Loading...
HomeMy WebLinkAboutContract 48366-CO3 FORT WORTH,:: City of Fort Worth CITY SECRETARY 4 g 1 _603 4� Change Order Request BreakdowRONTRACTNO. cP ProjectNamel Transportation Connections for Bicycles&Pedestrians Phase II City Sec# 1 48366 Client Project#(s) Contractorl The Fain Group, Inc. PM Clarence Bryant Inspectorl Eddie Walker Change Order Submittal# 0 Date 1/22/2018 Dept. PACS Contract Time Totals CD Original Contract Amount $3,222,964.25 $3,222,964.25 220 Extras to Date 10 Credits to Date Pending Change Orders(in M&C Process) $240,560.00 $240,560.00 45 Contract Cost to Date $3,463,524.25 $3,463,524.25 275 Amount of Proposed Change Order $68,482.46 $68,482.46 0 Revised Contract Amount $3,532,006.71 $3,532,006.71 275 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $68,482.46 $68,482.46 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 9.59% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25516) $4,028,705.31 AIL` v� #� r 1 :. ATION(RIlA OOH)F,9 CIiA 40E ORDER ` TRWD required more customized construction of the low water crossing and the addition of concrete riprap for bank and slope stabilization. As a result,this increased the quantities of certain items to construct this major component of the trail. In order to construct the low water crossing,more of the existing concrete slope had to be removed in order to tie in the additional concrete riprap. The low water crossing also required more concrete than the plan quantities showed. These changes were necessary to accomplish the construction of the low water crossing and meet the satisfaction of TRWD requirements. 1 8910rr OFFICIAL RECORD CIn•oF P018 CITY SECRETARY CirySFRRcrga r�r w FT.WORTH,TX C) � OL68 L� FOR, H City of Fort worth Change Order Additions Project Name I Transportation Connections for Bicycles&Pedestrians Phase II City Sec# 48366 Client Project# Contractor The Fain Group,Inc. PM Clarence Bryant InspectorF Eddie Walker Charge Order Submittal# 0 Date 1122/2018 ADDITIONS ITEM L)t:b(;RIP I ION DEPT Qty Unit Unit os ota oncrete iprap -UT1 - xcavation( pecial) PA 7. 0 Y 1132-6006 Embankment PA 5 Backfilling avement ges PA Y 5 - obilization TACS 1.00000000 LT 7. 0104-6009 Remove Concrete Riprap PA Y 0420-6044 L C Conc(ooting)(H ) PACS 14.00000000 CY $2f9.UU 742 L C Conc( lab)(HP ) A 0 SF Aluminum Signs( yA) —PArT 2.00000000 EA _MTR7 Broadcast SeedPA Y Block sodding PA Y 4.75 1 Vegetative Watering PA M Dia Drilled Shafts PAS LF 0 one(Abut)(HP ) PACS 5.00000000 CY $1,025.00 04TT-60T RipRap(Stone ommon)( ry)(i 2in) PA 0 Y 0. 5- 5 Rail(Handrail)(Type E) A LF 5. 056TOW Barricades,Signs.Traffic Handling PA M 5 - Temp DMT ont Fence(Install) PA LF 5 - Temp DMT ont Fence(Remove) 1,041.00000000 LF 75 PACS $80,682.46 Sub Total Additions 8, 82. Change Order Additions Page 2 of 4 FoxT�rH City of Fort Worth Change Order Deletions Project Name Transportation Connections for Bicycles&Pedestrians Phase II CitySec# 48366 Client Project# Contractor The Fain Group,Inc. PM Clarence Bryant Inspector Eddie Walker Change Order Submittal# Date 1/22/2018 DELETIONS ITEM DESCRIPTION DEP I Qty Unit Unit Cost Total 1432-6041 iprap(Special) 0506-6041 Biodegradeable Erosion Control Logs PAS 60.00000000 LF PACS $12,200.00 Sub Total Deletions 1 ,2 Change Order Deletions Page 3 of 4 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT 1 7/12/2017 $97,950.00 2 5/31/2017 $142,610.00 3 11/28/2017 $68,482.46 Total $309,042.46 CFW Change Order Approval Pa-COApp03 Page 2 of 3 FORT WORTH® city of Fort Worth •■•. -••.--y Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 3 Change Order No.: Pa - COApp03 Date Started: 1/22/2018 Ad City Sec. No.: 48366 Date Due: 1/31/2018 Project Name: 01734 - Transportation Connections for Bicycles & Pedestrians 01734 DOE Numbers: Project Numbers: Project Concrete trails and pedestrian bridges Description: City Project Mgr.: Clarence Bryant City Inspector: Eddie Walker Contractor: The Fain Group COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Department: Cost($) Fund Account Center: Requested Days: PARD $ 61,432.19 39801-0800450-CO1734-CO438 0 PARD $ 7,050.27 39801-0800450-CO1734-CO500 0 Total: $ 68,482.46 Total Requested Days: 0 Approval Status: https:Hprojectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?Siteld=51500&ProcessI... 2/19/2018 CFW Change Order Approval Pa-COApp03 Page 3 of 3 Approved: Yes Comments: User: Perla Banda Date: 2018-01-24 8:13 AM Approved: Yes Comments: User: Clarence Bryant Date: 2018-01-24 8:34 AM Approved: Yes Comments: User: Joel McElhany Date: 2018-01-29 9:20 AM Approved: Yes Comments: User: Debra Rose Date: 2018-01-29 10:38 AM Approved: Yes Comments: User: David Creek Date: 2018-02-06 5:08 PM Approved: Yes Comments: User: Richard Zavala Date: 2018-02-06 11:26 AM Approved: Yes Comments: User: Doug Black Date: 2018-02-13 6:06 PM A60"d by o 0 RT Approved: Yes Comments: User: Susan Alanis Date: 2018-02-16 9:53 AMS J. tf9 1101ty S TEXT` Action Required: Review and Approve OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX https://projectpoint.buzzsaw.com/ bz web/Forms/Fon Print.aspx?SiteId=51500&Processl... 2/19/2018 CFW Change Order Approval Pa-COApp03 Page 1 of 3 Links 1 fortw_orthgov/PACS/01734 -Transportation Connections for Bicycles&Pedestrians Part 2/Contractor/Change Orders/CO3/Change Order #3.xls Attachments(0) No Attachments have been added to this form. https:Hprojectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?Siteld=51500&ProcessI... 2/19/2018 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. � 1 Name of Employee R,O C-r-T- N� h4W- Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature