WHEREAS, the City of Fort Worth (City) and Carter & Burgess, (Engineer)
made and entered into City Secretary Contract No. 18476= (the Contract) which was
authorized by the City Council by M&C C-12837 on the 30`h day of April, 1991; and
amended by City Council on May 16, 2000 (M&C C-17970), and subsequently amended
by nine (9) previous amendments; and
WHEREAS, the Contract involves engineering services for the following project:
Construction Management Services for West Fork Relief Main, Segments
WF-4, and WF-5.
WHEREAS, it has become necessary to execute Amendment No. 10 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
1.
Section 1, Services of the Engineer, of the Contract is amended to include the
additional engineering services specified in a proposal letter dated June 15, 2001, a copy
of which is attached hereto and incorporated herein. The cost to City for the additional
services to be performed by Engineer total $ 55,897.15.
2.
Section IV, Compensation to Engineer, of the Contract is amended to provide for
an increase in the maximum fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid by the City for all
work and services shall not exceed the sum of$ 2,871,050.15.
3.
All other provisions of the contract, which are not expressly amended herein, shall
remain in full force and effect.
EXECUTED on this the_ /Lf',kday of_ r , 2001, in Fort
Worth,Tarrant County, Texas.
APPROVAL RECOMMENDED: APPROVED:
d
.—flj-A I Y"
A. Douglas Rademaker, P.E. Mike Groomer UN
Director, Department of Engineering Assistant City Manager
CARTER & BURGESS
ENGINEER
TTEST:
Gloria Pearso i y Secretary
Fre6' H. Evans,
Senior Vice President
Name:
Contract Authorization
Date
APPROVED AS TO FORM AND LEGALITY:
Gary Steinberger
Assistant City Attorney
65 VRML HCOM
CE*/Uffiky
777 Main Street
Fort Worth, Texas 76102
Carter:--Burgess P.O. Box 901058
Fort Worth, Texas 76101-2058
Phone: 817.735.6000
Fax: 81 7.735.61 48
www.c-b.com
June 15, 2001
Mr. Gopal Sahu, P.E.
City of Fort Worth
Department of Engineering
1000 Throckmorton
Fort Worth, TX 76102
Reference: West Fork Relief Sewer WF-4, WF-5
Construction Observation
DOE Project No. 0660
Sewer Project No. PS46-070460220080
Dear Mr. Sahu:
This letter serves as the "Letter of Intent"for Carter& Burgess, Inc.'s proposed M/WBE
commitment for the above referenced project. Carter & Burgess proposes to use ANA
Consultants, L.L.C. to fulfill the M/WBE requirement on this project.
ANA Consultants, L.L.C. will provide project representation services during the
construction observation of WF-4 & WF-5 projects. Compensation for ANA Consultants,
L.L.C. services will be at least$8,386.47, which is approximately 15% of the proposed
engineering contract amendment amount of$55,897.15.
If you have any questions or need further information, please contact me at (817) 735-
6150.
Sincerely,
CARTER & BURGESS, INC. ANA CONSULTANTS, L.L.C.
4 3-4—j— 13,- Ak
Sam M. Zabaneh, P.E Assad N. Assad, P.E.
Public Works Group Manager President
SMZ/mds
90135213.1-64
cc: Correspondence U uj�1r/ r S�Gz
Sam Zabaneh
Gretchen Williams0
Carter & Burgess, Inc Carter& Burgess Consultants, Inc. Nixon & Laird Architects/Engineers, P.C. Nixon & Laird Architects/Engineers, Inc. C&B Nevada, Inc.
777 Main Street
Fort Worth, Texas 76102
Carter.-.-Burgess P.O. Box 901058
Fort Worth, Texas 76101-2058
Phone: 817.735.6000
Fax: 817.735.6148
Wv W.c-b.com
June 15, 2001
Mr. Gopal Sahu, P.E.
Department of Engineering
1000 Throckmorton Street
Fort Worth, TX 76102
Reference: West Fork Relief Main, Segments WF-4 and WF-5
Dear Mr. Sahu:
Carter& Burgess acknowledges its commitment for making a "good faith" effort to meet the
City of Fort Worth's goals for disadvantaged business enterprises (DBE) participation in City
of Fort Worth contracts. The staffing requirements for this project will consist of:
• One part-time construction representative
• One part-time secretary
• One part-time project manager
Our current contract amount is $2,815,153.00 with a M/WBE participation of$422,271.05 for
an involvement of 15%. We propose to engage a certified M/WBE firm to provide project
representation services in the amount of$8,386.47 on this amendment. This will result in a
total M/WBE participation of$430,657.52 on the revised total contract amount of
$2,871,050.15, which is a total project commitment of 15%.
We feel this is the most feasible means of providing M/WBE participation on what is basically
a one-person assignment (one project representative). It also achieves our goal of 15%
participation on the overall project.
We look forward to the opportunity of serving you on this project. If I can be of further
assistance please give me a call.
Sincerely,
CARTER & BURGESS, INC.
Sam M. Zabaneh, P.E.
Public Works Group Manager
SMZ/mds
90135213163
cc: correspondence ^^V.
Sam M Zababeh-C&B vu u P�I5I 11J U:�!'
Gretchen N.Williams-C&B (` C 6i ;a 611,
1Crm�I�O�U'''��a���r((((((yyyjjj�t1 .(�:�MG�(((�'''177��G//�11
Y UO yV C."TH, Vag
Carter & Burgess, Inc. Carter & Burgess Consultants, Inc. Nixon & Laird Architects/Engineers, P.C. Nixon & Laird Architects/Engineers, Inc. C&B Nevada, Inc.
City of Fort Worth Summary of Additional Professional Fees
1 Actual Work Effort Performed in April/May $27,387.15
2 Anticipated Effort Remaining on WF-4 Project $10,140.00
3 Anticipated Effort Remaining on WF-5 Project $18,370.00
$55,897.15
V061081200 46 AM
City of Fort Worth WF-4
Time spend on WF-4 Project in the Month of April and May
Carter Burgess, Inc.
DESCRIPTION HOURS COST
1 Resident Representative '1 82 $6,645
2 Project Management '1 64.5 $6,644
3 Secretarial •1 14.5 $697
4 Project Director *2 10.5 $1 591
TOTAL $15,577
Expenses $646
111 —$16,222
'1 See attached documentation for detailed breakdown of work performed
'2 Project Director time was for coordination with Client and overseeing project
City of Fort Worth WF-5
Time spend on WF-5 Project in the Month of April and May
Carter Burgess, Inc.
DESCRIPTION HOURS COST
1 Resident Representative "1 44 $3,460
2 Project Management •1 50 $5,195
3 Secretarial •1 14.5 $697
4 Project Director '2 10.5 $1,591
TOTAL $10,943
Expenses $222
$11 165
•1 See attached documentation for detailed breakdown of work performed
'2 Project Director time was for coordination with Client and overseeing project
OFFICGB�,d <: ,
061081200103:21 PM
City of Fort Worth Anticipated Effort Remaining on WF-4 Project
Service Provided from June 1 to September 4,2001
Carter Burgess, Inc.
PROD. PROJ.
LPC MGR Representative CLERICAL TOTAL
DESCRIPTION HRS HRS HRS HRS HRS COST
1 Coordination with Contractor 1 4 0 2 7 $700
2 One Site Visit 1 2 40 0 43 $4,160
3 Coordination with City 2 6 0 0 8 $930
4 Final Inspection 0 41 12 21 18 $1,690
5 Review Pay Requests 0 41 8 01 12 $1,180
6 Pro'ect Close-Out 1 41 4 21 ill $1,080
TOTAL 5 24 64 6 99 $9,740
Expenses $400
Anticipated end date:September 4,2001
Total $10140
City of Fort Worth Anticipated Effort Remaining on WF-5 Project
Service Provided from June 1 to August 15,2001
Carter Burgess, Inc.
PROJ. PROJ.
PIC MGR Representative CLERICAL TOTAL
DESCRIPTION HRS HRS HRS HRS HRS COST
1 Coordination with Contractor 0 8 0 2 10 $970
2 Periodic Inspections 0 8 120 0 128 $12,240
3 Coordination with Residents 0 2 0 0 2 $210
4 Final Inspection 0 41 121 2 18 $1,690
5 Review Pay Requests 0 41 81 0 12 $1,180
6 1 Pro'ect Close-Out 1 41 41 2 11 $1 080
TOTAL 30 144 6 181 $17,370
Expenses $1,000
Anticipated end date:August 15,2001
6 wks Total -$18,370,1
C-I ur
06/08/200109:46 AM
City of Fort Worth, Texas
4velgov And Council Communication
DATE REFERENCE NUMBER LOG NAME PAGE
7/24/01 **C-18676 1 30FORK 1 of 1
SUBJECT AMENDMENT NO. 10 TO ENGINEERING AGREEMENT WITH CARTER & BURGESS
INC. FOR ADDITIONAL CONSTRUCTION MANAGEMENT AND INSPECTION OF
WEST FORK RELIEF SEWER PROJECT SECTIONS WF-4 AND WF-5
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute Amendment No. 10 to
City Secretary Contract No. 18476, for construction management and inspection services with Carter &
Burgess, Inc. for additional work related to West Fork Relief Sewer Project Sections WF-4 and WF-5 for
a fee of$55,897.15 increasing the total contract amount to $2,871,050.15.
DISCUSSION:
On April 30, 1991 (M&C C-12837), the City Council authorized the execution of an engineering
agreement with Carter & Burgess, Inc. for engineering services for West Fork Sanitary Sewer Relief
Project Sections WF-2, WF-3, WF-4, and WF-5 in the amount of $1,949,500.00. Construction of
Sections WF-2 and WF-3 has been completed. This contract was previously revised by nine
amendments, thereby increasing the total contract amount to $2,815,153.00.
The construction of West Fork Sanitary Sewer Project Sections WF-4 and WF-5 is in progress and
nearing completion. Due to unforeseen utility conflicts and subsequent required design modifications
that have lengthened the project duration, Carter & Burgess, Inc. is requesting an additional 105
calendar days (30 days for WF-4 and 75 days for WF-5) of construction inspection services be added to
its contract. The original contract included inspection services based on construction duration of 330
days for WF4 and 270 days for WF-5. Staff has received the Cater & Burgess, Inc. proposal for
additional construction inspection services and cancurs with the additional days requested.
Carter & Burgess, Inc. proposes to provide additional construction and management services for a fee
not to exceed $55,897.15. Staff considers this fee to be fair and reasonable for the work to be performed.
This project is located in COUNCIL DISTRICTS 7 and 9, Mapsco 61 R, X, U, and 62S.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the Commercial Paper-Sewer Fund.
MG:n
Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY
Office by: (to)
Mike Groomer 6140
Originating Department Head: G��Q'5��'jBVU A
A. Douglas Rademaker 6157 (from) AH1® r LS�� ljcJl�
PS46 531200 070460220080 $55,897.15 '
Additional Information Contact: SUV UWO UC ��a
A. Douglas Rademaker 6157
City of Fort Worth, Texas
4vayor and Council communieniflon
DATE REFERENCE NUMBER LOG NAME PAGE
7/24/01 **C-18676 30FORK 1 of 1
SUBJECT AMENDMENT NO. 10 TO ENGINEERING AGREEMENT WITH CARTER & BURGESS
INC. FOR ADDITIONAL CONSTRUCTION MANAGEMENT AND INSPECTION OF
WEST FORK RELIEF SEWER PROJECT SECTIONS WF-4 AND WF-5
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute Amendment No. 10 to
City Secretary Contract No. 18476, for construction management and inspection services with Carter &
Burgess, Inc. for additional work related to West Fork Relief Sewer Project Sections WF-4 and WF-5 for
a fee of$55,897.15 increasing the total contract amount to $2,871,050.15.
DISCUSSION:
On April 30, 9991 (M&C C-12837), the City Council authorized the execution of an engineering
agreement with Carter & Burgess, Inc. for engineering services for West Fork Sanitary Sewer Relief
Project Sections WF-2, WF-3, WF-4, and WF-5 in the amount of $1,949,500.00. Construction of
Sections WF-2 and WF-3 has been completed. This contract was previously revised by nine
amendments, thereby increasing the total contract amount to $2,815,153.00.
The construction of West Fork Sanitary Sewer Project Sections WF-4 and WF-5 is in progress and
nearing completion. Due to unforeseen utility conflicts and subsequent required design modifications
that have lengthened the project duration, Carter & Burgess, Inc. is requesting an additional 105
calendar days (30 days for WF-4 and 75 days for WF-5) of construction inspection services be added to
its contract. The original contract included inspection services based on construction duration of 330
days for WF4 and 270 days for WF-5. Staff has received the Cater & Burgess, Inc. proposal for
additional construction inspection services and cancurs with the additional days requested.
Carter & Burgess, Inc. proposes to provide additional construction and management services for a fee
not to exceed $55,897.15. Staff considers this fee to be fair and reasonable for the work to be
performed.
This project is located in COUNCIL DISTRICTS 7 and 9, Mapsco 61 R, X, U, and 62S.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the Commercial Paper-Sewer Fund.
MG:n
Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY
Office by: (to)
APPROVED
Mike Groomer 6140 ���� COUNCIL Originating Department Head:
A.Douglas Rademaker 6157 (from) JUL 24 2001
PS46 531200 070460220080 $55,897.15 � )
Additional Information Contact:
City Secretary of the
A.Douglas Rademaker 6157 City of Fort Worth,Texas