Loading...
HomeMy WebLinkAboutContract 48958-FP1 Department of TP &W Const.Services CPN# Date Project Manager _ b _ >TY SECRETARY Risk Management Canad -4 t-1 G 'k� Wo RT ® CONTRACT cCT No. � D.O.E. Brotherton CFA Morales/Scanned 1-1a GutzlerlScanned a-1®-1-6 The Proceeding people have been Contacted concerning the request for final payment&have TION AND PUBLIC WORKS ` 6��(� released this project for such payment. -PROJECT COMPLETION 6-9 to '! ►eveloper Projects) Clearance Conducted By Ph&mwfa 9az City Project N2: 100693 Regarding contract 100693 for EDWARDS RANCH CLEARFORK ADDITION TAILHEAD PHASE 2 as required by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted thc�p )im I a i �! FEB 0 7 201$ I 1 Original Contract Price: $55,490.08 Amount of Approved Change Orde �-m- Ns Revised Contract Amount: Total Cost Work Completed: $55,490.08 —7) 10��- 6C Til Recommended for c ptance Date Asst. Director, TSP - evelopment Services Accepted Date Asst. Director, WATER DEPARTMENT Asst. City Manager Date Comments: FICIAL RECORD RECEIVED FEB 9 2018 Ci TY�7---C TRY FT. . ►1-x Rev.9/22/16 ��� FEB 0 7 2018 // /7� L 6- %C) �- 1 06 V^/9-3 City Project Numbers 100693 ��..—.� -------------�• DOE Number 1693 Contract Name EDWARDS RANCH CLEARFORK ADDITION TAILHEAD PHASE 2 Estimate Number 1 Contract Limits Payment Number I Project Type WATER For Period Ending 1/22/2018 Project Funding Project Manager NA City Secretary Contract Number Inspectors DICKINSON / CAZORLA Contract Date 4/18/2017 Contractor TRI DAL EXCAVATION&UTILITIES INC Contract Time 60 CD 540 COMMERCE ST Days Charged to Date 150 CD SOUTHLAKE, TX 76092 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $55,490.08 Less %Retained $0.00 Net Earned $55,490.08 Earned This Period $55,490.08 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $55,490.08 Monday,January 22,2018 Page 4 of 4 FORT WORTH. CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name EDWARDS RANCH CLEARFORK ADDITION TAILHEAD PHASE 2 Contract Limits Project Type WATER City Project Numbers 100693 DOE Number 1693 Estimate Number 1 Payment Number 1 For Period Ending 1/22/2018 CD City Secretary Contract Number Contract Time 6GD Contract Date 4/18/2017 Days Charged to Date 150 Project Manager NA Contract is 100.00 Complete Contractor TRI DAL EXCAVATION&UTILITIES INC 540 COMMERCE ST SOUTHLAKE, TX 76092 Inspectors DICKINSON / CAZORLA Monday,January 22,2018 Page 1 of 4 City Project Numbers 100693 DOE Number 1693 Contract Name EDWARDS RANCH CLEARFORK ADDITION TAILHEAD PHASE 2 Estimate Number I Contract Limits Payment Number 1 Project Type WATER For Period Ending 1/22/2018 Project Funding WATER RAPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total _-------------- 1 8"PVC WATER PIPE 513 LF $33.16 $17,011.08 513 $17,011.08 2 6"PVC WATER PIPE 35 LF $31.00 $1,085.00 35 $1,085.00 3 T WATER SERVICE 3 EA $2,835.00 $8,505.00 3 $8,505.00 4 CONNECTION TO EXISTING 4"-12"WATER 2 EA $1,570.00 $3,140.00 2 $3,140.00 MAIN 5 8"GATE VALVE 5 EA $1,350.00 $6,750.00 5 $6,750.00 6 FIRE HYDRANT ASSEMBLY 2 EA $4,266.00 $8,532.00 2 $8,532.00 7 DUCTILE IRON WATER FITTINGS 0.83 TN $10,300.00 $8,549.00 0.83 $8,549.00 W/RESTRAINT 8 TRENCH SAFETY 548 LF $3.50 $1,918.00 548 $1,918.00 Sub-Total of Previous Unit $55,490.08 $55,490.08 Monday,January 22,2018 Page 2 of 4 City Project Numbers 100693 DOE Number 1693 Contract Name EDWARDS RANCH CLEARFORK ADDITION TAILHEAD PHASE 2 Estimate Number l Contract Limits Payment Number 1 Project Type WATER For Period Ending 1/22/2018 Project Funding Contract Information Summary Original Contract Amount $55,490.08 Change Orders Total Contract Price $55,490.08 J4�1'04 "'� Date /-2,:5-/$ Total Cost of Work Completed $55,490.08 Contractor Less %Retained $0.00 n"ail OA!n ate / .-30,../8 Net Earned $55,490.08 Ins p tion i pervi or Earned This Period $55,490.08 Date Retainage This Period $0.00 Less Liquidated Damages ProjWagepW Days @ /Day $0.00 Date "� � L ssPavement Deficiency $0.00 AsstT,^�' ^t- -�WRign and 9814 ;�/�� ,t-f;�ess Penalty $0.00 lezG'd'`'' Date 2/7/�o �,� w�P� Less Previous Payment $0.00 Director/Contracting Department Plus Material on Hand Less 15% $0.00 Balance Due This Payment $55,490.08 Monday,January 22,2018 Page 3 of 4 FORTWORTH rev 03/05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO. 1 NAME OF PROJECT: Edwards Ranch Clearfork Addition phase 2 PROJECT NO.: CONTRACTOR: Tri-Dal Utilities, Inc 100693 DOE NO. PERIOD FROM TO: FINAL INSPECTION DATE: 17-Jan-18 WORK ORDER EFFECTIVE CONTRACT TIME 60 O WC* CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH DU RING_ CREDITED DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS PERIOD 150 PREVIOUS PERIOD 0 TOTALS TO DATE 150 *REMARKS; CONTRACTOR DATE INS 2�/�� DATE ENGINEERING DEPARTMENT - The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845 FORTWORTHREV:8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA Name of Contractor Project Name Tri-Dal Utilities,Inc Edwards Ranch Clearfork Addition Phase 2 Inspector City Project Number Adilda Cazorla 100693 Construction Components Project Manager El Water❑ Waste Water❑ Storm Drainage❑ Pavement Patrick Buckley Initial Contract Amount Project Difficulty $55,490.00 OO Simple O Routine O Complex Final Contract Amount Date $55,490.00 1/17/2018 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 N 2 Public Notifications 5 N 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Trak Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 N 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 N 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 375 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 375 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 380 Rating(ITS/MS] x 100%) 375 / 380 = 99% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signatures` Contractor Signature Inspector's Supervisor Signature ` d.,&, CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 8851 Camp Bowie West Blvd. •Fort Worth,TX 76116 • (817)392-8306 FORTWORTHREV:02122'07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 1/17/2018 Name of Contractor Project Name Tri-Dal Edwards ranch Clearfork Addition phase 2 DOE Inspector Project Manager Adilda Cazorla Patrick Buckley DOE Number Project Dctrlt)l Tipe of Contract OO Simple O Routine O Complex El Water❑ Waste Water❑ Storm Drainage❑ Pavement Initial Contract Amount Final Contract Amount $55,490.00 $55,490.00 Il)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS I Availability of Inspector 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities q 13 Applicability of Specifications 4 Display Of Professionalism q4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution q PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector CCS Signature DOE Inspector's Supervisor Q INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817) 392-7941 •Fax: (817)392-7845 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Edward Ranch Clerafork Addition Phase 2 PROJECT NUMBER: 100693 DOE NUMBER: WATER PIPE LAID SIZE TYPE OF PIPE LF new line 8" PVC 513 FIRE HYDRANTS: VALVES(16" OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: SEWER PIPE LAID SIZE TYPE OF PIPE LF PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: TRANSPORTATION AND PUBLIC WORKS F The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,Thi 76012-6311 (817)392-7941 •Fax: (817)392-7845 ____....._........ AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Scott Langham, Project Manager Of Tri Dal Utilities, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Edwards Ranch Clearfork Addition Trail ead phase 2 BY Sc gham Project Manager Subscribed and sworn before me on this date 25th of July, 2017. No&4 Public Tarrant County, Texas JUDY SAWBERGER � Notary Public,state of Texas =N'• / `^�=Comm.Expires 08-28-2018 Notary ID 2885266 CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ TO FINAL PAYMENT CONTRACTOR ❑ AIA DOCUMENT G707 SURETY ❑ OTHER ❑ BOND# 106289587 PROJECT: Public Water&Sanitary Sewer Improvements to serve Edwards Ranch (name, address) Clearfork Addition Blocks NW 4-13 Fort Worth,TX TO: (Owner) CONTRACT FOR: Water and Sanitary Sewer Clearfork Retail Venture,LLC 225 W.Washington Street CONTRACT DATE: 5/29/2015 Indianapolis,IN 46204 CONTRACTOR: Tri Dal Utilities,Ltd. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here insert name and address of Surety Company) Travelers Casualty and Surety Company of America One Tower Square Hartford,CT 06183 on bond of SURETY COMPANY, (here insert name and address of Contractor) Tri Dal Utilities,Ltd. 540 Commerce St. Southlake,TX 76092 CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety company of any of its obligations to (here insert name and address of Owner) Clearfork Retail Venture,LLC 225 W.Washington Street OWNER, Indianapolis,IN 46204 as set forth in the said Surety Company's bond IN WITNESS WHEROF, The Surety Company has hereunto set its hand this 24th day of January 2017 . Travelers Casualty and Surety Company of America Surety Company ignature of Authorized Representative Attest (seal): Y onne Sims Witness Linda Stalder _ Title Atto:rey-in-Fact A1.A DOCUMENT G707*CONSENT OF SURETY COMPANY TO FINAL PAYMENT*APRIL 1970 EDITION*AIA 1970 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.NW WASHINGTON,D.C.2006, WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Comany,Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insura.-ice Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company,which resolutions are now in full force and effect,reading as follows: RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President,any Vice President,any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds,recognizances,contracts of indemnity,and other writings obligatory in the nature of a bond,recognizance,or conditional undertaking,and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her;and it is FURTHER RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary;and it is FURTHER RESOLVED,that any bond,recognizance,contract of indemnity,or writing obligatory in the nature of a bond,recognizance,or conditional undertaking shall be valid and binding upon the Company when(a)signed by the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President,any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;or(b)duly executed(under seal,if required)by one or more Attomeys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED,that the signature of each of the following officers:President,any Executive Vice President,any Senior Vice President,any Vice President, any Assistant Vice President,any Secretary,any Assistant Secretary,and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents,Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof,and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I,Kevin E.Hughes,the undersigned,Assistant Secretary,of Farmington Casualty Company,Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this OIL& day of�1(R"l 6y-a 20 1 . Kevin E.Hughes,Assistant Sec tart' 2 pASU,1�T _o``r-��,5(�� ♦ EIRE 44'w/ \*N�,G� ,.::�,1NSUA y. PITY ANO SUA l�Y"'�J Al s�e�,' '•;2n,_ �m mG9 .�j.. vo �4S e 19 8 2 O � a ORFORATED� m „'. Z ;, �.9TI z �x.�• S�''c i S €S F —._ ;�"s c HARTFORD t �`7 FKRTFORD,!� i � a O 1951 ,20 5�e SE AL.,oW :�s;SBAI�•iD o z�; � CONN. n �GCNti.� 1896 a• AN ,� �� iii ,Hs' "my'�sn n�E °' 1d lS•-^NyL- 1 ..as oma ••a.�� �S..m,,.�'' 1 tiP �� va Imo/per° To verify the authenticity of this Power of Attorney,call 1-800-421-3880 or contact us at www.travelersbond.com.Please refer to the Attorney-In-Fact number,the above-named individuals and the details of the bond to which the power is attached. WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER