Loading...
HomeMy WebLinkAboutContract 48519-FP1 Department of TPW Const. Services CPN# IL-E6 q )gate Project Manager E�L _ Risk Management S. Gatewood 2L CITY SECRETARY' D.O.E. BrothertonT WoPTH� CONTRACT NO. Water V. Gultzier, CFA Janie Morales/Scanned ❑ The Proceeding people have been Contacted concerning the request CATION AND PUBLIC WORKS /_�((�� —7 for final payment&have released this project for such payment. �P PROJECT COMPLETION t�V •-- ��� / Clearance Conducted By Etta Bacy ___(Developer Projects) City Project Ne: 100587 Regarding contract 100587 for TIMBERLAND CENTER as required by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Tr, PQ Department has accepted the project as complete. i�®, yz FEB 15 2018 Original Contract Price: $77,933.00 Lay— Amount of Approved Change Orders: $91,574.60 Ne 1 &2 f Revised Contract Amount: $169,507.60 j j Total Cost Work Completed: $169,507.60 i 1 1 i t 1 Recommended nce Date Asst. Director, - evelopment Services C�2z 2 l/swe Accepted Date *ft Director, WATER DEPARTMENT i Asst. Ci/y Manager % J ( Date 1 j Comments: LOFFICIAL RECORD CITY ECRLTAtY TRECEIVED SER l0RYH, 1 Rev.9/22/16 0!:, j r 7 {2 1 1 FEB 15 2018 6-%C) -X 06587 City Project Numbers 100587 y' "' DOE Number 5870 Contract Name TIMBERLAND CENTER Estimate Number I Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 10/15/2017 Project Funding Project Manager NA City Secretary Contract Number 058701 Inspectors RODGERS / SUTTERFIELD Contract Date 12/13/2016 Contractor ROCK SOLID,INC. Contract Time 60 CD 664 MANOR DR Days Charged to Date 275 CD ARGYLE, TX 76226 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $169,507.60 Less %Retained $0.00 Net Earned $169,507.60 Earned This Period $169,507.60 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $169,507.60 Monday,November 13,2017 Page 5 of 5 FoRTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name TIMBERLAND CENTER Contract Limits Project Type WATER&SEWER City Project Numbers 100587 DOE Number 5870 Estimate Number 1 Payment Number I For Period Ending 10/15/2017 CD City Secretary Contract Number 058701 Contract Time 60:D Contract Date 12/13/2016 Days Charged to Date 275 Project Manager NA Contract is 100.00 Complete Contractor ROCK SOLID,INC. 664 MANOR DR ARGYLE, TX 76226 Inspectors RODGERS / SUTTERFIELD Monday,November 13,2017 _ Page 1 of 5 City Project Numbers 100587 DOE Number 5870 Contract Name TIMBERLAND CENTER Estimate Number I Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 10/15/2017 Project Funding UNIT I:WATER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 REMOVE CONC.PVMT(CO#1) 109 SY $36.00 $3,924.00 109 $3,924.00 2 SALVAGE FIRE HYDRANT 1 EA $2,500.00 $2,500.00 1 $2,500.00 3 CONC.PVMT REPAIR,ARTERIAL(CO#1) 109 SY $36.00 $3,924.00 109 $3,924.00 4 10"WATERLINE LOWERING 1 EA $2,500.00 $2,500.00 1 $2,500.00 5 TRENCH SAFETY(CO#1)(CO#2) 898 LF $1.00 $898.00 898 $898.00 6 DUCTILE IRON WATER FITTINGS 1.1 TN $6,500.00 $7,150.00 1.1 $7,150.00 W/RESTRAINT 7 6"WATER PIPE(CO#2) 11 LF $45.00 $495.00 11 $495.00 8 8'WATER PIPE 6 LF $48.00 $288.00 6 $288.00 9 10"WATER PIPE(CO#I&2) 889 LF $55.00 $48,895.00 889 $48,895.00 10 FIRE HYDRANT(CO#2) 2 EA $3,500.00 $7,000.00 2 $7,000.00 11 CONNECTION TO EXISTING 4"-12"WATER 2 EA $2,100.00 $4,200.00 2 $4,200.00 MAIN 12 2"WATER SERVICE(CO#2) 2 EA $1,000.00 $4,000.00 2 $4,000.00 13 10"GATE VALVE(CO#I&2) 6 EA $2,400.00 $14,400.00 6 $14,400.00 14 6"GATE VALVE(CO#2) 2 EA $1,000.00 $2,000.00 2 $2,000.00 15 1"WATER SERVICE(CO#1&2) 2 EA $7,000.00 $14,000.00 2 $14,000.00 16 1.5 WATER SERVICE(CO#1) 1 EA $9,000.00 $9,000.00 1 $9,000.00 Sub-Total of Previous Unit $125,174.00 $125,174.00 UNIT 11:SANITARY SEWER RvIPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 REMOVE 6"SEWER LINE 19 LF $20.00 $380.00 19 $380.00 2 8"SEWER PIPE(CO#1) 501 LF $50.00 $25,050.00 501 $25,050.00 3 4"SEWER PIPE 5 LF $40.00 $200.00 5 $200.00 4 4'MANHOLE 1 EA $4,500.00 $4,500.00 1 $4,500.00 5 4'SHALLOW MANHOLE 1 EA $4,500.00 $4,500.00 1 $4,500.00 6 CONCRETE ENCASEMENT FOR UTILITY PIPES 1.05 CY $1,000.00 $1,050.00 1.05 $1,050.00 7 POST-CCTV INSPECTION(CO#1) 516 EA $1.10 $567.60 516 $567.60 8 TRENCH SAFETY(CO#1) 516 LF $1.00 $516.00 516 $516.00 9 MANHOLE VACUUM TESTING(CO#1) 3 EA $100.00 $300.00 3 $300.00 Monday,November 13,2017 Page 2 of 5 City Project Numbers 100587 DOE Number 5870 Contract Name TIMBERLAND CENTER Estimate Number I Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 10/15/2017 Project Funding 10 MANHOLE ADJUSTIMENT,MINOR I EA $100.00 $100.00 1 $100.00 11 EPDXY MANHOLE LINER(CO#1) 6 VF $200.00 $1,200.00 6 $1,200.00 12 6"SEWER PIPE(CO#1) 10 LF $47.00 $470.00 10 $470.00 13 4"DROP MANHOLE(CO#1) 1 EA $5,500.00 $5,500.00 1 $5,500.00 Sub-Total of Previous Unit $44,333.60 $44,333.60 Monday,November 13,2017 Page 3 of 5 City Project Numbers 100587 DOE Number 5870 Contract Name TIMBERLAND CENTER Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 10/15/2017 Project Funding Contract Information Summary Original Contract Amount $77,933.00 Change Orders Change Order Number 1 $58,850.60 Change Order Number 2 $32,724.00 Total Contract Price $169,507.60 Date Total Cost of Work Completed $169,507.60 Contractor Less %Retained $0.00 ` Net Earned $169,507.60 Date Earned This Period $169,507.60 'InspectionSu�isor - y� Retainage This Period $0.00 Date V Less Liquidated Damages Projec anager Days @ /Day $0.00 1� Date ` LessPavement Deficiency $0.00 Asst.Di - lg t-UMMUutivil/ Less Penalty $0.00 14 Date Z!l S �`(j �-� Less Previous Payment $0.00 Director/Contracting Department Plus Material on Hand Less 15% $0.00 Balance Due This Payment $169,507.60 Monday,November 13,2017 Page 4 of 5 a a, cs t tia 1 i q � t i8. t ryf � 1 4i i LU mss' r � F-, � ti'qt it i�''jjw}'��r�r't,��i%'*�s �'� �.'e i"� s• '�i C,4 0 rz p t C C 1#I r� < Q 3IrLm LU CL LU p uj Im ems., Q LU Ul 7 E➢! 1d1 ® d �4 N ul CC re at ul z � L�1 LULL _ ip C3 � G 1;7 > cPJ :ts` z t9 Its` . «„w re dao C%l C3 C4 cl m LL 00 60 m to U3 L 0 to 0 z w > i6 6 X A. 4J 0 E 7i m z U. Z110 gap] - ffi; a fii :CL Efiffm tu cc Z Lu 0 w LLJ w 0 CL LL w �zg E V HMU - > co —————— Lu 11'a Alm M m x Im E W u .9 tz g 1�I CS =1 ya r. mr) rr E I ROM bow w m E z CD (D D) co a s- U a CLCD 0 U W CS oa o t7 car � o F 0 w y , W >H » sg W O p U O C1 z N U o a.' C) w as srr z c 6 0 p n o 0 o c c w 04 p U ❑ r- Nr LY " O N cli R R' try tllED (D r r H = O N ao F ¢ c ti z U Q a Q o o w U Q O > H v o W), P0 0 til U U p � O � zz d < N N U lap o' IL O O ❑ � L L W LL CL W ri h ❑ Of W of CD C m rs'i sh �' 1� to ca CT Q Cl OCK) 00 C N r W N 0- O O O O O O ca W ren c°Dn t!1 0 0 0 f!3 y U W O O = N w w o ❑ C O r OL LL U U m v m ~ oo < o o C = CV C) 0 U o 0 0 0 o r O 4 N o. r o Nw m CD CD @ 1� f0 O Q coo Cl) coi m eN+, a srs srr m sir d f- N z O in X p p t- Ir Z LU p � U O t- C L LY U' O = Z k w Z O eY to O d- I- (' _ J-2 I- U di L- W wQ U w U h O O W z ¢ WQ d Q U Q.' U ca ZF- z ¢ o o a Z as w N LLI 0 o F Z U tg ig U U V o Ov w w ¢ o tr Q z Q W 1W- 3: w n Q w a H D � G m O ti tz O Q W -i CO w ZE � w z o > o U 0 U ❑ S u1 ti z a o w o ° a '' 0) to Q ci O p`O oIIO a pp0 OrVNOpa�WN h �ga�� ��� Q �)) C4 c ®d ¢ D Z ar N S� -r 1W C6 � srs tR h9 U' LD Lu G9 Z y tQtt to O � a. ¢ m z 0 z 0 O U CS m 1L�`> ,� LL O U Q: 40.. CS qJ Y a Es7 Lu CL O ay N w HlI ilu a� N i w 0.F C ��yim C� COLS ELE S W Q G w C3 O 0 3 Ucon a m E a1 ® Q to z o o J 6 CL m zw maS w rm.-ear wr in Q � m w Z aiei��000�u L'� lik. a Q OPt tfOtyyNNC?O.o m ®yL_�r r Ot� r_r I �o mm00 OO dD mtry r Q C C U o ¢ ox x m lY m m m w Z � O W p y v m a a S � z r Sn o r FoRTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Timberland Center PROJECT NUMBER: 100587 DOE NUMBER: N/A IN XT m_ PIPE LAID SIZE TYPE OF PIPE LF Diamond/C-900 6 " PVC/slip joint 11 Pianuit d/I-9510 S" pVL"/cljn utint 6 Diamond/C-900 10" PVC/slip joint 889 FIRE HYDRANTS: 2 ea. VALVES(16" OF.,LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: yes NEW SERVICES: 2" Copper 2 ea. V Copper 2 ea. 1.5 Copper 1 ea. SEWER PIPE LAID SIZE TYPE OF PIPE LF Diamond/SDR 26 8" PVC/slip joint 501 Diamond/SDR 26 4" PVC/slip joint 5 Diamond/SDR 26 6" PVC/slip joint 10 PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: yes NEW SERVICES: TRANSPOKE&7C110N AND PILTBUC WORKS 'r T)-(CmW®ff mit Wor➢n•IlQDIII )Thwdmwalm Stt x t•butt Worth,TX 76012-6311 (817)392-7941•Fay(817)392-7845 FORTWORTHREV:8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR CONTRACTOR&PROJECT DATA Name of Contractor Project Name Rock Solid Inc. Timberland Center Inspector City Project Number Hershel Stanley Sutterfield 100587 Construction Components Project Manager 0 water 2 wastewater ❑ Storm Drainage ❑ Pavement Fred Ehia Initial Contract Amount Project Difficulty $77,933.00 Q Simple QQ Routine Q Complex Final Contract Amount Date $169,507.60 11/9/2017 In PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(X) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 3 8 6 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 3 20 15 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Trak Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 436 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 436 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS] *100%) 436 / 448 = 97% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature / ontractor Signature Inspector's Supervisor Signature _- CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 8851 Camp Bowie West Blvd. • Fort Worth,Tx 76116• (817) 392-8306 FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION _ Date: ;11/9/2017 Name of Contractor Project Name Rock Solid Inc. Timberland Center DOEInspector Project Manager Hershel Stanley Sutterfield _ 'Fred Ehia DOENumber Project Difficulty Type of Contract N/A/CPN# 100587 )1 0 Simple QQ Routine Q Complex Q water El waste water ❑ Storm Drainage ❑ Pavement Initial Contract Amount Final Contract Amount $77,933.00 $169,507.60 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENr RATING 'ELEMENT RATIlVG (0-4) INSPECTION EVALUATION PLANS& SPECIFICATIONS (0-4) 1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions 3 2 Knowledge of Inspector i 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 A licabili of Specifications 14 Display Of Professionalism �—�`p -- -p 4 Accuracy of Plan Quantities 5 Citizen Com Taint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution (ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 3 ni 3 Commucation 2 Timliness of Contractor Payments !4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe En)COMMENTS& SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Superviso INSPECT'OR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street• Fort Worth,TX 76012-6311 (817) 392-7941 • Fax: (817) 392-7845 SURETEC INSURANCE COMPANY 9737 Great Hills Trail, Suite 320, Austin, Tx 78759 OWNER 0 ARCHITECT 0 CONSENT OF SURETY CONTRACTOR 0 TO FINAL PAYMENT SURETY 0 OTHER 0 BONDNO_-, 4409686 TO OBLIGEE: (Napncand,fddress,> COINITR-ACT FOR: City of Fort Worth Water and Sewer -Improvements 1000 Throckmorton Street City Project No. 100587 Fort Worth, TX 76102 PROJECT: CONTRACT DATED: 12/7/1201.6 Timberland center - Fort worun, -7,x PRINCIPAL HD Gooks Rock Solid,Inc.dba Rock Sdid,Inc. At the request ofthe Obligee and the Principal indicated above, SureTec Insurance Company,9737 Great Hills Trail,Suite 320,Austin,Tx 78759 ,SURETY. on bond of HD Cooks Rock Solid,Inc.dba Rock Solid,Inc. P 0 Box 1155,Roanoke,TX 76262-1155 CON' -FRACTOR' and conditioned on the representation by Obligee that all Contract provisions relating to the payment of final payment under the Contract have been satisfied by Principal as of the date offmal payment,and that no claims by Obligee or any third party are kno%Nn or believed by Obligee or its representatives to exist as of the date of final payment,representations as to the truth and accuracy of the foregoing conditions being deemed to have been made by Obligee in connection Nvith this request for Consent of Surety,hereby approves of the final payment to the Principal,and agrees that final payment in accordance with the terms hereofshallnot relieve the Surety of its obligations to (Inseri natnu and address of0bligee) ,OBLIOCE, as;set forth in said Surety's bond. IN \VITNESS WHEREOF,the Surety has hereunto set its hand on.this date: (Inserrinwriting the November 17, 2017 SUreTeAi-.--,urance Company firk Dr'%., A�_., ttc Attest: 0,1*ney_in_f_ ct (Seal): and lit SURCTEc coNscIrr TO FINALPAYMEN'T REV_ 1.1.2(104 POA#: 4221060 SureTec Insurance Company LIMITED POWER OF ATTORNEY Know All Men by Yhese Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents make,constitute and appoint Frank Swingle,Warren Gravely,Jr., Ed Veale, Chris W. Peterie, Matthew B. Elmore, Kirk D. Dreyer its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments`or contracts of suretyship to include waivers to the conditions of contracts and consents of surety for,providing the bond penalty does not exceed Four Million Dollars and no/100($4,000,000.00) and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President, sealed with the corporate seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney-in-Fact may do in the premises. Said appointment shall continue in force until 12/31/2019 and is made under and by authority of the following resolutions of the Board of Directors of the SureTec Insurance Company: Be it Resolved, that the President, any Vice-President, any Assistant Vice-President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorneys)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company,to execute, acknowledge and deliver,any and all bonds,recognizanccs,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved,that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20`h of April, 1999) In Witness Whereof,SURETEC INSURANCE COMPANY has caused these presents to be signed by its President, is corporate seal to be hereto affixed this 11th day of May ,A.D. 2017 . RANm4,N SURETEC SUP—AN C s X...-1°ei By: Cr �= John Knox resid t r DE State of Texas ss: Cr �'f1Y County of Harris y •-........• On this 11th day of May . A.D. 2017 before me personally came John Knox Jr.,to me known,who,being by me y sworn,did depose and say,that he resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the Board of Directors of said Company;and that he signed his name thereto by like order. JACQUELYN GREENLEAF n�Notary Public,State of Texas y `•P= Comm.Expires 05-18-2021 '''F..•tE Jacq elYn Greenleaf,Notary PublicNotary ID 126903029 My commission expires May 18,2021 I,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney,executed by said Company,which is still in full force and effect;and furthermore,the resolutions of the Board of Directors, set out in the Power of Attorney are in full force and effect. Given under my hand and the seal of said Company at Houston, Texas this I1 day of A.D. r M.Brent Beaty,Assistant Secretary Any instrument issued in excess of the penalty stated above is totally void and without any validity. For verification of the authority of this power you may call(713)812-0800 any business day between 8:00 am and 5:00 pm CST. sureTec Insurance Company THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION Statutory Complaint Notice/Filing of Claims To obtain information or make a complaint:You may call the Surety's toll free telephone number for information or to make a complaint or file a claim at: 1-866-732-0099.You may also write to the Surety at: SureTec Insurance Company 9737 Great Hills Trail, Suite 320 Austin,Tx 78759 You may contact the Texas Department of Insurance to obtain information on companies,coverage,rights or complaints at 1-800-252- 3439.You may write the Texas Department of Insurance at PO Box 149104 Austin,TX 78714-9104 Fax#:512-490-1007 Web:hM://www.tdi.state.tx.us Email:ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIM DISPUTES:Should you have a dispute concerning your premium or about a claim,you should contact the Surety first. If the dispute is not resolved,you may contact the Texas Department of Insurance. Texas Rider 06042014 1 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me,the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared CHARLES COOK, PROJECT MANAGER Of HD COOKS ROCK SOLID INC., known to me to be a credible person,who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; TIMBERLAND DEVELOPMENT �/ BY e�4t CHARLES COOK- PROJECT MANAGER Subscribed and sworn before me on this date 16 of NOVEMBER, 2017. Notary Public _ �`"OrP"'• THOMAS TODAR i DENTON County, TEXAS ff* Vic, Notary public, State of Texas a� } Cm-rim Expires 04-01.2020 ,;}'aF' ,. Notary ID 130603300 FORTWORTH rev 03/05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.: 1 NAME OF PROJECT: Timberland Center PROJECT NO.: 100587 CONTRACTOR: Rock Solid Inc. DOE NO.: N/A PERIOD FROM:02/06/17 TO: 11/07/17 FINAL INSPECTION DATE: 1-Nov-17 WORK ORDER EFFECTIVE: v 2�' 7 CONTRACT TIlVIE: 60 days 0 WD • CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH DEUR E CREDITED DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29, 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS & TOO COLD RELOCATIONS OTHERS * CHARGED DAYS THIS PERIOD 275 275 PREVIOUS PERIOD TOTALS TO DATE 275 275 *REMARKS: CO CTOR DATE INSPECTOR DATE ENGINEERING DEPARTMENT � � The City of Fort Worth • 1000 Throckmorton Street• Fort Worth,TY 76012-6311 (817) 392-7941 • Fax: (817) 392-7845