HomeMy WebLinkAboutContract 48508-FP2 FORTWORTH® CITY SECRETARY CONTRACT M TRANSPORTATION AND PUBLIC WORKS NOTICE OF PROJECT COMPLETION (Developer Projects) e t p 0m one-d City Project Ns: 02305 J es#`f Bsa6 Regarding contract 02305 for TWIN MILLS SECTION 2 PI-I 213 as required by the TRANSPORTATION& PUBLIC WORKS as approved by City Council on N/A through NI&C N/A the director of the TRANSPORTATION & PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Price: $1,087,066.10 Amount of Approved Change Orders: Ne Revised Contract Amount: Total Cost Work Completed: $1,087,066.10 t I Recommendc ,8 cceptance Date Asst. Directo ,ATPW - n Accepted Date • Director, TRANSPORTATION & PUBLIC WORI<S ' Asst. City, anager _ Date Department f TP W Const. Services CPN# [i Dat Project Manager ' Risk Management Canad _C- .-I�1 Comments: D.O.E. Brotherton CFA Morales /Scanned 11� OFFICIAL RECORD Gutzler/Scanned �� RECEIVED 12�UcerrZing Peeding people have be ntontacted CITY SECRETARY the request for final payment& have FTS WORTH,TX released this project for such payment. Rev.9� Clearance Conducted By 0""m ai _ 1 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name TWIN MILLS SECTION 2 PH 2B Contract Limits Project Type STORM DRAIN&PAVING City Project Numbers 02305 DOE Number 2305 Estimate Number 1 Payment Number 1 For Period Ending 12/19/2017 CD City Secretary Contract Number Contract Time 20UD Contract Date Days Charged to Date 283 Project Manager NA Contract is 100.00 Complete Contractor JACKSON CONSTRUCTION LTD 5112 SUN VALLEY DRIVE FORT WORTH, TX 76119 Inspectors DICKINSON / DAVIS Tuesday,December 19,2017 Page 1 of 5 City Project Numbers 02305 DOE Number 2305 Contract Name TWIN MILLS SECTION 2 PH 2B Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 12/19/2017 Project Funding STORM DRAIN Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 6'X3'BOX 534 LF $279.00 $148,986.00 534 $148,986.00 2 4'X3'BOX 223 LF $184.00 $41,032.00 223 $41,032.00 3 30"RCP 188 LF $87.00 $16,356.00 188 $16,356.00 4 24"RCP 122 LF $70.00 $8,540.00 122 $8,540.00 5 21"RCP 65 LF $62.00 $4,030.00 65 $4,030.00 6 18"RCP 34 LF $60.00 $2,040.00 34 $2,040.00 7 CONNECT TO EXISTING RCP I EA $585.00 $585.00 1 $585.00 8 4'JUNCTION MANHOLE 1 EA $2,830.00 $2,830.00 1 $2,830.00 9 REMOVE EXISTING Y-INLET 1 EA $526.00 $526.00 1 $526.00 10 DUAL 6'X3'TXDOT TYPE"PW"HDWAL 1 EA $7,054.00 $7,054.00 1 $7,054.00 11 4'X3'TXDOT TYPE"PW"HDWAL I EA $5,097.00 $5,097.00 1 $5,097.00 12 PEDESTRAIN HANDRAIL 71 LF $119.00 $8,449.00 71 $8,449.00 13 10'INLET 4 EA $3,681.00 $14,724.00 4 $14,724.00 14 20'INLET 4 EA $6,946.00 $27,784.00 4 $27,784.00 15 ROCK RIP RAP 159 SY $64.00 $10,176.00 159 $10,176.00 Sub-Total of Previous Unit $298,209.00 $298,209.00 PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 6"CONC PVMT 6472 SY $32.55 $210,663.60 6472 $210,663.60 2 7"CONC PVMT 4584 SY $35.75 $163,878.00 4584 $163,878.00 3 7"CONC PVMT 3190 SY $35.75 $114,042.50 3190 $114,042.50 4 6"-8"LIME TREATMENT 15177 SY $3.00 $45,531.00 15177 $45,531.00 5 HYDRATED LIME 303 TN $171.00 $51,813.00 303 $51,813.00 6 BARRIER FREE RAMP 8 EA $1,403.00 $11,224.00 8 $11,224.00 7 ADJUST EXISTING SSMH 6 EA $1,688.00 $10,128.00 6 $10,128.00 8 4"CONCRETE SIDEWALK 4485 SF $5.00 $22,425.00 4485 $22,425.00 9 4"CONCRETE SIDEWALK 9660 SF $5.00 $48,300.00 9660 $48,300.00 10 6"ASPHALT TRANSITION 86 SY $65.00 $5,590.00 86 $5,590.00 11 4"SOLID WHITE STRIPING 70 LF $6.00 $420.00 70 $420.00 Tuesday,December 19,2017 Page 2 of 5 City Project Numbers 02305 DOE Number 2305 Contract Name TWIN MILLS SECTION 2 PH 2B Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 12/19/2017 Project Funding 12 8"SOLID WHITE STRIPING 20 LF $6.00 $120.00 20 $120.00 13 BARRIER FREE RAMP 2 EA $1,900.00 $3,800.00 2 $3,800.00 14 REMOVE CONC DRIVE 17 SY $24.00 $408.00 17 $408.00 15 INSTALL BARRICADE 29 LF $30.00 $870.00 29 $870.00 16 FURNISH/INSTALL ALUM SIGN MOUNT CITY 3 EA $454.00 $1,362.00 3 $1,362.00 17 24"SLD PVMT MARKING HAE 48 LF $28.00 $1,344.00 48 $1,344.00 18 REMOVE STREET BARRICADE 70 LF $3.00 $210.00 70 $210.00 19 CONCRETE STREET HEADER 87 LF $10.00 $870.00 87 $870.00 Sub-Total of Previous Unit $692,999.10 $692,999.10 ST LIGHT Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No, Quanity Total Quanity Total 1 FURNISIVINSTALL70W-ATBO-30B 20 EA $517.00 $10,340.00 20 $10,340.00 2 FURNISH/INSTALL RDWY ILLUM FOUNDATION 20 EA $1,237.00 $24,740.00 20 $24,740.00 3 FURNISH/INSTALL CONDUIT SCH 80 PVC 2" 2442 LF $7.00 $17,094.00 2442 $17,094.00 OPEN CUT 4 #6 ALUM WIRE 2442 CL $2.00 $4,884.00 2442 $4,884.00 5 FURNISH/INSTALL RDWY POLE 20 EA $1,802.00 $36,040.00 20 $36,040.00 6 FURNISH/INSTALL TYPE 33B 20 EA $138.00 $2,760.00 20 $2,760.00 Sub-Total of Previous Unit $95,858.00 $95,858.00 Tuesday,December 19,2017 Page 3 of 5 City Project Numbers 02305 DOE Number 2305 Contract Name TWIN MILLS SECTION 2 PH 213 Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 12/19/2017 Project Funding Contract Information Summat-V Original Contract Amount $1,087,066.10 Chane Orders Total Contract Price $1,087,066.10 Date / 0 Total Cost of Work Completed $1,087,066.10 Contra r Less %Retained $0.00 Net Earned $1,087,066.10 Dae ! -� b sp cti n up i 'so)Y/f/;) Earned This Period $1,087,066.10 J�O�S1 Retainage This Period $0.00 Date / (X1 Less Liquidated Damages Proj t n ge Days @ /Day $0.00 i Date LessPavement Deficiency $0.00 Asst.Do PW-Inca s ��� 7�+t ��/jai Less Penalty $0.00 ('). a 2-L-7 Less Previous Payment $0.00 Director/Co acting Department Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,087,066.10 Tuesday,December 19,2017 Page 4 of 5 City Project Numbers 02305 DOE Number 2305 Contract Name TWIN MILLS SECTION 2 PH 213 Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 12/19/2017 Project Funding Project Manager NA City Secretary Contract Number Inspectors DICKINSON / DAVIS Contract Date Contractor JACKSON CONSTRUCTION LTD Contract Time 200 CD 5112 SUN VALLEY DRIVE Days Charged to Date 283 CD FORT WORTH, TX 76119 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $1,087,066.10 Less %Retained $0.00 Net Earned $1,087,066.10 Earned This Period $1,087,066.10 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,087,066.10 Tuesday,December 19,2017 Page 5 of 5 FORTWORTH rev 03/05/07 TRANSPORTATION& PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.: NAME OF PROJECT: Twin Mills Sec.2B ph.2 PROJECT NO.: 2305 CONTRACTOR: Jackson Construction DOE NO.: N/A PERIOD FROM:02/27/17 TO: 12/06/17 FINAL INSPECTION DATE: 6-Dec-17 WORK ORDER EFFECTIVE:2/27/2017 CONTRACT TIME: 200 O WD O CD DAYS DAY ODAYS F REASON FOR DAYS DAY OF CHARGED REASON FOR DAYS CHARGED CREDITED MONTH CREDITED MONTH DURING DURING 1. 16. 2. 17. 3. 18. 4 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS 283 PERIOD PREVIOUS PERIOD TOTALS 283 TO DATE *REMARKS: CONTRACTOR DATE PECTOR DATE ENGINEERING DEPARTMENT Er The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Troy L. Jackson, President Of Jackson Construction, Ltd,known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Twin Mills Section 2 Phase 2B BY TroyX. Jackson, President Subscribed and sworn before me on this date 3rd of January, 2018. Notary Public ____CARME �,uuu,p CARMEN L. @ST[P Tarrant, Texas '`o�*."•�P" Notary Public,State of Texas Comm.Expires 04.06-2020 Notary ID 2910611 r Q� CONSTRUCTION LTD. 51-12 SUN VALLEY DRIVE FORT WORTH,TX 76119 TEL:817-572-3303 FAX:817=478-0443 Affidavit of All Bills Paid STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS: COUNTY OF TARRANT I,Troy L.Jackson, of,the undersigned principal hereby certify,that all obligations, claims and debts due laborers, materialme:n, subcontractors,- suppliers, and others incurred in or contingent to the performance of the work-on the project known as Twin Mills Section 2; Phase 213 in the City of Fort _ Worth, Texas have been fully paid. This affidavit is made for the purpose of obtaining.payment from the . City of Fort Worth on above'construction work. Subscribed and sworn to before me this .`Jackson Construction, Ltd: Principal 3rd Day,of.January, 2018 - By; Notary SignatureTro L. Jack n, President Commission Expires: 04/06/2020 `„gnun. CARMEN L.ESTEP Notary PubBc,State of Texps z P, Comm.Expires 04-06-2020 Nofary'ID 2910611, *-CONSTRUCTION-LTC?_' 5112 SUN VALLEY DRIVE FORT WORTH,TX 76119 TEL:817-572-3303 FAX 817-478-0443 January 3 2018 _City•of Fort Worth CFA Administration 1000 Throckmorton St. Fort Worth,-TX 76102 RE: Twin Mills Sec 2 PH 2B _ - City-Project 402305 The purpose of this letter is to acknowledge that we have been paid in full by D.R. Horton—Texas, LTD for the public improvements constructed to serve Twin Mills Sec 2 PH 2B in Fort Worth, Texas. As a result.-we hereby waive, release and`relinquish all demand fo g y r lien in connection with this project: ri hts to assert an claim or de Please feel free to contact me with any questions you may have: Sincerely, . TroyL. Jackson President _ AL Nomad oftma /�0NSENT OF SURETY OWN FR FINAL PAYMENT �a NF>z FRrcT AL4 Docwn"G707 >] CONTRACTOR Q Bond No. 1054910 SURETY7 OTHFR 0 'MQIX�N�: ARCHITECT'S PROJECT NO.: 1NennY terzdaddrnsr) D.R. Horton -Texas, Ltd. 6751 North Freeway CONTRACT FOR: Water,sewer,Storm Drainage,Paving and street Lights Fort Worth, TX 76131 PROJECT! (AWIneandCON11MACTDATED, Twin Mills-Section 2, Phase 2B In accordance with The provisions ofthe Contract between the Owner and the Contractor as indimteti above,the �LWNnaszeMldaddh�ow rrrr?iJ The Hanover Insurance Company 440 Lincoln Street Worcester, MA 01653 on bond of SURF.Ty, ffrrsen narneand addrYtsuf ConlzYzctor) Jackson Construction, Ltd. 5112 Sun Valley Drive Fort Worth, TX 76119 hereby approves of the final payment to the Contractor,and agrees that final CC�?VTRACrOR, any dirs obligations to p }tment to the Contractor shall not relieve the Surety of flot�trnatzteandadtlre�o,fOmr'rezq D.R. Horton -Texas, Ltd. 6751 North Freeway Fort Worth, TX 76131 as set fortb in said Surety's bond. = aWhIER, IN WITNESS WHEREor,the Surety has hereun€o set its hand an this date. January 3, 2018 flsxuttY ett!['f71ir{p,for ruantbfotiau er1 Fi�tFx rrmnrricdczreartr!}mar.) The Hanover Insurance Company By: f5{�rira[itrkurrtlwzyxrd r + taxrisr) - Att£St: , (sew): ` �` �'`� Jack M. Crowley Attorney-in-Fact 1P191IJrd ttalttY Stlt{/Iillpj Surety Phone No. 508-853-7200 x-4476 0707-1994 FORTWORTHREV:8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR 1) CONTRACTOR&PROJECT DATA Name of Contractor Project Name Jackson Construction Twin Mills Sec.2B Ph.2 Inspector City Project Number Jesse Davis 2305 Construction Components Project Manager R1 Water 121 Waste Water El Storm Drainage 2 Pavement Patrick Buckley Initial Contract Amount Project Difficulty $1,167,332.60 0 Simple O Routine O Complex Final ContractAn:ount Date $1,167,332.60 15-Dec-17 II)PERFORMANCE EVALUATION 0-Inadequate i-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 3 8 6 2 Public Notifications 5 Y 3 20 15 3 Plans on Site 5 Y 3 20 15 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 3 20 15 11 Property Restoration 5 Y 3 20 .15 12 After Hours Response 5 Y 3 20 15 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 341 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 341 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS] r 100%) 341 / 448 = 76% Performance Category Good <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature Co �ttractor Signature Inspector's Supervisor Signature o/Z/XZZZ-4 CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•8851 Camp Bowie West Blvd. •Fort Worth,Thi 76116 •(817)392-8306 FoRdWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: Name of Contractor Project Name Jackson Construction Twin Mills Sec.213 ph.2 DOE Inspector Project Manager Jesse Davis Patrick Buckleyh DOE Number Project Difficulty Type of Conn-act N/A Simple O Routine O Complex D Water D Waste Water El Storm Drainage B Pavement Initial Contract Amount Final Contract Amount $1,167,332.60 $1,167,332.60 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector 3 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicability of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution �!5 PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS A It Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor �» INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS �R The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845