HomeMy WebLinkAboutContract 26979 AMENDMENT NO. 1
STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. C
(No M&C Needed)
COUNTY OF TARRANT $
WHEREAS, the City of Fort Worth (City) and RJN Group, Inc. ,
(Engineer) made and entered into City Secretary Contract No. 24246,
(the Contract) which was authorized by the City Council by M&C
16981 on the 8th day of September 1998; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of the Clear Fork Parallel
Relief Sanitary Sewer.
WHEREAS, it has become necessary to execute Amendment No. 1 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated July 20,
2001, a copy of which is attached hereto and incorporated herein.
The cost to City for the additional design services to be performed
by Engineer total $14,830.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $316,173.00.
09MCC BA I PECORD
�II p!$E" I"9A,W 0
" "a uvGt��tlI1D ��e
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the day of 2001, in Fort
Worth, Tarrant County, Texas.
A ST:
' �e
'i Contract Authorization-
Gloria Pearson, City Secreta
g-C3 Date
APPROVAL RECOMNENDED: APPROVED:
A. Douglas Rademaker, PJi. Mike Groomer
Director, Department of Assistant City Manager
Engineering
RJN GROUP, INC.
ENGINEER p
By: 144t/
Name: Huah M. Kelso
Reaional Vice President
7524 Mosier View Court, Suite 110
Fort Worth, TX 76118
APPROVED AS TO FORM AND LEGALITY:
Gary Steinberger � � a�
���(�OIGQ °�� }E��uG�D
Assistant City Attorney
N 7,
�
24246-1
-2-
Z :
7524 Mosier View Court, Suite 106
4 RJN GROUP, INC. Fort worth, Tx 76118
} An Employee-Owned Firm
817.595.2199
uJNEngineering and Information fax 817.595.3375
Technology Services www.rin.com
Mr. Mike Domenech, Project Manager July 20, 2001
City of Fort Worth
Department of Engineering
811 Lamar, Suite 300
Fort Worth, Texas 76112
RE: Contract Amendment No. 1
Clear Fork Parallel Relief Sewer Project&Sanitary Sewer Main M134R
Rehabilitation Project, Part 1
Unit 1 —DOE 2345& Unit 2 -DOE No, 2884
Sewer Project No. PS46-070460140250
Dear Mr. Domenech:
This letter constitutes a request for Contract Amendment No. 1 to the Clear Fork Parallel Relief
Sewer Project & Sanitary Sewer Main M134R Rehabilitation Project, Part 1. As the design and
construction of the wastewater collection system improvements for the project have proceeded, it
has been necessary to revise the scope of the engineering services provided to the City of Fort
Worth by RJN Group, Inc. (RJN).
Amendment No. 1 includes compensation for the preparation of documentation required by the
U.S. Army Corps of Engineers (Corps) and the Tarrant Regional Water District (TRWD) to secure a
National 404 Permit, Floodway Permit, and approval from the TRWD to construct the sewer line.
Because the alignment thru the TRWD property was not approved until after the alternative
alignment study and cost feasibility studies were performed, these permits were not included in the
original scope of work for the project. The costs summarized below include preparation of the
permit application, coordination meetings with the governing agencies, map exhibits, coordination
with an independent geotechnical engineer for soil borings, and modifications to the plans and
specifications, as required for approval. The additional costs (Special Services) associated with this
work are as follows:
US Army Corps of Engineers& TRWD Permits(Special Services)
Engineering Design Services (RJN Group)
Project Manager— 80 Hours at $111/hr. _ $ 8,880
Project Engineer— 40 Hours at $85/hr. = 3,400
Senior CADD Designer—34 Hours at $75/hr = 2,550
Sub-total USArmy Cores& TRWD Permits $14,830
Please process Amendment No. 1 to the Clear Fork Parallel Relief 56—w-er ant �r�, er Main
134R Rehabilitation Project in the amount of$14,830. c
(�9r"C r"°1 nUStl
Mr. Mike Domenech, Project Manager July 20, 2001
Re: Clear Fork Parallel Relief Sewer Project, Contract Amendment No. 1 Page 2 of 2
We appreciate the opportunity to be of service to the City of Fort Worth. Thank you in advance for
your prompt attention to this matter.
Sincerely,
RJN GROUP, INC.
Jeffrey M. Hawkins, P.E.
Project Manager
xc: Arefin, P.E.; Hugh Kelso, Regional V.P. - RJN
J M H/eg c:\projects\1490\corresp\AmendmentNo.l.doc
NED
flJArJrC�� ; 'LSWNWU
RJN GROUP, INC. Engineering and Information Technology Services
FoP,TWOP,TH
MEMORANDUM
TO: A. Douglas Rademaker, Director, DOE and
Mike Groomer, Assistant City Manager
FROM: Tony Sholola, DOE
DATE: July 24, 2001
RE: DESIGN FEE AMENDMENT NO. 1 TO THE CLEAR FORK PARALLEL RE-
LIEF SANITARY SEWER PROJECT NO. PS46-070460140250
The proposed amendment will reimburse RJN Group, Inc. for the following additional services
they provided on the project as requested by the City:
The preparation of documentation for the U.S. Army Corps of Engineers(Corps) and the Tarrant
Regional Water District (TRWD) to secure a National 404 Permit, Floodway Permit, and ap-
proval from the TRWD to construct the sewer line. Because the alignment through the TWCD
property was not approved until after the alternative alignment study and cost feasibility studies
were performed, these permits were not included in the original scope of work for the project.
The additional services included preparation of the permit application, coordination meetings
with the governing agencies, map exhibits, coordination with an independent geotechnical engi-
neer for soil borings, and modifications to the plans and specifications, as required for approval.
RJN Group, Inc., has requested reimbursement in the amount of$14,830.00 for the additional
services, thereby increasing the contract fee from $301,343.00 to $316,173.00 I believe this fee
is fair and reasonable for additional services that were provided.
Please authorize the additional fee by your signatures on the attached contract amendment form.
Attachment
cc: Mike Domenech, Project Manager
Berdena Hamilton, Water Department = ��� � ..
Dan Pepon, Water Department " J���A
�1'U/r� SI;f�M�? SNJI°��GM.���
MEMORN I� VU U'V 9 7H EX
ENGINEERING DEPARTMENT
THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311
(817) 871-7941 * FAX(817) 871-7854
�'� Printed on recycled paper