Loading...
HomeMy WebLinkAboutContract 50271 Received Date: 02/19/18 Received Time: 09:29am Developer and Project Information Cover Sheet: Developer Company Name: Bloomfield Homes,L.P. Address, State,Zip Code: 1050 E.Highway 114, Suite 210, Southlake,TX 76092 Phone&Email; 817-416-1572,donkbloomfieldhomes.net Authorized Signatory,Title: Donald J.Dykstra,President Project Name: Rosemary Ridge Addition Phase 3 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights, Signals Project Location: West of McCart Avenue and South of Mountain Meadow Road Plat Case Number: [Plat Case#] rPlatame: [Plat Name] Mapsco: 117 G ncil District: 6 CFA Number: 2017-151 City Project Number: 101224 taffRTo be completed by staff.- Received eceived by: Date: City of Fort Worth,Texas Standard Community Facilities Agreement-Rosemary Ridge Addition Phase 3 CFA Official Release Date:02.20.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 50271 WHEREAS, Bloomfield Homes, L.P., ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements")related to a project generally described as Rosemary Ridge Addition Phase 3 ("Project")within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Rosemary Ridge Addition Phase 3 OFFICIAL RECORD CFA Official Release Date:02.20.2017 CITY SECRETARY Page 2 of 11 FT.WORTHS TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) E. Sewer(A-1) Z. Paving(B) N. Storm Drain(B-1) El, Street Lights & Signs (C) . E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section Il, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Rosemary Ridge Addition Phase 3 CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Rosemary Ridge Addition Phase 3 CFA Official Release Date: 02.20.2017 Page 4of11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or emploVees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in anyway connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Rosemary Ridge Addition Phase 3 CFA Official Release Date: 02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (21/6) for a total of 4%of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent(4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Rosemary Ridge Addition Phase 3 CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2)will not boycott Israel during the term of the contract. R. IMMIGRATION AND NATIONALITY ACT Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,DEVELOPER'S EMPLOYEES, SUBCONTRACTORS,AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-Rosemary Ridge Addition Phase 3 CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name:Rosemary Ridge Addition Phase 3 CFA No.: 2017-151 City Project No.: 101224 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 243,296.00 2.Sewer Construction S 173,689.20 Water and Sewer Construction Total $ 416,985.20 B. TPW Construction 1.Street $ 513,377.64 2.Storm Drain $ 583,871.00 3.Street Lights Installed by Developer $ 47,594.00 4. Signals $ TPW Construction Cost Total $ 1,144,842.64 Total Construction Cost(excluding the fees): $ 1,561,827.84 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 8,339.70 D. Water/Sewer Material Testing Fee(2%) $ 8,339.70 Sub-Total for Water Construction Fees $ 16,679.40 E. TPW Inspection Fee(4%) $ 43,889.95 F. TPW Material Testing(2%) $ 21,944.97 G. Street Light Inspsection Cost $ 1,903.76 H. Signals Inspection Cost 5 H. Street Signs Installation Cost 5 - Sub-Total for TPW Construction Fees $ 67,738.68 Total Construction Fees: $ 84,418.08 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,561,827.84 Completion Agreement=100%/Holds Plat $ 1,561,827.84 x Cash Escrow Water/Sanitary Sewer-125% $ 521,231.50 Cash Escrow Paving/Storm Drain=125% $ 1,431,053.30 Letter of Credit=125%w/2yr expiration period $ 1,952,284.80 City of Fort Worth,Texas Standard Community Facilities Agreement-Rosemary Ridge Addition Phase 3 CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Bloomfield Homes,L.P. Jesus J Chapa(Feb 15,2018) Jesus J. Chapa ba �1 bN � Assistant City Manager Donald J Dykstra(Fe 15,2018) Date: Feb 15,2018 Name: Donald J. Dykstra Title: President Recommended by: Date: Feb 15,2018 Evelyn Robe 5(Feb 15�,20118)) Evelyn Roberts/Jennifer Ezernack Project Assistant Contract Compliance Manager: Planning and Development By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including Approved as to Form &Legality: ensuring all performance and reporting requirements. Richard A.McCracken(Feb 15,2018) Janie SG9i'le "Morales Richard A. McCracken Janie Scarlett Morales(Feb 15,2018) Assistant City Attorney Name: Janie Morales M&C No. N/A Title: Development Manager Date: N/A Form 1295: ATTEST: F )Rr� N �- MaryJ. ayser(Feb 19,2- 018) Mary J. Kayser/Ronald nz4.les City Secretary/Assistant �Y sel etary �E)CP`' City of Fort Worth,Texas Standard Community Facilities Agreement-Rosemary Ridge Addition Phase 3 OFFICIAL RECOR® CFA Official Release Date:02.20.2017 �%1 $ �RETARY Page 9 of 11 F '.�Vl'3R�'H�TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map I Exhibit A: Water Improvements Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements ® Paving Cost Estimate Exhibit 13-1: Storm Drain Improvements ® Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Rosemary Ridge Addition Phase 3 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"I" Changes to Standard Agreement Community Facilities Agreement City Project No. 101224 None City of Fort Worth,Texas Standard Community Facilities Agreement-Rosemary Ridge Addition Phase 3 CFA Official Release Date: 02.20.2017 Page 11 of 11 PROPOSAL CONATSER C014S [LUUC I low TX,L.P. mvwOffft-MCONATSER CONSTRUCTION TX, L.P. 5327 Wichita Street Ft.Worth,TX 76119 Contact: Brock Huggins Phone: 817.534.1743 Fax: 817.534.4556 ote To: Bloomfield Homes Job Name: Rosemary Ridge Ph.3 Attn:Mike Gavin Date of Plans: Phone: Revision Date: Fax: This proposal is priced as a package bid only. Bid Date:October 25,2017 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT 1010 8"PVC Pipe 2,326.00 LF 31.00 72,106.00 1020 8"Carrier Pipe 70.00 LF 60.00 4,200.00 1030 8"GV&BX 8.00 EA 1,250.00 10,000.00 1040 Std.FH Assy w/6"GV&BX 4.00 EA 4,500.00 18,000.00 1050 DI WTR FTNGS w/RESTR. 0.30 TN 6,200.00 1,860.00 1060 20"Casing By OTOC(W.L.Bore w/20"Casing) 70.00 LF 390.00 27,300.00 1070 8"End&Plug 2.00 EA 500.00 1,000.00 1080 1"DOM WTR SVC 43.00 EA 915.00 39,345.00 1090 1"DOM WTR SVC(Phase 4 Lots 26-29 Blk 118) 4.00 EA 1,000.00 4,000.00 1100 1"DOM WTR SVC-BORED 7.00 EA 1,800.00 12,600.00 1110 1"DOM WTR SVC on Ex.W.L. 17.00 EA 1,150.00 19,550.00 1120 Adj.&Extend Ex. 1"WTR SVC 16.00 EA 650.00 10,400.00 1130 Plug&Abandon Ex. 1"WTR SVC In Place 24.00 EA 382.50 9,180.00 1140 Conn to Ex.8"W.L. 2.00 EA 5,098.00 10,196.00 1150 RMV Ex.8"W.L. 38.00 LF 20.00 760.00 1160 W.L.Grouting(Abandon Ex.8"W.L.In Place) 0.50 CY 400.00 200.00 1170 Trench Safety 2,396.00 LF 0.25 599.00 1180 1"IRR SVC-Bored(McCart Avenue) 1.00 EA 2,000.00 2,000.00 SUBTOTAL:WATER $243,296.00 2010 8"SDR-26 PVC 1,884.00 LF 42.00 79,128.00 2020 8" SDR-26 w/CSS BKFL 96.00 LF 66.00 6,336.00 2030 4'Std.Dia.SS MH(0'-10') 5.00 EA 4,000.00 20,000.00 2040 Xtra Depth for 4'Std.Dia.MH(>6') 37.00 VF 175.00 6,475.00 2050 Conn to Ex.8"SS Stub-out 1.00 EA 1,500.00 1,500.00 2060 Extend Ex.4"SWR SVC 40.00 EA 400.00 16,000.00 2070 4"SS SVC 43.00 EA 750.00 32,250.00 2080 4" SS SVC(Ph 4 Lots 26-29 Blk 118) 4.00 EA 800.00 3,200.00 2090 Adj.MH Rim Elevation 1.00 EA 795.00 795.00 2100 End&Plug 8"SS Line 2.00 EA 500.00 1,000.00 Page 1 of 4 ITEM i DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT 2110 MH VACC Testing 5.00 EA 118.00 590.00 2120 POST-CCTV INSPECTION 1,980.00 LF 2.24 4,435.20 2130 Trench Safety 1,980.00 LF 1 1.00 1,980.00 SUBTOTAL:SANITARY SEWER $173,689.20 3010 10'Curb Inlet 4.00 EA 4,000.00 16,000.00 3020 10'Recessed Inlet(McCart Ave) 1.00 EA 4,750.00 4,750.00 3030 15'Curb Inlet 2.00 EA 5,000.00 10,000.00 3040 18"RCP,Class 111 18.00 LF 50.00 900.00 3050 24"RCP,Class 111 73.00 LF 59.00 4,307.00 3060 24"RCP,Class III(McCart Ave) 33.00 LF 68.00 2,244.00 3070 27"RCP,Class 111 24.00 LF 66.00 1,584.00 3080 30"RCP,Class III 314.00 LF 72.00 22,608.00 3090 36"RCP,Class III(McCart Ave) 341.00 LF 99.00 33,759.00 3100 42"RCP,Class III(McCart Ave) 276.00 LF 115.00 31,740.00 3110 5'x4'Box Culvert 105.00 IF 242.00 25,410.00 3120 6'x4'Box Culvert 852.00 LF 285.00 242,820.00 3130 6'x4'Box Culvert(McCart Ave) 377.00 LF 290.00 109,330.00 3140 4'Storm June Box 1.00 EA 4,500.00 4,500.00 3150 5'Storm Juncn Box(McCart Ave) 1.00 EA 5,500.00 5,500.00 3160 6'Storm Junc Box 1.00 EA 6,500.00 6,500.00 3170 8'Storm Junc Box(McCart Ave) 1.00 EA 9,000.00 9,000.00 3180 4'MH Riser 1.00 EA 2,500.00 2,500.00 3190 6'x4'RCB HDWL(McCart Ave) 1.00 EA 7,500.00 7,500.00 3200 6"Rock Rip-Rap 413.00 SY 67.00 27,671.00 3210 6"Rock Rip-Rap(McCart Ave) 145.00 SY 67.00 9,715.00 3220 RMV Ex.36"RCP(McCart Ave) 54.00 LF 30.00 1,620.00 3230 RMV Ex.36"RCP Sloped End HDWL(McCart 1.00 EA 500.00 500.00 Ave) 3240 Conn to Ex.36"RCP(McCart Ave) 1.00 EA 1,000.00 1,000.00 3250 Trench Safety 1,386.00 LF 1.00 1,386.00 3260 Trench Safety(McCart Ave) 1,027.00 LF 1.00 1,027.00 SUBTOTAL: STORM DRAIN $583,871.00 4010 UTILITIES MAINTENANCE BOND 1.00 LS 22,750.00 22,750.00 SUBTOTAL:UTILITIES MAINTENANCE $22,750.00 BOND 5010 6"Reinf Conc PVMT(Res.)' 7,544.00 SY 35.00 264,040.00 5020 6"Lime STBLZD SBGRD(Res.) 8,025.00 SY 3.25 26,081.25 5030 Hydr.Lune 31.5lb/SY(Res.) 127.00 TN 167.50 21,272.50 5040 10.5"Reinf Cone PVMT(McCart Ave) 1,983.00 SY 49.50 98,158.50 5050 8"Lime STBLZD SBGRD(McCart Ave) 2,071.00 SY 3.50 7,248.50 5060 Hydr.Lime 42.2lb/SY(McCart Ave) 44.00 TN 167.50 7,370.00 5070 Conn to Ex.Cone Header(McCart Ave) 28.00 LF 13.50 378.00 5080 Conn to Ex.PVMT 70.00 LF 14.90 1,043.00 5090 Conn to Ex.PVMT(McCart Ave) 654.00 LF 14.90 9,744.60 5100 Full-Depth Saw Cut&RMV Ex.CONC PVMT 70.00 LF 24.95 1,746.50 5110 CONC Header 58.00 LF 20.00 1,160.00 5120 Relo EOR Barr.(McCart Ave) 1.00 EA 865.00 865.00 Page 2 of 4 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT 5130 Type III EOR Ban. 56.00 LF 26.75 1,498.00 5140 BF Ramp,Type R-1 8.00 EA 1,484.00 11,872.00 5150 BF Ramp,Type R-1 (McCart Ave) 2.00 EA 1,484.00 2,968.00 5160 BF Ramp,Type M-2 3.00 EA 1,400.00 4,200.00 5170 BF Ramp,Type M-2 On Ex.Curb(McCart Ave) 1.00 EA 1,800.00 1,800.00 5180 24"CONTL Xwalk PVMT Marking Lines HAE(V) 120.00 LF 10.43 1,251.60 (McCart 5190 24"Wide Stop Bar 12.00 LF 16.45 197.40 5200 REFL Raised Marker Type II-A-A(McCart Ave) 15.00 EA 4.00 60.00 5210 REFL Raised Marker Type I-C (McCart Ave) 31.00 EA 4.00 124.00 5220 8"SLD PVMT MARKING(HAS)(W) (MCCART 341.00 LF 2.95 1,005.95 AVE) 5230 8"SLD PVMT MARKING HAS m(MCCART 170.00 LF 2.95 501.50 AVE) 5240 4"BRK PVMT MARKING HAS(W)(MCCART 1,106.00 LF 1.34 1,482.04 AVE) 5250 DBL 4"SLD PVMT MARKING HAS(W) 768.00 LF 2.95 2,265.60 (MCCART AVE) 5260 DBL 4"SLD PVMT MARKING HAS m 1,225.00 LF 2.95 3,613.75 (MCCART AVE) 5270 6'CONC SDWLK (McCart Ave) 593.00 LF 29.35 17,404.55 5280 RMV Ex.Guardrail (McCart Ave) 640.00 LF 4.95 3,168.00 5290 RMV Ex.Type"W"4"Raised PVMT Markers 690.00 LF 0.34 234.60 (McCart A 5300 RMV Ex.Type"1-C"Raised PVMT Markers 350.00 LF 0.34 119.00 (McCart Av 5310 RMV Ex.Type 2-A-A 4"Raised PVMT Markers 318.00 LF 0.60 190.80 (McCart 5320 RMV Ex. School Zone Signage&Post (McCart 1.00 EA 153.60 153.60 Ave) 5330 RMV Ex.Xwalk Signage&Post (McCart Ave) 1.00 EA 153.60 153.60 5340 RMV Ex.4"Solid Wh Stripe PVMT Markings 350.00 LF 0.94 329.00 (McCart 5350 RMV Ex.4"Solid DBL Yell Stripe PVMT 318.00 LF 1.80 572.40 Markings (M 5360 RMV Ex.8"Xwalk PVMT Markings(McCart Ave) 117.00 LF 1.80 210.60 5370 INSTL TXDOT MGBF GUARDRAIL(McCart Ave) 220.00 LF 40.00 8,800.00 5380 Traffic Control 1.00 LS 2,500.00 2,500.00 5390 Traffic Control (McCart Ave) 1.00 LS 2,745.00 2,745.00 SUBTOTAL:PAVING $508,528.84 6010 PAVING MAINTENANCE BOND 1.00 LS 12,800.00 12,800.00 SUBTOTAL:PAVING MAINTENANCE BOND $12,800.00 7010 STREET SIGN(ALUM SIGN,GR MNT,CITY 20.00 EA 169.99 3,399.80 STD) 7020 STOP SIGN(Rl-1) 5.00 EA 89.80 449.00 7030 SCHOOL ZONE(S1-1)(MCCART AVE) 2.00 EA 250.00 500.00 7040 DIAGONAL ARROW(W 16-7P)(MCCART AVE) 2.00 EA 250.00 500.00 SUBTOTAL: STREET SIGN $4,848.80 80101 LED Lighting Fixture 10.00 EA 329.951 3,299.50 Page 3 of 4 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT 8020 Type H Pole w/33 BB Arm 10.00 EA 1,949.85 19,498.50 8030 Rdy Ilium Found.TY 1,2,and 4 10.00 EA 1,500.00 15,000.00 8040 #10 Insulated Elec Condr,Copper 1,488.00 LF 1.25 1,860.00 8050 2"Conduit PVC Sch 80(T) 496.00 LF 16.00 7,936.00 SUBTOTAL:STREET LIGHTS $47,594.00 GRAND TOTAL $1,597,377.84 NOTES: EXCLUSIONS: -Inspection Fees -Impact,Tap or Connection Fees -Engineering Control -Meter Fees and/or Deposits -Construction -Construction Material Testing -Geotech Testing -Adjustment Of Existing Utilities -Locate Of Private Utilities �s -Does not include wire or pumps Page 4 of 4 NORTH CROWLEY CLEBURNE w z 1D m w J U J O O f� 1— U Z D W J U S ITE SWEET CLOVER LN w z MOUNTAIN Lu MEADOW RDa F--- Or-1 I 7< WEST CLEBURNE - CROWLEY VICMTY MAP N.T.S. ROSTit""MARY =GE PlEASE HHH ATM IN C� OF FORT V V ORTIH9 TEXAS PREPARED BY: OWNER1DEVELOPER: Qy OGDVAN s MARSHALL Y BIAOMFEELD HOMES,L.P. CML ENGINEERS—PLANNERS—SURVEYORS 1050 E.HWY 114,S=210 SOUTHLAKK TX,76092 05¶ 24Mustang Drlve,Grapevine,Texw 78061 PHONE:(817)416-1572 S°E4 -0MSE4 R 201 7 Metro(817)329-4373 PAX:(817)416-1397 TBPE REGISTRATION#F-2944 TBPLS#10021700 E,\10586 —Rosemary Ridge\Plans\Rosemary Ridge Phase 3.pro Tue Sep 26 08 t 44 131 2017 n o aN N E! � N F� Ln LO 03z cn x o to cu 3Ld~ o O LL: X x MCG ART AVENUE w w EX.8'W.L. ¢ `n o °' N L M N 7r D — fA F LL m V M M t W m M �= M N = x an �; Off' ¢ cz—n Q Q "'w M w �I; L LO L CD w U Q j Z N M N I w� ¢ Z Q Q — M I a N Q J } > p COLO �9 OO C 0 F- W Q > CO \ \ O M N j 2 �y d 3 m w a rn _ m ccQCD U) U) Z U) V) Z ZCO U 1-- T L d d d Or cn N N 0 LL 1 M N — CD C_) e m O a s w a a w w cc Nw ED 1 v N o JI U') _ N N N m N �Iu M n NJ = I I N _ o O z 3 �M Z N w v 18, L� N N N� O { N M f M 3/� 0 � T V I p Q v N�> N)iNVO 0VHS N _ > v CD L N N C7 LL- 0') 61NE,X I I M OD • N CD (per N N Ch NQ N 61 Q_ r cn N = 3A 0 _ CD M SSl3 7303 C\jU MO MSN LO M J M �W M N ry� N 61 m I ;, N W car N k,As M O uN �� �jJ 61 OC6w LO rl) - �, j /-N / Jt M z 9 ® ' x w Q n N N LO W �A ON j LO V=1CIO Z � � N 00 3 a N 1C�Q4 r�Or�•��++ O F- O L a MCCART AVENUE i d aw �w a EX FM ' -01 QJ H M a o �o z F �. Nz Qz N A Q a +w w0 �§ N M N — an ZOr NZ NZ I w M M Z F �Q 0_Q ogM N O� N e 0= M 1 u m NJ Lf)-J WN — fn Ln O M g 2F- Lu O� Oi N N M 8 Z Q m 0 0_w N w d w to N a7 V I p�pkv ZO 3 m CLN WN dN � M � In I AarM W w N N U a OD LO O — M N cr.U 0) co Z r CA Cn r 0) '`�Q NOD r e Y I I U rl)4 LO = C� O Ix U N N N m O N �3 N O J 03 —ZOD N N �� N � O i N N N w M O 1 N N M N N V 'T N m o — _ N 4n _— ~ N O I 3AB YG 0) V O Q U N N)/NVG GVHS — — V f� CO In Nm N Q N N O �` rn co r` L4 CD N N tl co N 07 N N � k O N 7303 m N N Ln 0) J N � :: N CMN m M — caiJ cli M LLJ k� — -� � rn o ) NO MO O Ohm V ---a--, N IYl LD to j 0') Q0 :I M--_b—. M i CD Ln N 'I CD PY_ '. _ �O 0� cD _.�1 _ O N Cl) w O I� Q -,u oC � �'��•i�r„ co N — •• d Q MCCART AVENUE, j i�� a af Lai M N _ m CD fficc n 1-0g T F- IL E LLJ LO 2LLJ O N N S z S m N �+ O SYcc LO O OZ u'7 � Q QZ 30 U m J N M u5 N — N O U N E N J m IO R� 2 X m O tb v o — acc cm cm oj m<L m 11,1 m N a' T m Q N O m 2 NLn N Ly Lo U W N I to N N N — o Y Z Y U ti J �N � N N ltl - - N n 3/1 y0 2 rn Q Y O N)1NVG (OV"HS N :;. OQ O N O _ m Ln •�r4r J 1` O N N cr Otb .........._.__._.....__ N Cp CO OD N CF N v"�'• CD C3 N O N --- Z �Or 3/lIH �a k O z N C° a .— SSl3 7303 ; CO Q O YOJ a,) I CM Zcm u Ln M --j �.� N N T .. N ., N — m ci�M —I ._, -Q O= CDlzt Y — — O � O �Q , a LO W tom, � m r/_ a -- - a , ---- - --- --- -- ��6r�a aooh�H�l�d(Y m J8nl�u 0 6l ® ppa�yy — ' �l w cn' ~� Q n N N LO v z U) �' F� " ~a LON CL �? w m y in . z a s z U o Ka ?D_D_ a O U U O g 0 TUU XZX CDZx x IC,D:D: • a C\j IT (D LO--3 v N mem (D _ m p M(D M MCCART AVENUE N xxx W W W a M N _ Q Itf7 M J U') J • T II U N(n d y E M Q m U ¢ m — LO '� OM �J o x W N LO Z s N _ CO N � •m � m ca L m � F LL M Z d � LOU an f o g aco \� N _, $ ro Q O O �? of a�Twn pmt, I— • CDU pl > EO wa a ZO N N = co Q� x Pp SZ �p m — v d v U Z� :3tn N _ N O J U m Ln O �N N N —W N N — ui X rh O d I N — W M Z N riD _ N a I;j- N N N O _ ro �m in (3 N — N C, Lr) 3A HG CO U O Q v N NNNV'8 OWNSEr N LU N N N O m 0) z r (U O h GD w CD �y N N D F 2 c0N O_ N 67 (D xzx W p� I N N O lV 2 J N _ 3/1 YG (D m 2 J 2 N CD o SS/3 7303 2 4 Q O O Y� JM N � � O rh �4 J N hO_'F-- N 4J M N W Nm rh W'-. IV�W Q) NO h h W O O CD ti ro o_ k� E=4r") / - -- w OD lC, ~� �M Gd ® �0') CD n ®� W �0 C IN Z (n F,a m N 0 MCCART AVENUE cl __ rn m g rM N O_ _ W W �r a ro ) cL a J[n u> m MC Q N an W p V 000333 Cc O rn M m z _� Ln O W M N p®q 0� � E O.m � IWW (s7 rn f�� � �� ¢� o _ I J m OC4 g @q5e twp cc V co d m PEap O r til b I�xp a mM N J U j ji d v U rn M J N I` Qcc J CD U h O I �> ON V m 0 JN e O U CV d- 0� N 0-) J dm cc Im N N V d �� N O p m O N I � r, N N M J W q M Q W I I N - i W Q �� On ro �� d" d m CV N J� w N N O ~ (� rri 111.m O � cnO ( N I Z _ N O to 3A Y0 9d U q U N NMYB OWNS N co _ d r m — m r Q I N N W W IIS 0) N(75 I r7 m r CD N N R dm OQ PC W m� N O dm 0) N N - 2 Qc I.cn N53 ( _ 3A 0 _ cr c k O N _� rn W ;' v SSl3 7303 2 r`' O Y o l l, , N N Uy ��-) Ln ro LLJ N ?~ Ljm re) Qz — O ' O�� J j Py� q� —rn — a' Y ; Z C�2 O Z P�JFJjJ rn M It O ', U O �;, CW7 Oo � O 2 r M � C2, �N y a 2 C\, M ULn 61 CD .I Lo LT CD r- ra � �/ ----------------- rn I CD 0) LLJ �i iyJ - r M CY CY d" V t=7 ® CD1T 811 �I5O 9 x W N � m W � 00 t Ln Oi� Cb Z CI) x.. a1 o .. N SI 3 .. CL in MCCART AVENUE -- n N m L M N •au � a M M N F LL m t w m pk: a M N an Q+ N M I j7j F g > N cc Ln Ln O M q a O E N i £ 2 C7a N -� ¢ m� �� cc LC) 8 z a N o m r a O M Z N (-o I Z N _ CDCDcla Z Y WO " N = m O1 w cc Q0 m N N J J cr Nco NI N O cD — N M NN — o N N N� N 11 ztO Ln O - N N O Ln 311 0 Qo rn oQ U C° N)iNVG GVHS N- - - r co Ln co m N Q, N N O ~ M co QO 47 — co Z N N r N � .. 3A 0 k O N C0 M W; SSl3 7303 N U M J -- �a- N M M J N : W m 61 M � N �(r) M N CD M M �U� = o- •. M —h LLY+i1....---0 , :P a o N b — / LC) co r ----------------- ® �, M -- .-. -- .. �. .- M — - -- --- ---�Q i� a- % % � �1 .N O - M M N M W � 811 >00