HomeMy WebLinkAboutContract 45640-CO3 CITY SECRETARY f� FORT WORTH City of Fort Worth CONTRACT NO. Change Order Request Breakdown Project Namel HMAC Surface Overlay Contract 2014-3 City Sec# 45640 Client Project#(s)l 02258;DOE 7215 Contractorl JEB Contracting PM K.Sugrim Inspector[__ Mike Glover Change Order Submittal# Date 1/23/2018 Dept. TlPW Water Sewer Contract Time Totals CD Original Contract Amount $729,273.66 $364,636.84 $364,636.84 31,458,547.34 180 Extras to Date $183,173.81 $86,437.65 $86,437.65 $356,049.11 140 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $912,447.47 $451,074.49 $451,074.49 $1,814,596.45 320 Go to ADD&DEL Tabs to Enter CO Backup $0.00 $0.00 $0.00 650 Revised Contract Amount $912,447.47 $451,074.49 $451,074.49 51,814,596.45 970 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 $0.00 $0.40 Additional Funding(if necessary) CHANGE ORDERS to DATE{INCLUDING THIS ONE]AS%OF ORIGINAL CONTRACT 24.41°Ja MAXALLOWASLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,823,184.1$ JUSTIFICATION(REASONS)FOR CHANGE ORDER The requested additional time for this contract is required for the construction of Covert Ave.,Meadowbrook Dr.and VW Biddison St. Extensive delays were encountered in the completion of the water and sanitary sewer rehabilitations on these projects. Similarly,there were some conflicts with Atmos Energy.Also,several non-productive days were incurred from inclement weather, apt F��r J G[L� OFFICIAL RECORD CITY SECRETARY PT.WORTH,TX FQ WnRTz11 City of Fort Worth �V— Change Order Additions Project Name NMAG Surface Overlay Con i ract 2014-3 City Sec# 45640 Client Project# 02258;DOE 7215 Contractor JLBOontracting t'M K.Sup- inspector Mike Glover Change Order Submittal# Dale 112312018 ADDITIONS ITEM DESCRIPTION DEP I Qty Unit nit cost Total Tit=' j".pCj Se•.v?r 50.CC, uc7c.:a A2-bogs Change Order Additions Page 1 of 1 FnYrWoerx City of Fort Worth !!r Change Order deletions d5roject Name uMAC Sr�ace Over'ay_Co�:•ac:20"G-3 CRY Sec# 45fidil Client Project# F 02258;DCt!72'5 Contractor) ._3'-or�ram.gg ?-qft Inspector MkeGlover e J,oer Submittal 0 3 Date 1123f2U18 ui I t ICUNS ITEM ota ww T" $0.00 Water $0.00 Sewer $0.00 Diad eiefians Ch8ngeOrder Deletions Page 1 of 1 MISBE Breakdown for this Change Order M1SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 CFW Change Order Approvat St-COApp03 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgoylInfrastructure Proiects/02258 - HMAC Surface Overlay (2014-3)/Contractor/Change Orders/Change Order Breakdown CO #3 DOE 7215.xls.xlsx Attachments(01 No Attachments have been added to this farm. https://projectpoint.buzzsaw.coml_bz—web/Forms/FomiPrint.aspx?Siteld=51500&Processld.., 2/812018 GFW Change Order Approval St-COApp03 Page 2 of 3 FORT WORTHn, City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 13 Change Order No.: St-COApp03 Date Started: 2018-01-25 City Sec. No.: 45540 Date Due: .2018-03-17 Project Name: 02258 - HMAC Surface Overlay (2014-3) 02258 DOE Numbers: Project Numbers: DOE No. 7215 Project Removal and replacement of nonfsnctional curb&gutter, Description: idr4veways and sidewalks; followed by tre pulvernzation and stat;iiization of the eisting pavement and a 2" HMAC overlay. Project Manager: Kristian Sugrim City Inspector: .Mike Glover Contractor: JLB Contracting COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 0.00 Total Cost:,$ 0•fl0 Total Requested Days: 650 Approval Status: https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 2/8/2018 CFW Change Order Approval St-COApp43 Page 3 of 3 Approved: Yes Comments: User: Sam Davis Date: 2018-01-25 2:11 PM Approved: Yes Comments: User: Kristian Sugrim Date: 2018-01-25 2:21 PM Approved: Yes Comments: User: Najib Fares Date: 2018-01-29 10:20 AM Approved: Yes Comments: User: Kim Arnold Date: 2018-02-05 2:19 PM Approved: Yes Comments: User: Doug Wiersig Date: 2018-02-07 3:15 PM Approved: Yes Comments: User: Jay Chapa Date: 2018-02-08 8:49 AM Action Required: :x Mary J. , CiS taxy , TEx � OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX https://proj ectpoint.buzzsaw.coml_bz_web[Form s/FormPrint.aspx?SiteId=51500&ProcessId... 2/8/2018 Contract Compliance Manager Re: Change Order No. 3 ($0.00) Contractor: JLB Contracting, LLC. Project Name: HMAC 2014-3 Surface Overlay City Secretary No.: 45640 Project No.: CO2258 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract including ensuring all performance and reporting requirements. Name of Employee Project Manager Title