Loading...
HomeMy WebLinkAboutContract 27018 CITY SECRETARY AMENDMENT NO. 3 CONTRACT NO STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and Huitt-Zollars, Inc. , (Engineer) made and entered into City Secretary Contract No. 247741 (the Contract) which was authorized by the City Council by M&C C-17357 on the 30th day of March 1999 and subsequently revised by two previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Clear Fork Parallel Relief Sanitary Sewer, Part 2. WHEREAS, it has become necessary to execute .Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 24, 2001, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $11,500.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $168,387.40. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force d effect. EXECUTED on this the day of 2001, in Fort Worth, Tarrant County, Texas. ATTES Gloria Pearson, ity Secretary APPROVAL RECOMMENDED: APPROVED: J lb - A. Douglas Rademaker, P.E. Mike Groomer Director, Department of Assistant City Manager Engineering .W6 HUITT-ZO INC. Contract Authorization ENGINE By: TJ i �a&4�= C, Date Name: Charles T. Aldredae, P.E. Vice President 500 W. 7t' Street Fort Worth, TX 76102-4728 APPROVED AS TO FORM AND LEGALITY: Gary Stein ;efger Assistant City Attorney 24774-3 HUTF-ZDLL/TS Huitt-Zollars,Inc./500 W.7th Street/Suite 300/Fort Worth,Texas 76102-4728/Phone(817)335-3000/Metro(817)429-1291/Fax(817)335-1025 July 24, 2001 Mr. Mike Domenech, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Street Fort Worth,Texas 76102 Re: Amendment No.3 (Scope Increase) Clear Fork Parallel Relief Sanitary Sewer,Part 2,Main 21 City Secretary No.24774,Sewer Project No.PS46-0704601400250 DOE No.2572,HZI Project No.03-0631.01 Dear Mr. Domenech: Following receipt of your request, we are pleased to provide this proposal for the provision of additional survey and engineering services with respect to the above referenced project. The work is to be performed as a single phase which will make up Amendment No. 3 for the project. Services associated with this phase of the work are specifically listed below: • Survey and tie the two locations of existing manholes recently installed by City forces on the M-134 sewer main within the Centennial railroad yard. Field measurements are to be tied to control points associated with the construction drawings. Field information regarding the new manholes will be added to the construction drawings. • Design of cross connections from the two new manholes, referenced in Task 1 above,to the proposed M-439 relief sewer main. Cross connections to consist of 24-inch ductile iron pipe. Provision of knife gate valves at the two M-134 connection points. • Redesign of the manhole scheduled to be constructed at station 203+39.43 on the proposed M-439 main to include a gap of 3-feet between the wall of the manhole and the stop gate for the provision of maintenance equipment ingress and egress. • Elimination of the two manholes proposed to be located at stations 92+80 and 100+10 on existing sewer main M-134. Addition of a new manhole on this main at approximately station 96+00 to provide one of the cross connections to the proposed M-439 main as noted in Task 2 above. Addition of a new manhole to the proposed M-439 main between stations 177+96 and 182+96 without the provision of a stop gate. Amendment No. 3 services will be provided for a fixed fee of$11,500.00. �XV�t2�r�,( 4i,1te,M The fee as listed above are based upon a single plan submission for each amendment aric a `1 15rJU� WilUitl, of review comments requiring clarifications only. R Dallas/Fort Worth/Houston/EI Paso/Phoenix/Tustin/Ontario/Albuquerque/Seattle/Tacoma/Denver Mr. Mike Domenech July 24, 2001 Page 2 Following is an updated Project Fee Summary: Contract Item Description Fee Original Contract Notice to Proceed(04/09/00) $137,416.00 Amendment No. 1 UPRR Added Easements $5,521.40 Amendment No. 2 Increased Scope $13,950.00 Amendment No. 3 Revision/Increased Scope $11,500.00 TOTAL $168,387.40 All work as outlined above will be directed and coordinated through our Fort Worth office and is anticipated to be completed entirely in-house. We trust the information as provided herein is satisfactory to your needs. This proposal, along with the standing terms and conditions of our original contract, will comprise our agreement. Thank you for the opportunity to be of service to the City of Fort Worth. Sincerely, HUITT-ZOLLARS,INC. ACCEPTED Title ig P. Schellbach P.E. Date DR. NW00111VITHIT . H:\proj\03063101\Admin\Amend 3 072401.doc