HomeMy WebLinkAboutContract 26959 CITY SECRETARY CONTRACT NO. 122 AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. 25699 COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Freese and Nichols, Inc., (Engineer) made and entered into City Secretary Contract No. 25699 (the Contract) which was authorized by the City Council by M&C C-17849 on the 8`h day of February, 2000; and WHEREAS, the Contract involves engineering services for the following project: Engineering Contract for the North Holly Water Treatment Plant Improvements -Design Phase, Project Number PW77-060770500120. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the following additional engineering services: Modify Attachment "A-1" to include the attached additional pages Al-7 through Al-10. 2. Article II, Attachment `B" of the Contract is amended to provide for an increase in the maximum fee to be paid to the Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$2,765,588. The cost to City for these additional services to be performed by Engineer total four hundred seventy-three thousand six hundred seventy-six dollars ($473,676.) The attached "Amendment No. 1: Exhibit "B-3A"" replaces Exhibit "B-3" in the original agreement. The attached "Amendment No. 1: Exhibit "B-4A"" supplements Exhibit "B-4" in the original agreement. Amendment No. 1 ° 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the day of. , 2001, in Fort Worth, Tarrant County, Texas. ATT ST: APPROVE Gloria Pearson Kike G omer City Secretary Assistant City Manager APPROVED AS TO FORM APPROVAL RECOMMENDED: AND LEGALITY: Gary Steinberger Dale A. Fisseler, P.E. Assistant City Attorney Director, Water Department contract Authorization V Robert F. Pence, P.E. Senior Vice President Date FREESE AND NICHOLS, INC. Tf o Amendment No. 1 Page 2 of 2 ATTACHMENT A-1 SUPPLEMENTAL SCOPE OF SERVICES (SUPPLEMENT TO ATTACHMENT A) AMENDMENT NO. 1 Scope of Services Construction Phase Engineering North Holly Water Treatment Plant Improvements Fort Worth Water Department Task 200—Design Phase (Continued) Task 227 —Additional Construction Items—Contract A This task includes design services necessary for the following additional proposed facilities for Phase 1 (Contract A) of the North Holly Water Treatment Plant Improvements: 1. Replacement electrical switchgear and motors for storm drain and emergency storm drain pumps. 2. Replacement of electrical feeders to the South Holly Water Treatment Plant. Task 228 —Additional Construction Items—Contract B This task includes design services necessary for the following additional proposed facilities for Phase 2 (Contract B) of the North Holly Water Treatment Plant Improvements: 1. Additional remodeling of existing buildings to provide accessible office space and meeting facilities. 2. Structural modification of existing filter structures to accommodate parking between Filter Wings 2 and 3. 3. Remodeling of portion of existing Chemical Building to provide laboratory space. Task 229 —TXU Electric Substation/Service Upgrade Meet with representatives of TXU Electric to determine modifications required to the North Holly and/or Middle Holly Substations to provide required electric power supply for the proposed plant improvements. Advise City of recommended improvements and evaluate options for providing satisfactory power service to the facility. CG)LC00 D Attachment A 1-7 Task 400—General Representation—Phase 1 Upon completion of the bid phase services, Engineer will proceed with the performance of construction phase services as described below. Engineer will endeavor to protect the City in providing these services however, it is understood that Engineer does not guarantee the Contractor's performance, nor is Engineer responsible for supervision of the Contractor's operation and employees. Engineer shall not be responsible for the means, methods, techniques, sequences or procedures of construction selected by the Contractor, or any safety precautions and programs relating in any way to the condition of the premises, the work of the Contractor or any Subcontractor. Engineer shall not be responsible for the acts or omissions of any person (except its own employees or agents) at the Project site or otherwise performing any of the work of the Project. This scope of services is based on Engineer providing on-site construction administration and observation services in accordance with a separate agreement between the City and Engineer. Task 401 —Conformed Documents Engineer will assist City in the preparation of Construction Contract Documents for construction contracts. Provide ten sets of Construction Contract Documents which include information from the apparent low bidder's bid documents, legal documents, and addenda bound in the documents for execution by the City and construction contractor. Distribute five copies of these documents to the contractor with a notice of award that includes directions for the execution of these documents by the construction contractor. Provide City with the remaining five copies of these documents for use during construction. Additional sets of documents can be provided as an additional service. Furnish contractor copies of the drawings and specifications for construction pursuant to the General Conditions of the Construction Contract. Task 402—Pre-Construction Conference and Monthly Meetings Attend pre-construction conference with the City and Contractor, and attend monthly project review meetings at the project site. A total of twenty meetings are included in the basic services. Task 403 —Review Project Submittals Review contractor's submittals, including, requests for information, modification requests, shop drawings, schedules, and other submittals in accordance with the requirements of the construction contract documents for the projects. fo Fix NI QU Attachment A 1-8 Task 404—Site Visits Make 24 visits to the site (as distinguished from the continuous services of a Resident Project Representative) to observe the progress and the quality of work and to attempt to determine in general if the work is proceeding in accordance with the Construction Contract Documents. In this effort Engineer will endeavor to protect the City against defects and deficiencies in the work of Contractor and will report any observed deficiencies to the City. Visits to the site in excess of the specified number are an additional service. Task 405 —Document Interpretation Engineer will interpret the drawings and specifications for the City and Contractor. Investigations, analyses, and studies requested by the Contractor and approved by City, for substitutions of equipment and/or materials or deviations from the drawings and specifications is an additional service. Task 406—Contract Modifications Engineer will provide technical review of proposed changes to the construction contracts and assist the Resident Engineer in negotiating with the contractor on behalf of the City to determine the cost and time impacts of these changes. Prepare change order documentation for approved changes for execution by the City and Contractor. Investigations, analyses, studies or design for substitutions of equipment or materials, corrections of defective or deficient work of the contractor or other deviations from the construction contract documents requested by the contractor and approved by the City are an additional service. Substitutions of materials or equipment or design modifications requested by the City are an additional service. Prepare documentation for contract modifications required to implement modifications in the design of the project. Assist the Resident Engineer in evaluating notices of contractor claims and make recommendations to the City on the merit and value of the claim on the basis of information submitted by the contractor or available in project documentation. Providing these services to review or evaluate construction contractor claims, supported by causes not within the control of Engineer are an additional service. Task 407 —Final Review Conduct, in company with Resident Engineer and City's representative, a final review of the Project for conformance with the design concept of the Project and general compliance with the Construction Contract Documents. Prepare a list of deficiencies to be corrected by the contractor before recommendation of final payment. Review and comment on the certificate of completion and the recommendation for final payment to the Contractor. Visiting the site to review completed work in excess of two trips are an additional service. c--IFFEN A�[� Attachment A 1-9 fit , ,�M9 p12M h Vit, W tSW, Task 409—Motor Witness Testing Provide up to 48 hours engineering and expenses to witness testing of the replacement motors for the North Holly high service pumps. Task 410—SCADA System Coordination Provide up to 300 hours additional engineering to coordinate the proper operation, appearance, reporting and documentation of the Supervisory Control and Data Acquisition system with the facility improvements at the North Holly Water Treatment Plant. OFF0r ��,� G� uQD Attachment Al-10 EXHIBIT B-3A NORTH HOLLY WATER TREATMENT PLANT IMPROVEMENTS COST SUMMARY AND MIWBE PARTICIPATION TOTAL WITH AMENDMENT NO.I (AS 0110/5/00) MAYBE PROJECT DISCIPLINES FNI SUB-CONSULTANT WlMARKUP TOTAL M1WBE% MMBE FEE FIRM PROCESS DESIGN $496,949 $496,949 STRUCTURAL DESIGN $205,699 $205,699 ELECTRICAL DESIGN $266,233 $266,233 ARCHITECTURAL DESIGN $59,647 $248,100 $285,315 $344,962 71.9% ROBERTS.BRADLEY RSBA ARCHITECTS MECHANICAL DESIGN $65,765 $65,765 INSTRUMENTATION DESIGN $164,306 $164,308 CIVIL DESIGN $41,400 $80,000 $92,000 $133,400 CHIANG,PATEL S YERBY,INC. DRAFTING $196,655 $75,000 $86,250 $369,155 20.3% KADDASSOCIATES $75,000 $86,250 20.3% TECHNICAL ASSOCIATES SERVICES CONSTRUCTION SERVICES $77,227 $77,227 GEOTECHNICAL $0 $20,000 $23,000 $23,000 87.0% TERRA-MAR,INC. SURVEYING $0 $15,000 $17,250 $17,250 CARSON-SALCEDO-WIVILLIAMS PRINTING $0 $20,000 $23,000 $27,600 72.5% METRO BLUELINE $4,000 $4,600 14.5% HUGO C.TREVINO PUBLIC INFORMATION $0 $25,000 $28,750 $28,750 LINDA PAVUK 6 ASSOCIATES EXPENSES $66,778 $0 $0 $66,778 ------------------------------------------------- Sub Total _________________Sub-Total $1,640,661 $562,100 $646,415 $2,287,076 24.6% SPECIALIZED EXPERT SUB-CONSULTANTS: OZONE PROCESS DESIGN $350,000 $402,500 CAROLLO ENGINEERS OZONE OPTIMIZATION $43,097 $49,562 PROCESS APPLICATIONS,INC. ELECTRICAL SWITCHGEAR&WIRING TESTING $23,000 $26,450 $26,450 MULTATECH ENGINEERING,INC. ---------------------------------------- Sub-Total $393,097 $23,000 $26,450 $478,512 TOTAL M/WBE PARTICIPATION: $585,100 $2,765,588 21.2% C�f�BCB�°' GIC:CIS D CITU' R 1fTE1p"(p; L''. u (! r J. EXHIBT B-4A CITY OF FORT WORTH NORTH HOLLY WATER TREATMENT PLANT IMPROVEMENTS ENGINEERING FEE-MANHOURS,EXPENSES&SUB-CONSULTANTS AMENDMENT NO.1 (As of 11(20/00 CONSTRUCTION PHASE-ENGINEERING SERVICES PROCESS DESIGN STRUCTURAL ELECTRICAL ARCHITECTURAL MECHANICAL 1160 1129 1128 1127 1128 TASK Description Hours Cost Effort Hours Cost Effort Hours Cost Effort Hours Cost Effort Hours Cost Effort 227 Add1 Construction Items-Contract A 8 $691 0 $0 125 $12,424 0 $0 0 $0 228 Add'I Construction Items-Contract 8 76 $8,492 20 $2,617 20 $1,988 310 $30,772 12 $1,305 229 Coord.of TXU Electric Service Upgrade 16 $1,204 0 $0 100 $10,962 0 $0 0 $0 401 Conformed Documents 32 $2,661 0 $0 8 $795 0 $0 0 $0 402 Pre-Construction Conference&Monthly Meeting 184 $20,944 16 $2,094 32 $3,999 8 $794 0 $0 403 Review Project Submittals 190 $16,705 44 $5,758 411 $40,849 10 $993 16 $1,740 404 Site Visits 288 $31,423 48 $6,281 32 $3,180 8 $794 16 $1,740 405 Document Interpretation 240 $22,826 32 $4,188 60 $5,963 12 $1,191 8 $870 406 Contract Modifications 504 $53,631 48 $6,281 160 $15,902 8 $794 16 $1,740 407 Final Review 48 $5,316 0 $0 20 $2,192 8 $794 8 $870 409 Motor Witness Testing 0 $0 0 $0 48 $5,998 0 $0 0 $0 4101S CADA System Coordination 32 $5,056 0 $0 300 $34,420 0 $0 0 $0 TOTALS 1618 $168,949 208 $27,219 1316 $138,671 364 $36,132 76 $8,265 o EXHIBT 13-4A CITY OF FORT WORTH NORTH HOLLY WATER TREATMENT PLANT IMPROVEMENTS ENGINEERING FEE-MANHOURS,EXPENSES&SUB-CONSULI AMENDMENT NO.1 (As of 11120/00) CONSTRUCTION M/WBE CONSTRUCTION PHASE-ENGINEERING SERVICES DRAFTING SERVICES EXPENSES SUB-CONSULTANT 1160 1129 Architectural TASK Description Hours Cost Effort Hours Cost Effort Expenses Markup,Expenses Markup 227 Add'1 Construction Items-Contract A 0 $0 0 $0 $253 $291 228 Add'I Construction Items-Contract B 20 $2,172 0 $0 $0 $0 $32,600 $37,490 229 Coord.of TXU Electric Service Upgrade 0 $0 0 $0 $65 $75 401 Conformed Documents 20 $2,172 20 $1,161 $335 $386 402 Pre-Construction Conference&Monthly Meeting 0 $0 0 $0 $116 $134 403 Review Project Submittals 0 $0 327.75 $19,026 $1,078 $1,240 404 Site Visits 24 $2,606 0 $0 $710 $817 405 Document Interpretation 0 $0 0 $0 $1,296 $1,490 406 Contract Modifications 96 $10,425 0 $0 $2,152 $2,475 407 Final Review 0 $0 0 $0 $28 $32 409 Motor Witness Testing 0 $0 0 $0 $968 $1,113 410 SCADA System Coordination 0 $0 0 $0 $858 $986 TOTALS 160 $17,375 347.75 $20,187 $7,859 $9,038 $32,600 $37,490 OFFMAa ffco � EXHIBT B-4A CITY OF FORT WORTH NORTH HOLLY WATER TREATMENT PLANT IMPROVEMENTS ENGINEERING FEE-MAN HOURS,EXPENSES&SUB-CONSULI AMENDMENT NO.1 (As of 11/20/00) M/WBE M/WBE CONSTRUCTION PHASE-ENGINEERING SERVICES SUB-CONSULTANT SUB-CONSULTANT TOTALS Geotechnical Printing TASK Description Expenses Markup Expenses Markup Labor Cost Expenses Total 227 Add'I Construction Items-Contract A $13,114 $291 $13,405 228 Add'I Construction Items-Contract B $47,346 $37,490 $84,836 229 Coord.of TXU Electric Service Upgrade $12,166 $75 $12,241 401 Conformed Documents $4,000 $4,600 $6,789 $4,986 $11,775 402 Pre-Construction Conference&Monthly Meeting $27,831 $134 $27,964 403 Review Project Submittals $85,070 $1,240 $86,310 404 Site Visits $5,000 $5,750 $46,025 $6,567 $52,592 405 Document Interpretation $35,038 $1,490 $36,528 406 Contract Modifications $88,773 $2,475 $91,248 407 Final Review $9,172 $32 $9,204 409 Motor Witness Testing $5,998 $1,113 $7,112 410 SCADA System Coordination $39,475 $986 $40,462 TOTALS $5,000 $5,750 $4,000 $4,600 $416,798 $56,878 $473,676 OFMCCIA11 PEI--�� pVp/gp�Cd�6��PMdi Ta II ilo vuVGUUU� . City of Fort Worth, Texas 4Vavor and Council Communication DATE REFERENCE NUMBERLOG NAME PAGE 6/19/01 **C-18630 60HOLLY 1 of 1 SUBJECT AMENDMENT NO. 1 TO THE ENGINEERING AGREEMENT WITH FREESE & NICHOLS, INC. FOR DESIGN OF THE NORTH HOLLY WATER TREATMENT PLANT IMPROVEMENTS RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No.1 to the engineering agreement with Freese & Nichols, Inc. (City Secretary Contract No. 25699) for design of the North Holly Water Treatment Improvements project, increasing the total contract by $473,676 from $2,291,912 to $2,765,588. DISCUSSION: On February 15, 2000 (M&C C-17849), the City Council authorized the execution of an engineering agreement with Freese & Nichols, Inc. for design of the North Holly Water Treatment Plant Improvements. Proposed Amendment No. 1 is for Freese & Nichols, Inc. to provide general representative services during the construction phases. The project construction phasing had not been determined when the original contract was negotiated. The engineer will also design the replacement of the electrical switchgear and electric motors for the storm drain pumps to improve reliability, a new plant laboratory in the Chemical Building, and will design the replacement of the main back-up electrical power feed for the South Holly Water Treatment Plant as part of the upgrade of the Texas Utilities substation. Freese & Nichols, Inc. has proposed to do this work for a fee not to exceed $473,676. Freese & Nichols, Inc. is in compliance with the City's MIWBE Ordinance by committing to an additional 9% M/WBE participation on this amendment No. 1. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Capital Project Water Fund. MG:k Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY, Office by: (to) Mike Groomer 6140 � Originating Department Head: CITY r Dale Fisseler 8207 (from) JUN 19 2001 P160 531200 060160500010 $473,676.00 Additional Information Contact: •t�iw:sr + Dale Fisseler 8207 Cityof�e «T*Xr