworn before me on this date 18th of December, 2017.
Nota ublic
Tarrant County, Texas
MARY PANNELL
=r Notary Public, Star;or TeYa8
NT:r�.•,'c Comm.Expires l0-1Y-2018
Notary ID 5144239