Loading...
HomeMy WebLinkAboutContract 32604 CITY SECRETARY \v/ CITY SECRETARY D.O.E. FILE ,!_ CONTRACI,NO. ,- _� _ CONTRACTOR'S BONDING CO SPECIFICATION CONSTRUCTION'S COPY AND CLIENT DEPARTMENT CONTRACT DOCUMENTS FOR H.M.A.C. SURFACE OVERLAY (2005-13) AT VARIOUS LOCATIONS IN THE CITY OF FORT WORTH, TEXAS DOE PROJECT NO. 4886 TPW PROJECT NO. GS93-020930522760 _ 2005 (50/50) MIKE MONCRIEF CHARLES BOSWELL MAYOR CITY MANAGER _ ROBERT D. GOODE , P.E. , DIRECTOR DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS A. DOUGLAS RADEMAKER, P.E. , DIRECTOR DEPARTMENT OF ENGINEERING PREPARED BY DEPARTMENT OF ENGINEERING ENGINEERING SERVICES DIVISION Nx EXHIBIT "Allqt •'r seem Al, +� ORIGINALS .. i Home I Council Agenda I M&C I Employee Directory Online I Departments Print M&C COUNCIL ACTION: Approved on 9/27/2005 -Ordinance No. 16615-09-2005 DATE: 9/27/2005 REFERENCE NO.: **C-21020 LOG NAME: 30HMAC2005-13 CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Adopt Appropriation Ordinance and Authorize Execution of Contract with JRJ Paving, L.P., for H.M.A.C. Surface Overlay 2005-13 at Various Locations RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$325,774.00 from the Water& Sewer Operating Fund to the Water Capital Project Fund in the amount of$291,826.60 and Sewer Capital Project Fund in the amount of$33,947.40; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriation in the Water Capital Project Fund in the amount of$291,826.60 and the Sewer Capital Project Fund in the amount of $33,947.40, from available funds; and 3. Authorize the City Manager to execute a contract with JRJ Paving, L.P., in the amount of$588,948.00 for H.M.A.C. Surface Overlay 2005-13 at various locations. DISCUSSION: In the FY2004-05 Contract Major Maintenance Program, various types of street maintenance techniques are grouped into specific contract packages. H.M.A.C. Surface Overlay 2005-13 at various locations, provides for surface and base rehabilitation, replacement of failed curb and gutter, sidewalk and driveway approaches - for asphalt streets at various locations. The proposed street improvements will be conducted after the replacement of water and/or sewer mains under a separate contract. The cost for the proposed street improvements will be shared equally (50/50) between the Transportation and Public Works Department and the Water Department. Following is a summary of the streets included in this project: Project Name Limits Council District Ma sco Adolph St. White Settlement Rd. - S. Dead End 9 62Y Ave. B W. Dead End - S. Beach St 8 78J S. Beach St. Ave. B - Mitchell Blvd. 8 78J s Bilglade Rd. McCart Ave. - Odessa Ave. 3 90K W. Drew St. Sandage Ave. - Merida Ave. 9 90F Glendora St. Schadt St. -Weber St. 2 62D Haltom Rd. 4600' N. of E. 1 st St. - 800' S. of Etsie St. 4 64Q Mosson Rd. Marie Jones Rd. - Dorothy Ln. 5 93P Schadt St. Glendora St. - NE 33rd St. 2 62D The City reserves the right to increase or decrease quantities of individual pay items within the contract provided that the total contract amount remains within plus or minus 25% of the contract award. This project was advertised on July 7 and 14, 2005. On August 11, 2005, the following bids were received: Bidders Amount Time of Completion JRJ Paving, L.P. $588,948.00 110 Working Days Peachtree Construction, Ltd. $627,783.00 JRJ Paving L.P., is in compliance with the City's M/WBE Ordinance by committing to 40% M/WBE participation. The City's goal on this project is 14%. In addition to the contract cost, $15,000 (Water: $13,500; Sewer: $1,500) is required for inspection and a $16,300 (Water: $13,300; Sewer: $3,000) is required for project contingencies. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval and completion of recommendation one, and adoption of the appropriation ordinance, funds will be available in the current budget, as appropriated, of the Water and Sewer Capital Projects Fund and the Contract Street Maintenance Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 1&2)PW53 472045 060530175660 $291,826.60 1)PE45 538070 0609020 $291,826.60 1&2)PS58 472045 070580174830 $33_947.40 1)PE45 538070 0709020 $33,947.40 2)PW53 531350 030530175660 $13,500.00 3)PW53 541200 060530175660 $265,026.60 2)PW53 541200 060530175660 $Z7_8326.60 3)PS58 541200 070580174830 $29,447.40 2)PS58 531350 030580174830 $1,500.00 GS93 541200 020930522760 $294,474.00 2)PS58 541200 070580174830 $32,447.40 Submitted for City Manager's Office by: Marc Ott (6122) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: A. Douglas Rademaker (6157) ATTACHMENTS �, Ord..pdf SPECIFICATIONS AND CONTRACT DOCUMENTS FOR H.M.A.C. SURFACE OVERLAY (2005-13) AT VARIOUS LOCATIONS IN THE CITY OF FORT WORTH, TEXAS DOE PROJECT NO. 4886 PROJECT NO. GS93-020930522760 2005 A. DOUGLAS RADEMAKER, P.E. j S• DATE DIRECTOR, DEPARTMENT OF ENGINEERING GEORGE A. BEHMANESH, P.B. DATE ASSISTANT DIRECTOR TRANSPORTATION AND PUBLIC WORKS DEPARTMENT ia DOff KIM, P.E. DATE ENGINEERING MANAGER WATER DEPARTMENT TABLE OF CONTENTS 1. Notice to Bidders 2. Special Instructions to Bidders 3. Prevailing Wage Rates 4. Proposal S. Vendor Compliance 6. Disadvantaged Business Enterprise 7. Special Provisions 8. Contractor Compliance with Workers Compensation Law 9. Certificate of Insurance 10. Performance Bond 11. Payment Bond 12. Maintenance Bond 13. Contract 14. Project Designation Sign 15. Notice of Construction 16. Details 17., Soil reports 18. Street Locations 19. Valley Gutter Locations � �� oCOO NOTICE TO BIDDERS Sealed proposals for the following project: H.M.A.C. SURFACE OVERLAY (2005-13) AT VARIOUS LOCATIONS DOE Project No. 4886 TPW Project No. GS93-020930522760 Addressed to Mr. Charles R. Boswell, City Manager of the City of Fort Worth, Texas will be received at The Purchasing Office until 1:30 P.M. , August 11, 2005 and then publicly opened and read aloud at 2:00 P.M. Plans, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas, 76102 . A pre-bid conference will be held at 9:00 A.M. , July 22, 2005 in the Transportation and Public Works Conference Room 270 2nd floor, Municipal Building. One set of documents will be provided to prospective bidders for a non-refundable fee of twenty dollars ($20.00) . Additional sets may be also purchased for a fee of twenty dollars ($20.00) per set. The documents can be purchased at the front desk of Department of Engineering 1000 Throckmorton Street, 2nd floor, Municipal Building. For additional information contact Mr. Riad I. Nusrallah, P.E. , at (817) 392-2347 . Charles R. Boswell A. Douglas Rademaker, P.E. City Manager Director, Department of Engineering OV PUBLICATION: By: (0(1!JSJI, July 7, 2005 Tony Sholola, P.E. , July 14, 2005 Engineering Manager, DOE 1 Mllprr SPECIAL INSTRUCTIONS TO BIDDERS 1. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of Fort Worth,in an amount of not less than 5 percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeit in the event the successful bidder fails to execute the contract documents within ten days after the contract has been .. awarded. To be an acceptable surety on.the bid bond, the surety must be authorized to do business in the state of Texas. In addition,the surety must (1)hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess ., of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. .. Satisfactory proof of any.such reinsurance shall be provided to the City upon request. The City,in its sole discretion,will determine the adequacy of the proof required herein. Am 2. PROPOSAL: After proposals have been opened and read aloud,the proposals will be tabulated on the basis of the quoted prices,the quantities shown in the•proposal, and the application of such formulas or other methods of bringing items to a common basis as �• may be established in the Contract Documents. The total obtained by taking the sum of the products.of unit prices quoted and the .. estimated quantities plus any lump sum items and such other quoted amounts as`may enter into the cost of the completed project-will be considered as the amount of the bid. Until the award of the contract is made by the Owner,the right will be reserved to reject any or all proposals and waive technicalities,to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. The quantities of work and materials to be furnished as may be listed in the proposal forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans. The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided,without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. 3. ADDENDA: Bidders are responsible for obtaining all addenda to the Contract Documents prior to the bid receipt. Information regarding the status of addenda may be obtained by contacting the Department of Engineering Construction Division at(817) .. 871-7910. Bids that do not acknowledge all applicable addenda will be rejected as non- responsive. Ma SPECIAL INSTRUCTIONS TO BIDDERS - 1- i _ 4. AWARD OF CONTRACT: The contract,if awarded,will be awarded to the lowest responsive bidder. The City reserves the right to reject any or all bids and waive any or all irregularities. No bid may be withdrawn until the expiration of forty-nine(49) City business days from the date that the M/WBE UTILIZATION FORM,PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation")is received by the City. 5. PAYMENT PERFORMANCE AND MAINTENANCE BONDS: The successful bidder entering into a contract for the work will be required to give the City surety in a sum equal to the amount of the contract awarded. The successful bidder shall be required to famish bonding as applicable in a sum equal to the amount of the contract awarded. The form of the bond shall be as herein provided and the surety shall be acceptable to the City. All bonds furnished hereunder shallmeet the requirements of Chapter 2253 of the Texas Government Code,as amended. A. If the total contract price is$25,000 or less,payment to the contractor shall be made in one lump sum. Payment shall not be made for a period of 45 calendar days from the date the work has been completed and accepted by the City. B. If the contract amount is in excess of$25,000, a Payment Bond shall be executed, in the amount of the contract, solely for the protection of all claimants •• supplying labor and material in the prosecution of the work. C. If the contract amount is in excess of$100,000, a Performance Bond shall be .. executed, in the amount of the contract conditioned on the faithful performance of the work in accordance with the plans, specifications, and contract documents. Said bond shall solely be for the protection of the City of Fort Worth. D. A Two-year Maintenance Bond is required for all projects to insure the prompt, full and faithful performance of the general guarantee as set forth in Paragraph 7 of the Special Provisions. To be an acceptable surety on the performance, payment and maintenance bonds, the surety must be authorized to do business.in the state of Texas and meet all requirements of Texas Insurance Code, section 7.19-1. In addition, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the .. adequacy of the proof required herein. No sureties will be accepted by the City that are at the time in default or delinquent on any bonds or which are interested in any litigation against the City. Should any surety on the contract be determined unsatisfactory at any time by the City,notice will be given to the contractor to that effect and the contractor shall immediately provide a i Lew � N .. satisfactory to the City s� '�>,-'.l '�D Eca CIT u33MCNEq RY SPECIAL INSTRUCTIONS TO BIDDERS � � -2"- rr 6. LIQUIDATED DAMAGES: The Contractor's attention is called to Part 1 - General .. Provisions,Item 8,Paragraph 8.6,Standard Specifications for Street and Storm Drain Construction of the City of Fort Worth, Texas,concerning liquidated damages for late completion of projects. 7. EMPLOYMENT AND NON-DISCRD4114ATION: The Contractor shall not discriminate against any person(s)because of sex,race,religion, color or national origin and shall comply with the provisions of sections 13A-21 through 13A-29 of the Code of the City of Fort Worth(1986),as amended,prohibiting discrimination in employment practices. 8 WAGE RATES: All bidders will be required to comply with provision 5159a of "Vernons Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates as established by the City of Fort Worth,Texas, and set forth in Contract Documents for this project. 9. FINANCIAL STATEMENT: A current certified financial statement may be required by the Department of Engineering Director for use by the CITY OF FORT WORTH in ,. determining the successful bidder. This statement,if required,is to be prepared by an independent Public Accountant holding a valid permit issued by an appropriate State Licensing Agency. 10. INSURANCE: Within ten days of receipt of notice of award of contract,the Contractor must provide, along with executed contract documents and appropriate bonds,proof of insurance for Workers Compensation(statutory); Comprehensive General Liability ($1,000,000 per occurrence, $2,000,000 aggregate); and Automobile Insurance ($1,000,000 each accident on a combined single basis or$250,000 property .. damage/$500,000 bodily injury per person per occurrence. A commercial business policy shall provide coverage on"any auto",defined as autos owned,hired, and non- owned). Additional lines of coverage may be requested. If such a request is made after bid opening, Contractor shall be entitled to additional compensation equal to 110% of the additional premium cost.For worker's compensation insurance requirements, see Special .e Instructions to Bidders-Item 16. ADDITIONAL INSURANCE REQUIREMENTS: " A. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers'compensation insurance policy. B. Certificates of insurance shall be delivered to the City of Fort Worth, contract administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, TX 76102,prior to commencement of work on the contracted project. r` C. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. D. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation, non-renewal, and/or material change in policy terms .. SPECIAL INSTRUCTIONS TO BIDDERS -3_ r„ or coverage. A ten days notice shall be acceptable in the event of non-payment of premium. �. E. Insurers must be authorized to do business in the State of Texas and have a current A.M. Best rating of A: VII or equivalent measure of financial strength and solvency. .r F. Deductible limits, or self-funded retention limits, on each policy must not exceed $10,000.00 per occurrence unless otherwise approved by the City. G. Other than worker's compensation insurance, in lieu of traditional insurance, City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups. The City must approve in writing any alternative coverage. .. H. Workers' compensation insurance policy(s) covering employees employed on the project shall be endorsed with a waiver of subrogation providing rights of recovery in favor of the City. I. City shall not be responsible for the direct payment of insurance premium costs. for contractor's insurance. J. Contractor's insurance policies shall each be endorsed..to provide that such insurance is primary protection and any self-funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery. K. In the course of the project, Contractor shall report,in a timely manner,to City's officially designated contract administrator any known loss occurrence which could give rise to a liability claim-or lawsuit or which could result in a property loss. L. Contractor's liability shall not be limited to the specified amounts of insurance required herein. M. Upon the request of City, Contractor shall provide complete copies of all .r insurance policies required by these contract documents. 11. NON-RESIDENT BIDDERS: Pursuant to Texas Government Code, art. 2252.002,the .. City of Fort Worth will not award this contract to a non-resident bidder unless the non- resident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a non-resident bidder to obtain a comparable contract in the state in which the non- resident's principal place of business is located. "Non-resident bidder"means a bidder whose principal place of business is not in this state,but excludes a contractor whose ultimate parent company of majority owner has its principal place of business in this state. SPECIAL INSTRUCTIONS TO BIDDERS -4- "Texas resident bidder"means a bidder whose principal place of business is in this state, and includes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. •r This provision does not apply if the project is funded in whole or in part with federal funds. The appropriate blanks of the Proposal must be filled out by all non-resident bidders in order for its bid to meet specifications. The failure of a non-resident contractor to do so ,., will automatically disqualify that bidder. 12. MINORITY/WOMEN BUSINESS ENTERPRISE: In accordance with City of Fort .. Worth Ordinance No. 11923, as amended by Ordinance No. 13471, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts.You may obtain a copy of the Ordinance from the .. Office of the City Secretary. The M/WBE Utilization Form,Prime Contractor Waiver Form and the Good Faith Effort •• Form, as applicable,must be submitted no later than 5:00 p. m. five(5)City business days after the bid opening date, exclusive of the bid opening date. The bidder shall submit the documentation at the reception area of the Department of Engineering + ("Managing Department"),2nd floor, City Hall, and shall obtain a receipt. Failure to comply shall render your bid non-responsive. Upon contract execution between the City of Fort Worth and the successful bidder,now known as Contractor, a pre-construction meeting will be scheduled at which time the Contractor is required to submit either Letters of Intent or executed agreements with the M/WBE firm(s)to be utilized on this project. Such Letters of Intent or executed agreements shall include the following information: 1. Name of Contract 2. Name of M/WBE firm utilized 3. Scope of Work to be performed by the M/WBE firm 4. Monetary amount of work to be performed by the M/WBE firm 5. Signatures of all parties A notice to proceed will not be issued until the signed letter(s) or executed agreement(s)have been received. Throughout the duration of this project,the Contractor comply with the M/WBE Ordinance by complying with the following procedures: a • A M/WBE Participation Report Form must be submitted monthly until the contract is completed. The first report will be due 30 days after commencement of work. The monthly report MUST have an original signature to ensure accountability for audit purposes. • Reports are to be submitted monthly to the M/WBE Office,regardless of whether or not the M/WBE firm has been utilized. If there was no activity by an M/WBE in a particular month,place a"0"or"no participation" in-the spaces provided, and provide SPECIAL INSTRUCTIONS TO BIDDERS _5 a brief explanation. • The Contractor shall provide the M/WBE Office proof of payment to the M/WBE subcontractors and suppliers only. The M/WBE Office will accept the following as proof of payment: .� 1. Copies of submitted invoices with front and back copies of canceled check(s), OR 2. A notarized letter explaining,in detail: a Subcontractor/supplier Scope of Work b. Date when services were received from subcontractor/supplier c. Amounts paid to the subcontractor/supplier d. Original signatures from both parties must be included on this letter. .. • If the Contractor foresees a problem with submitting participation reports and/or proof of payment on a monthly basis, the M/WBE Office should be notified. If the Contractor wishes to change or delete an M/WBE subcontractor or supplier, adhere to the following: 1. Immediately submit a Reguest for Approval of Change For to the M/WBE Office explaining the request for the change or deletion. 2. If the change affects the committed M/WBE participation goal, state clearly how and why in documentation. a. All requests for changes must be reviewed and pre-approved by the M/WBE Office. b. If the Contractor makes change(s)prior to approval,the change will not be considered when performing a post compliance review on this project. .. • Upon the Contractor's successful completion of this project, and within ten days after receipt of final payment from the City of Fort Worth,The Contractor will provide the M/WBE Office with a Final Participation Report Form to reflect the total .. participation from ALL subcontractors/suppliers utilized on the project. • All forms are available at the M/WBE Office, 3rd floor-City Hall. For additional information regarding compliance to the M/WBE Ordinance, call(817) 871-6104. Upon request,Contractor agrees to provide to Owner Complete and accurate information regarding actual work performed by a Minority/Women Business Enterprise(M/WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books,records or files in its possession that will substantiate the actual work performed by an M/WBE. The misrepresentation of facts(other than a negligent misrepresentation)and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation(other than a negligent misrepresentation)and/or commission of fraud .r SPECIAL INSTRUCTIONS TO BIDDERS -6- .. will result on the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three years.. „r 13. AMBIGUITY: In case of ambiguity or lack of clearness in stating process in the proposal,the City reserves the right to adopt the most advantageous construction thereof or to reject the proposal. .r 14. PROGRESS PAYMENTS FINAL PAYMENT PROJECT ACCEPTANCE AND WARRANTY: a. The contractor will receive full payment(less 5%retainage) from the city for each pay period. A b. Payment of the retainage will be included with the final payment after acceptance of the project as being complete. c. The project shall be deemed complete and accepted by the City as of the date the final punch list has been completed, as evidenced by a written statement signed by the .� contractor and the City. d. The warranty period shall begin as of the date that the final punch list has been completed. e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding(i) final quantities,or(ii)liquidated damages,city shall make a progress payment in the amount that city deems due and payable. g. In the event of a dispute regarding either final quantities or liquidated damages,the parties shall attempt to resolve the differences within 30 calendar days. 15. AIR POLLUTION WATCH DAYS: The Contractor shall be required to observe the following guidelines relating to-working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON,within the Metroplex area,runs from May 1,through October 31,with 6:00 a.m. - 10:00 a.m.being critical because emissions from this time period have enough time to bake in the hot atmosphere that leads to early aftemoon ozone formation. The Texas Commission on Environmental Quality(TCEQ), in coordination with the National Weather Service,will issue the AIR POLLUTION WATCH by 3:00 p.m. on the .. afternoon prior to the WATCH day. On designated AIR POLLUTION WATCH DAYS, the Contractor shall bear the responsibility of being aware that such days have been designated AIR POLLUTION WATCH DAYS and as such shall not begin work until 10:00 am.whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. i However, the Contractor may begin work prior to 10:00 am.if use of motorized equipment is less than 1-hour, or if pgMi_pment is new and certified by EPA as "Low SPECIAL INSTRUCTIONS TO BIDDERS -7- Emitting",or eguinment burns Ultra Low Sulfur Diesel(UCSD),diesel emulsions,or alternative fuels such as CNG. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m.-- 6:00 p.m., on a designated AIR POLLUTION WATCH DAY, that day will be considered as a weather day and added onto the allowable weather days of a given month. 16. WORKERS COMPENSATION INSURANCE COVERAGE: Contractors compliance with Workers Compensation shall be as follows: A. Definitions: Certificate of coverage("certificate") -A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage .• agreement(TWCC-81,TWCC-82,TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity employees providing services on a project,for the duration of the project. Duration of the project-includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project("subcontractor"in, 406.096)-includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project,regardless of whether that person has employees. This includes,without limitation, independent contractors, subcontractors,leasing companies,motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include,without limitation,providing,hauling, or delivering equipment or materials,or providing labor,transportation,or other service related to a project. "Services" does not include activities unrelated to the project,such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The contractor shall provide coverage,based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44)for all employees of the contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must,prior to the end of the .. coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. „f E. The contractor shall obtain from each person providing services on a project, and provide to the City: SPECIAL INSTRUCTIONS TO BIDDERS -8- (1) a certificate of coverage,prior to that person beginning work on the project, so the City will have on file certificates of coverage showing coverage for all persons providing services on the project; and (2) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. E. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery,within ten days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice,in the text,form and manner prescribed by the Texas Workers'Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. .. I. The contractor shall contractually require each person with whom it contracts to provide services on a project,to: +` (1) provide coverage,based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements,which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees .. providing services on the project, for the duration of the project; (2) provide to the contractor,prior to that person beginning work on the project, a " certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; (3) provide the contractor,prior to the end of the coverage period, a new certificate of coverage showing extension of coverage,if the coverage period shown on the current certificate of coverage ends during the duration of the project; (4) obtain from each other person or entity with whom it contracts, and provide to the contractor: .. (a) a certificate of coverage,prior to the other person or entity beginning work on the project; and (b) a new certificate of coverage showing extension of coverage,prior to the end of the coverage period,if the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and for one year.thereafter. SPECIAL INSTRUCTIONS TO BIDDERS. -9- (6) notify the governmental entity in writing by certified mail or personal delivery, within ten days after the person knew or should have known,of any change that materially affects the provision of coverage of any person providing services on •r the project; and (7) contractually require each person with whom it contracts,to perform as required by paragraphs(1)-(7),with the certificates of coverage to be provided to the person for whom they are providing services. J. By signing this contract or providing or causing to be provided a certificate of coverage,the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by workers' compensation coverage for the duration of the project,that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or,in the case of a self- As insured,with the commission's Division of Self-Insurance Regulation. Providing false of misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties or other civil actions. K. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the City to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the City. .r "The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This .. notice does not satisfy other posting requirements unposed by the Texas Workers' Compensation Act or other Texas Workers'Compensation commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 +■ point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text,without any additional words or changes: . REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must be covered by workers'compensation insurance. This includes persons providing,hauling,or delivering equipment or materials,or providing labor or transportation or other service related to the project,regardless of the identity of their employer or status as an employee." "Call the Texas Workers'Compensation Commission at(512)440-3789 to receive information on the legal requirement for coverage,to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." do 17. AGE DISCRIMINATION: In accordance with the policy("Policy")of the Executive .. Branch of the federal government,contractor covenants that neither it nor any officers, members,agents or employees who engage in the performance of this contract shall,in +f SPECIAL INSTRUCTIONS TO BIDDERS 10- connection with such employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against any person because of their age.except on the basis of a bona fide occupational qualification,retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers,members, agents or employees acting on their behalf, shall specify in solicitations or advertisements for employees to work on those contract a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification,retirement plan or statutory requirement. Contractor warrants that it will fully comply with the Policy and will defend,indemnify and hold City harmless against any and all claims or allegations filed by third parties .. against.City arising out of Contractor's alleged failure to comply with the Policy in the performance of this contract. 18. DISCRIMINATION DUE TO DISABILITY: In accordance with the provisions of the Americans with Disabilities Act of 1990 C ADA'),Contractor warrants that it will not A unlawfully discriminate on the basis of disability in the provision of services to the general public,nor in the availability,terms or conditions of employment for applicants for employment,with,or current employees of, Contractor.'Contractor warrants that it will fully comply with the ADA's provisions and any other applicable federal, state, or local laws concerning disability and will defend, indemnify and hold City harmless against any and all claims or allegations filed by third parties against City arising out of Contractor's alleged failure to comply with the ADA in the performance of this contract. ,. END OF SECTION .� SPECIAL INSTRUCTIONS TO BIDDERS -II- CITY OF FORT WORTH HIGHWAY CONSTRUCTION PREVAILING WAGE RATE FOR 2000 CLASSIFICATION HOURLY RATE Asphalt Raker $10.32 Asphalt Shoveler $9.75 Batching Plant Weigher $9.65 Carpenter (Rough) $13.64 Concrete Finisher-Paving $10.16 Concrete Finisher Helper(Paving) $9.70 Concrete Finisher-Structures $13.44 Flagger $7.00 Form Builder-Structures $13.44 Form Setter-Paving & Curbs $10.25 Form Setter-Structures $9.75 Laborer-Common $7.64 Laborer-Utility $8.64 Mechanic $13.25 Servicer $10.13 Pipe Layer $7.35 Pipe Layer Helper $6.75 Asphalt Distributor Operator $11.45 Asphalt Paving Machine Operator $11.09 Concrete Paving Saw $10.53 Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (< 1 1/2 $10.00 CY) Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (> 1 1/2 $11.52 CY) Front End Loader (21/2 CY& less) $9.94 Front End Loader (over 2 1/2 CY) $9.32 Milling Machine Operator $8.00 Mixer $11.00 Motor Grader Operator(Fine Grade) $12.31 Motor Grader Operator $13.75 Pavement Marking Machine $11.00 Roller, Steel Wheel Plant-Mix Pavements $9.88 Roller, Steel Wheel Other Flatwheel or Tamping $12.12 Roller, Pneumatic, Self-Propelled Scraper $8.02 Traveling Mixer $10.00 Reinforcing Steel Setter(Paving) $9.75 Truck Driver-Single Axle (Light) $8.00 Truck Driver-Tandem Axle Semi-Trailer $10.22 Truck Driver-Lowboy/Float $10.54 Truck Driver-Transit Mix $10.63 Truck Driver-Winch $9.80 P R O P O S A L TO: MR. CHARLES BOSWELL Fort Worth, Texas City Manager Fort Worth, Texas FOR: H.M.A.C. SURFACE OVERLAY (2005-13) AT VARIOUS LOCATIONS DOE PROJECT NO. 4886 TPW PROJECT NO. GS93-020930522760 Pursuant to the foregoing "Notice to Bidders", the undersigned has thoroughly examined the plans, specifications and the site, understands the amount of work to be done, and hereby proposes to do all the work and furnish all labor, equipment, and materials necessary to fully complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Director of the Department of Engineering of the City of Fort Worth. Total quantities given in the bid proposal may not reflect actual quantities; however, they are given for the purpose of bidding on and awarding the contract. The City also reserves the right to increase or decrease quantities of individual pay items within the contract provided that the total contract amount remains within plus or minus (t) 25% of the contract award. The contractor isnot entitled to any additional compensation or renegotiation of individual pay item bid prices. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish Performance, Payment and Maintenance Bonds acceptable to and approved by the City of Fort Worth for performing and completing the said work within the time stated and for the following sums, to-wit: SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID S.P. 1 2 EA. Project Designation Sign Two Shndred Dollars & No Cents Per EA. $ 200.00 $ 400.00 S.P. 2 LUMP SUM Utility Adjustment Six Thousand Dollars & No Cents Per L.S. $ 6,000.00 $ 6,000.00 406 3 30 EA. Manhole Adjustment 450 Three-Hundred and Fifty Dollars S.P. & No Cents Per EA. $ 350.00 $ 10,500.00 P-1 SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID 406 4 17 EA. Water Valve Boxes Adjustment 450 Two-Hundred and Fifty Dollars & S.P. No Cents Per EA. $ 250.00 $ 4,250.00 S.P. 5 1 EA. Water Meter Boxes Adjustment Thirty-Five Dollars & No Cents Per EA. $ 35.00 $ 35.00 104 6 3,100 L.F. Removal and Replacement of 502 Concrete Curb and Gutter S.P. K 1 l,( "� Dollars & Cents Per L.F. $ $ U9018 i 104 7 200 S.Y. Removal and Replacement of 6" 504 Concrete Driveway S.P. froa Dollars & /� 4- Cents Per S.Y. $ /y� $ 104 8 160 S.Y. Removal and Replacement of 4" 504 Concrete Sidewalks S.P. 1 't'• Dollars & 2 ,0&il!!h batL Cents Per S.Y. $ �'�•7� $ 2� yo 300 9 50 C.Y. Removal and Replacement of 304 H.M.A.C. Pavement and 312 Base (Base Repair) S.P. Q►(�. F}1�.�q�? �SI�F Dollars & dl{• Cents Per C.Y. $ I +� $ Lot 208 10 50 C.Y. Graded Crushed Stones S.P. ,�v� qX Dollars & •/ •� SS ,f Cents Per C.Y. $ (� l $ v S.P. 11 11,000 L.F. Wedge Milling 2" to 0" Depth 5.0' Wide @ Dollars & t ►Ck�s�1( Cents Per L.F. $ r J� $ ^�O •,� ( S.P. 12 7 EA. Butt Joint-Milled '}�•fa t�,,,,(pQ,F,,,?4ttti► Dollars & $ $ • Cents Per EA. '1 Ot c;%4 d L. P-2 SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID 300 13 70 TON H.M.A.C. Level-Up @ 312 g jr46! y Dollars & t4- Cents Per TON $ GC) $ 312 14 53,300 S.Y. 2"H.M.A.C. Surface Course S.P. (Type "D" Mix) @ Dollars & $Cents Per S.Y. �Q� -2.61�,v A � 104 15 10 S.Y. Removal and Replacement of 7" 314 Concrete Valley Gutter @ S.P. JA Dollars & _Cents Per S.Y. $ $ �I qo 314 16 110 S.Y. New 7" Cont(e Valley Gutter @ j�.j•�(� S.P. } " Dollars & A( Cents Per S.Y. $ $ 104 17 12 S.Y. Standard 4" Reinforced Concrete 505 Wheelcha' Ramps @ S.P. +k. Dollars & �. • Cents Per S.Y. $ /yam $ 54c) 402 18 800 L.F. 6" PVC Perforated Pipe _1 ' 500 Subdrain@ 620 -C71M;,Mj Dollars & S.P. /�.( . Cents Per L.F. $ i $ 500• 502 19 50 L.F. New Concrete Curb and Gutter @ Dollars & �• p{ r Cents Per L.F. 504 20 10 S.Y. New 4" Concrete Sidewalk @ �111ryQ-�C`'� Sly Dollars & �1. Cents Per S.Y. $ � $ �4,p •� 214 21 30,900 S.Y. 8" Pavement Pulverization @ S.P. -t\010 Dollars & mssr Cents Per S.Y. $ 'L Ci$ $ 214 22 404 TON Cement @ SiAL(ii Dollars & ��Cents Per TON $$ l$ $ j$ Q •� P-3 SPEC PAY APPROX. DESCRIPTION OF ITEMS. WITH BID UNIT TOTAL ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID S.P. 23 3 EA. Remobilization Five Hundred Dollars & No Cents Per EA. $ 500.00 $ 1,500.00 106 24 100 C.Y. Unclassified Street Excavation S.P. 4"" 'o"i Dollars & 10 r1r"V Cents Per C.Y. $ 1i k S.P. 25 1 EA. Removal and Replacement of Top of 5-foot Drainage Inlet ' Dollars & $ �O i $ 3�p.� �.( • Cents Per EA. S.P. 26 10 EA. Paint Replacement of House Address on Curb Removed & Replaced .y ��•!� Dollars & $ Ind $ O':. Cents Per EA. $ TOTAL BID e j 5 P-4 This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04 (F) of the Texas Limited Sales, Excise and Use Tax Act. Taxes. All equipment and materials not consumed by or incorporated into the project construction, are subject to State sales taxes under House Bill 11, enacted August 15, 1991. The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in, employment practices. The undersigned agrees to complete all work covered by these contract documents within One Hundred and Ten (110) Working Days from and after the date for commencing work as set forth in the written Work order to be issued by the Owner, and to pay not less than the "Prevailing Wage Rates for Street, Drainage and Utility Construction" as established by the City of Fort Worth, Texas. Within Ten (10) Calendar Days of receipt of notice of acceptance of this bid, the undersigned will execute the formal contract and will deliver an approved Surety Bond for the faithful performance of thiscontract. The attached deposit check in the sum of rj��o G .13 -12> . Dollars ($ ) is to become the property of the City of Fort Worth, Texas, or the attached Bidder's Bond is to be forfeited in the event the contract and bond are not executed within the time set forth, as liquidated damages for delay and additional work caused thereby. The Contractor shall mobilize within ten (10) calendar days of the notice given by the Construction Engineer for any of the locations. If the contractor fails to begin the work within ten (10) calendar days, a $200 dollars liquidated damage will be assessed per Block per day. I (we) , acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration in preparation of the foregoing bid: Respectfully submitted, Addendum No. 1 (Initials) x'121 ISA I Addendum No. 2 (Initials) Company Addendum No. 3 (Initials) By: Signature OA1UQ�,�—ti, t`�uS.Ul�tc,'Yc- Printed Nakme of P-ri pa] Address: ���1�li1� .r�r-IGH' (Seal) email address: IM Ce- 72S 010ar.:cp.Lft ,.. Date: _ ( ( 6 C7 Telephone: P-5 w VENDOR COMPLIANCE TO STATE LAW The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of contracts to non-resident bidders. This law provides that, in order to be awarded a contract as low bidder, non-resident bidders (out-of-state contractors whose corporate offices or principal place of business are outside of the State of Texas) bid projects for construction, improvements, supplies or services in Texas;at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required too underbid a non-resident bidder in order to obtain a comparable contract in the State in which the non-resident's principal place of business is located. The g appropriate blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to meet specifications. The failure of out-of-state or non- resident contractors to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Non-resident vendors in (give State), our principal place of business, are required to be percent lower than resident bidders by State law. A copy of the Statute is attached. Non-resident vendors in (give*State), our principal place of business, are not required to underbid resident bidders. B. Our pr' pal place of business or corporate offices are in the State of Texas. Bidder: Company By: (Please p t) 04-16 Address Si ature -7 ��- city State Zip Title(Please print) THIS FORM MUST BE RETURNED WITH YOUR QUOTATION ATTACHMENT 1A i Page 1 of 4 - FORT WORTH City of Fort Worth o _ -x- r ave Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Check applicable block to describe prime v JRJ Paving, LP. PROJECT NAME: =MNVIDBE. NON-MNV/DBE 2005-13 HMAC Surface Overlay BID DATE 1/05 _ City's M/WBE Project Goal: Prime's MNVBE Project utilization: PROJECT NUMBER 14 % 1 40 % MAC 2005-13 DOE 4886 Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p:m. five (5)City,business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with, the MNVBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional - and/or knowing misrepresentation. of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications MMBEs listed toward meeting the project goal must be located in tha nine (9) county marketplace or currently doing business In the marketplace at the time of bid. Marketpla;:e is the geographic area of Tarrant, Parker,Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1St tier, a payment by a subcontractor to its supplier is considered 2"d tier ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise (DBE)is synonymous with Minority/Women Business Enterprise(M/WaE). If hauling services .are utilized, the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. 'The M/WBE may lease . trucks.from another M/WBE firm, including:IVI/WBE owner-operators, and receive full M/WBE credit. The MMBE may lease trucks--from ndn.M/.WBEs,.including owner:operators, but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the lease agreement. 0�1�I rl kr C Oil o CITYUGR,eV 5/30/03 i ATTACHMENT 1A FORT WORTH Page 2 of 4 Primes are required to identify ALL subcontractors/suppliers,regardless of status;I.e.,Minority,Women and non-M/WBEs. Please list MIWBE firms first,use additional sheets if necessary. Certification N (check one) SUBCONTRACTOR/SUPPLIER T n Y Company Name i N T Detail Detail Addresse M W C X M Subcontracting Work Supplies Purchased Dollar Amount T D W Telephone/Fax r B B R O B . E E C T .E A /P70- Materials X Asphalt Box 2496 Material $ 232,761.00 Denton, TX 76202 940-243-8530 940-243-8518 Lattimore Materials X Concrete $ 17,600.00 P.O. Box _556 McKinney, TX 75070 972-221-4646 972-221-9647 Holc. m X Cement 33,046.00 P.0...Box 95124 Dallas, TX 75395 972-299-5054 Barnsco Rebar $ 1,500.00 2609 Willowbrook Rd. Rings $ 2,750.00 Dallas, TX X 214-352-9091 214-352-7568 a Rev.5/30/03 i ATTACHMENT IA FORTWORTH Page a of a Total Dollar Amount of M/WBE Subcontractors/Suppliers $ 232,761.00 i# Total Dollar Amount of Non-MMBE Subcontractors/Suppliers $ 54,896.00 TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ 287,657.00 The Contractor will not makeadditions,-deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord-with-the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested changeladdition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. . By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable RL subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the MMI/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1)year. Marty Murphy Aut orized Signature Printed Signature Aurin sa Manager same Title Contact NamefMle pf different) .M1 paving. LP 940-320-6340 Company Name Telephone andlor Fax P.O. Box 2136 ",z- martvm@irinaving.com Address . E-mail Address Denton, TX 76202 All &105 City/statemp Date Rev.5/30/03 SPECIAL PROVISIONS FOR:H.M.A.C. SURFACE OVERLAY (2005-13) AT VARIOUS LOCATIONS DOE PROJECT NO. 4886 TPW PROJECT NO. GS93-020930522760 1. SCOPE OF WORK: The work covered by these details and specifications consists of the removal (only) of all existing traffic buttons, removal and replacement of existing concrete curb and gutter and driveways and existing base repair and the addition of a new surface layer of H.M.A.C. for those streets designated as Mill Overlay (MOL) . For those streets designated as Pulverized Overlay (POL), the work consists of the same removal and replacement items as described above, surface & base rehabilitation of existing pavement with cement and the addition of a new surface layer of H.M.A.C. These items are described in the Special Provisions of these specifications. The work also consists of all other miscellaneous items of construction to be performed as outlined in the details and specifications which are necessary to satisfactorily complete the work. These streets will have water/sanitary sewer line replacement by others prior to any pavement work. The Contractor shall mobilize within ten (10) calendar days of the notice given by the Construction Engineer for any of the locations. If the contractor fails to begin the work within ten (10) calendar days, a $200 dollars liquidated damage will be assessed per Block per day. For street locations see list at the back of this document. At the sole discretion of the City, the City reserves the right to add, delete or substitute streets in this contract. The City also reserves the right to increase or decrease quantities of individual pay items within the contract provided that the total contract amount remains within plus or minus (t) 25% of the contract award. The contractor is not entitled to any additional compensation or renegotiation of individual pay item bid prices. The contractor is encouraged to conduct site visits and survey all these possibilities. The contractor shall verify these locations with the Construction Engineer. All short cul-de-sac streets and turnouts that intersect with a street to be repaired shall be included in this contract, even though they may not be listed on a Work Order due to their size. The contractor shall mill, clean, apply tack coat, overlay and adjust facilities. - Total quantities given in the bid proposal may not reflect actual SP-1 quantities, but represent the best estimate based on a reasonable effort of investigation; however, they are given for the purpose of bidding on and awarding the contract. 2. EXAMINATION OF SITE: It shall be the responsibility of the prospective bidder to visit the project site and make such examinations and explorations as may be necessary to determine all conditions that may affect construction of this project. Particular attention should be given to methods of providing ingress and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be given to these details during preparation of the Proposal and all unusual conditions that may give rise to later contingencies should be brought to the attention of the City prior to the submission of the Proposal. During the construction of this project, it is required that all parkways be excavated and shaped including bar ditches at the same time the roadway is excavated. Excess excavation will be disposed of at locations approved by the Engineer. During construction of this project, the Contractor shall comply with present zoning requirements of the City of Fort North in the use of vacant property for storage purposes. 3. BID SUBMITTALS FOR CONTRACT AWARD: The City reserves the right to require contractor who is the apparent low bidder(s) for a project to submit such information as the City, in sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule, to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract documents at any time. Failure to bid or fully execute contract without retaining contract documents intact may be grounds for designating bids as "non-responsive" and rejecting bids or voiding contract as appropriate and as determined by the Director of the Department of Engineering. Affected contractors will be notified in writing of a recommendation to the City Council. 4. WATER FOR CONSTRUCTION: Water for construction will be furnished by the Contractor at his own expense. 5. SANITARY FACILITIES FOR WORKERS: The Contractor shall provide all necessary conveniences for the use of workers at the project site. Specific attention is directed to this equipment. 6. LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractor's particular attention is directed to the requirements of Item 7, "Legal Relations and Responsibilities to the Public" of SP-2 the "Standard Specifications for Street and Storm Drain Construction. 7. MATERIAL STORAGE: Material shall not be stored on private property unless the Contractor has obtained permission from the property Owner. 8. PROTECTION OF EXISTING UTILITIES AND IMPROVEMENTS: The Contractor shall take adequate measures to protect all ex sting structures, improvements and utilities, which may be encountered. 9. CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor Covenants and agrees to indemnify City's Eng neer and Architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such injury, damage or death is caused, in whole or in part, by the negligence or alleged negligence of City, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the City from and against any and all injuries to City's officers, servants and employees and any damage, loss or destruction to property of the City arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in part by the negligence or alleged negligence of City, its officers, servants or employees. In the event City receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to City satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides City with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if deemed appropriate, refuse to accept bids on other City of Fort North public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 10.WORKING DAYS: The Contractor agrees to complete the Contract within the allotted number of days. If the Contractor fails to complete the work within the number of days specified, liquidated damages shall be charged, as outlined in Part 1, Item 8, Paragraph 8.6, of the "General Provisions" of the Standard Specification for Construction of the City of Fort North, Texas. 11.EARLY WARNING SYSTEM FOR CONSTRUCTION: Time is of the essence in the completion of this contract. In order to insure that the contractor is responsive when notified of unsatisfactory SP-3 performance and/or of failure to maintain the contract schedule, the following process shall be applicable: The work progress on all construction projects will be closely monitored. On a bi-monthly basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the contractor is less than the percentage of time allowed by 20% or more (example: 10% of the work completed in 30% of the stated contract time as may be amended by change order) , the following proactive measures will be taken: A. A letter will be mailed to the contractor by certified mail, return receipt requested demanding that, within 10 days from the date that the letter is received, it provide sufficient equipment, materials and labor to ensure completion of the work within the contract time. In the event the contractor receives such a letter, the contractor shall provide to the City an updated schedule showing how the project will be completed within the contract time. B. The Project Manager and the Directors of the Department of Engineering, and Department of Transportation and Public works will be made aware of the situation. If necessary, the City Manager's Office and the appropriate city council members may also be informed. C. Any notice that may, in the City's sole discretion, be required to be provided to interested individuals will distributed by the Engineering Department's Public Information Officer. D. Upon receipt of the contractor's response, the appropriate City departments and directors will be notified. The Engineering Department's Public Information Officer will, if necessary, then forward updated notices to the interested individuals. E. If the contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contract, the bonding company will be notified appropriately. 12.RIGHT TO ABANDON: The City reserves the right to abandon, without obligation to the Contractor, any part of the project, or the entire project, at any time before the Contractor begins any construction work authorised by the City. 13.CONSTRUCTION SPECIFICATIONS: This contract and project are governed by the two following published specifications, except as modified by these Special Provisions: STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION- CITY OF FORT WORTH and STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION-NORTH CENTRAL TEXAS. General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. SP-4 A copy of these specifications may be purchased at the office of the Department of Engineering, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort worth, Texas 76102. The specifications applicable to each pay item are indicated in the call-out for the pay item by the designer. If not shown, then applicable published specifications in any of these documents may be followed at the discretion of the Contractor. 14.MAINTENANCE STATEMENT: The Contractor shall be responsible for defects in this project due to faulty materials and workmanship, or both, for a period of two (2) years from date of final acceptance of this project by the City of Fort worth and will be required to replace at his expense any part or all of the project which becomes defective due to these causes. See Special Instructions to Bidders Item No. 14 for further requirements. 15.TRAFFIC CONTROL: The contractor will be required to obtain a "Street Use Permit" prior to starting work. As part of the "Street Use Permit" a traffic control plan is required. The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provisions set forth in the "Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways", codified as Article 6701d Vernon's Civil Statues, pertinent sections being Section Nos. 27, 29, 30 and 31. A traffic control plan shall be submitted for review to Mr. Charles R. Burkett, City Traffic Engineer 81817-392-8770 at leastl0 working days prior to the preconstruction conference. Although work will not begin until the traffic control panel has been reviewed, the Contractor's time will begin in accordance with the time frame established in the Notice to the Contractor. The Contractor will not remove any regulatory sign, instructional sign, street name sign, or other sign which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public works Department, Signs and Markings Division (phone number 871-7738) , to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be re- installed, the Contractor shall again contact the Signs and SP-5 Markings Division to re-install the permanent sign and shall leave his temporary sign in place until such re-installation is completed. The Contractor shall limit his work within one continuous lane of traffic at a time to minimize interruption to the flow of traffic upon the approval of the City Engineer. Work shall not be performed on certain locations/streets during peak traffic periods" as determined by .the City Traffic Engineer and in accordance with the applicable provision of the `City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work Areas." See Special Instructions to Bidders Item No. 15, for further work time restrictions on "Air Pollution Watch Day" with substantial use of motorized equipment. 16.PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION: Prior to beginning construction on any street in this contract, the contractor shall, prepare and deliver a notice/flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice/flyer shall be posted three (3) days prior to beginning any construction activity along each street. The flyer shall be prepared on the Contractor's letterheads and shall include the same information as what is in the provided sample. The contractor shall submit a schedule showing the construction start and finish dates for each street of the project to the inspector at the pre-construction conference. In addition, a copy of the Notice of Construction/flyer shall be delivered to the City inspector for his review prior to being distribution. The contractor will not be allowed to begin construction on any street until the flyer is delivered to all residents of the street. All work involved with the notification flyer shall be considered subsidiary to the contract price and no additional compensation shall be made. 17.PAYMENT: The Contractor will receive bi-weekly payment (minus 5% retainage) from the City for all work for each pay period. Payment of the remaining amount shall be made with the final payment, and upon acceptance of the project. See Special Instructions to Bidders Item No. 14 for further requirements. 18.DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra SP-6 cost to the Contractor is caused by the failure of the Cityto provide information or material, if any, which is to be furnished by the City. When such extra compensation is claimed a written statement thereof shall be presented by the Contractor to the Engineer and if by him found correct shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon by the Council shall be final and binding. If delay is caused by specific orders given by the Engineers to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the approval of the City and no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. 19.DETOURS AND BARRICADES: The Contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area. Contractor shall protect construction, as required by Engineer, by providing barricades. Barricades, warning and detour signs shall conform to the Standard Specifications "Barriers and Warning and/or Detour Signs", Item 524, and/or as shown on the plans. Construction signing and barricades shall conform with the latest edition of the "Texas Manual on Uniform Traffic Control Devices, Vol. No. 111. 20.DISPOSAL OF SPOIL/FILL MATERIAL: Prior to the disposing of any spoil/fill material, the Contractor shall advise the Director of the Department of Engineering acting as the City of Fort Worth's Flood Plain Administrator ("Administrator") , of the location of all sites where the contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinance of the City of Fort worth (Ordinance No. 10056) and a flood plain permit issued. All disposal sites must be approved by the Administrator to ensure the filling is not occurring within a flood plain without a permit. A flood plain permit can be issued upon approval of necessary engineering studies. No fill permit is required if disposal sites are not in a flood plain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary engineering studies, shall be at Contractor's expense. In the event that the SP-7 Contractor disposes of spoil/fill material at a site without a fill permit or a letter from the Administrator approving the disposal site, upon notification by the Director of the Department of Engineering, Contractor shall remove the spoil/fill material at its expense and dispose of such materials in accordance with the Ordinance of the City and this section. 21.FINAL CLEAN-UP: Final cleanup work shall be done for this project as soon as the work has been completed. No more than seven days shall elapse after completion of construction before the roadway and right-of-way is cleaned up to the satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the work before acceptance by the City or its representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. 22. SUBSTITUTIONS: The specifications for materials set out the minimum standard of quality that the City believes necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a substitution for the material that has been specified. Where the term "or equal", or "or approved equal" is used, it is understood that if a material, product, or piece of equipment bearing the name so used is furnished, it will be approvable, as the particular trade name was used for the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed substitutes is procured by the Contractor. Where the term "or equal", or "approved equal" is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose. However, the Contractor shall have the full responsibility of providing that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions. The provisions of the sub-section as related to "substitutions" shall be applicable to all sections of these specifications. 23.PROPERTY ACCESS: Access to adjacent property shall be maintained at all times unless otherwise directed by the Engineer. 24.CONSTRUCTION SCHEDULE: It shall be the responsibility of the Contractor to furnish the Construction Engineer, prior to construction, a schedule outlining the anticipated time each phase of construction will begin and be completed, including sufficient time being allowed for cleanup. 25.SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES: The following procedures will be followed regarding the subject item on this contract: SP-8 1) A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows: "WARNING --UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." 2) Equipment that may be operated within ten feet of high voltage lines shall have an insulating cage-type of guard about the boom or arm, except back hoes or dippers, and insulator links on the lift hood connections. 3) When necessary to work within six feet of high voltage electric lines, notification shall be given the power company (TU Electric Service Co.) which will erect temporary mechanical barriers, de- energize the line, or raise or lower the line. The work done by the power company shall not be at the expense of the City of Fort Worth. The notifying department shall maintain an accurate log of all such calls to TU Electric Service Company, and shall record action taken in each case. 4) The Contractor is required to make arrangements with the TU Electric Service Company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense. 5) No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (3) . 26.RIGHT TO AUDIT: Contractor agrees that City shall, until the expiration of three (3) years after final payment under this contract is made by City, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of Contractor involving transactions relating to this contract. Contractor agrees that City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that City shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine any directly pertinent books, documents, papers and shall be provided adequate and appropriate work space, in SP-9 v' �j��Gi! r�i�� l� �� :c'UI@,��9 GVa order to conduct audits in compliance with the provisions of this article together with Article VI. City shall give the subcontractor reasonable advance notice of intended audits. Contractor and subcontractor agree to photocopy such documents as may be requested by City. City agrees to reimburse Contractor and/or subcontractor for the cost of copies at the rates as contained in the Texas Administrative Code at the time payment is made. 27.CONSTRUCTION: The City of Fort Worth maintains a "CONFINED SPACE ENTRY PROGRAM" for its employees and all contractors and their sub- contractors must comply with this program as a condition of the contract. All active sewer manholes, regardless of depth, are defined as "permit required confined spaces". Contractors will be required to complete the "CONFINED SPACE ENTRY PERMIT" used by the Fort Worth Water Department (Field Operations Division) for each entry and possess and use the equipment necessary to comply with this program. The cost of complying with this program will be considered subsidiary to the pay items involving work in confined spaces (e.g. vacuum testing, cleaning, televising, construction, etc.) . NON-PAY ITEM NO. 1 - SPRINKLING FOR DUST CONTROL% All applicable provisions of Standard Specifications Item No. 200, "Sprinkling for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be considered incidental to this contract. NON-PAY ITEM NO. 2 - REMOVAL OF TRAFFIC BUTTONS AND TEMPORARY LANE TAPE: All traffic buttons shall be removed from the existing asphalt surface before resurfacing begins. The contractor shall be responsible for the removal of all buttons. Upon completion of the job the City will install new buttons after proper notification. The contractor shall also be responsible for all materials, equipment and labor to place temporary adhesive lane marking tape, at locations as directed by the Construction Engineer, to direct traffic flow until permanent markers are installed. The contractor shall notify the Construction Engineer to arrange for the replacement of the buttons and adhesive lane markers (arrows, etc.) . All costs to the contractor shall be figured as subsidiary to this contract. SP-10 NON-PAY ITEM NO. 3 - LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES: The contractor shall be responsible for locating and marking all previously exposed manholes and water valves in each street of this contract before the resurfacing process commences for a particular street. The contractor shall attempt to include the Construction Engineer (if he is available) in the observation and marking activity. In any event a street shall be completely marked a minimum of two (2) working days before resurfacing begins on any street. Marking the curbs with paint is a recommended procedure. It shall be the contractors responsibility to notify the utility companies that he has commenced work on the project. As the resurfacing is completed (within same day) the contractor shall locate the covered manholes and valves and expose them for later adjustment. Upon completion of a street the contractor shall notify the utilities of this completion and indicate the start of the next one in order for the utilities to adjust facilities accordingly. The following are utility contact persons: Company Telephone Number Contact Person SBC Telephone 817-338-6202 Mr. Gary Tillory 214-384-3732 Cell ONCOR Electric: Downtown 817-215-6424 Mr. Scott King Other than Downtown 817-215-6688 Mr. Robert Martinex Oncor Gas: 817-215-4306 Mr. Roger Oliver CPW Street Light and Signal 817-392-8100 Mr. Dwayn Cox Mr. Roger Martin Storm Drain 817-392-8100 Mr. Gordon Couch Water & Sewer 817-212-2649 and Mr. Kristian Sugrim 817-925-2271 817-212-2642 and Mr. Scott Neystel 817-994-8663 Of course, under the terms of this contract, the contractor shall complete adjustment of the storm drain and Water Department facilities, one traffic lane at a time within five (5) working days after completing the laying of proposed H.M.A.C. overlay adjacent to said facilities. Any deviation from the above procedure and allotted working days may result in the shut down of the resurfacing operation by the Construction SP-11 Engineer. The contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. NON-PAY ITEM NO. 4 - STORM DRAIN INLET PROTECTION: All pulverization and overlay streets with storm drain inlets shall use inlet protection for sediment control, in accordance with the Standard Specifications for Public Works Construction-North Central Texas. The contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. NON-PAY ITEM NO. 5 - CRACK SEALING: All cracks that develop after completion of the street resurfacing and until the end of the 2-year warranty period shall be crack sealed with asphalt cement AC-20, as per the Standard Specifications for Street and Storm Drain Construction-City of Fort Worth. The contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. PAY ITEM NO. 1 - PROJECT DESIGNATION SIGN: The Contractor shall construct and install two (2) Project Designation Signs and it will be the responsibility of the Contractor to maintain the signs in a presentable condition at all times on each project under construction. Maintenance will include painting and repairs as directed by the Engineer. It will be the responsibility of the Contractor to have the individual project signs lettered and painted in accordance with the enclosed detail. The quality of the paint, painting, and lettering on the signs shall be approved by the Engineer. The height and arrangement of the lettering shall be in accordance with the enclosed detail. The sign shall be constructed of 3/4" fir plywood, grade A-C (exterior) or better. SP-12 These signs shall be installed on barricades or as directed by the Engineer, and in place at the project site upon commencement of construc- tion. The work, which includes the painting of the signs, installing and removing the signs, furnishing the materials, supports and connections to the support, and maintenance shall be to the satisfaction of the Engineer. The unit price pre bid per each will be full compensation for all labor, material, equipment, tools, and incidentals necessary to complete the work. PAY ITEM NO. 2 - UTILITY ADJUSTMENT: This item is included for the basic purpose of establishing a contract price which will be comparable to the final cost of making necessary adjustments required due to street improvements to water, sanitary sewer, and natural gas service lines and appurtenances where such service lines and appurtenances are the property owner's responsibility to maintain. An arbitrary figure has been placed in the Proposal; however, this does not guarantee any payment for utility adjustments, neither does it confine utility adjustments to the amount shown in the Proposal. It shall be the Contractor's responsibility to provide the services of a licensed plumber to make the utility adjustments determined necessary by the Engineer. No payment will be made for utility adjustments except those adjustments determined necessary by the Engineer. Should the Contractor damage service lines due to his negligence, where such lines would not have required adjustment or repair otherwise, the lines shall be repaired and adjusted by the Contractor at the Contractor's expense. The payment to the Contractor for utility adjustments shall be the actual cost of the adjustments plus ten percent (10%) to cover the cost of bond and overhead incurred by the Contractor in handling the utility adjust- ments. PAY ITEM N0. 3 - MANHOLE ADJUSTMENT: This item shall include adjusting the tops of existing manhole to match proposed grade as shown on the plans, in the detail at the back of this document or as directed by the Engineer. Standard Specification Item Nos. 450 "Adjusting Manholes and Inlets" and 406 "Concrete for Structures" shall apply except as herein modified. The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch. Work shall be completed and street open to traffic within seven (7) calendar days. If the contractor fails to complete the work within seven (7) calendar SP-13 days, a $100 dollars liquidated damage will be assessed per each manhole per day. Prior to beginning of work, the Contractor shall make an inventory of the condition of existing manholes. The Engineer will field verify this inventory and provide the Contractor replacements for broken manhole covers. The contractor shall replace the manhole covers which are damaged during construction at no cost to the City. Included as part of this pay item shall be the application of a cold-applied preformed flexible butyl rubber or plastic sealing compound for sealing interior and/or exterior joints on concrete manhole sections, as per current City Water Department Special Conditions. The unit price pre bid per each will be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. PAY ITEM NO. 4 - WATER VALVE BOXES ADJUSTMENT: Contractor will be responsible for adjusting water valve boxes to match new pavement grade. The water valves themselves will be adjusted by City of Fort Worth Water Department forces. Prior to beginning of work, the Contractor shall make an inventory of the condition of existing water valve boxes. The Engineer will field verify this inventory and provide the Contractor replacements for broken valve boxes. The contractor shall replace the valve boxes which are damaged during construction at no cost to the City. The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch. Work shall be completed and street open to traffic within seven (7) calendar days. If the contractor fails to complete the work within seven (7) calendar days, a $100 dollar liquidated damage will be assessed per each water valve box per day. The unit price pre bid per each will be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. PAY ITEM NO. 5 - WATER METER BOX ADJUSTMENT: This item only apply when the adjacent curb and gutter has been determined to be removed and replaced as directed by the Engineer. The adjustment shall include raising or lowering the existing water meter box to the proper grade. SP-14 The unit price pre bid per each will be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. PAY ITEM NO. 6 - REMOVAL AND REPLACEMENT OF CONCRETE CORS AND GUTTER: These provisions require the contractor to remove all failed existing curb and gutter, as designated by the Construction Engineer, and replace with standard concrete curb and gutter, laydown curb and gutter, or in like kind, as governed by the standard City Specifications, Item No. 104 "Removing Old Concrete", Item No. 502 "Concrete Curb and Gutter", and Drawing Nos. S-S2 through S-S4. Pay limits for laydown curb and gutter are as shown in Drawing No. S-S5 of the Standard Specifications. Contractor shall sawcut the curb and gutter and pavement prior to removal. Included, and figured subsidiary to this unit price, will be the required sawcut excavation, as per specification Item No. 106 "Unclassified Street Excavation", into the street to aid in the construction of the curb and gutter. The pay limit will be 9" out from the gutter lip, with same day haul-off of the removed material to a suitable dump site. The street void shall be filled with H.M.A.C. Type "D" mix as per TxDOT Specifications for "Construction and Maintenance of Highways, Streets, and Bridges-, specification Item No.300 "Asphalts, Oils, and Emulsions", and CFW Standard specification Item No. 304 "Prime Coat" and Item No. 312 "Hot Mix Asphaltic Concrete" and compacted to standard City densities. Top soil as per specification Item No. 116 "Top Soil", if needed, shall be added and leveled to grade behind the curb. Existing improvements within the parkway such as water meters, sprinkler system, etc. damaged during construction shall be replaced with same or better at no cost to the City. Backfill for curb and gutter shall be completed within fourteen (14) calendar days from the day of demolition to date of completion. If the contractor fails to complete the work within fourteen (14) calendar days, a $100 dollar liquidated damage will be assessed per block per day. The unit price bid per linear foot shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. PAY-ITEM NO. 7 - REMOVAL AND REPLACEMENT OF 6" CONCRETE DRIVEWAYS: This item shall include the removal and replacement of existing concrete driveways, due to deterioration or in situations where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul- off of the removed material to a suitable dump site. For specifications governing this item see Item No. 104 "Removing Old Concrete", Item No. 504" Concrete Sidewalk and Driveways". Pay limits for concrete driveway are as shown in Drawing No. S-SS of the Standard Specifications. SP-15 The unit price bid per square yard shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the work. PAY-ITEM NO. 8 - REMOVAL AND REPLACEMENT OF 4" CONCRETE SIDEWALK: This item shall include the removal and replacement of existing concrete sidewalk due to failure or in situation where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul-off of the removed material to a suitable dump site. For specifications governing this item see Item No. 104 "Removing Old Concrete", and Item No. 504 "Concrete Sidewalk and Driveways". The unit price bid per square yard shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the removal and replacement work. PAY-ITEM NO. 9 - REMOVAL AND REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE: The contractor shall remove all existing deformed H.M.A.C. pavement and/or bad base material that shows surface deterioration and/or complete failure. The Engineer will identify these areas upon which time the contractor will begin work. The failed area shall be saw cut, or other similar means, out of the existing pavement in square or rectangular fashion. The side faces shall be cut vertically and all failed and loose material excavated. As a part of the excavation process, all unsatisfactory base material shall be removed, if required, to a depth sufficient to obtain stable sub-base. The total depth of excavation could range from a couple of inches to include the surface-base-some sub-base removal for which the Engineer will select the necessary depth. The remaining good material shall be leveled and uniformly made ready to accept the fill material. All excavated material shall be hauled off site, the same day as excavated, to a suitable dump site. After satisfactory completion of removal as outlined above, the contractor shall place the permanent pavement patch, with Type "D" surface mix. This item will always be used even if no base improvements are required. The proposed H.M.A.C. repair shall match the existing pavement section or the depth of the failed material, whichever is greater. However, the patch thickness shall be a minimum of 2 inches. Generally the existing H.M.A.C. pavement thickness will not exceed 611. Before the patch layers are applied, any loose material, mud and/or water shall be removed. A liquid asphalt tack coat shall be applied to all exposed surfaces. Placement of the surface mix lifts shall not exceed 3 inches with vibrator compactions to follow each lift. Compactions of the mix shall be to standard densities of the City of Fort Worth, made in preparation to accept the recycling process. C.7 r ((��moi. '� SP-16 v} A ,C.71 vI �5 {�2)1 All applicable provisions of Standard Specification Item Nos. 300 "Asphalts, Oils, and Emulsions", 304 "Prime Coat", and 312 "Hot-Mix Asphaltic Concrete" shall govern work. The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. PAY-ITEM NO. 10 - GRADED CRUSHED STONES: This item shall be used to repair the failed base material in areas exceed 8" deep as directed by the Engineer. The material shall be graded crushed stone. For specifications governing this item see Item No. 208 "Flexible Base". The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. PAY-ITEM NO. 11 - WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE: 1. Description This item shall consist of milling the existing pavement from the lip of gutter at a depth of 2" and transitioning to match the existing pavement (0" cut) at a minimum width of 51 . The existing pavement to be milled will either be asphalt, concrete, or brick pavement. The removal and disposal of the milled materials shall be as directed by the Engineer. The milled surface shall provide a smooth surface free from gouges, ridges, oil film, and other imperfections of workmanship and shall have a uniform textured appearance. In all situations where the existing H.M.A.C. surface contacts the curb face the wedge milling shall include the removal of the existing asphalt covering the gutter up to and along the face of curb. The wedge milling operations for this project will be performed in a continuous manner along both sides of the street. Details of milling locations are at the back of this document. Contractor is required to begin the overlay, within five (5) calendar days from the date of the wedge milling completion of any one street. Should the contractor fail to meet this condition, the wedge milling will be shut down, and liquidated damage of $500.00 per day per street will be assessed until all wedge milled streets are overlayed. The overlay, once begun on a street shall continue uninterrupted until complete. The Contractor shall haul-off the removed material to a suitable dumpsite. SP-17 2. Equipment The equipment for removing the pavement surface shall be a power operated milling machine or other equal or better mechanical means capable of removing, in either one pass or two passes, the necessary pavement thickness in a five-foot minimum width. The equipment shall be self-propelled with sufficient power, traction and stability to maintain accurate depth of cut and slope. The machine shall be equipped with an integral loading and reclaiming means to immediately remove material being cut from the surface of the roadway and discharge the cuttings into a truck, all in one operation. Adequate back-up equipment (mechanical street sweepers, loaders, water truck, etc.) and personnel will also be provided to keep flying dust to a minimum and to insure that all cuttings are removed from street surface daily. Stockpiling of planed material will not be permitted on the project site unless designated by the Engineer. The machine shall be equipped with means to control dust created by the cutting action and shall have a manual system providing for uniformly varying the depth of cut while the machine is in motion thereby making it possible to cut flush to all inlets, manholes, or other obstructions within the paved area. The speed of the machine shall be variable in order to leave the desired grid pattern specified under Surface Texture. The unit price bid per linear feet shall be full compensation for all labor, material, equipment, tools, and incidentals necessary to complete the work. PAY-ITEM NO. 12 - BUTT JOINTS - MILLED: Description: This item requires the contractor to mill "butt joints" into the existing surface, in association with the wedge milling operation (PAY ITEM N0. 11) to the depth and at locations as described below. The butt joint will provide a full width transition section, whereby the new overlay shall maintain constant depth at the point the new overlay is terminated and the new surface elevation matches the existing pavement. The construction activities, performance standards and equipment needed for the butt joints milling operations shall be governed by the special provisions of Pay Item No. 11 - Wedge Milling. The configuration of the butt joints is described in more detail below. General details of butt joint locations - along with wedge milling in general - are shown in plan form at the back of this document. Construction Details: Prior to the milling of the butt joints, the contractor shall consult with SP-1s the construction Engineer for proper location of these joints and verify that the selected limits of the projects street are correct. The general locations for butt joints are at all beginning and ending points of streets listed in the project and as more graphically detailed at the back of this specification book. The joints are also required on both sides of all railroad tracks and concrete valley gutters, bridge decks and culverts and all other items which transverse the street and end the continuity of the asphalt surface. Each butt joint shall be 20 feet long and milled out across the full width of the street section to a tapered depth of 211. This milled area shall be tapered within the 20 feet to a depth from 0" to 2" at a line adjacent to the beginning and ending points or intermediate transverse items. This butt joint - when overlayed - will consist of an asphalt section that will transition the new overlay to match the existing pavement elevation. The contractor shall provide a temporary wedge of asphalt at all butt joints to provide a smooth ride over the bump. Measurement and Payment: Butt joints as prescribed above, will be measured by the unit of each butt joint milled. The disposal of excess material involved will not be measured for payment. Each butt joint-milled, measured as above, complete-in place-in accordance with these specifications, will be paid for at the unit price shown in the proposal for "Butt Joints". The unit price bid per each shall be full compensation for all.milling, including material haul-off, tools, labor, equipment and incidentals necessary to complete the required work. PAY-ITEM NO. 14 - 2" H.M.A.C. (TYPE "D" MIX) POLYMER MODIFIED ASPHALT CEMENT SURFACE COURSE: The Type "D" mix shall consist of a Polymer Modiped Asphalt Cement PG 70-22 as per TxDOT Specifications for "Construction and Maintenance of Highways, Streets, and Bridges", Item No. 300 "Asphalts, Oils, and Emulsions", and CFW Standard specification Item No. 304 "Prime Coat" and Item No. 312 "Hot Mix Asphaltic Concrete" and compacted to standard City densities. City of Fort Worth Standard Specification 312.5 (1) shall be revised as follows: The prime coat, tack coat, or the asphaltic mixture shall not be placed unless the air temperature is fifty (50) degrees Fahrenheit and rising, the temperature being taken in the shade and away from artificial heat. Asphaltic material shall also not be placed when the wind conditions are unsuitable in the opinion of the Engineer. SP-19 The contractor shall furnish batch design of the proposed hot mix asphaltic concrete for City approval 48 hours prior to placing the H.M.A.C. overlay. The City will provide laboratory control as necessary. The unit price bid per square yard of H.M.A.C. complete and in place, shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. PAY ITEM NO. 15 - REMOVAL AND REPLACEMENT OF 7" CONCRETE VALLEY GUTTER: This item shall include the removal and reconstruction of existing concrete valley gutters at locations to be determined in field by the Construction Engineer. Removal of existing concrete valley, asphalt pavement, concrete base, curb and gutter, and necessary excavation to install the concrete valley gutters all shall be subsidiary to this pay item. Furnishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter details, shall be subsidiary to this Pay Item. See standard specification Item No. 314, "Concrete Pavement", Item 312 "Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item No. 106, "Unclassified Street Excavation" Item No. 208 "Flexible Base", Drawing No. S-S6 and detail enclosed. Measurement for final quantities of valley gutter will be by the square yard of concrete pavement and the curb and gutter section will be included. Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu of Crushed Stone at no additional cost. See Item No. 314 "Concrete Pavement". The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch. Contractor shall work on one-half of Valley Gutter at a time, and the other half shall be open to traffic. Work - shall be completed on each half within seven (7) calendar days. If the contractor fails to complete the work on each half within seven (7) calendar days, a $100 dollars liquidated damage will be assessed per each half of valley gutter per day. The unit price bid per square yard for Concrete Valley as shown on the proposal will be. full compensation for materials, labor, equipment, tools and incidentals necessary to complete the work. PAY-ITEM NO. 16 - NEW 7" CONCRETE VALLEY GUTTER: This item shall include the construction of concrete valley gutters at SP-20 various locations to be determined in field by the Construction Engineer. Removal of existing, asphalt pavement, concrete base, curb and gutter, and necessary excavation to install the concrete valley gutters all shall be subsidiary to this pay item. Furnishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter details shall be subsidiary to this Pay Item. See standard specification item No. 314, "Concrete Pavement", Item 312 "Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item No. 106, "Unclassified Street Excavation" Item No. 208 "Flexible Sass", Drawing No. S-S6 and detail enclosed. Measurement for final quantities of valley gutter will be by the square yard of concrete pavement and the curb and gutter section will be included. Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu of Crushed Stone at no additional cost. See Item No. 314, "Concrete Pavement". The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch. Contractor shall work on one-half of valley gutter at a time, and the other half shall be open to traffic. Work shall be completed on each half within seven (7) calendar days. if the Contractor fails to complete the work on each half within seven (7) calendar days, a $100 dollars liquidated damage will be assessed per each half of valley gutter per day. The unit price bid per square yard for Concrete valley as shown on the proposal will be full compensation for materials, labor, equipment, tools and incidentals necessary to complete the work. PAY-ITEM NO. 17 - NEW 4" STANDARD WHEELCHAIR RAMP: This item shall include the construction of standard concrete wheelchair ramps at various locations to be determined in field by the Construction Engineer. The removal of existing substandard wheelchair ramps and sidewalk as required for the installation of new wheelchair ramps shall be subsidiary to this pay item. The removal and replacement of existing curb and gutter as required for the installation of new wheelchair ramps shall be included in Pay Item 6 (Removal and Replacement of Curb and Gutter) . Pay limits for laydown curb and gutter are as shown in the Standard Pay Limit Detail (WR- 1) . The pay limit will extend from 9" outside the lip of gutter to 15" back from the face of curb. Any asphalt tie-in shall be subsidiary to the curb and gutter pay item. Pay limits for "Standard Wheelchair Ramp" will start 15" back from the face of curb and encompass the remainder of the SP-21 ,, °1 `010°1D +J�.� ramp and sidewalk. All applicable provision of standard Specifications Item 104 "Removing Old Concrete" and Item 504 "Concrete Sidewalk Driveways" shall apply except as herein modified. All concrete flared surface shall be colored with LITHOCHROME color hardener as manufactured by L.M. Scofield Company or equal. The color hardener shall be brick red color and dry-shake type, and shall be used in accordance with manufactures instructions. Concrete stain may be applied after concrete is poured (Product sold by BAER) . "Contractor shall provide a colored sample concrete panel of one foot by one foot by three inches dimension, or other dimension approved by the Engineer, meeting the aforementioned specification. The sample, upon approval by the Engineer, shall be the acceptable standard to be applied for all construction covered in the scope of this pay item. The method of application shall be by screen, sifter, sieve or other means in order to provide for a uniform color distribution." The unit price bid per square yard for 4" standard wheelchair ramp as shown on the proposal will be full compensation for materials, labor, equipment, tools and incidentals necessary to compete the work. PAY-ITEM NO. 18 - 6" PERFORATED PIPE SUBDRAIN: This item shall consist of furnishing and installing 6" perforated subdrain and filter material all as shown on the enclosed details, or as directed by the Engineer. All applicable provision of standard Specifications Item 500 "SQBDRAINS" shall apply except as herein modified. The pipe material shall be poly vinyl chloride (PVC) with the standard dimensional ratio of 35 (SDR35) and meet the ASTM D 1784. Filter fabric shall have the capability of passing ground water without transporting the soil placed around the filter fabric. The fabric shall be constructed exclusively of synthetic thermoplastic fibers and may be either woven or nonwoven to form a mat of uniform quality. Fabric fibers may be either continuous or discontinuous and oriented in either a random or a aligned pattern throughout the fabric. The fabric shall be mildew resistant, rot proof, shall be satisfactory for use in a wet soil and aggregate environment, contain ultraviolet stabilizers and have nonravelling edges. The fabric shall most the following requirements when sampled and tested in accordance with the methods indicated: Test Original Physical Method Requirements Properties SP-22 Fabric weight, on an ambient SDHPT Test Method Tex- 4.0 minimum for temperature air-dried tension 616-J"Testing of under drains and free sample, expressed in Construction Fibers" Slope Stabilisation, oz/sq. yd. 6.0 minimum for Gabions Revetment Water flow rate by falling Tex-616-J 80 minimum head method, 7.9 inches (20 cm) to 3.9 inches (10 cm) on 2 inch ID cylinder with 1 inch diameter orifice, with flow rate expressed in gal/sq. ft/minute. Breaking load in either ASTM Designation: D 100 minimum machine or cross-machine 1682 grab method G as direction, expressed in modified by Tex--616-J pounds. Equivalent opening size (IIS COP-02215, IIS Army 70 to 100 Standard sieve no.) Corps of Engineers, Civil Works Construction Guide Specification. "Plastic Filter Fabric", Nov. 1977. "Apparent elongation" at ASTM Designation: D 100 maximum breaking load in either 1682 grab method G as machine or cross-machine modified by Tex-616-J direction, expressed as percent. The "Filter Fabric" shall be installed in accordance with the manufacturer's recommendations, as indicated or as directed by the Engineer. When lapping is required, it shall be in accordance with the manufacturer's recommendations. Backfilling around the Filter Fabric shall be done in such a way as not to damage the Filter Fabric material during the placement. The unit price bid per L.F. shall be full compensation for all labor, materials, equipments, tools, and incidentals necessary to complete the work. PAY-ITEM NO. 21 - 8" PAVEMENT PULVERIZATION: Contractor shall pulverize the existing pavement to a depth of 8". After pulverization is completed, contractor shall temporarily remove and store SP-23 the 8" deep pulverized material, then cut the base 2" to provide place for the new 2" H.M.A.C. surface. The 2" base cut shall start at a depth of 8" from the existing pulverized surface. After the undercut operation is completed, contractor shall spread, mix, and compact the pulverized material to a 95% compaction per City's Standard Specifications or as directed by the Engineer in the field. A 3.5% portland cement shall be used to mix the pulverized material. If the existing pavement has a combination of 10" H.M.A.0 and crushed stone/gravel, undercut will not be required, the contractor will pulverize 10" inches, the 2" inch cut will be taken from the 10" pulverized material. Pulverization shall start within (ten) 10 calendar days after all concrete work has been completed on a street. If the contractor fails to begin the work within ten (10) calendar days, a $200 dollars liquidated damage will be assessed per block per day. After the pulverized material is cured, the contractor shall overlay it with 2" H.M.A.C. surface within five (5) calendar days. If the contractor fails to begin the work within five (5) calendar days, a $200 dollars liquidated damage will be assessed per block per day. The unit price bid per square yard shall be full compensation for all labor, material, equipment, tools, and incidentals necessary to pulverize, remove and store the pulverized material, undercut the base, mixing, compaction, haul off, sweep, and dispose of the undercut material. The 2" H.M.A.C. surface will be paid by separate item. PAY-ITEM NO. 23 - REMOBILIZATION: This item shall compensate the Contractor to remobilize personnel, equipment, supplies, and material to perform an additional work as directed by the Engineer. Remobilization will be considered when concrete "Flat-work" has been completed, personnel and equipments were demobilized, and the street is clean and ready for the overlay. Remobilization shall be determined by the Engineer. Any Remobilization without the approval of the Engineer will not be compensated. The unit price per bid per each will be full compensation for all labor, equipment, material, tools, and all incidentals necessary to complete the work. PAY-ITEM NO. 24 - UNCLASSIFIED STREET EXCAVATION: SP-24 This item will be used if additional excavation is needed that is not covered by Pay Item No. 21 - "8" PAVEMENT PULVERIZATION". Additional Excavation is the removal of the excessive crown and base to bring the new base to proper "grade & City standard specifications for street reconstruction. All applicable provisions of Item No. 106 "Unclassified Street Excavation" shall apply, work shall be paid per cubic yard. PAY ITEM NO. 25 - REMOVAL AND REPLACEMENT OF TOP OF 5' DRAINAGE INLETS: This item shall include the removal and replacement of a 7" thick drainage inlet top of 5 -foot drainage inlet openings on Beach Street. The removal and replacement of the drainage inlet top shall be in accordance with Standard Specification Item NO. 4"50 'Adjusting Manholes and Inlets", as shown in the Drawing S-S02 and as directed by the construction engineer. The unit price per bid per each will be full compensation for all labor, equipment, material, tools, and all incidentals necessary to complete the work. PAY ITEM NO. 26 - PAINT REPLACEMENT OF HOUSE ADDRESS ON CURB REMOVED & REPLACED: This item shall include paint replacement of house address on curb and or driveway radiuses that are removed and replaced in this contract. The background shall be white reflective safety paint and the letters shall be black exterior concrete enamel paint as directed by the construction engineer. The minimum size for the background shall be 6" wide x 16" long and the minimum size for the letters shall be 4" high or as directed by the construction engineer. The unit price per bid per each will be full compensation for all labor, equipment, material, tools, and all incidentals necessary to complete the work. END OF SECTION SP-25 EQUIPMENT SCHEDULE List of Equipment owned by Bidder that is in serviceable condition and available for use: Portions of work Bidder proposes to sublet in case of Award of Contracts including amount and type: EXPERIENCE RECORD List of projects your or anization has successfully completed: Amount Of Contract Type of Work Date Accepted Name and Address of Owner Award List of projects your organization is now engaged in completing: Amount Of Contract Type of Anticipated Name and Address of Owner Award Work Date of Completion List Surety Bonds in force on above incomplete work: Date of Contract Award Type of Work Amount of Name and Address of Bond Bond Surety ACORDCERTIFICATE OF LIABILITY INSURANCE DATE 1o(M(MM/DD/YY) WrsooS PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Allied N. America Corp. of Tx ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 12770 Colt Road, Suite 750 HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Dallas, TX 75251 (972)455-1400 F:(972)3874837 INSURERS AFFORDING COVERAGE INSURED INSURER A: Amer Guarantee dr Llab Ins Co JRJ Paving, LP INSURER B: Great American Insurance Co P. O. Box 2136 INSURER C: rel Denton, Texas 76202 INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSRTYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATIONLIMITS LTR DATE MM/DD/YY DATE MM/DD/YY GENERAL LIABILITY EACH OCCURRENCE 1 000 00o A X COMMERCIAL GENERAL LIABILITY GLO3994391 08/29/05 08/29/06 FIRE DAMAGE(Any one fire500 000 CLAIMS MADE [-X I OCCUR MED EXP(Any oneperson) 50,000 PERSONAL&ADV INJURY 1,000,000 GENERAL AGGREGATE 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS•COMP/OP AGG 2 000 000 POLICY X PRO- JECT RO LOC AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1 000 ow A X ANY AUTO TAP5115726 08/26/05 08/29/06 (Ea accident) + + ALL OWNED AUTOS BODILY INJURY SCHEDULED AUTOS (Per person) $ X HIRED AUTOS BODILY INJURY $ X NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY.EA ACCIDENT ANY AUTO EA ACC OTHER THAN AUTO ONLY: AGG B EXCESS LIABILITY TUU6627691 08/29/05 08/29/06 EACH OCCURRENCE 10,000,000 X OCCUR a CLAIMS MADE AGGREGATE 10,000,W0 ^IIDEDUCTIBLE ,E RETENTION $ STAT $ A WORKERS COMPENSATION AND WC3994389 08/29/05 08(29/06 X TORY IMITSI J_ER EMPLOYERS'LIABILITY E.L.EACH ACCIDENT 1000 000 E.L.DISEASE.EA EMPLOYEE 1 000 o00 T_ E.L.DISEASE.POLICY LIMIT $ 1,000,000 OTHER DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS Project: H.M.A.C. Surface Overlay (2005-13) m If required by written contract signed by Named Insured, the City of Fort Worth, Its officers, employees and servants are named Additional Insured for coverages except Workers' Compensation and Is provided Waiver of Subrogation for Workers'Compensation. CERTIFICATE HOLDER ADDITIONAL INSURED;INSURER LETTER: CANCELLATION r 4^ SHOULD ANY OF THE ABOVE DESCRIBED POLICIES E�('i4 �� O �Pl TION �. q r:PT DATE THEREOF,THE ISSUING INSURER WILL ENDE OR 1 IN9YIL /� RI N 0 J NOTICE TO THE CERTIFICATE HOLDER NAMED TO T1 E LE4 BUT:PAt TJ 0 S LL -City o f Fort Worth IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND POKE'' S$ i, 1Sa\1PTS O 1000 Throckmorton Street REPRESENTATIVES. Fort Worth, Texas 76102 AUTHORIZED REPRESENTA ACORD 25-S(7/97) @ACORD66RPORATION 1988 CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A. Labor Code §406.96 (2000), as amended, Contractor certifies that it provides workers' compensation insurance coverage for all of its employees employed on City of Fort Worth Department of Engineering No.4886 and City of Fort Worth Project No. GS93- 020930522760. CONTRACTOR JRJ Paving, L.P. By: Name: Marty Murphy Title: Manager/Estimating Date: L1, -2-0 � STATE OF TEXAS § COUNTY OF TARRANT § Before m the undersigned authority, on this day personally appeared Qf known to me to be the person whose name is subscribed to the foregoiriVinstrurAent,uand acknowledged to me that he executed the same as the act and deed of JRJ Paving, L.P. for the purposes and consideration therein expressed and in the capacity therein stated. Given Under My Hand and Seal of Office this 17 day of 20 . ,PTIP IIi ��C/l_YV Y/- ,ao.*.. .�.;�.,= tart'Pu LA F.S to of T Notary Public in and for the State of Texas _ Notary Public,State of Texas My Commission Expires 1=0110;�` April 08, 2009 Bond No. 08802869 1 PERFORMANCE BOND 1 THE STATE OF TEXAS § (NOW ALL BY THESE PRESENTS: 1 COUNTY OF TARRANT § Colonial American Casualty and 1 That wo (1) JRJ Paving, L.P. as Principal herein, and (.) Surety Company , a corporation organized under the laws of the State of(3) Maryland ,and who is authorized to issue surety bonds in the State of Texas, Surety herein, are held and firmly bound unto the City of Fo t Worth, a municipal corporation located in Tarrant and Denton C011itties,Texas,Obligee herein,in the sum of: 'Five ffpndred Eighty-eight Thousand Nine Hundred Forty-eight an no/100................................................ ($S ,948.001 Dollars for the payment of which sum we bind ourselves,our heirs,executors,administrators, successors and assigns,,jointly and severally,firmly by these presents. WHEREAS, Principal has entered into a certain contract wid. the Obligea dated the ZM of September 2005 a copy of which is attached hereto and made a part hereof,for the :onstruction of H.M.A.C. SURFAQ 0YCRLAY 2005-13 at Ve.RTOUS LOCATIO1(S NOW THEREFORE, the condition of this obligation is such, if the said Principle shall faithfully perform the work in accordance with the plans, specifications, and contract do euments and shall fully indemnify and hold harmless the Obligee from all costs and damages which Obligee may suffer by reason of Principal's default, and reimburse and repay Obligee for all outlay and expense that Obligee r iay incur in making good.such default, then this obligation shall be void;otherwise,to remain in full force and effer t. J J J J J -------------- pROVIDED, HOWEVER, that this bond is executed ptusuan to Chapter 2253 of the Texas Government - Code, as amended, and all liabilities on this bond shall be determine( in accordance with the provisions of such statute,to the same extent as if it were copied at length herein. ' fN WITNESS WHEREOF, the duly authorized representat ves of the Principal and the Surety have executed this instrument. ' STGNF-D and SEALED this 27thof Septetnl3er,2op5.ATTEST-favi ia.I-P. ' (Principal)Secretary pRINCII'AL(4 BY: Title:_Xgrty rrurahv. anager/Estimatins (SEA,) PO Box 2136 Deaton,TX 76207 (Address) ' Colonial American Casualty and SnYsty Company Witness as TA Prin final .1 Surety -• ddress BY: ' AT ST: Robbi Morales, (Attorney-in-fact) St-Attorney-in-fact ( u ty)Secretary 2711 N. Haskell Ave. , Suite 800 75204-. (Address) (SEAL) NOTE: Date of.Bond must not be prior to date of Contract (1) Correct Name of Contractor (2) Correct name of Surety (3) State of incorporation of Surety Telephone n6raber of surety must be stated. ' Tn addition,an original copy of Power of Attorney shall be attached to Bond by Attorney-in-Fact. ' The date of bond shall not be prior to date of Contract. - ' Witness as to Surety 2711 N. Haskell Ave. , Suite 800, Dallas, TX 75204 (Address) ' e f i Bond No. 08802869 PAYNIE14T BOND THE STATE OF TEXAS § § )NOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § Colonial American Casualty That we,(1).1Ri Paying,L.P.,as Principal herein,and(2) and Surety Company a corporation organized and existing under the laws of the State of(3)Xaryland as surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation loci red in Tarrant and Denton Counties,Texas, Obligee herein., in the amount of Five Hlirldred Eighty-eiabt Tl ousand Nine Hundred Forty-eight and W10%.......................... Dollars ($588,948.00) for the payment wh•Teof, the said Principal and Surety bind MR themselves and their heirs, executors, administrators, successors and a signs,.jointly and severally, firmly by these presents: WHEREAS,the Principal has entered into a certain written co ttract with the Obligee dated the 27th day of September,2005,which contract is hereby referred to and made a part hereof as if fully and to the same extent as if copied at length,for the following project: U.M.A,C.SURFACE OVERLAY 2005-13 a t VARIOUS LOCATTQNS i NOW, TIIEREFORE, THE CONDITION OF THIS 013LIG MON IS SUCH, that if the said Principal shall faithfully make payment to each and every claimant(as defined i i Chapter 2253,Texas Government Code, as amended)supplying labor or materials in the prosecution of the work w ides the contract,then this obligation shall be void;otherwise,to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuat t to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determine d in accordance with the provisions of said statute,to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representa ives of the Principal and the Surety have executed this instrument. SIGNED and SEALED this 27th day of,September 2005, IRJ Pavina, L.P. 'RINCIPA ATTEST: 3y: dame: Marty Mu"hy (Principal) Secretary ritie: Manager/Estimating (S E A L) kddress: PO Box 2136 Denton, TX 76207 .. Witness as to Principal Colonial American Casualty and Surety Company SURETY A EST: 3y: �. r �d� Vame: Robbi Morales Secretary UAttorney in Fact (S E A L) Address: 2711 N. Haskell-Ave. . Suite 800 Dallas, TX _5204 Witness as to Surety Telephone Number. 214/989-J000 NOTE: (1) Correct name of Principal (Contracto ). (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated In addition, an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of bond shall not be prior to date o'Contract. Bond No. 08802869 MAZMANCE B0ND TTS STATE OF TBXAS COUNTY OF TA.RRANT Colonial American Casualty That JRJ Paving, L.P. ("Contractor"), as principal, a id and Surety Company a corporation organized under the laws of the State of Maryland ("Surety"), do hereby J acknowledge themselves to be held and bound to pay unto the City of Fort Worth, a Municipal Corporation chartered by virtue of Constitution and law a of the State of Texas, ("City") in Tarrant County, Texas, the sum of Five Hundred Eighty-eight 'thousand Nine Hundred Forty-eight and no/1 00.. ..................... .......................................................I........................ Dollars ($588,948.00), lawful money of the United States, for pay rent of which sum well and truly be made _ unto said City and its successors, said Contractor and Su-ety do hereby bind themselves, their heirs, executors, administrators, assigns and successors,jointly s nd severally. This obligation is conditioned, however, that: WHEREAS, said Contractor has this day entered nto a written Contract with the City of Fort Worth, dated the 27th of September, 2005, a copy of whic i is hereto attached and made a part hereof, for the performance of the following described public impro,rements: H.M.A.C. SURFACE OVERLAY 2005-13 at VARIOUS LOCATIONS the same being referred to herein and in said contract a: the Work and being designated as project ' number(s) GS93-020930522760 and said contract, incl.iding all of the specifications, conditions, -� addenda, change orders and written instruments referre I to therein as Contract Documents being incorporated herein and being made a part hereof; and, .. WHEREAS, in said Contract, Contractor binds itsE If to use such materials and to so construct the work that it will remain in good repair and condition fo• and during a period of after the date of the final acceptance of the work by the City; and ' WHEREAS, said Contractor binds itself to mair tain said work in good repair and condition for said term of Two Z ears; and WHEREAS, said Contractor binds itself to repair c r reconstruct the Work in whole or in _ part at any time within said period, if in the opinion of V ie Director of the City of Fort Worth Department of Engineering, it be necessary; and, r r 1 _ WHEREAS, said Contractor binds itself, upon recei/ing notice of the need therefore to R repair or reconstruct said Work as herein provided. NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or reconstruct said Work in accordance witl all the terms and conditions of said Contract, these presents shall be null and void, and have no force or effect. Otherwise, this Bond shall be and remain in full force and effect, and th? City shall have and recover from Contractor and Surety damages in the premises as prescrib�d by said Contract. This obligation shall be a continuing one and succe:;sive recoveries may be had hereon for successive breaches until the full amount hereof is exha fisted. JIN WITNESS WHEREOF, this instrument is execute i in 4 counterparts, each of which shall be deemed an original, this 27th day of S®ptember, A D. 2005. ATTEST: JRJ Pa Ping, L.P. (S E A L) Contrac tar APA 4rLY-d V BY Secretary Name:_ Marty Murphy Title:— Man�s F f F RX i ma i n g r r ATTEST: Colonial American Casualty and Surety Company (S E A L) Surety r .� By��-�� Secretary Narne:_Robbi Morales Title:_Attorney-in-fact 1 2711 N. Haskell Ave. , Suite 800 Dallas, TX 75204 Addres 5 I f r Power of Attorney FIDELITY AND DEPOSIT COMPANY OF MARYLAND COLONIAL AMERICAN CASUALTY AND SURETY COMPANY KNOW ALL MEN BY THESE PRESENTS:That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND,and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY,corporations of the Statyaryland, by PAUL C. ROGERS,Vice President, and T.E.SMITH,Assistant Secretary,in pursuance ofAudtp ' y Article VI,Section 2, of the By-Laws of said Companies, which are set forth on the reverse sid d�uWl ere4 `igied to be in full force �+ and effect on the date hereof,does hereby nominate,constit € qr tt)ecr' ? RNELL,Robbi MORALES,Lisa M.BONNOT,Anuj JAIN, i `�c�) er�,, �� R.,all of Dallas,Texas, EACH its true and lawful agent and Attorney-i� �c O I cu ,�je�11 �i for,and on its behalf as surety,and as its act and deed: any and allyl adiik� cins (1lios on behalf of Independent Executors,Community Survivors and Co=dVJ51and a pans. aid� n of such bonds or undertakings in pursuance of these presents, shall be as binding � amply,to all intents and purposes,as if they had been duly executed and acknowledged b.. rl} acted officers of the Company at its office in Baltimore,Md.,in their own proper persons. This power rney revokes that issued on behalf of Jerry P.ROSE,Don E.CORNELL,Robbi MORALES,Lisa M. BONNOT,Kathleen DAY,Sheila YOUNG,Christopher J. KUTTER,Luke J.NOLAN,Anuj JAIN,dated July 31,2002. The said Assistant Secretary does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article VI, Section 2,of the By-Laws of said Companies,and is now in force. .w IN WITNESS WHEREOF, the said Vice-President and Assistant Secretary have hereunto subscribed their names and affixed the Corporate Seals of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY,this 19th day of April,A.D. 2004. ATTEST: FIDELITY AND DEPOSIT COMPANY OF MARYLAND COLONIAL AMERICAN CASUALTY AND SURETY COMPANY '*'p OEPOSI`C. 046ftVft Awl Y T. E. Smith Assistant Secretary Paul C. Rogers Vice President `* State of Maryland ss: City of Baltimore } On this l9th day of April, A.D. 2004, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, came PAUL C. ROGERS, Vice President, and T. E. SMITH, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, to me personally known to be the individuals and officers described in and who executed the + preceding instrument, and they each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the Companies aforesaid,and that the seals affixed to the preceding instrument is the Corporate Seals of said Companies,and that the said Corporate Seals and their signatures as such wr officers were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. on 01"4"b Dennis R. Hayden Notary Public My Commission Expires: February 1,2005 POA-F 168-0589 EXTRACT FROM BY-LAWS OF FIDELITY AND DEPOSIT COMPANY OF MARYLAND "Article VI, Section 2. The Chairman of the Board, or the President, or any Executive Vice-President, or any of the Senior Vice-Presidents or Vice-Presidents specially authorized so to do by the Board of Directors or by the Executive Committee, shall have power, by and with the concurrence of the Secretary or any one of the Assistant Secretaries, to appoint Resident Vice-Presidents, Assistant Vice-Presidents and Attorneys-in-Fact as the business of the Company may require, or to ., authorize any person or persons to execute on behalf of the Company any bonds, undertaking, recognizances, stipulations, policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in the nature of mortgages,...and to affix the sea]of the Company thereto." EXTRACT FROM BY-LAWS OF COLONIAL AMERICAN CASUALTY AND SURETY COMPANY "Article VI, Section 2. The Chairman of the Board, or the President, or any Executive Vice-President, or any of the Senior Vice-Presidents or Vice-Presidents specially authorized so to do by the Board of Directors or by the Executive Committee, shall have power, by and with the concurrence of the Secretary or any one of the Assistant Secretaries, to appoint Resident Vice-Presidents, Assistant Vice-Presidents and Attorneys-in-Fact as the business of the Company may require, or to authorize any person or persons to execute on behalf of the Company any bonds, undertaking, recognizances, stipulations, policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in the nature of mortgages,...and to affix the seal of the Company thereto." CERTIFICATE I, the undersigned, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that the Vice-President who executed the said Power of Attorney was one of the additional Vice-Presidents specially authorized by the Board of Directors to appoint any Attorney-in-Fact as provided in Article VI, Section 2, of the respective By-Laws of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND,and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY. This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the 10th day of May, 1990 and of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY _ COMPANY at a meeting duly called and held on the 5th day of May, 1994. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice-President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed." IN TESTIMONY WHEREOF,I have hereunto subscribed my name and affixed the corporate seals of the said Companies, this 27th day of September 2005 0� Assistant Secretury .. 0 ZURICH IMPQRTANT DISCLQSIMd Fidelity and Deposit Company of Maryland, Colonial American Casualty and Surety Company, Zurich American Insurance Company, and American,.G3uarantee and Liability Insurance Company are making the following informational disclosures in compliance with The Terrorism Risk Insurance Act of 2002. No action is required on your part. Disc s fe aL Tor[grrkm Praingm The premium charge for risk of loss resulting Froin acts of terrorism(as defined in the Act)under this bond is waived_. This amount is reflected in the total premium for 1$is bond, Disclosure of Avnhbilltv,� of Coverage for nrro�,rism Losses. As-required by the Terrorism Risk Insurance Act of 2002, we have made available to you coverage for losses resulting from acts of terrorism(as defined in the Act)with terms, amounts, and limitations that do not dimer materially as those • for losses arising from events other than acts of terrorism. Disclosure of Federal Share of Insurance Qmaanv'j Terrorism Losses The Terrorism Risk Insurance Act of 2002 establishes a mechanism by which the United States government will share In iasurance company losses resulting from ads of terrorism(as-defined In the Act)after a insurance company has paid bases in excess of an annual aggregate deductible. For 2002,the insurance company deductible is 1%c,f direct earned premium in the-prior year for 2003, 7%of direct earned premium in the prior year,for 20(M, 10%of direct earned premium in the prior year;and for 2005, 15%of direct earned premium In the prior year. The federal share of an kwurance company's losses above its deductible Is 900%. In the event the Uctlted States government participates in losses,@re United States government may direct insurance companies to-collect a terrorism surcharge from policyholders. The Act does not currently provide for insurance industry or United States government participation in terrorism losses that exceed $100 billion In any one calendar year. Nfinitlon of Act off"Terrorism The Terrorism Risk Insurance Act defines "act of terrorism" as any act that is certified by the Secretary of the Treasury, In concurrence with the Secretary of State and the Attorney General of the United States: I. to be an act of terrorism; 2. to be a violent act or an act that Is dangerous to human life,property or Infrastructure; 3. to have resulted In damage within the United States,or outside of the United States in the case of an air carrier (as defined In section 40102 of title 49,United 17 States Code)or a United States flag vessel(or a vessel based principally in the United States, on which United States income tax is paid and whose insurance coverage Is subject to regulation in the United States), or the premises of a United States mission;and 4. to have been committed by an individual or Individuals acting on behalf of any foreign person or foreign Iftterest as part of an effort to ooeroe the civilian population of the United States or to influence the policy or affect the conduct of the United States Governmont by coerolon, But, no act shall be oertifled by the Sooretary as an act of terrorism If the act is committed as part of the oourse of a war deolared by Congress(except fbr workers'oompensatlon)or property and casualty insuranoo losses resulting from the sot; In the aggregate, do not ex000d$5,000,OM. Those disclosures are Ynformatlonal only and do not modify your bond or affect your rights under the bond, Oopyright Zwioh American Insurance Corti my 2003 0 C� Fidelity and Deposit Company of Maryland Home Wee: P.O.Do% Baltimore.MD 21103.1217 IMPORTANT NOTICE To obtain information or make a complaint: You may call the Fidelity and Deposit Company of Maryland or Colonial Ai6zican Casualty and Surety Co'mpany's toll-free telephone number for infotmadon onto make a complaint at: _. %w t-$00.654-5155 You may contact the Texas Department of Insurance to obtain information on companies. coverages. rights. or complaints at: 1-800-252-3439 y • You may write the Texas Department of Insurance: P.O. Box 149104 Austin, TX 78714-9104 PAX N (512) 475-1771 P M1UM OR CLAIN.MSE ES: Should you have a dispute concerning the premium or .bout a claim,you should first contact Fidelity and Deposit Company of Maryland or Colonial American Casualty and Surety Company. If the dispute is not resolved, you may contact the Texas Department of Insurance, ATTACH T_H(S NOTiQ TO X2 pgLICY; This notice is for infbrmation only and does not become A part or condltlott of the attached document. 1 CITY OF FORT WORTH,TEXAS CONTRACT THE STATE OF TEXAS KNOW ALL BY THESE PRESENTS COUNTY OF TARRANT This agreement made and entered into this the 27th day of September A.D., 2005, by and between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and existing under and by virtue of a special charter adopted by the qualified voters within said City on the 11th day of December, A.D. 1924, under the authority (vested in said voters by the "Home Rule" provision) of the Constitution of Texas, and in accordance with a resolution duly passed at a regular meeting of the City Council of said city , and the City of Fort Worth being hereinafter termed Owner, JRJ Paving,L.P.,HEREINAFTER CALLED Contractor. WITNESSETH: That said parties have agreed as follows: 1. That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: H.M.A.C.SURFACE OVERLAY 2005-13 at VARIOUS LOCATIONS 2. That the work herein contemplated shall consist of furnishing as an independent contractor all labor, tools, appliances and materials necessary for the construction and completion of said project in n accordance with the Plans and Specifications and Contract Documents prepared by the Department of Engineering for the Transportation and Public Works Department of the City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto attached and made a part of this contract the same as if written herein. 3. The Contractor hereby agrees and binds himself to commence the construction of said work within ten(10) days after being notified in writing to do so by the Department of Engineering of the City of Fort Worth. 4. The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Department of Engineering of the City of Fort Worth and the City Council of the City of Fort Worth within a period of 110 working days. If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract Documents within the time so stipulated, plus any additional time allowed as provided in the General Conditions, there shall be deducted from any monies due or which may thereafter become due him, the sum of$315 Per working day, not as a penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for such deficiency. 5. Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans, Specifications and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete same in accordance with the Contract Documents or to take charge of _ and complete the work in such a manner as it may deem proper, and if in the completion thereof,the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. 6 Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such injury, damage or death is caused, in whole or in Part, by the negligence or alleged negligence of Owner, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and _ employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in Part by the negligence or alleged negligence of Owner, its officers, servants or employees.. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior r to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 7. The Contractor agrees, on the execution of this Contract, and before beginning work, to make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful performance of the terms and stipulations of the Contract and for the payment to all claimants for labor and/or materials famished in the prosecution of the work, such bonds being as provided and required in Article 5160 of the Revised Civil Statutes of Texas, as amended, in the form included in the Contract Documents, and such bonds shall be for 100 percent of the total contract price, and said surety shall be a surety company duly and legally authorized to do business in the State of Texas, and acceptable to the City Council of the City of Fort Worth. 8. - Said City agrees and binds itself to pay, and the said Contractor agrees to receive, for all of the aforesaid work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted by the successful bidder hereto attached and made a part hereof. Payment will be made in monthly installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount(including/excluding)alternates n/a, shall be Five Hundred Eiahty-eizht Thousand Nine Hundred Forty-eight and no/100................................................................................................Dollars,($588,948.00). 9. It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or assigned to anyone else by said Contractor without the written consent of the Director of the Department of Engineering. 10. The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto and made a part hereof the same as if it were copied verbatim herein. 11. It is mutually agreed and understood that this agreement is made and entered into by the parties hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with references to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with all the provisions of the same. IN WITNESS THEREOF, the City of Fort Worth has caused this instrument to be signed in 4 s counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through its duly authorized officers in 4 counterparts with its corporate seal attached. Done in Fort Worth,Texas,this the 27th day of September,A.D.,2005.