Loading...
HomeMy WebLinkAboutContract 26976 AMENDMENT NO. 8 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. (No MSC Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and Halff Associates Inc. , (Engineer) made and entered into City Secretary Contract No. 23668, (the Contract) which was authorized by the City Council by MSC C-16627 on the 24th day of February, 1998; and subsequently revised by seven previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Main C1C4B Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 6, Contract 2) , Part 4 . WHEREAS, it has become necessary to execute Amendment No. 8 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated May 3, 2001, a copy of which is attached .hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $2,350.00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $371,385.00. All,� �C'��UG�D Ol Y CSE^Uy'�WNW U 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. ( t" EXECUTED on this the day of 2001, in Fort Worth, Tarrant County, Texas. ATTEST: FG Contract Authoriz tion Gloria Pearson, City Secretary51-0 Date APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E. Mike Groomer Director, Department of Assistant City Manager Engineering HALFF ASSOCIATES, INC. ENGINEER By: Name: Jerry F. Roberts, P.E. Vice President 4001 Fossil Creek Blvd. Fort Worth, TX 76137 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney 23668-8 -2- ("II l V Ni'i"Pt,L�U A I U �L � , VENO 4000 FOSSIL CREEK BOULEVARD mom Hal f f Associates FORT WORTH,TEXAS 76137 -9975 (817)847-1422 METRO(817)429-9975 MEN FAX(817)232-9784 ENGINEERS • ARCHITECTS • SCIENTISTS PLANNERS • SURVEYORS May 3,2001 AVO 16993 Mike Domenech, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Fort Worth, Texas 76102 Re: Amendment No. 8 (M-70, M-30, and Main St. Services) Main C 1 C413 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 6, Contract 2), Part 15, DOE No. 3176 Dear Mr. Domenech: Halff Associates is pleased to present this Contract Amendment for the following additional services: Main C1C411,Part 15—Main 70,Main 30 and Main Street Sanitary Sewer Services • Preparation of Right-of-Entries (3) for 700, 701, and 710 S. Main Street. Note, easement preparation is outside the original Scope of Work. • Site visit with owners/owners' representatives to determine sanitary sewer service line reconnection requirements. • Update Plans and Specs to reflect Sections A (SRF Project)and B (non- SRF Project). • Reproduction including SRF plans. Following is an updated Project Fee Summary: Contract Item Description Fee Original Contract Notice to Proceed(3/9/98) $317,385 Contract Modification Modification of Services (2/3/99) $0 Amendment No. 1 Part 10 Design/Survey(3/12/99) $9,150 Amendment No. 2 Part 13 Waterline (5/6/99) $3,930 Amendment No. 3 Part 4 Re-Advertisement(6/17/99) $2,900 Amendment No.4 Part 9, 10, & 4 Modifications (9/1/99) $13,600 Amendment No. 5 Part 9 Plans& Specs Update $2,300 Amendment No. 6 Part 9 & 10 Plans& Spec Update $5,200 Amendment No. 7 M-70, M-30, &Main St. Services $14,990 Amendment No. 8 Part 15 Esmts,Plan& Spec Update $2,350 Total 1 $371,805 Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Sincerely, HALFF ASSOCIATES,INC. ,;f7 �� UGUS°�( Vy 6% ar-�M UISW Michael A. Moya,P. . FORT WORTH DALLAS • HOUSTON • McALLEN TRANSPORTATION • WATER RESOURCES • LAND DEVELOPMENT • MUNICIPAL • ENVIRONMENTAL STRUCTURAL MECHANICAL • ELECTRICAL SURVEYING • GEOGRAPHIC INFORMATION SYSTEMS ARCHITECTURE LANDSCAPE ARCHITECTURE • PLANNING FoP,TWOF,TH MEMORANDUM TO: A. Douglas Rademaker, Director DOE and Mike Groomer, Assistant City Manager FROM: Mike Domenech, P.E. 40 DATE: July 9, 2001 RE: DESIGN FEE AMENDMENT NO. 8 TO MAIN C1C4B DRAINAGE AREA SANITARY SEWER REHABILITATION AND IMPROVE- MENTS (GROUP 6,CONTRACT 2),PART 4,DOE NO. 1829 The proposed amendment will reimburse Halff Associates, Inc., for the additional engi- neering services that will be provided on the project as requested by the City. At the request of City staff, Halff Associates has modified and merged the plans and specifications of several individual projects in order to combine them into a single unit. The integration of these separate projects has required the preparation of additional ease- ments, site visits and added fees for reproduction which demanded the expenditure of ad- ditional time and effort on the part of the consultant. Halff Associates, Inc., has requested a fee of$2,350.00 for the additional services to be provided thereby increasing the contract fee from $369,035.00 to $371,385.00. I believe this fee is fair and reasonable for the additional services that were provided. Please authorize this additional design fee by your signatures on the attached contract amendment form. cc: Tony Sholola, P.E.,Program Manager Berdena Hamilton, Water Department Dan Pepon, Water Department t,�t�� !kI�� r°1 c0P"D 0 ENGINEERING DEPARTMENT ` THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEW 76102-6311 (817) 871-7941 * Fax (817) 871-7854 C Printed on recycled paper