Loading...
HomeMy WebLinkAboutContract 27033 (3) SECOND AMENDMENT TO `,1TY SECRETARY `7NTRACT NO. oZ CITY SECRETARY CONTRACT NO. 17201 CITY OF BURLESON WHOLESALE WATER CONTRACT WHEREAS, on the 27"' day of June, 1989, the City of Fort Worth and the City of Burleson entered into City of Fort Worth City Secretary Contract No. 17207 (the "Contract"), for the sale of treated water by the City of Fort Worth to the City of Burleson; and WHEREAS, on the 2nd July, 1991, the City of Fort Worth and the City of Burleson amended the Contract by entering into City of Fort Worth City Secretary Contract No. 18583, said contract amendment being related to the assessment and collection of system access fees; and WHEREAS, the City of Fort Worth and the City of Burleson desire to fiirther amend the Contract in order for the City of Burleson to obtain an additional point of connection to the Fort Worth System: and WHEREAS, the City of Fort Worth has sufficient capacity in the water main where the additional point of connection is to be installed and there is no need to construct new water mains in order to allow the additional point of connection. NOW, THEREFORE,KNOW ALL BY THESE PRESENTS: 1. City of Fort Worth City Secretary Contract No. 17201 is amended by adding a new paragraph 24 which shall be and read as follows: "24. Additional Point of Connection 24.1 Customer is granted an additional point of connection to the Fort Worth System, such point of connection to be located at the approximate location as shown on Exhibit"A" attached hereto. 24.2 Customer, at its sole cost and expense, shall be responsible for the design and construction of the meter vault and the installation of all metering equipment, which shall be subject to the review and approval of Fort Worth. The metering equipment shall be in compliance with paragraph 3.1 of City of Fort Worth City Secretary Contract No. 17201. All construction shall be inspected by and acceptable to Fort Worth. Upon completion and acceptance of the meter vault and metering equipment, the operation and maintenance of same shall be the responsibilit F Worth, the cost thereof being a System Cost. �i�A �NOW ifG`�(�SAdy 24.3 Customer, at its sole cost and expense, shall be responsible for cons ru �.. the water main extension from the Fort Worth water main to the meter statin ' f . 24.4 Customer, at its sole cost and expense, shall design and construct install a backflow prevention device, together with any necessary housing therefore, which shall be subject to the review and approval of Fort Worth. Customer, at its sole cost and expense, shall be responsible for the operation and maintenance of such backflow prevention device and housing. 24.5 In the event Customer desires to have a larger meter installed at a time when the sixteen-inch(16")turbo meter is not otherwise in need of replacement, Customer shall make written request to Fort Worth for its consideration. If Fort Worth, in its sole discretion, approves the installation of the larger meter, Customer, at its sole cost and expense, will be responsible for the design of the larger meter, such design being subject to Fort Worth's written approval. The installation of the larger meter will be at Customer's sole cost and expense. 2. All other terms, conditions, and covenants contained in City of Fort Worth City Secretary Contract 17201 not amended herein shall continue in full force and effect. ST: CITY OF F WO H By: lona Pears , City Secretary Mike Groomer Assistant City Manager Approved as to Form and C-- g L q/ Legality: -ontract Authorization J Assistant City Attorney .,to ATTEST: CITY OF BURLESON By: City Secr t Approved as to Form and LegtAev City uk)@ NO EIN 9 � . Ii�{ 7R 302% •. 1R SAS 1 � I Itr Ta SA2 iR 3 u 14 680 I ZD E. °1 TA SA 3 a =U m 1 TR!Ma � 19 20 tJ 1 t 2 . �3 Lnn Gv PROJECT LOCATION- 4 m At 1, SAf-5 '° ` CITY OF BURLESON WATER METER NO. 2 a x 2 TR!« 856 N.E. ALSBURY BLVD. 16—INCH MODEL W10 000 DR' _ CENSUS TURBO METH 7 ° W '1 C.� iR 2. a J 1Az f- 1 TR J4 � a6 2 t3748° I SAS $� (n 0016-00001 E. ALS9URY iJRY BLVD). cr- 20• LI AVI L r N E ALSSURY 1 6• w 1 .790 l TM �°te-00710 Z \ •7880 Sa1 61 MET SGU�' 13 Y T E CI Y F O�p�- i SUCTION is, v AQ�,� \ . pL L SgUR P oiiu 76E 20 VI PL LpGE AS 2 2 1 VIL F1 aR 9R .712 O 1 2 12 ' �SEUar 8 �•6 IL app" Yl��pr 1 14 2 A TR 3.1 /7 7R 302J J\ NI TR� / 2A � �1 I to BOONE 5T. CO. R0. 1064 i TR 1A02 1 / IR.2f TR 33Y2A TR 902J7 7R!OS �� �Sc� U l in F fRI TR!A 1 7R!02! 6 1020 J� 2 IA L 1 P , 1 6 ! a Ta!a la 8A3 I7R 302C TR 88 - 7R 8ES D IV 7R 3_9�"""'�' �•. (/} I 6E R.C.M.. City of Fort Worth, Texas "floor and council Communication DATE REFERENCE NUMBER I LOG NAME PAGE 7/31/01 **C-18691 60BURLESON 1 of 1 SUBJECT UNIFORM WATER CONTRACT AMENDMENT WITH THE CITY OF BURLESON RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract amendment with the City of Burleson providing for the construction of an additional wholesale water meter connection to the Fort Worth system. DISCUSSION: The uniform wholesale water contract requires additional points of connection to the Fort Worth system be mutually agreed upon by the wholesale customer and the City of Fort Worth. The City of Burleson has requested an additional water connection at the location of 856 N.E. Alsbury Boulevard to provide service to the City of Burleson's tank site. Under the terms of the contract, the City of Burleson will pay the cost of the new metering facilities and any cost associated with connection to the Fort Worth system. Staff has reviewed the requested meter locations and capacity issues with the City of Burleson and has no objection to approval of these connections. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that this action will have no material effect on City funds. MG:n Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) APPROVED Mike Groomer 6140 CITY COUNCIL Originating Department Head: JUL 31 2001 Dale Fisseler 8207 (from) Additional Information Contact: City sectstauy of 00 CitT of Fott watth.?as" Dale Fisseler 8207