Loading...
HomeMy WebLinkAboutContract 26978 AMENDMENT NO. 2 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT 6 CITY SECRETARY , t' CONTRACT NO. WHEREAS, the City of Fort Worth (City) and Huitt-Zollars, Inc. , (Engineer) made and entered into City Secretary Contract No. 24774 , (the Contract) which was authorized by the City Council by M&C C-17357 on the 30th day of March 1999; and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Clear Fork Parallel Relief Sanitary Sewer, Part 2. WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 24, 2001, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $13,950.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $156,887.40. uD DV 1,II., 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this theday of 2001, in Fort Worth, Tarrant County, Texas. ATTEST: "1'1Lm Contract Authorization Gloria Pear on City Secretary Date APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E. Mike Groomer Director, Department of Assistant City Manager Engineering HUITT-ZOLLARS, INC. ENGINE 7.30.0. Name: Charles T. Aldredge, P.E. Vice President 500 W. 7t' Street Fort Worth, TX 76102-4728 APPROVED AS TO FORM AND LEGALITY: Gary -Ste-tbberger Assistant City Attorney 24774-2 ISUI-TT-ZJLLARS Huitt-Zollars,Inc./500W.7th Street/Suite 300/Fort Worth,Texas 76102-4728/Phone(817)335-3000/Metro(817)429-1291/Fax(817)335-1025 July 24, 2001 Mr. Mike Domenech, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Street Fort Worth,Texas 76102 Re: Amendment No.2 (Scope Increase) Clear Fork Parallel Relief Sanitary Sewer,Part 2,Main 21 City Secretary No.24774,Sewer Project No.PS46-0704601400250 DOE No.2572,HZI Project No.03-0631.01 Dear Mr.Domenech: Following receipt of your request, we are pleased to provide this proposal for the provision of additional survey and engineering services with respect to the above referenced project. The work is to be performed as a single phase which will make up Amendment No. 2 for the project. Services associated with this phase of the work are specifically listed below: • Provision of research, field work, computations, drafting, and supervision required to update the project Pre-final plans and specifications submitted for review in November 1999; • Incorporation of 3,589 linear feet of HMAC pavement roadway; • Relocation of two manholes on the parallel relief sanitary sewer and redesign to incorporate diversion stubs and stop logs; • Provision of manhole venting,canisters,and lifting rings as directed; • Incorporation of five (5) manholes on line 272-D into bid documents and remove four (4) manholes on line M134; • Revise specifications and update project cost estimates; • Survey existing line 272-D to field locate as requested; Amendment No. 2 services as listed above will be provided for a fixed fee of$13,950. The fee as listed above is based upon a single plan submission for the amendment and a single round of review comments requiring clarifications only. ,I Mfr a1 c D Q��G Following is an updated Project Fee Summary: 1�-f �; ��Q Contract Item Description Fee6rll� � 11f.-TH Original Contract Notice to Proceed(04/09/00) $137,416.00 611 U: Amendment No. I UPRR Added Easements $5,521.40 Amendment No. 2 Increased Scope $13,950.00 TOTAL $156,887.40 Dallas/Fort Worth/Houston/EI Paso/Phoenix/Tustin/Ontario/Albuquerque/Seattle/Tacoma/Denver Mr. Mike Domenech July 24, 2001 Page 2 All work as outlined above will be directed and coordinated through our Fort Worth office and is anticipated to be completed entirely in-house. We trust the information as provided herein is satisfactory to your needs. This proposal, along with the standing terms and conditions of our original contract, will comprise our agreement. Thank you for the opportunity to be of service to the City of Fort Worth. Sincerely, HUITT-ZOLLARS,INC. ACCEPTED 'Z Title C g P. Schellbach P.E. Date 1.�RV Aa E CUED \\FIZFTWORTH\disk2\proj\03063101\Admin\Amend 2 072401.doc