Loading...
HomeMy WebLinkAboutContract 50306 CITY�CRETARY CONTRACT NO.FORTWORTH PROJECT MANUAL FOR THE CONSTRUCTION OF M-339 Sewer Main Improvements City Project No.B45002 Betsy Price David Cooke Mayor City Manager Kara L. Shuror Interim Water Department Director Douglas W. Wiersig, P.E. Director, Transportation and Public Works Department Prepared for The City of Fort Worth Water Department 11/14/2017 James DeOtte Engineering, Inc. AdVA James (J'D DeOtte................... Engineering �r''s qs ltt ENGINEERING :.;IC1C. ...................... .............................. BRIAN S. DARBY X11 82623.....:: OFFICIAL RECORD CITY SECRETARY FaFFs G�,�P�y FT.WORTH,TX �� ��� w City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 2/6/2018 - Ordinance No. 23107-02-2018 DATE: Tuesday, February 6, 2018 REFERENCE NO.: "C-28574 LOG NAME: 60SSM3391-CIRCLEC SUBJECT: Authorize Execution of a Contract with William J. Schultz Inc. d/b/a Circle C Construction Company in the Amount of$984,998.00 for Sanitary Sewer Main M-339 Improvements Located in the Harmony Hills Neighborhood, Provide for Project Costs and Contingencies for a Total Amount of$1,181,042.00 and Adopt Appropriation Ordinance (COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the amount of$1,181,042.00 from available funds in the Sewer Capital Projects Close Fund; and 2. Authorize the execution of a contract with William J. Schultz Inc. d/b/a Circle C Construction Company in the amount of$984,998.00 for Sanitary Sewer Main M-339 Improvements (City Project No. B45002). DISCUSSION: This Mayor and Council Communication is to authorize a construction contract for the replacement of the existing deteriorated sanitary sewer beginning from a point on Morrison Drive located 100 feet south of the I.H. 30 Frontage Road/Morrison Drive intersection, southeasterly 3,650 feet. The project was advertised for bid on November 16, 2017 and November 23, 2017 in the Fort Worth Star- Telegram. On December 7, 2017, the following bids were received: Bidder Amount Time of Completion William J. Schultz, Inc. dba Circle C Construction, $984,998.00 300 Calendar Days Co. PM Construction & Rehab -Texas $1,087,787.50 ARK Contracting Services, LLC $1,594,596.00 http://apps.cfwnet.org/ecouncil/printinc.asp?id=25534&print—true&DocType=Print 2/12/2018 In addition to the contract amount, $146,794.00 is required for project management, material testing and inspection and $49,250.00 is provided for project contingencies. This project will have no impact on the Water Department's operating budget when completed. Construction is expected to start in April 2018 and be completed by April 2019. Under this project approximately 3,650 linear feet of 10-inch will be replaced with 18-inch pipe via pipe enlargement method. M/WBE OFFICE: William J. Schultz, Inc. d/b/a Circle C Construction Company is in compliance with the City's Ordinance by committing to seven percent MBE participation. The City's MBE goal on this project is six percent. Construction for the Sanitary Sewer Main M-339 Improvements is one component of the overall project that includes design, project management, easement, acquisition, utility coordination, material testing and inspection.The overall project budget is $1,606,000.00. This project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. The project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance funds will be available in the current capital budget, as appropriated of the Sewer Capital Projects Close Fund. The Fiscal Year 2018 Water Operating Budget includes appropriations of$29,022,689.00 for the purpose of providing Pay-As-You-Go funding for Sewer Capital Projects. After this transfer for Fiscal Year 2018, the balance will be$13,910,987.00. Appropriations for Sanitary Sewer Main M-339 Improvements project will consist of the following: FUND Existing Additional Project Appropriations Appropriations Total* Water Capital Projects $175,000.00 $0.00 $175,000.00 Closed Fund 59605 Sewer Capital Projects $175,000.00 $1,181,042.00 $1,356,042.00 Closed Fund 59608 Project Total $350,000.00 $1,181,042.00 $1,531,042.00 * Numbers rounded for presentation purposes. FUND IDENTIFIERS (FIDs): TO Fund Departmentccoun Project JProgram ctivity Budget Reference# mount ID 1A ID I Year Chartfield 2 http://apps.cfwnet.org/ecouncil/printmc.asp?id=25534&print=true&DocType=Print 2/12/2018 FROM Fund Department ccoun Project Program ctivity Budget Reference# moun ID ID Year Chartfiald 2 CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Kenneth Morgan (8246) Additional Information Contact: Robert Sauceda (2387) ATTACHMENTS 1. 60SSM3391-CIRCLEC 1295.pdf (Public) 2. 60SSM3391-CIRCLEC ComplianceMemo.pdf (CFW Internal) 3. 60SSM3391-CIRCLEC FID Table (Dan).docx (CFW Internal) 4. 60SSM3391-CIRCLEC Map.pdf (Public) 5. 60SSM3391-CIRCLEC SAMpdf (CFW Internal) 6. 60SSM3391-CIRCLEC 60 AO 18.docx (Public) http://apps.cfwnet.org/ecouncil/printmc.asp?id=25534&print=true&DocType=Print 2/12/2018 FoRTWORTH. "I, City of Fort Worth Standard Construction Specification Documents Adopted September 2011 000000-1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 4 SECTION 00 00 00 TABLE OF CONTENTS Division 00- General Conditions 0005 10 Mayor and Council Communication 0005 15 Addenda 00 11 13 Invitation to Bidders 0021 13 Instructions to Bidders 0035 13 Conflict of Interest Affidavit 00 41 00 Bid Form 00 42 43 Proposal Form Unit Price 0043 13 Bid Bond 00 43 37 Vendor Compliance to State Law Nonresident Bidder 0045 11 Bidders Prequalifications 0045 12 Prequalification Statement 0045 13 Bidder Prequalification Application 00 45 26 Contractor Compliance with Workers' Compensation Law 00 45 40 Minority Business Enterprise Goal 00 45 41 Small Business Enterprise Goal 00 52 43 Agreement 0061 13 Performance Bond 0061 14 Payment Bond 0061 19 Maintenance Bond 00 61 25 Certificate of Insurance 00 72 00 General Conditions 00 73 00 Supplementary Conditions Division 01 -General Requirements 01 1100 Summary of Work 01 2500 Substitution Procedures 01 31 19 Preconstruction Meeting 01 3120 Project Meetings 01 32 16 Construction Progress Schedule 01 3233 Preconstruction Video 01 3300 Submittals 01 35 13 Special Project Procedures 01 4523 Testing and Inspection Services 01 5000 Temporary Facilities and Controls 01 5526 Street Use Permit and Modifications to Traffic Control 01 57 13 Storm Water Pollution Prevention Plan 01 58 13 Temporary Project Signage 01 60 00 Product Requirements 01 6600 Product Storage and Handling Requirements 01 7000 Mobilization and Remobilization 01 71 23 Construction Staking and Survey 01 7423 Cleaning 01 77 19 Closeout Requirements 01 78 23 Operation and Maintenance Data 01 7839 Project Record Documents CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Projcct No.B45002 Rcviscd February 2,2016 000000-2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 4 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents Division 31 -Earthwork 31 1000 Site Clearing Division 99—Additional Specifications 99 99 00 Construction Allowance Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's Buzzsaw site at: htps://projectpoint.bLizzsaw.com/client/fortworthgov/Resources/02%20- "'o20Construction%20Documcnts/Specifications Division 02 -Existing Conditions 0241 13 Selective Site Demolition 0241 14 Utility Removal/Abandonment 0241 15 Paving Removal Division 03 -Concrete 03 30 00 Cast-In-Place Concrete 0334 13 Controlled Low Strength Material(CLSM) 03 34 16 Concrete Base Material for Trench Repair 03 8000 Modifications to Existing Concrete Structures Division 31 -Earthwork 3123 16 Unclassified Excavation 31 23 23 Borrow 31 24 00 Embankments 31 25 00 Erosion and Sediment Control Division 32 -Exterior Improvements 3201 17 Permanent Asphalt Paving Repair 32 01 29 Concrete Paving Repair 32 1123 Flexible Base Courses 32 1129 Lime Treated Base Courses 32 1133 Cement Treated Base Courses 32 12 16 Asphalt Paving 32 13 13 Concrete Paving 32 1373 Concrete Paving Joint Sealants 32 16 13 Concrete Curb and Gutters and Valley Gutters 32 1723 Pavement Markings 3232 13 Cast-in-Place Concrete Retaining Walls 3291 19 Topsoil Placement and Finishing of Parkways 3292 13 Hydro-Mulching, Seeding, and Sodding 32 93 43 Trees and Shrubs Division 33 -Utilities 33 01 30 Sewer and Manhole Testing CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised February 2,2016 000000-3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of4 33 01 31 Closed Circuit Television (CCTV)Inspection 3303 10 Bypass Pumping of Existing Sewer Systems 33 04 50 Cleaning of Sewer Mains 3305 10 Utility Trench Excavation,Embedment, and Backfill 3305 12 Water Line Lowering 3305 13 Frame, Cover and Grade Rings-Cast Iron 3305 13.01 Frame, Cover and Grade Rings-Composite 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 3305 17 Concrete Collars 33 05 26 Utility Markers/Locators 33 05 30 Location of Existing Utilities 33 11 05 Bolts,Nuts, and Gaskets 33 11 12 Polyvinyl Chloride(PVC)Pressure Pipe 33 31 15 High Density Polyethylene(HDPE)Pipe for Sanitary Sewer 33 31 20 Polyvinyl Chloride(PVC)Gravity Sanitary Sewer Pipe 33 31 21 Polyvinyl Chloride (PVC)Closed Profile Gravity Sanitary Sewer Pipe 33 31 23 Sanitary Sewer Pipe Enlargement 33 31 50 Sanitary Sewer Service Connections and Service Line 3339 10 Cast-in-Place Concrete Manholes 33 3920 Precast Concrete Manholes 33 39 30 Fiberglass Manholes 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts 3349 10 Cast-in-Place Manholes and Junction Boxes 33 49 20 Curb and Drop Inlets Division 34-Transportation 3441 30 Aluminum Signs 3471 13 Traffic Control Appendix GC-4.02 Subsurface and Physical Conditions GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GC-6.09 Permits and Utilities GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised February 2,2016 0005 10- 1 MAYOR AND COUNCIL COMMUNICATION(M&C) Page 1 of 1 1 SECTION 00 05 10 2 MAYOR AND COUNCIL COMMUNICATION(M&C) 3 4 5 6 [,4ssembler: For Contract Document execution, remove this page and replace with the approved 7 ASI&C for the u1,vard of the project. AJ&C insert shall he ori binepaper.J 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 END OF SECTION CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised July 1,2011 CITY OF FORT WORTH WATER DEPARTMENT ADDENDUM NO. 1 M-339 SEWER MAIN IMPROVEMENTS CITY PROJECT NO. B45002 ADDENDUM RELEASE DATE: December 4,2017 BID OPENING DATE: December 7, 2017 INFORMATION TO BIDDERS: The Plans and Project Manual for the above-mentioned project are revised and amended as follows: PLANS Sheet 3 General Notes: Omit Note#24 in reference to Bypass Pumping being incidental. Bypass Pumping shall be paid for with Pay Item 13. PROJECT MANUAL 1. A full and updated excel file of the entire Bid Proposal Workbook has been posted to Buzzsaw. 2. Specification Section 00 42 43 Proposal Form: a. Bid Item No.27 for Construction Allowance is now a Pre-bid amount of$75,000 IS. b. Bid Item No.28A: i. Now reads for 4'Manhole(with Spectrashield-INSTALLED), ii. Now includes the additional reference to the modified speci ication section 33 31 60 included in this addendum. c. Bid Item No. 2813: i. Renamed to be Bid Item Na 29A ii. Now reads for 4' Extra Depth Manhole(with Spectrashield-INSTALLED), iii. Now includes the additional reference to the modified specification section 33 39 60 included in this addendum, iv. Now is for 120 VF in lieu of 100 VF. d. Bid Item No.28C for 4'Manhole(Armorock Polymer MH): i. Renamed to be Bid Item No. 28B, ii. Now is a pre-bid amount of$6,000 EA. 1%4-339 Addendum 1 -2017-12-04 e. Bid Item No.28D for for 4'Extra Depth Manhole(Armorock Polymer MH).- i. H):i. Renamed to he Bid Item No.29B, ii. Now is for 120 VF in lieu of 100 W. iii. Now is a pre-bid amount of 5400 VF. £ New Bid Item No.30B for 4'Manhole(Armorock Polymer MH)-INSTALLATION)for 14 EA has been added. g. New Bid Item No.28C for 4'Manhole(with Warren Environmental 5-301-14 Epoxy Corrosion Protection-INSTALLED)for 14 EA has been added and includes the reference to the modified specification section 33 39 60 included in this addendum. h. New Bid Item No.29C for 4'Extra Depth Manhole(with Warren Environmental S-301- 14 Epoxy Corrosion Protection-INSTALLED)for 120 VF has been added and includes the reference to the modified specification section 33 39 60 included in this addendum. i. Instructions to the pay items with asterisks(*)have been updated to read: *Bidders must select nay items for either A.B,or C 3. Specification Section 00 45 40 Minority Business Enterprise Specifications has been updated to now have a construction MBE goal of 6%. 4. Modified Specification Section 33 39 60 Liner Systems for Sanitary Sewer Structures has been added. CLARIFICATIONS 1. Questions regarding the use of Armorock Polymer manholes should be directed Mike Bussio 949-371-3297. 2. No flow monitoring data is available for the use of bypass pumping;however,all pipes should be assumed to be flowing full. 3. Per the updated pay item instructions,contractors shall use only one type of manhole product (Spectrashield,Armorock,or Warren)for the entire project. Please acknowledge receipt of the Addendum in the following locations: (1) In the space provided below_ (2) In SECTION 00 4100: BID FORM on Page 3 of 3 in Part 7 Bid Submittal. (3) Indicate in upper case letters on the outside of the sealed bid envelope: "RECEIVED&ACKNOWLEDGED ADDENDUM NO. I" Failure to acknowledge the receipt of Addendum No. 1 could cause the subject bidder to be considered "NON-RESPONSIVE",resulting in disqualification. RECEIPT ACKNOWLEDGED: KARA L.SHUROR INTERIM DIRECTOR --- By: f, By: ROBERTO C. SAUCEDA,P.E, Title: is-r' t 74 SENIOR PROFESSIONAL ENGINEER M-339 Addendum 1-2017-12-04.docx 33 39 6U-1 LINER SYSTEM FOR SANITARY SEWER STRUCTURES Page I of 1 SECTION 33 39 60 2 FINERS SYSTEM FOR SANITARY SEWER STRUCTURES 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Application of a high-build epoxy coating system(or modified polymer liner 7 system,i.e.SpectraShield)to concrete utility structures such as manholes, lift 8 station wet wells,junction boxes or other concrete facilities that may need 9 protection from corrosive materials. This covers rehabilitation of existing 10 sanitary sewer structures and newly installed sanitary sewer structures. 11 2. For sanitary sewer mains, use of a structural liner system,Warren 12 Environmental System 301,ARC S1HB by A.W.Chesterton Company,or 13 SpectraShield,is acceptable. 14 B. Deviations from this City of Fort Worth Standard Specification 15 1. Section 1.1.A. 16 2. Section 1.2.A.Le. 17 3. Section 1.2.A.2.c. 18 4. Section 1.6.A.5. 19 5. Section 1.6.13. 20 6. Section 1.11.A. 21 7. Section 2.2.B.3.b. 22 8. Section 2.2.C.3. 23 9. Section 2.4.I.e. 24 10. Section 3.l.A. 25 11. Section 3.3.8.1. 26 12. Section 3.3.13. 27 13. Section 3.7. 28 14. Section 3.11.B. 29 C. Related Specification Sections include but are not necessarily limited to: 30 1. Division 0—Bidding Requirements,Contract Forms, and Conditions of the 31 Contract 32 2. Division 1 —General Requirements 33 3. Section 33 01 30—Sewer and Manhole Testing 34 1.2 PRICE AND PAYMENT PROCEDURES 35 A. Measurement and Payment 36 1. Manholes 37 a. Measurement CIN OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No &15002 Revised March 30,2017 33 3960-2 LINER.SYSTEM FOR SANITARY SEWER STRUCTURES Page 2 or 8 1 1) Measurement for this Item shall be per vertical foot of coating as measured 2 from the bottom of the frame to the top of the bench. 3 b. Payment 4 1) The work performed and materials furnished in accordance with this Item 5 and measured as provided under"Measurement"will be paid for at the unit 6 price bid per vertical foot of"Epoxy Manhole Liner"applied. 7 c. The price bid shall include: 8 1) Removal of roots 9 2) Removal of existing coatings 10 3) Removal of steps 11 4) Repair/seal connection of the existing frame to chimney 12 5) Repairs of any cracks in the existing structure chimney,corbel(cone), 13 wall,bench,including any replacement of damaged rebar,pipe 14 6) Surface cleaning 15 7) Furnishing and installing Liner as specified by the Drawings 16 8) Hauling 17 9) Disposal of excess material 18 10) Clean-up 19 11) Cleaning 20 12) Testing 21 2. Non-Manhole Structures 22 a, Measurement 23 1) Measurement for this Item shall be per square foot of area where the 24 coating is applied. 25 b. Payment 26 1) The work performed and materials furnished in accordance with this Item 27 and measured as provided under"Measurement"shall be paid for at the unit 28 price bid per square foot of"Epoxy Structure Liner"applied. 29 c. The price bid shall include: 30 1) Removal of roots 31 2) Removal of existing coatings 32 3) Removal of steps 33 4) Repairlsea]connection of the existing frame to chimney 34 5) Repairs of any cracks in the existing structure chimney,corbel(cone), 35 wall,bench,including any replacement of damaged rebar,pipe 36 6) Surface cleaning 37 7) Furnishing and installing Liner as specified by the Drawings 38 8) Hauling 39 9) Disposal of excess material 40 10) Clean-up 41 11)Cleaning 42 12) Testing 43 1.3 REFERENCES 44 A. Reference Standards 45 1. Reference standards cited in this Specification refer to the current reference 46 standard published at the time of the latest revision date logged at the end of this 47 Specification, unless a date is specifically cited. CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No,B45002 Revised March 30.2017 333960-3 LINER SYSTEM FOR SANITARY SEWER STRUCTURES Page 3 of 8 1 2. ASTM International(ASTM); 2 a. D543, Standard Practices for Evaluating the Resistance of Plastics to Chemical 3 Reagents. 4 b. D638, Standard Test Method for Tensile Properties of Plastics. 5 c. D695, Standard Test Method for Compressive Properties of Rigid Plastics. 6 d. D790,Standard Test Methods for Flexural Properties of Unreinforced and 7 Reinforced Plastics and Electrical Insulating Materials. 8 e. D4060, Standard Test Method for Abrasion Resistance of Organic Coatings by 9 the Taber Abraser, 10 f. D4414, Standard Practice for Measurement of Wet Film Thickness by Notch I 1 Gages. 12 g. D4541, Standard Test Method for Pull-off Strength of Coatings Using Portable 13 Adhesion Testers. 14 3. Environmental Protection Agency(EPA). 15 4. NACE International(MACE). 16 5. Occupational Safety and Health Administration(OSHA). 17 6. Resource Conservation and Recovery Act,(RCRA). 18 7. The Society for Protective Coatings/NACE International (SSPC/NACE): 19 a. sp 13/NACE No. 6, Surface Preparation of Concrete. 20 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 21 1.5 SUBMITTALS 22 A. Submittals shall be in accordance with Section 01 33 00. 23 B. All submittals shall be approved by the City prior to delivery. 24 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS 25 A. Product Data 26 1. Technical data sheet on each product used 27 2. Material Safety Data Sheet(MSDS)for each product used 28 3. Copies of independent testing performed on the coating product indicating the 29 product meets the requirements as specified herein 30 4. Technical data sheet and project specific data for repair materials to be topcoated 31 with the coating product including application,cure time and surface preparation 32 procedures 33 5. Material and method for repair of leaks or cracks in the structure 34 B. Contractor Data 35 1. Current documentation from coating product manufacturer certifying Contractor's 36 training(and/or licensed)as an approved installer and equipment complies with 37 the Quality Assurance requirements specified herein CITY OF FORT WORTII M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 845002 Revised March 30,2017 333960-4 LINER SYSTEM FOR SAMTARY SEWER STRUCTURES Page 4 of 8 1 2. 5 recent references of Contractor indicating successful application of coating 2 product(s)of the same material type as specified herein,applied by spray 3 application within the municipal wastewater environment. References shall 4 include at least the following: owner name,City inspector name and phone 5 number,prosect name/number,size and linear footage of sanitary sewer main, 6 manhole diameter,structure dimensions and number of each,square feet for 7 vertical feet)of product installed,contract cost,and contract duration. 8 Contractor must demonstrate a successful history of installing the moduct in 9 structures of similar size and scope. 10 1.7 CLOSEOUT SUBMITTALS [NOT USED[ 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE 13 A. Qualifications 14 1, Contractor 15 a. Be trained by, or have training approved and certified by,the coating product 16 manufacturer for the handling, mixing,application and inspection of the coating 17 product(s)to be used as specified herein is b. Initiate and enforce quality control procedures consistent with the coating 19 product(s)manufacturer recommendations and applicable NACE or SSPC 20 standards as referenced herein 21 1.10 DELIVERY,STORAGE,AND HANDLING 22 A. Keep materials dry,protected from weather and stored under cover, 23 B. Store coating materials between 50 degrees F and 90 degrees F. 24 C. Do not store near flame,heat or strong oxidants. 25 D. Handle coating materials according to their material safety data sheets. 26 1.11 FIELD [SITE) CONDITIONS 27 A. Provide confined space entry,flow diversion and/or bypass plans as necessary to 28 perform the specified work. Active flows shall be diverted with flow through plugs as 29 required to ensure that flow is maintained off the surfaces to be lined. 30 1.12 WARRANTY 31 A. Contractor Warranty 32 1. Contractor's Warranty shall be in accordance with Division 0. 33 PART 2- PRODUCTS 34 2.1 OWNER-FURNISHED loej OWNER-SUPPLIED PRODUCTS [NOT USED] 35 2.2 EQUIPMENT,PRODUCT TYPES, MATERIALS 36 A. Repair and Resurfacing Products CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.1345002 Revised March 30,2017 333960-5 LINER SYSTEM FOR SANITARY SEWER STRUCTURES Page 5 of 8 1 1. Compatible with the specified coating product(s)in order to bond effectively, thus 2 forming a composite system 3 2. Used and applied in accordance with the manufacturer's recommendations 4 3. The repair and resurfacing products must meet the following: 5 a. 100 percent solids,solvent-free epoxy grout specifically formulated for epoxy 6 topcoating compatibility 7 b. Factory blended,rapid setting, high early strength, fiber reinforced, non-shrink 8 repair mortar that can be toweled or pneumatically spray applied and 9 specifically formulated to be suitable for topcoating with the specified coating 10 product used I I B. Coating Product 12 1. Capable of being installed and curing properly within a manhole or concrete utility 13 environment 14 2. Resistant to all forms of chemical or bacteriological attack found in municipal 15 sanitary sewer systems;and,capable of adhering to typical manhole structure 16 substrates 17 3. The 100 percent solids, solvent-free ultra high-build epoxy system shall exhibit the 18 following characteristics: 19 a. Application Temperature—50 degrees F, minimum 20 b. Thickness—125 mils minimum for newly installed structures;250 mils 21 minimum for rehabilitation of existina structures(Warren Environmental 22 System 301,ARC S1HB by A.W.Chesterton Company); 500 mils minimum 23 (SpectraShield). 24 c. Color—White, Light Blue, or Beige 25 d. Compressive Strength(per ASTM D695)—8,800 psi minimum 26 e. Tensile Strength(per ASTM D638)—7,500 psi minimum 27 f. Hardness,Shore D(per ASTM D4541)—70 minimum 28 g. Abrasion Resistance(per ASTM D4060 CS 17F Wheel)—80 mg loss 29 maximum 30 h. Flexural Modulus(per ASTM D790)—400,000 psi minimum 31 i. Flexural Strength(per ASTM D790)— 12,000 psi minimum 32 j. Adhesion to Concrete,mode of failure(ASTM D4541): Substrate(concrete) 33 failure 34 k. Chemical Resistance(ASTM D543IG20)all types of service for: 35 1) Municipal sanitary sewer environment 36 2) Sulfuric acid, 70 percent 37 3) Sodium hydroxide,20 percent 38 C. Coating Application Equipment 39 1. Manufacturer approved heated plural component spray equipment 40 2. Hard to reach areas, primer application and touch-up may be performed using hand 41 tools. 42 3. AyOicator shall use approved specialty equipment that is adequate in size, 43 capacW,and number sufficient to accomplish the work in a timely manner. CITY OF FORT WORTH M-339 Sewer Main improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No B45002 Revmd March 30,2017 333960-6 LINER SYSTEM FOR SANITARY SEWER STRUCTURES Page 6 of 8 1 2.3 ACCESSORIES [NOT USED] 2 2.4 SOURCE QUALITY CONTROL 3 1. Testing 4 a. Take wet film thickness gauge per ASTM D4414 at 3 locations within the 5 manhole,2 spaced equally apart along the wall and I on the bench. 6 1) Document and attest measurements and provide to the City, 7 b. After coating has set,repair all visible pinholes by lightly abrading the surface 8 and brushing the lining material over the area. 9 c. Repair all blisters and evidence of uneven cover according to the 10 manufacturer's recommendations. 11 d. Test manhole for final acceptance according to Section 33 01 30. 12 e. A bonded third partv testine company shall perform the testine. 13 PART 3- EXECUTION 14 3.1 INSTALLERS 15 A. All installers shall be certified applicators approved by the manufacturers. Applicator 16 shall use adequate number of skilled workmen that have been trained and 17 experienced for the approved product. 18 19 3.2 EXAMINATION[NOT USED] 20 3.3 PREPARATION 21 A. Manhole Preparation 22 1. Stop active flows via damming, plugging or diverting as required to ensure all 23 liquids are maintained below or away from the surfaces to be coated. 24 2. Maintain temperature of the surface to be coated between 40 and 120 degrees F. 25 3. Shield specified surfaces to avoid exposure of direct sunlight or other intense heat 26 source. 27 a. Where varying surface temperatures do exist,coating installation should be 28 scheduled when the temperature is falling versus rising. 29 B. Surface Preparation 30 1. Remove oils, roots rease, incompatible existing coatings,waxes, form release, 31 curing compounds, efflorescence, sealers,salts or other contaminants which may 32 affect the performance and adhesion of the coating to the substrate. Remove any 33 steps found in the structure. 34 2. Remove concrete and/or mortar damaged by corrosion,chemical attack or other 35 means:of degradation so that only sound substrate remains. 36 3. Surface preparation method, or combination of methods,that may be used include 37 high pressure water cleaning, high pressure water jetting,abrasive blasting, 38 shotblasting, grinding,scarifying,detergent water cleaning,hot water blasting and 39 others as described in SSPC SP 13/NACE No. 6. CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 845002 Revised March 30,2017 333960-7 LINER SYSTEM FOR SANrrARY SEWER STRUCTURES Page 7 or 1 4. All methods used shall be performed in a manner that provides a uniform, sound, 2 clean,neutralized, surface suitable for the specified coating product. 3 5. After completion of surface preparation,inspect for leaks,cracks,holes, 4 exposed rebar,ring and cover condition,invert condition,and inletloutlet pipe 5 condition. 6 6. After defects in the structure have been identified,seal cracks,repair exposed 7 rebar with new rebar to match existing,repair leaks and cracks with grout or 8 other methods approved by the Manufacturer. All new rebar shall be 9 embedded in I%inch epoxy mastic. Replace/seal connection between existing 10 frame and chimney if it is found loose or not attached. 11 7. The repair mortar and epoxy topcoat must share the same epoxy matrix to 12 ensure a bonded weld. No cementitious repair material,quick setting high 13 strength concrete with latex or curing agent additives,or quick set mortars 14 will be allowed. Proper surface preparation procedures must be followed to 15 ensure adequate bond strength to any surface to be coated. New cement cure 16 time is at least 30 days prior to coating. 17 3.4 INSTALLATION 18 A, General 19 1. Perform coating after the sewer line replacement/repairs,grade adjustments and 20 grouting are complete. 21 2. Perform application procedures per recommendations of the coating product 22 manufacturer, including environmental controls,product handling,mixing and 23 application. 24 B. Temperature 25 1. Only perform application if surface temperature is between 40 and 120 degrees F. 26 2. Make no application if freezing is expected to occur inside the manhole within 24 27 hours after application. 28 C. Coating 29 1. Spray apply per manufacturer's recommendation at a minimum film thickness of 30 125 mils. 31 2. Apply coating from bottom of manhole frame to the bench/trough.. including the 32 bench/trough. 33 3. After walls are coated,remove bench covers and spray bench/trough to at least the 34 same thickness as the walls. 35 4. Apply any topcoat or additional coats within the product's recoat window. 36 a. Additional surface preparation is required if the recoat window is exceeded. 37 5. Allow a minimum of 3 hours of cure time or be set hard to touch before reactivating 38 flow. CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No R45002 Revised March 30,2017 333960-8 LINER SYSTEM FOR SANITARY SEWER STRUCTURES Page 8 of 8 1 3.5 REPAIR/RESTORATION [NOT USED] 2 3.6 RE-INSTALLATION [NOT USED] 3 3.7 FIELD loR] SITE QUALITY CONTROL 4 A. Each structure will be visually inspected by the City the same day following the 5 application. 6 B. Groundwater infiltration of the system shall be zero. 7 C. All nice connections shall be open and clear. 8 D. The inspector will check for deficiencies, pinholes,voids,cracks,uncured spots, 9 delamination,and thin spots. Any deficiencies in the liner shall be marked and to repaired according to the procedures outlined by the Manufacturer. 11 E. If leaks are detected they will be chipped back,plugged and coated immediately with 12 protective epoxy resin coating. 13 1. Make repair 24 hours after leak detection. 14 3.8 SYSTEM STARTUP[NOT USED] 15 3.9 ADJUSTING [NOT USED] 16 3.10 CLEANING [NOT USED] 17 3.11 CLOSEOUT ACTIVITIES 18 A. Upon final completion of the work,the manufacturer will provide a written certification 19 of proper application to the City. 20 B. The certification will confirm that the deficient areas were repaired in accordance with 21 the procedure set forth in this Specification. The final report will detail the location of 22 the repairs in the structure and description of the repairs. 23 3.12 PROTECTION [NOT USED] 24 3.13 MAINTENANCE [NOT USED] 25 3.14 ATTACHMENTS [NOT USED] 26 END OF SECTION 27 Revision Log DATE NAME SUMMARY OF CHANGE 28 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No B45002 Revised March 30,2017 00 11 13-1 INVITATION TO BIDDERS Page 1 of 2 1 SECTION 00 1113 2 INVITATION TO BIDDERS 3 4 RECEIPT OF BIDS 5 Sealed bids for the construction of M-339 Sewer Main Improvements, City Project No. B45002 6 will be received by the City of Fort Worth Purchasing Office: 7 8 City of Fort Worth 9 Purchasing Division 10 1000 Throckmorton Street 11 Fort Worth, Texas 76102 12 until 1:30 P.M. CST,Thursday,December 7,2017,and bids will be opened publicly and read 13 aloud at 2:00 PM CST in the Council Chambers. 14 15 GENERAL DESCRIPTION OF WORK 16 The major work will consist of the (approximate) following: 17 2,700 LF of 10"to 18"DR 11 HDPE Sewer by Pipe Enlargement 18 950 LF of 18"ASTM F679 PVC Sewer Pipe by Open Cut 19 20 PREQUALIFICATION 21 The improvements included in this project must be performed by a contractor who is pre- 22 qualified by the City at the time of bid opening. The procedures for qualification and pre- 23 qualification are outlined in the Section 00 21 13 —INSTRUCTIONS TO BIDDERS. 24 25 DOCUMENT EXAMINATION AND PROCUREMENTS 26 The Bidding and Contract Documents may be examined or obtained on-line by visiting the City 27 of Fort Worth's Purchasing Division website at http://www.fortworthtexas..,,ov/purchasing/and 28 clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site. The 29 Contract Documents may be downloaded, viewed, and printed by interested contractors and/or 30 suppliers. The contractor is required to fill out and notarize the Certificate of Interested 31 Parties Form 1295 and the form must be submitted to the Project Manager before the 32 contract will be presented to the City Council. The form can be obtained at 33 https://www.ethics.state.tx.us/tee/1295-Info.htm . 34 35 Copies of the Bidding and Contract Documents may be purchased from James DeOtte 36 Engineering, Inc. which is as follows located at 2201 Dottie Lynn Parkway, Suite 119,Fort 37 Worth, Texas 76120. A 24-hour notice must be given to Brian Darby,P.E. (briandarbySn'deotte- 38 en ,.com)prior to picking up drawings and specifications. 39 40 The cost of Bidding and Contract Documents is: 41 Set of Bidding and Contract Documents with full size drawings: $75 per set. 42 Set of Bidding and Contract Documents with half size (if available)drawings: No half size 43 available. 44 45 46 47 48 49 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised December 22,2016 00 11 13-2 INVITATION TO BIDDERS Page 2 of 2 1 2 PREBID CONFERENCE 3 A prebid conference may be held as described in Section 00 21 13 -INSTRUCTIONS TO 4 BIDDERS at the following location, date,and time: 5 DATE: November 30, 2017 6 TIME: 9:30 AM 7 PLACE: 311 West 10th Street 8 Fort Worth, Texas 76107 9 LOCATION: Water Department Engineering Section 10 11 12 CITY'S RIGHT TO ACCEPT OR REJECT BIDS 13 City reserves the right to waive irregularities and to accept or reject bids. 14 15 INQUIRIES 16 All inquiries relative to this procurement should be addressed to the following: 17 Attn: Roberto C. Sauceda, P.E., City of Fort Worth 18 Email: robert.sauceda@fortworthtexas.gov 19 Phone: 682-432-5478 20 AND/OR 21 Attn: Brian Darby,P.E., James DeOtte Engineering, Inc. 22 Email: briandarby@deotte-eng.com 23 Phone: 817-446-6877 24 25 ADVERTISEMENT DATES 26 November 16, 2017 27 November 23, 2017 28 29 END OF SECTION CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised December 22,2016 0021 13-1 INSTRUCTIONS TO BIDDERS Page 1 of 10 1 SECTION 00 2113 2 INSTRUCTIONS TO BIDDERS 3 4 1. Defined Terms 5 6 1.1. Terms used in these INSTRUCTIONS TO BIDDERS,which are defined in Section 00 7 72 00 -GENERAL CONDITIONS. 8 9 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 10 meanings indicated below which are applicable to both the singular and plural thereof. 11 12 1.2.1. Bidder: Any person, firm,partnership, company, association, or corporation acting 13 directly through a duly authorized representative, submitting a bid for performing 14 the work contemplated under the Contract Documents. 15 16 1.2.2. Nonresident Bidder: Any person, firm,partnership, company, association, or 17 corporation acting directly through a duly authorized representative, submitting a 18 bid for performing the work contemplated under the Contract Documents whose 19 principal place of business is not in the State of Texas. 20 21 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City 22 (on the basis of City's evaluation as hereinafter provided)makes an award. 23 24 2. Copies of Bidding Documents 25 26 2.1. Neither City nor Engineer shall assume any responsibility for errors or 27 misinterpretations resulting from the Bidders use of incomplete sets of Bidding 28 Documents. 29 30 2.2. City and Engineer in making copies of Bidding Documents available do so only for the 31 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant 32 for any other use. 33 34 3. Prequalification of Bidders (Prime Contractors and Subcontractors) 35 36 3.1. All Bidders and their subcontractors are required to be prequalified for the work types 37 requiring prequalification at the time of bidding. Bids received from contractors who are 38 not prequalified(even if inadvertently opened) shall not be considered. Prequalification 39 requirement work types and documentation are as follows: 40 41 3.1.1. Paving—Requirements document located at; 42 https://proiectpoint.buzzsaw.com/fortworthgov/Resources/02°io20- 43 %20Construction%20Doc uments/Contractor%20PrequalificationiTPW`%20Pay Ing 44 %20Contractor%2OPrequalification%2OPrograln/PREQUALIFICATION%20REQ 45 UIREMENTS%20FOR%20PAVING%2000NTRACTORS.PDF?public 46 47 3.1.2. Roadway and Pedestrian Lighting—Requirements document located at; CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised August 21,2015 0021 13-2 INSTRUCTIONS TO BIDDERS Page 2 of 10 1 https://proiectpoint.buzzsaw.coin/fortwoi-thgov/Resourcesi02%20- 2 %20Construction°/02ODocuments/Contractor%2OPrequalificatioii/TPW°/>2OPaving 3 %20Conti-actor%2OPrcqualification°/o2OProgram/PREQUALIFICATION%2OREQ 4 UIREMENTS%20FOR%20PAVING°/>2000NTRACTORS.PDF?public 5 6 3.1.3. Water and Sanitary Sewer—Requirements document located at; 7 https://proicctpoint.buzzsaw.com/fortworth�ov/Resources/02%20- 8 4%20Coiisti-uction4%2ODocumeiits/Contractor%2OPrequalificat]on/Water%20and%2 9 0San]tart'%20Sewer`Yo20Contractor°/o20PrequaIificat1 on%20Program/WSS%20pre 10 qual%20rcquirements.doc?public 11 12 13 3.2. Each Bidder unless currently prequalified,must be prepared to submit to City within 14 seven(7)calendar days prior to Bid opening,the documentation identified in Section 00 15 45 11, BIDDERS PREQUALIFICATIONS. 16 17 3.2.1. Submission of and/or questions related to prequalification should be addressed to 18 the City contact as provided in Paragraph 6.1. 19 20 21 3.3. The City reserves the right to require any pre-qualified contractor who is the apparent 22 low bidder(s) for a project to submit such additional information as the City,in its sole 23 discretion may require, including but not limited to manpower and equipment records, 24 information about key personnel to be assigned to the project, and construction schedule, 25 to assist the City in evaluating and assessing the ability of the apparent low bidder(s)to 26 deliver a quality product and successfully complete projects for the amount bid within 27 the stipulated time frame. Based upon the City's assessment of the submitted 28 information, a recommendation regarding the award of a contract will be made to the 29 City Council. Failure to submit the additional information, if requested,may be grounds 30 for rejecting the apparent low bidder as non-responsive. Affected contractors will be 31 notified in writing of a recommendation to the City Council. 32 33 3.4. In addition to prequalification, additional requirements for qualification may be required 34 within various sections of the Contract Documents. 35 36 3.5. Special qualifications required for this project include the following: 37 3.5.1.The contractor must have a minimum of 100,000' LF of pipe burst pipeline 38 rehabilitation, within the last three(3)years. 39 3.5.2.The contractor must have a minimum or 10,000 LF of"Double Upsize"Pipe 40 bursting, within the last five(5)years. 41 3.5.3.Example: existing 8"up to a 12", or existing 15"up to a 21" 42 3.5.4.Contractor must furnish a list of references where pipe bursting was completed. 43 3.5.5.Contractor's Superintendent must have been employed by the contractor for a 44 minimum of three (3)years. 45 3.5.6.Superintendent will provide a reference list for projects they worked with"Double 46 Upsize"Pipe bursting. 47 48 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 49 50 4.1. Before submitting a Bid, each Bidder shall: 51 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised August 21,2015 0021 13-3 INSTRUCTIONS TO BIDDERS Page 3 of 10 1 4.1.1. Examine and carefully study the Contract Documents and other related data 2 identified in the Bidding Documents(including "technical data" referred to in 3 Paragraph 4.2. below).No information given by City or any representative of the 4 City other than that contained in the Contract Documents and officially 5 promulgated addenda thereto, shall be binding upon the City. 6 7 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and 8 site conditions that may affect cost,progress,performance or furnishing of the 9 Work. 10 11 4.1.3. Consider federal, state and local Laws and Regulations that may affect cost, 12 progress,performance or furnishing of the Work. 13 14 4.1.4. Study all: (i)reports of explorations and tests of subsurface conditions at or 15 contiguous to the Site and all drawings of physical conditions relating to existing 16 surface or subsurface structures at the Site(except Underground Facilities)that 17 have been identified in the Contract Documents as containing reliable "technical 18 data" and(ii)reports and drawings of Hazardous Environmental Conditions, if any, 19 at the Site that have been identified in the Contract Documents as containing 20 reliable "technical data." 21 22 4.1.5. Be advised that the Contract Documents on file with the City shall constitute all of 23 the information which the City will furnish. All additional information and data 24 which the City will supply after promulgation of the formal Contract Documents 25 shall be issued in the form of written addenda and shall become part of the Contract 26 Documents just as though such addenda were actually written into the original 27 Contract Documents. No information given by the City other than that contained in 28 the Contract Documents and officially promulgated addenda thereto, shall be 29 binding upon the City. 30 31 4.1.6. Perform independent research, investigations,tests,borings, and such other means 32 as may be necessary to gain a complete knowledge of the conditions which will be 33 encountered during the construction of the project. On request, City may provide 34 each Bidder access to the site to conduct such examinations, investigations, 35 explorations,tests and studies as each Bidder deems necessary for submission of a 36 Bid. Bidder must fill all holes and clean up and restore the site to its former 37 conditions upon completion of such explorations, investigations,tests and studies. 38 39 4.1.7. Determine the difficulties of the Work and all attending circumstances affecting the 40 cost of doing the Work,time required for its completion, and obtain all information 41 required to make a proposal. Bidders shall rely exclusively and solely upon their 42 own estimates, investigation,research,tests, explorations, and other data which are 43 necessary for full and complete information upon which the proposal is to be based. 44 It is understood that the submission of a proposal is prima-facie evidence that the 45 Bidder has made the investigation, examinations and tests herein required. Claims 46 for additional compensation due to variations between conditions actually 47 encountered in construction and as indicated in the Contract Documents will not be 48 allowed. 49 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.845002 Revised August 21,2015 002113-4 INSTRUCTIONS TO BIDDERS Page 4 of 10 1 4.1.8. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or 2 between the Contract Documents and such other related documents. The Contractor 3 shall not take advantage of any gross error or omission in the Contract Documents, 4 and the City shall be permitted to make such corrections or interpretations as may 5 be deemed necessary for fulfillment of the intent of the Contract Documents. 6 7 4.2. Reference is made to Section 00 73 00—Supplementary Conditions for identification 8 of- 9 10 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to 11 the site which have been utilized by City in preparation of the Contract Documents. 12 The logs of Soil Borings, if any, on the plans are for general information only. 13 Neither the City nor the Engineer guarantee that the data shown is representative of 14 conditions which actually exist. 15 16 4.2.2. those drawings of physical conditions in or relating to existing surface and 17 subsurface structures (except Underground Facilities)which are at or contiguous to 18 the site that have been utilized by City in preparation of the Contract Documents. 19 20 4.2.3. copies of such reports and drawings will be made available by City to any Bidder 21 on request. Those reports and drawings may not be part of the Contract 22 Documents,but the "technical data" contained therein upon which Bidder is entitled 23 to rely as provided in Paragraph 4.02. of the General Conditions has been identified 24 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 25 responsible for any interpretation or conclusion drawn from any"technical data" or 26 any other data, interpretations, opinions or information. 27 28 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder(i) 29 that Bidder has complied with every requirement of this Paragraph 4, (ii)that without 30 exception the Bid is premised upon performing and furnishing the Work required by the 31 Contract Documents and applying the specific means, methods, techniques, sequences or 32 procedures of construction(if any)that may be shown or indicated or expressly required 33 by the Contract Documents, (iii)that Bidder has given City written notice of all 34 conflicts,errors, ambiguities and discrepancies in the Contract Documents and the 35 written resolutions thereof by City are acceptable to Bidder, and when said conflicts, 36 etc.,have not been resolved through the interpretations by City as described in 37 Paragraph 6., and(iv)that the Contract Documents are generally sufficient to indicate 38 and convey understanding of all terms and conditions for performing and furnishing the 39 Work. 40 41 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated 42 biphenyls (PCBs),Petroleum, Hazardous Waste or Radioactive Material covered by 43 Paragraph 4.06. of the General Conditions,unless specifically identified in the Contract 44 Documents. 45 46 5. Availability of Lands for Work,Etc. 47 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised August 21,2015 0021 13-5 INSTRUCTIONS TO BIDDERS Page 5 of 10 1 5.1. The lands upon which the Work is to be performed, rights-of-way and easements for 2 access thereto and other lands designated for use by Contractor in performing the Work 3 are identified in the Contract Documents. All additional lands and access thereto 4 required for temporary construction facilities, construction equipment or storage of 5 materials and equipment to be incorporated in the Work are to be obtained and paid for 6 by Contractor. Easements for permanent structures or permanent changes in existing 7 facilities are to be obtained and paid for by City unless otherwise provided in the 8 Contract Documents. 9 10 5.2. Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed 11 in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- 12 of-way, easements, and/or permits are not obtained,the City reserves the right to cancel 13 the award of contract at any time before the Bidder begins any construction work on the 14 project. 15 16 5.3. The Bidder shall be prepared to commence construction without all executed right-of- 17 way, easements, and/or permits, and shall submit a schedule to the City of how 18 construction will proceed in the other areas of the project that do not require permits 19 and/or easements. 20 21 6. Interpretations and Addenda 22 23 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to 24 City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions 25 received after this day may not be responded to. Interpretations or clarifications 26 considered necessary by City in response to such questions will be issued by Addenda 27 delivered to all parties recorded by City as having received the Bidding Documents. 28 Only questions answered by formal written Addenda will be binding. Oral and other 29 interpretations or clarifications will be without legal effect. 30 31 Address questions to: 32 33 City of Fort Worth 34 200 Texas Street 35 Fort Worth, TX 76102 36 Attn: Roberto C. Sauceda,P.E. Water Department 37 Fax: 817-392-8195 38 Email: robert.sauceda@fortworthtexas.gov 39 Phone: 682-432-5478 40 41 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by 42 City. 43 44 6.3. Addenda or clarifications may be posted via Buzzsaw. 45 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised August 21,2015 002113-6 INSTRUCTIONS TO BIDDERS Page 6 of 10 1 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or 2 INVITATION TO BIDDERS. Representatives of City will be present to discuss the 3 Project. Bidders are encouraged to attend and participate in the conference. City will 4 transmit to all prospective Bidders of record such Addenda as City considers necessary 5 in response to questions arising at the conference. Oral statements may not be relied 6 upon and will not be binding or legally effective. 7 8 7. Bid Security 9 10 7.1. Each Bid must be accompanied by Bid Bond made payable to City in an amount of five 11 (5)percent of Bidder's maximum Bid price on form attached, issued by a surety meeting 12 the requirements of Paragraphs 5.01 of the General Conditions. 13 14 7.2. The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award 15 have been satisfied. If the Successful Bidder fails to execute and deliver the complete 16 Agreement within 10 days after the Notice of Award, City may consider Bidder to be in 17 default,rescind the Notice of Award, and the Bid Bond of that Bidder will be forfeited. 18 Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all 19 other Bidders whom City believes to have a reasonable chance of receiving the award 20 will be retained by City until final contract execution. 21 22 8. Contract Times 23 The number of days within which, or the dates by which,Milestones are to be achieved in 24 accordance with the General Requirements and the Work is to be completed and ready for 25 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the 26 attached Bid Form. 27 28 9. Liquidated Damages 29 Provisions for liquidated damages are set forth in the Agreement. 30 31 10. Substitute and "Or-Equal" Items 32 The Contract, if awarded,will be on the basis of materials and equipment described in the 33 Bidding Documents without consideration of possible substitute or"or-equal" items. 34 Whenever it is indicated or specified in the Bidding Documents that a "substitute" or"or- 35 equal" item of material or equipment may be furnished or used by Contractor if acceptable to 36 City, application for such acceptance will not be considered by City until after the Effective 37 Date of the Agreement. The procedure for submission of any such application by Contractor 38 and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General 39 Conditions and is supplemented in Section 01 25 00 of the General Requirements. 40 41 11. Subcontractors, Suppliers and Others 42 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised August 21,2015 0021 13-7 INSTRUCTIONS TO BIDDERS Page 7 of 10 1 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020- 2 12-2011 (as amended),the City has goals for the participation of minority business 3 and/or small business enterprises in City contracts. A copy of the Ordinance can be 4 obtained from the Office of the City Secretary. The Bidder shall submit the MBE and 5 SBE Utilization Form, Subcontractor/Supplier Utilization Form, Prime Contractor 6 Waiver Form and/or Good Faith Effort Form with documentation and/or Joint 7 Venture Form as appropriate. The Forms including documentation must be received 8 by the City no later than 2:00 P.M. CST, on the second business days after the bid 9 opening date. The Bidder shall obtain a receipt from the City as evidence the 10 documentation was received. Failure to comply shall render the bid as non- 11 responsive. 12 13 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person 14 or organization against whom Contractor has reasonable objection. 15 16 12. Bid Form 17 18 12.1. The Bid Form is included with the Bidding Documents; additional copies may be 19 obtained from the City. 20 21 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form 22 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 23 the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit 24 price item listed therein. In the case of optional alternatives, the words "No Bid," 25 "No Change," or"Not Applicable" may be entered. Bidder shall state the prices, 26 written in ink in both words and numerals, for which the Bidder proposes to do the 27 work contemplated or furnish materials required. All prices shall be written legibly. 28 In case of discrepancy between price in written words and the price in written 29 numerals,the price in written words shall govern. 30 31 12.3. Bids by corporations shall be executed in the corporate name by the president or a 32 vice-president or other corporate officer accompanied by evidence of authority to 33 sign. The corporate seal shall be affixed. The corporate address and state of 34 incorporation shall be shown below the signature. 35 36 12.4. Bids by partnerships shall be executed in the partnership name and signed by a 37 partner,whose title must appear under the signature accompanied by evidence of 38 authority to sign. The official address of the partnership shall be shown below the 39 signature. 40 41 12.5. Bids by limited liability companies shall be executed in the name of the firm by a 42 member and accompanied by evidence of authority to sign. The state of formation of 43 the firm and the official address of the firm shall be shown. 44 45 12.6. Bids by individuals shall show the Bidder's name and official address. 46 47 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 48 indicated on the Bid Form. The official address of the joint venture shall be shown. 49 50 12.8. All names shall be typed or printed in ink below the signature. 51 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised August 21,2015 002113-8 INSTRUCTIONS TO BIDDERS Page 8 of 10 1 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda,the numbers of 2 which shall be filled in on the Bid Form. 3 4 12.10. Postal and e-mail addresses and telephone number for communications regarding the 5 Bid shall be shown. 6 7 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of 8 Texas shall be provided in accordance with Section 00 43 37—Vendor Compliance 9 to State Law Non Resident Bidder. 10 11 13. Submission of Bids 12 Bids shall be submitted on the prescribed Bid Form,provided with the Bidding Documents, 13 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, 14 addressed to Purchasing Manager of the City,and shall be enclosed in an opaque sealed 15 envelope, marked with the City Project Number,Project title,the name and address of 16 Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent 17 through the mail or other delivery system, the sealed envelope shall be enclosed in a separate 18 envelope with the notation "BID ENCLOSED" on the face of it. 19 20 14. Modification and Withdrawal of Bids 21 22 14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office 23 cannot be withdrawn prior to the time set for bid opening. A request for withdrawal 24 must be made in writing by an appropriate document duly executed in the manner 25 that a Bid must be executed and delivered to the place where Bids are to be submitted 26 at any time prior to the opening of Bids. After all Bids not requested for withdrawal 27 are opened and publicly read aloud,the Bids for which a withdrawal request has been 28 properly filed may, at the option of the City,be returned unopened. 29 30 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 31 time set for the closing of Bid receipt. 32 33 15. Opening of Bids 34 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 35 abstract of the amounts of the base Bids and major alternates (if any)will be made available 36 to Bidders after the opening of Bids. 37 38 16. Bids to Remain Subject to Acceptance 39 All Bids will remain subject to acceptance for the time period specified for Notice of Award 40 and execution and delivery of a complete Agreement by Successful Bidder. City may, at 41 City's sole discretion, release any Bid and nullify the Bid security prior to that date. 42 43 17. Evaluation of Bids and Award of Contract 44 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised August 21,2015 0021 13-9 INSTRUCTIONS TO BIDDERS Page 9 of 10 1 17.1. City reserves the right to reject any or all Bids, including without limitation the rights 2 to reject any or all nonconforming, nonresponsive,unbalanced or conditional Bids 3 and to reject the Bid of any Bidder if City believes that it would not be in the best 4 interest of the Project to make an award to that Bidder,whether because the Bid is 5 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to 6 meet any other pertinent standard or criteria established by City. City also reserves 7 the right to waive informalities not involving price, contract time or changes in the 8 Work with the Successful Bidder. Discrepancies between the multiplication of units 9 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies 10 between the indicated sum of any column of figures and the correct sum thereof will 11 be resolved in favor of the correct sum. Discrepancies between words and figures 12 will be resolved in favor of the words. 13 14 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 15 among the Bidders, Bidder is an interested party to any litigation against City, 16 City or Bidder may have a claim against the other or be engaged in litigation, 17 Bidder is in arrears on any existing contract or has defaulted on a previous 18 contract, Bidder has performed a prior contract in an unsatisfactory manner, or 19 Bidder has uncompleted work which in the judgment of the City will prevent or 20 hinder the prompt completion of additional work if awarded. 21 22 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers, and 23 other persons and organizations proposed for those portions of the Work as to which 24 the identity of Subcontractors, Suppliers, and other persons and organizations must 25 be submitted as provided in the Contract Documents or upon the request of the City. 26 City also may consider the operating costs,maintenance requirements,performance 27 data and guarantees of major items of materials and equipment proposed for 28 incorporation in the Work when such data is required to be submitted prior to the 29 Notice of Award. 30 31 17.3. City may conduct such investigations as City deems necessary to assist in the 32 evaluation of any Bid and to establish the responsibility, qualifications, and financial 33 ability of Bidders,proposed Subcontractors, Suppliers and other persons and 34 organizations to perform and furnish the Work in accordance with the Contract 35 Documents to City's satisfaction within the prescribed time. 36 37 17.4. Contractor shall perform with his own organization, work of a value not less than 38 35%of the value embraced on the Contract,unless otherwise approved by the City. 39 40 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and 41 responsive Bidder whose evaluation by City indicates that the award will be in the 42 best interests of the City. 43 44 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award 45 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than 46 the lowest bid submitted by a responsible Texas Bidder by the same amount that a 47 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a 48 comparable contract in the state in which the nonresident's principal place of 49 business is located. 50 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised August 21,2015 0021 13-10 INSTRUCTIONS TO BIDDERS Page 10 of 10 1 17.7. A contract is not awarded until formal City Council authorization. If the Contract is 2 to be awarded, City will award the Contract within 90 days after the day of the Bid 3 opening unless extended in writing. No other act of City or others will constitute 4 acceptance of a Bid. Upon the contractor award a Notice of Award will be issued by 5 the City. 6 7 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 8 9 18. Signing of Agreement 10 When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the 11 required number of unsigned counterparts of the Agreement. Within 14 days thereafter 12 Contractor shall sign and deliver the required number of counterparts of the Agreement to 13 City with the required Bonds, Certificates of Insurance, and all other required documentation. 14 City shall thereafter deliver one fully signed counterpart to Contractor. 15 16 17 18 END OF SECTION CITY OF FORT WORTH M-339 Sewer Main improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised August 21,2015 00 35 13 BID FORM Page 8 of 8 SECTION 00 3513 CONFLICT OF INTEREST AFFIDAVIT Each bidder, offeror, or respondent (hereinafter also referred to as "you") to a City of Fort Worth (also referred to as "City") procurement are required to complete Conflict of Interest Questionnaire (the attached CIQ Form) and Local Government Officer Conflicts Disclosure Statement(the attached CIS Form) below pursuant to state law. This affidavit will certify that the Bidder has on file with the City Secretary the required documentation and is eligible to bid on City Work. The referenced forms may also be downloaded from the website links provided below. hftp://www.ethics,state.tx.us/forms/CIQ.Pdf http://wwvv.ethics.state.tx.us/forms/CIS�pd CIQ Foran is on file with City Secretary CIQ Form is being provided to the City Secretary CIS Form is on File with City Secretary CIS Form is being provided to the City Secretary BIDDER: William J Schultz Inc dba Circle C Construction Comp By: Teresa S Skelly PO Box 40328 Signature: Fort Worth, Texas 76140 Title: President ,,,;r---- END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS M-339 Sewer Main Improvements Form Revised 20120327 City Project No.B45002 0041 00 BID FORM Page 1 of 8 SECTION 00 4100 BID FORM TO: The Purchasing Manager c/o.The Purchasing Division 1000 Throckmorton Street City of Fort Worth,Texas 76102 FOR: M-339 Sewer Main improvements City Project No.: 845002 1. Enter into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated In the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the Interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association,organization,or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice"means the offering, giving, receiving,or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the bidding process to the detriment of City(b)to establish Bid prices at artificial non-competitive levels, or(c)to deprive City of the benefits of free and open competition. c. "collusive practice"means a scheme or arrangement between two or more Bidders,with or without the knowledge of City,a purpose of which is to establish Bid prices at artificial,non-competitive levels. d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS M-339 Sewer Main Improvements Form Revised 20150821 City Project No.845002 004100 BID FORM Page 2 of 8 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Sewer Pipe Enlargement 24-inches and smaller b. c. d. 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 180 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work{and/or achievement of Milestones}within the times specified In the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 4100 b. Required Bid Bond, Section 00 43 13 Issued by a surety meeting the requirements of Paragraph 3.01 of the General Conditions. c. Proposal Form,Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms(optional at time of bid) f. Prequalification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 3513 *If necessary,CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown In this proposal and then totaling all of the extended amounts. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS M43N Sewer Main Improvements Form Revised 2DI50821 City Project No.8450D2 00 41 00 BID FORM Page 3 of 8 6.3. Evaluation of Alternate Bid Items Total Base Bid $881,798.00 Alternate A Bid Alternate B Bid Total Bid $881,798,00 7. Bid Submittal This Bid is submitted on December 7,2017 by the entity named below. Respectfully submitted, Receipt Is acknowledged of the initial --�' following Addenda: By: Addendum No. 1: TSS (Signature) Addendum No.2: Addendum No,3: Teresa S SkeRy Addendum No.4: (Printed Name) Title: President Company: William J Schultz Inc dba Circle C Construction Compa Corporate Seal: Address: PO Box 40328 Fort Worth,Texas 76140 State of Incorporation: Texas Email: t.skeily@circlecconstruction.com Phone: 817-293-1863 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS M339 Sewer Main Improvements Form Revised 20150821 City Project No.845402 W 42 Cl nn)I MIrCIMAt. Pug.5 JN SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID Bidder's Annlication Project Item Information Bidders Proposal Bidlist Unit of Bid Item No. Description Specification Section No. Measure Quantity Unit Price Bid Value 1 3331.1107 10"-18"Pipe Enla rtt DR 11 HDPE 33 31 23 LF 2,700 $155.00 $418,500.00 2 3331.4225 18"Sewer Pi ASTM F679 33 11 10,33 31 13,33 3120,33 3121 LF 950 $155.00 5147,250.00 3 0241.2201 Remove 4'Sewer Mange 02 41 14 EA 13 $1,000.00 $13,000.00 4 3125.0101 SWPPP k 1 acre 312500 LS 1 $15000.00 $15,000.00 5 3201.0202 Asphalt Pvmt Repair Beyond Defined Width,Arterial 32 01 17 SY 150 $65.00 $9.750.00 6 3201.0614 Conc Pvmt Repair,Residential 32 01 29 SY 50 $125.0D $6,250.00 7 3217.0001 4"SLD Pvmt Marks HAS(W) 321723 LF 30 $15.00 $450.00 a 3217.4201 Fire Lane Marldrig 32 17 23 LF 30 $25.00 $750.00 9 3292.0400 Seeding,Hromuich 329213 SY 230 $5,00 $1,150.00 10 3301.0001 Pre-CCN Inspection 33 01 31 LF 3,650 $5.00 $18,250.00 11 3301.0002 Post-CCN Inspection 330131 LF 3,650 $3.00 $10,950.00 12 3301.0101 Manhole Vacuum Testing 33 01 30 EA 14 $200.00 $2,800.00 13 3303.0001 Bypass Pumping 33 03 10 LS 1 $65,000.00 $65.000.00 14 3305.0103 Exploratory Excavation of Existing Utilities 330630 EA 10 $1,000.00 $10,000.00 15 3305.0109 Trench Safety 330510 LF 1,046 $1.00 $1,048.00 16 3305.0110 Utility Markers 330526 LS 1 $1,500.00 $1,500.00 17 3305.0112 Concrete Collar 33 05 17 EA 1 $450.00 $450.00 18 3305.0113 Trench Water Stops 330515 EA 2 $500.00 $1.000.00 19 3331.0108 18"Sewer Pipe,Point Repair 33 31 22,33 31 23 LF 270 $155.00 $41,850.00 20 3341.0103 18"RCP,Class 111 33 41 10 LF 30 $150.00 $4,500.00 21 3341.0201 21"RCP,Class 111 3341 10 LF 30 $150.00 $4,500.00 22 3471.0001 Traffic Control 34 71 13 MO 6 $2,500.00 $15,000.00 23 3471.0002 Portable Message Sin 34 71 13 WK 24 $350.00 $8,400.00 24 9999.0001 Remove 5'Recessed Open Back trial 02 41 14 EA 1 $1,500.00 $1,500,00 25 9999.0002 5'Recessed Open Back Inlet 33 49 20 EA 1 $5,500.00 $5,500.00 26 9999.0003 Gravel(crusted rock-6"depth) 330510 CY 70 $35.00 $2,450.00 27 9999.0004 Construction Allowance 99 99 DO LS 1 $75,000.00 $75,000,00 1211A 3339.1001 4'Manhole with S ectrashield-INSTALLED 33 39 10,33 39 20,33 39 60 EA 14 No Bid Value '28A 3339.1003 4'Extra Depth Manhole(with Spectrashield- 33 39 10,33 39 20,33 39 60 VF 120 No Bid Value INSTALLED) 288 3339.1001 4'Manhole Armorock Polymer MH 33 3910,33 39 20 EA 14 No Bid Value 29B 3339.1003 4'Extra Depth Manhole Armorock Polymer MH 33 39 10,33 39 20 VF 120 No Bid Value 308 3339.1001 4'Manhole Armorock Polymer MH -INSTALLATION 33 3910,33 39 20 EA 14 No Bid Value 28C 3339.1001 4'Manhole(with Warren Environmental S-301-14 Epoxy 33 3910,33 39 20,33 39 60 EA 14 4500 $63,000.00 Corrosion Protection-INSTALLED) 29C 3339.1003 4'Extra Depth Manhole(with Warren Environmental S- 33 39 10,33 39 20,33 39 60 VF 126 335 $40,200.00 301-14 Epoxy Corrosion Protection-INSTALLED) Bidders must select pay items for either A,B,or C. Total Base Bid $881,798.00 CHy OF FOµ7 w(wi71 S1 AstiDARV Y1N'SIVI.Y'tY1N SPRIA'AIYIN Di K'LIMFN 1 4319 Srn er Man l,gmnemmis R+m,Rniv:A.01211110 {'m 1',.gst N"DJY>ti;, 004313 BID BOND Page 4 of 8 SECTION 00 4313 BID BOND KNOW ALL BY THESE PRESENTS: That we,(Bidder Name) William J Schultz Inc dba_ Circle C C:on%truction Company hereinafter called the Principal, and(Surety Name) a corporation or firm duly authorized to transact surety business in the Slate of Texas, hereinafter called the Surety, are held and firmly, bound unto the City, hereinafter called the Obligee, In the sum of -.ZpO' (ik 1J'1r11bDr!- rr'optand No/100 Dollars 0a--Z .00), the payment of which sum Willi be well and truly made and the said Principal and the said Surety,bind ourselves,our heirs,executors, administrators,successors and assigns,jointly and severally,firm by these presents. WHEREAS, the Principal has submitted a proposal to perform work for the following project of the Obligee, identified as M-339 Sewer Main Improvements 0 NOW, THEREFORE, if the Obligee shall award the Contract for the foregoing project to the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the Contract and shall enter into the Contract in writing with the Obligee in accordance with the terms of such proposal, then this bond shall be null and void. If the Principal fails to execute such Contract in accordance with the terms of such proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal or falls to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal, this bond shall become the property of the Obligee, without recourse of the Principal and/or Surety, not to exceed the penalty hereof, and shall be used to compensate Obligee for the difference between PrincipaPs Total Bid Amount and the next selected Bidder's Total Bid Amount. SIGNED this day of ,2017. By: William J Schultz Inc dba Circle C Construction Company (Signature and Titer of Prtrmcipal) *BY S i"j (Signature of Attomeyof,Far) *Attach Power of Attorney(Surety)for Attomey-in-Fact Impressed Surety Seal Only END OF SECTION GTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS M339 Sewer Main Improvements Form Revised 20110627 City Project No.B45002 MERCHANTS BONDING COMPANY.- MERCHANTS OMPANYMERCHANTS BONDING COMPANY(MUTUAL) P.O. Box 14498, DES MOINES, IOWA 50306-3498 PHONE: (800)678-8171 FAX: (515)243-3854 BID BOND PUBLIC WORK Bond No. N/A KNOW ALL PERSONS BY THESE PRESENTS: That William J. Schultz, Inc. dba Circle C Construction Company, P.O.Box 40328, Fort Worth.TX 76140 (hereinafter called the Principal) as Principal, and the Merchants Bonding Company(Mutual) (hereinafter called Surety), as Surety, are held and firmly bound to City of Fort Worth, 1000 Throckmorton Street, Fort Worth Texas 76102 thereinafter called the Obligee)in the full and just sum of( 5%of Greatest Amount Bid ) Five Per Cent of Greatest Amount Bid Dollars good and lawful money of the United States of America, to the payment of which sum of money well and truly to be made, the Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns,jointly and severally, firmly by these presents. Signed and dated this 7th day of December 2017 THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Obligee shall make any award to the Principal for Construction of M-339 Sewer Main Improvements,City Project No. B45002 according to the terms of the proposal or bid made by the Principal therefore, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award, and shall give bond for the faithful performance thereof with the Merchants Bondins Company(Mutual) , as Surety, or with other Surety or Sureties approved by the Obligee;or if the Principal shall, in case of failure to do so, pay to the Obligee the damages which the Obligee may suffer by reason of such failure, not exceeding the penalty of this bond, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect IN TESTIMONY WHEREOF, the Principal and Surety have caused these presents to be duly signed and sealed. Witness: William J. Schultz, Inc,dba Circle C Construction Company / Principal Teresa S. ly,Pr nt Witness •. o Surety:' Merchan Ing o�y(Mutual) By � it John A. Miller Sheryl A. Kluite Attorney-in-Fact CON 0333(2/15) M.ERCHANT� BONDING COMPANY,~ POWER OF ATTORNEY Know All Persons By These Presents,that MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC., both being corporations of the Stale of Iowa(herein collectively called the'Companies)do hereby make,constitute and appoint,individually, John A Miller;John R Stockton;Sheryl A Klutts their true and lawful Attomey(s)-in-Fad, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power-of-Atiomey is granted and is signed and sealed by facsimile under and by authority of the following By-Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding,Inc.,on October 16,2015. 'The President, Secretary,Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys-in-Fact,and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto,bonds and undertakings,recognizances,contracts of indemnity and other writings obligatory in the nature thereof.* 'The signature of any authorized officer and the seat of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company,and such signature and seal when so used shalt have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only,it is agreed that the power and aut hority hereby given to the Attorney-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation, It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or Its assignee, shall not relieve this surety company of any of its obligations under Its bond. In Connection with obligations in favor of the Kentucky Department of Highways only,it is agreed that the power and authority hereby given to the Attomey-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner- Department of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation. In Witness Whereof,the Companies have caused this instrument to be signed and sealed this 6th day of April 2017 `'.•aQ p't�pG�A4 .,�.. •.�,QN11G•Ca, A MERCHANTS BONDING COMPANY(MUTUAL) O • •46.O RQ0R9.9�A 0. MERCHANT NATIONAL BONDING,INC. 2003 'q? :yr 1933 c; By / 'ted'• %v =c:• < ..........; ••. .•�p , •� 1� President STATE OF IOWA via •'••••••• COUNTY OF DALLAS ss. On this this 6th day of April 2017 , before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies;and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. _ �e"tstAt s AUCIA K.GRAM Z ,`, Commissial Number 767430 My Commission Expires r WI 1,2020 Notary Public (Expiration of notary's commission does riot Invalidate this instrument) 1,William Warner,Jr.,Secretary of MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC.,do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies,which is still in full force and effect and has not been amended or revoked. In Witness Whereof,I have hereunto set my hand and affixed the seal of the Companies on this 7th day of December , 2017 . �p ;�O.C4 VL POq' ski' si Z a Z :y: 1933 •'C: secretary �v. 2003 •r'.�: . POA 0018 (3/17) ""••`"` MERCHANTS BONDING COMPANY. MERCIIANT5 BONDING COMPANY(MUTUAL) • MERCHANTS NATIONAL. BONDING, INC. P.O, Box 14498 • DES MOINES,IOWA 50306-3498 (800)678-8171 • (515)243-3854 FAX Please send all notices of claim on this bond to: Merchants Bonding Company (Mutual)/Merchants National Bonding, Inc. P.O. Box 14498 Des Moines, Iowa 50306-3498 (515) 243-8171 (800) 678-8I7I Physical Address: 6700 Westown Parkway, West Des Moines, Iowa 50266 SUP 0073 TX(2/15) 004331 VENDOR COMPLIANCE TO STATE LAW Page B of 8 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders.This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A, Nonresident bidders in the State of Seta Hoo , our principal place of business, are required to be *re percent lower than resident bidders by State Law, A copy of the statute is attached. Nonresident bidders in the State of SMte #ere or Wang ,our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. P BIDDER: William J Schultz Inc dba Circle C Construction By: Teresa S Skelly Company PO Box 40328 (Signature) Fort Worth, Texas 76140 Title: President Date: X/eeZow P,-, 7 Ed/7 END OF SECTION CI YOF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS M-339 Sewer Main Improvements Forth Revised 20910827 City Project No.B45002 004511 -I BIDDERS PREQUALIFICATIONS Page 1 of 3 1 SECTION 00 45 11 2 BIDDERS PREQUALIFICATIONS 3 4 1. Summary.All contractors are required to be prequalified by the City prior to submitting 5 bids. To be eligible to bid the contractor must submit Section 00 45 12, Prequalification 6 Statement for the work type(s) listed with their Bid. Any contractor or subcontractor who is 7 not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder 8 Prequalification Application in accordance with the requirements below. 9 10 The prequalification process will establish a bid limit based on a technical evaluation and 11 financial analysis of the contractor. The information must be submitted seven (7) days prior 12 to the date of the opening of bids. For example, a contractor wishing to submit bids on 13 projects to be opened on the 7th of April must file the information by the 31 st day of March 14 in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's 15 Prequalification Application, the following must accompany the submission. 16 a. A complete set of audited or reviewed financial statements. 17 (1) Classified Balance Sheet 18 (2) Income Statement 19 (3) Statement of Cash Flows 20 (4) Statement of Retained Earnings 21 (5) Notes to the Financial Statements, if any 22 b. A certified copy of the firm's organizational documents (Corporate Charter,Articles 23 of Incorporation,Articles of Organization, Certificate of Formation, LLC 24 Regulations, Certificate of Limited Partnership Agreement). 25 c. A completed Bidder Prequalification Application. 26 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas 27 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification 28 number visit the Texas Comptroller of Public Accounts online at the 29 following web address www.window.state.tx.us/taxpermit/and fill out the 30 application to apply for your Texas tax ID. 31 (2) The firm's e-mail address and fax number. 32 (3) The firm's DUNS number as issued by Dun &Bradstreet. This number 33 is used by the City for required reporting on Federal Aid projects. The DUNS 34 number may be obtained at www.dnb.com. 35 d. Resumes reflecting the construction experience of the principles of the firm for firms 36 submitting their initial prequalification. These resumes should include the size and 37 scope of the work performed. 38 e. Other information as requested by the City. 39 40 2. Prequalification Requirements 41 a. Financial Statements. Financial statement submission must be provided in 42 accordance with the following: 43 (1) The City requires that the original Financial Statement or a certified copy 44 be submitted for consideration. CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised July I,2011 0045 11 -2 BIDDERS PREQUALIFICATIONS Page 2 of 3 1 (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting firm registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting firm should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: (1)express an unqualified opinion, or(2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require a new statement at any time. 20 (8) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital(working capital=current assets—current 26 liabilities)by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidder Prequalification Application. A Bidder Prequalification Application must be 33 submitted along with audited or reviewed financial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report, the notation of 37 "None"or"N/A" should be inserted. 38 (2) A minimum of five(5)references of related work must be provided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility to Bid 47 a. The City shall be the sole judge as to a contractor's prequalification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 contractor to demonstrate acceptable financial ability or performance. 50 c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised July 1,2011 0045 11 -3 BIDDERS PREQUALIFICATIONS Page 3 of 3 1 d. If a contractor has a valid prequalification letter, the contractor will be eligible to bid 2 the prequalified work types until the expiration date stated in the letter. 3 4 5 6 7 8 END OF SECTION 9 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised July I,2011 00 45 12 SID FORM Page 7 of 8 SECTION 00 4512 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Sewer Pipe Enlargement 24- Circle C Construction 4/30/2018 inches and smaller List work type here or space Company Name Here or space Date Here or space List work type here or space Company Name Here or space Date Here or space List work type here or space Company Name Here or space Date Here or space The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: William J Schultz Inc dba Circle C Construction By: Teresa S Skelly Company _r PO Box 40328 (Signature) Fort Worth,Texas 76140 Title: President Date: ZD/7 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS M-339 Sewer Main Improvements Form Revised 20120120 City Project No.B45002 FoRTWORTH SECTION 00 45 13 BIDDER PREQUALIFICATION APPLICATION Date of Balance Sheet Mark only one: Individual Limited Partnership Name under which you wish to qualify General Partnership Corporation Limited Liability Company Post Office Box City State Zip Code Street Address (required) City State Zip Code Telephone Fax Email Texas Taxpayer Identification No. Federal Employers Identification No. DUNS No. (if applicable) MAIL THIS QUESTIONAIRE ALONG WITH FINANCIAL STATEMENTS TO: CITY OF FORT WORTH TEXAS 1000 THROCKMORTON STREET FORT WORTH, TEXAS 76102-6311 AND MARK THE ENVELOPE: "BIDDER PREQUALIFICATION APPLICATION" 004513-2 BIDDER PREQUALIFICATION APPLICATION Page 2 of 8 BUSINESS CLASSIFICATION The following should be completed in order that we may properly classify your firm: (Check the block(s)which are applicable—Block 3 is to be left blank if Block 1 and/or Block 2 is checked) Has fewer than 100 employees and/or Has less than$6,000,000.00 in annual gross receipts OR Does not meet the criteria for being designated a small business as provided in Section 2006.001 of the Texas Government Code. The classification of your firm as a small or large business is not a factor in determining eligibility to become prequalified. MAJOR WORK CATEGORIES Water Department Augur Boring - 24-inch diameter casing and less Augur Boring -Greater than 24-inch diameter casing and greater Tunneling—36-Inches—60—inches, and 350 LF or less Tunneling - 36-Inches—60—inches, and greater than 350 LF Tunneling—66"and greater, 350 LF and greater Tunneling—66"and greater, 350 LF or Less Cathodic Protection Water Distribution, Development, 8-inch diameter and smaller Water Distribution,Urban and Renewal, 8-inch diameter and smaller Water Distribution, Development, 12-inch diameter and smaller Water Distribution,Urban and Renewal, 12-inch diameter and smaller Water Transmission, Development, 24-inches and smaller Water Transmission,Urban/Renewal, 24-inches and smaller Water Transmission, Development,42-inches and smaller Water Transmission, Urban/Renewal, 42-inches and smaller Water Transmission, Development,All Sizes Water Transmission, Urban/Renewal,All Sizes Sewer Bypass Pumping, 18-inches and smaller Sewer Bypass Pumping, 18-inches—36-inches Sewer Bypass Pumping 42-inches and larger CCTV, 8-inches and smaller CCTV, 12-inches and smaller CCTV, 18-inches and smaller CCTV, 24-inches and smaller CCTV,42-inches and smaller CCTV,48-inches and smaller CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised December 20,2012 004513-3 BIDDER PREQUALIFICATION APPLICATION Page 3 of S MAJOR WORK CATEGORIES,CONTINUED Sewer CIPP, 12-inches and smaller Sewer CIPP, 24-inches and smaller Sewer CIPP, 42-inches and smaller Sewer CIPP, All Sizes Sewer Collection System, Development, 8-inches and smaller Sewer Collection System, Urban/Renewal, 8-inches and smaller Sewer Collection System, Development, 12-inches and smaller Sewer Collection System, Urban/Renewal, 12-inches and smaller Sewer Interceptors, Development, 24-inches and smaller Sewer Interceptors, Urban/Renewal,24-inches and smaller Sewer Interceptors, Development, 42-inches and smaller Sewer Interceptors, Urban/Renewal,42-inches and smaller Sewer Interceptors, Development, 48-inches and smaller Sewer Interceptors, Urban/Renewal,48-inches and smaller Sewer Pipe Enlargement 12-inches and smaller Sewer Pipe Enlargement 24-inches and smaller Sewer Pipe Enlargement,All Sizes Sewer Cleaning, 24-inches and smaller Sewer Cleaning,42-inches and smaller Sewer Cleaning , All Sizes Sewer Cleaning, 8-inches and smaller Sewer Cleaning, 12-inches and smaller Sewer Siphons 12-inches or less Sewer Siphons 24-inches or less Sewer Siphons 42-inches or less Sewer Siphons All Sizes Transportation Public Works Asphalt Paving Construction/Reconstruction(LESS THAN 15,000 square yards) Asphalt Paving Construction/Reconstruction(15,000 square yards and GREATER) Asphalt Paving Heavy Maintenance(UNDER$1,000,000) Asphalt Paving Heavy Maintenance($1,000,000 and OVER) Concrete Paving Construction/Reconstruction(LESS THAN 15,000 square yards) Concrete Paving Construction/Reconstruction(15,000 square yards and GREATER) Roadway and Pedestrian Lighting CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised December 20,2012 0045 13-4 BIDDER PREQUALIFICATION APPLICATION Page 4 of 8 1. List equipment you do not own but which is available by renting DESCRIPTION OF EQUIPMENT NAME AND DETAILED ADDRESS OF OWNER 2. How many years has your organization been in business as a general contractor under your present name? List previous business names: 3. How many years of experience in construction work has your organization had: (a) As a General Contractor: (b)As a Sub-Contractor: 4. *What projects has your organization completed in Texas and elsewhere? CLASS LOCATION NAME AND DETAILED CONTRACT OF DATE CITY-COUNTY- ADDRESS OF OFFICIAL TO AMOUNT WORK COMPLETED STATE WHOM YOU REFER *If requalifying only show work performed since last statement. 5.Have you ever failed to complete any work awarded to you? If so,where and why? 6.Has any officer or owner of your organization ever been an officer of another organization that failed to complete a contract? If so, state the name of the individual, other organization and reason. 7.Has any officer or owner of your organization ever failed to complete a contract executed in his/her name? If so, state the name of the individual,name of owner and reason. CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised December 20,2012 004513-5 BIDDER PREQUALIFICATION APPLICATION Page 5 of 8 8. In what other lines of business are you financially interested? 9. Have you ever performed any work for the City? If so, when and to whom do you refer? 10. State names and detailed addresses of all producers from whom you have purchased principal materials during the last three years. NAME OF FIRM OR COMPANY DETAILED ADDRESS 11. Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship to this person or firm. 12. What is the construction experience of the principal individuals in your organization? PRESENT MAGNITUDE POSITION OR YEARS OF AND TYPE OF IN WHAT NAME OFFICE EXPERIENCE WORK CAPACITY 13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the same household with a City employee,please list the name of the City employee and the relationship. In addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or director who does not live in the same household but who receives care and assistance from that person as a direct result of a documented medical condition. This includes foster children or those related by adoption or marriage. CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised December 20,2012 0045 13-6 BIDDER PREQUALIFICATION APPLICATION Page 6 of 8 CORPORATION BLOCK PARTNERSHIP BLOCK If a corporation: If a partnership: Date of Incorporation State of Organization Charter/File No. Date of organization President Is partnership general,limited, or registered limited liability partnership? Vice Presidents File No. (if Limited Partnership) General Partners/Officers Secretary Limited Partners (if applicable) Treasurer LIMITED LIABILITY COMPANY BLOCK If a corporation: State of Incorporation Date of organization File No. Individuals authorized to sign for Partnership Officers or Managers (with titles, if any) Except for limited partners,the individuals listed in the blocks above are presumed to have full signature authority for your firm unless otherwise advised. Should you wish to grant signature authority for additional individuals, please attach a certified copy of the corporate resolution, corporate minutes,partnership agreement,power of attorney or other legal documentation which grants this authority. CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised December 20,2012 0045 13-7 BIDDER PREQUALIFICATION APPLICATION Page 7 of 8 14. Equipment $ TOTAL BALANCESHEET ITEM QUANTITY ITEM DESCRIPTION VALUE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Various- TOTAL Similar types of equipment may be lumped together. If your firm has more than 30 types of equipment, you may show these 30 types and show the remainder as "various". The City,by allowing you to show only 30 types of equipment,reserves the right to request a complete, detailed list of all your equipment. The equipment list is a representation of equipment under the control of the firm and which is related to the type of work for which the firm is seeking qualification. In the description include, the manufacturer, model, and general common description of each. CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised December 20,2012 004513-8 BIDDER PREQUALIFICATION APPLICATION Page 8 of 8 BIDDER PREQUALIFICATION AFFIDAVIT STATE OF COUNTY OF The undersigned hereby declares that the foregoing is a true statement of the financial condition of the entity herein first named, as of the date herein first given; that this statement is for the express purpose of inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who prepared the balance sheet accompanying this report as well as any depository, vendor or any other agency herein named is hereby authorized to supply each party with any information,while this statement is in force,necessary to verify said statement. , being duly sworn, deposes and says that he/she is the of , the entity described in and which executed the foregoing statement that he/she is familiar with the books of the said entity showing its financial condition; that the foregoing financial statement taken from the books of the said entity as of the date thereof and that the answers to the questions of the foregoing Bidder Prequalification Application are correct and true as of the date of this affidavit. Firm Name: Signature: Sworn to before me this day of , Notary Public Notary Public must not be an officer, director,or stockholder or relative thereof. CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised December 20,2012 00 45 26-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 4 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 5 provides worker's compensation insurance coverage for all of its employees employed on City 6 Project No. B45002. Contractor further certifies that, pursuant to Texas Labor Code, Section 7 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 8 worker's compensation coverage. 9 10 CONTRACTOR- 4,1,, O TRACTORi M e » cTcsa..//z .lin c. a 11 � -� 12 Circlt CCons s��fior7 GOir, 4h By: /eO/e—rdO ff�>r/fy 13 Company (Please Print) 14 15 p0 ,669X y0,3z8 Signature: /1—e .� 16 Address 17 / ��- 18 14,-V:r�G./o. � , �>°.�'QS �G�y4 Title: lo'(;, 'i 19 City/State/Zip (Please Print) 20 21 ,'iP"Y?ue"MICHELE S.LANKFORD 22 THE STATE OF TEXAS § Notary Public *� J�Y�;*s STATE OF TEXAS 23 =,"i�`: =.+p"= Notary ID#1175946-6 24 COUNTY OF TARRANT § �F My Comm.Exp.oar 7.2x19 25 26 BEFORE ME, the undersigned authority, on this day personally appeared 27 -re. -a g,0., S '--DV e,] l U , known to me to be the person whose name is 28 subscribed to the fore oing ins ent,and acknowledged to me that he/she executed the same as 29 the act and deed of r tG 6 eX for the purposes and 30 consideration therein expressed and in the capacity therein stated. 31 32 GIVEN UNDER MY HAND AND SEAL OF OFFICE this g day of 33 T:--P k-vu 20_LS 34 35 36 37 Notary Public in and for the State of T s 38 39 END OF SECTION 40 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised July 1,2011 004540-1 Minority Business Enterprise Specifications Page 1 of 2 1 SECTION 00 45 40 2 Minority Business Enterprise Specifications 3 4 APPLICATION OF POLICY 5 If the total dollar value of the contract is greater than $50,000, then a MBE subcontracting goal is 6 applicable. 7 8 POLICY STATEMENT 9 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority 10 Business Enterprises (MBE) in the procurement of all goods and services. All requirements and 11 regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid. 12 13 MBE PROJECT GOALS 14 The City's MBE goal on this project is 8% of the total bid value of the contract(Base bid applies to Parks 15 and Community Services). 16 17 Note: If both MBE and SBE subcontracting goals are established for this project, then an Offeror 18 must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive. 19 20 COMPLIANCE TO BID SPECIFICATIONS 21 On City contracts $50,000 or more where a MBE subcontracting goal is applied, Offerors are required to 22 comply with the intent of the City's Business Diversity Enterprise Ordinance by one of the following: 23 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation,or 24 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation,or 25 3. Good Faith Effort documentation,or; 26 4. Prime Waiver documentation. 27 28 SUBMITTAL OF REOUIRED DOCUMENTATION 29 The applicable documents must be received by the Purchasing Division, within the following times 30 allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall 31 deliver the MBE documentation in person to the appropriate employee of the purchasing division and 32 obtain a date/time receipt. Such receipt shall be evidence that the City received the documentation in the 33 time allocated. A faxed and/or emailed copy will not be accepted, 34 1. Subcontractor Utilization Form, if received no later than 2:00 p.m., on the second City business goal is met or exceeded: day after the bid opening date, exclusive of the bid opening date. 2. Good Faith Effort and received no later than 2:00 p.m., on the second City business Subcontractor Utilization Form, if day after the bid opening date, exclusive of the bid opening participation is less than statedgoal: date. 3. Good Faith Effort and received no later than 2:00 p.m., on the second City business Subcontractor Utilization Form, if no day after the bid opening date, exclusive of the bid opening MBE participation: date. 4. Prime Contractor Waiver Form, received no later than 2:00 p.m., on the second City business if you will perform all day after the bid opening date, exclusive of the bid opening contracting/supplier work: date. 35 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised June 9,2015 004540-2 Minority Business Enterprise Specifications Page 2 of 2 1 5. Joint Venture Form, if goal is met received no later than 2:00 p.m., on the second City business or exceeded. day after the bid opening date, exclusive of the bid opening date. 2 FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE 3 WILL RESULT IN THE BID BEING CONSIDERED NON-RESONSIVE TO SPECIFICATIONS. 4 FAILURE TO SUBMIT THE REQUIRED MBE DOCUMENTATION WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE.A SECOND FAILURE WILL RESULT IN THE OFFEROR 5 BEING DISQUALIFIED FOR A PERIOD OF ONE YEAR.THREE FAILURES IN A FIVE YEAR PERIOD WILL RESULT IN A DISQUALIFICAITON PERIOD OF THREE YEARS. 6 7 Any Questions,Please Contact The NI/WBE Office at(817) 212-2674. 8 END OF SECTION 9 10 11 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised June 9,2015 005243-1 Agreement Page 1 of 5 1 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on ►, is made by and between the City of Fort Worth, a 4 Texas home rule municipality, acting by and through its duly authorized City Manager, ("City"), and 5 William J. Schultz, Inc. dba Circle C Construction Company, authorized to do business in Texas, acting 6 by and through its duly authorized representative, ("Contractor"). 7 City and Contractor, in consideration of the mutual covenants hereinafter set forth,agree as follows: 8 Article 1.WORK 9 Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project 10 identified herein. 11 Article 2.PROJECT 12 The project for which the Work under the Contract Documents may be the whole or only a part is 13 generally described as follows: 14 M-339 Sewer Main Improvements 15 City Project No.B45002 16 Article 3.CONTRACT TIME 17 3.1 Time is of the essence. 18 All time limits for Milestones,if any,and Final Acceptance as stated in the Contract Documents are 19 of the essence to this Contract. 20 3.2 Final Acceptance. 21 The Work will be complete for Final Acceptance within 180 days after the date when the Contract 22 Time commences to run as provided in Paragraph 2.03 of the General Conditions. 23 3.3 Liquidated damages 24 Contractor recognizes that time is of the essence of this Agreement and that City will suffer 25 financial loss if the Work is not completed within the times specified in Paragraph 3.2 above,plus 26 any extension thereof allowed in accordance with Article 12 of the General Conditions. The 27 Contractor also recognizes the delays, expense and difficulties involved in proving in a legal 28 proceeding the actual loss suffered by the City if the Work is not completed on time. 29 Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages 30 for delay(but not as a penalty), Contractor shall pay City Six Hundred Fifty Dollars($650.00)for 31 each day that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City 32 issues the Final Letter of Acceptance. 33 34 35 36 37 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised January 6,2017 005243-2 Agreement Page 2 of 5 38 Article 4. CONTRACT PRICE 39 City agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an 40 amount in current funds of Nine Hundred Eighty-Four Thousand,Nine Hundred Ninety-Eight Dollars and 41 Zero Cents($984,998.00). 42 Article 5. CONTRACT DOCUMENTS 43 5.1 CONTENTS: 44 A. The Contract Documents which comprise the entire agreement between City and Contractor 45 concerning the Work consist of the following: 46 1. This Agreement. 47 2. Attachments to this Agreement: 48 a. Bid Form 49 1) Proposal Form 50 2) Vendor Compliance to State Law Non-Resident Bidder 51 3) Prequalification Statement 52 4) State and Federal documents(project specific) 53 b. Current Prevailing Wage Rate Table 54 c. Insurance ACORD Form(s) 55 d. Payment Bond 56 e. Performance Bond 57 f. Maintenance Bond 58 g. Power of Attorney for the Bonds 59 h. Worker's Compensation Affidavit 60 i. MBE and/or.SBE Commitment Form 61 j. Form 1295 Certification No. 2=4-1-2R2)431 62 3. General Conditions. 63 4. Supplementary Conditions. 64 5. Specifications specifically made a part of the Contract Documents by attachment or, if not 65 attached, as incorporated by reference and described in the Table of Contents of the 66 Project's Contract Documents. 67 6. Drawings. 68 7. Addenda. 69 8. Documentation submitted by Contractor prior to Notice of Award. 70 9. The following which may be delivered or issued after the Effective Date of the Agreement 71 and, if issued,become an incorporated part of the Contract Documents: 72 a. Notice to Proceed. 73 b. Field Orders. 74 c. Change Orders. 75 d. Letter of Final Acceptance. 76 77 78 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised January 6,2017 005243-3 Agreement Page 3 of 5 79 Article 6. INDEMNIFICATION 80 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, 81 the city, its officers, servants and employees, from and against any and all claims arising out 82 of, or alleged to arise out of, the work and services to be performed by the contractor, its 83 officers, agents, employees, subcontractors, licenses or invitees under this contract. This 84 indemnification provision is specifically intended to operate and be effective even if it is 85 alleged or proven that all or some of the damages being sought were caused, in whole or in 86 part, by any act, omission or negligence of the city. This indemnity provision is intended to 87 include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in 88 defending against such claims and causes of actions. 89 90 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,the city, 91 its officers, servants and employees, from and against any and all loss, damage or destruction 92 of property of the city, arising out of, or alleged to arise out of, the work and services to be 93 performed by the contractor, its officers, agents, employees, subcontractors, licensees or 94 invitees under this contract. This indemnification provision is specifically intended to operate 95 and be effective even if it is alleged or proven that all or some of the damages being sought 96 were caused,in whole or in part, by any act,omission or negligence of the city. 97 98 Article 7. MISCELLANEOUS 99 7.1 Terms. 100 Terms used in this Agreement which are defined in Article 1 of the General Conditions will have 101 the meanings indicated in the General Conditions. 102 7.2 Assignment of Contract. 103 This Agreement, including all of the Contract Documents may not be assigned by the Contractor 104 without the advanced express written consent of the City. 105 7.3 Successors and Assigns. 106 City and Contractor each binds itself, its partners, successors, assigns and legal representatives to 107 the other party hereto, in respect to all covenants, agreements and obligations contained in the 108 Contract Documents. 109 7.4 Severability. 110 Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable III by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall 112 continue to be valid and binding upon CITY and CONTRACTOR. 113 7.5 Governing Law and Venue. 114 This Agreement, including all of the Contract Documents is performable in the State of Texas. 115 Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District 116 of Texas, Fort Worth Division. CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.645002 Revised January 6,2017 005243-4 Agreement Page 4 of 5 117 7.6 Other Provisions. 118 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is classified, 119 promulgated and set out by the City, a copy of which is attached hereto and made a part hereof the 120 same as if it were copied verbatim herein. 121 7.7 Authority to Sign. 122 Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized 123 signatory of the Contractor. 124 125 IN WITNESS WHEREOF,.City and Contractor have executed this Agreement in multiple counterparts. 126 127 This Agreement is effective as of the last date signed by the Parties("Effective Date"). 128 Contractor: City of Fort Worth William J. Schultz, Inc. dba Circle C Construction Company B : Jesus J. Chapa By: f �f'�f� Assistant City Manager (Signature) �. Date: GI-olo _l F ORT.2 0 Teresa S. Skelly Attest: (Printed Name) City S c etary/ _ (Seal) Title: President Address: ��� �C 7 3v PAS P.O.Box 40328 M&C 500 W.Trammell Date: z..G—/,3 City/State/Zip: Contract Compliance Manager: By signing, I acknowledge that I am the person Fort Worth,Texas 76140 responsible for the monitoring and administration of this contract, including ensuring all perform d reporting Date requirem R berto C. $a6ceda,P1. PROJECT MANAGER, Water Department CITY OF FORT WORTH OFFICIAL M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY SECRETARY City Project No.B45002 Revised January 6,2017 FT.WORTH,TX 005243-5 Agreement Page 5 of 5 Approved as to Form and Legality: Douglas W. Black Senior Assistant City Attorney 129 130 131 132 133 APPROVAL RECOMMENDED: 134 13 �� 5 /�(.f 135 (� 137 Christopher Harder,P.E. 138 ASSISTANT DIRECTOR, 139 Water Department 140 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised January 6,2017 006113-1 PERFORMANCE BOND Pagel of 2 1 BOND NO. TXC608552 2 SECTION 00 6113 3 PERFORMANCE BOND 4 5 THE STATE OF TEXAS § 6 § KNOW ALL BY THESE PRESENTS: 7 COUNTY OF TARRANT § 8 9 That we, William J. Schultz, Inc. dba Circle C Construction Company, known as "Principal"herein 10 and Merchants Bonding Company(Mutual), a corporate surety(sureties, if more than one)duly authorized 11 to do business in the State of Texas, known as"Surety"herein(whether one or more), are held and firmly 12 bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of Texas, known 13 as "City" herein, in the penal sum of Nine Hundred Eighty-Four Thousand, Nine Hundred Ninety-Eight 14 Dollars and Zero Cents ($984,998.00), lawful money of the United States, to be paid in Fort Worth, 15 Tarrant County, Texas for the payment of which sum well and truly to be made, we bind ourselves, our 16 heirs, executors, administrators, successors and assigns,jointly and severally, firmly by these presents. 17 WHEREAS, the Principal has entered into a certain written contract with the City awarded the 18 60 day of t , 2018, which Contract is hereby referred to and made a part hereof 19 for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories 20 defined by law, in the prosecution of the Work, including any Change Orders, as provided for in said 21 Contract designated as M-339 Sewer Main Improvements, City Project No. B45002. 22 NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall 23 faithfully perform it obligations under the Contract and shall in all respects duly and faithfully perform 24 the Work, including Change Orders, under the Contract, according to the plans, specifications, and 25 contract documents therein referred to, and as well during any period of extension of the Contract that 26 may be granted on the part of the City, then this obligation shall be and become null and void, otherwise 27 to remain in full force and effect. 28 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant 29 County, Texas or the United States District Court for the Northern District of Texas,Fort Worth Division. CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised January 6,2017 0061 13-2 PERFORMANCE BOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas 2 Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the 3 provisions of said statue. 4 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this 5 instrument by duly authorized agents and officers on this the -- day of ,2018. 6 PRINCIPAL: 7 8 William J. Schultz,Inc. dba 9 Circle C Construction Co-m__pany 10 l� 11 BY: 12 Signature 13 ATTEST( 14 _MNkqAp a j ��L Teresa S. Skelly,President 15 (Principal) Secretary,Michele an rd Name and Title 16 17 Address: P. O.Box 40328 18 19 Fort Worth,TX 76140 20 21 22 Witness as to Principal 23 SURETY: 24 25 Merchants Ag/iding Company Mutual 26 27 BY: -RATI'l 1A 28 Signatur 29 30 Sheryl A.Klutts,Attorney-in-Fact 31 Name and Title 32 33 Address: 6700 Westown Parkway 34 /' 35 u West Des Moines,IA 50266 36 37 Witness as.to Surety,John A. Miller Telephone Number: 1-800-678-8171 38 39 40 *Note: If signed by an officer of the Surety Company,there must be on file a certified extract from the 41 by-laws showing that this person has authority to sign such obligation. If Surety's physical 42 address is different from its mailing address,both must be provided. The date of the bond shall 43 not be prior to the date the Contract is awarded. CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised January 6,2017 M.ERCHANT_S ftb, BONDING COMPANY,. POWER OF ATTORNEY Know All Persons By These Presents,that MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa(herein collectively called the"Companies")do hereby make,constitute and appoint,individually, John A Miller;John R Stockton;Sheryl A Klutts their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power-of-Attorney is granted and is signed and sealed by facsimile under and by authority of the following By-Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding,Inc.,on October 16,2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings,recognizances,contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company,and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only,it is agreed that the power and aut hority hereby given to the Attorney-in-Fact includes any and all consents for the release of retained percentages andlor final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only,it is agreed that the power and authority hereby given to the Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner- Department of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation. In Witness Whereof,the Companies have caused this instrument to be signed and sealed this 6th day of April 2017 .` .•� Cp,�•. •• �'(tP0/Q' �0 Q�'%pQ9 •Ay•: '4MERCHANTS BONDING COMPANY(MUTUAL) l':Z: VQ 9�.yc� MERCHANTS NATIONAL BONDING,INC. �. •1- -p` i7 • 2003 :'�; :y 1933 'c; By '•,�''• ` •'••rJ .•• •••�!y`' �1�• President STATE OF IOWA •••�•'�•�•••����,,' ••••••�••• COUNTY OF DALLAS ss. On this this 6th day of April 2017 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. �Pl s AUCIA K.GRAM a Commission Number 767430 Z In: My Commission Expires _ �- rQW� • April 1,2020 Notary Public (Expiration of notary's commission does riot invalidate this instrument) I,William Warner,Jr.,Secretary of MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC.,do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies,which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this day of 3l('1tA&r�S ,2018. 0 N4 PoR'•� ': RPOq .09.. .�y:GO 4j.•Ga v'. 2003 1933 ;•y• Secretary yy d a�c •.•b,; ........kA o. POA 0018 (3/17) •••''•••••:•••�� '••••••• 0061 14-1 PAYMENT BOND Pagel of 2 1 BOND NO. TXC608552 2 SECTION 00 6114 3 PAYMENT BOND 4 5 THE STATE OF TEXAS § 6 § KNOW ALL BY THESE PRESENTS: 7 COUNTY OF TARRANT § 8 That we, William J. Schultz, Inc. dba Circle C Construction Company, known as "Principal" 9 herein, and Merchants Bonding Company(Mutual), a corporate surety (sureties), duly authorized to do 10 business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly 11 bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of the State of 12 Texas, known as "City"herein, in the penal sum of Nine Hundred Eighty-Four Thousand, Nine Hundred 13 Ninety-Eight Dollars and Zero Cents ($984,998.00), lawful money of the United States,to be paid in Fort 14 Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves, 15 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these 16 presents: 17 WHEREAS, Principal has entered into a certain written Contract with City, awarded the 18 day of -InLAZ" , 2018 which Contract is hereby referred to and made a part hereof for all 19 purposes as if fully set forth herein, to furnish all materials, equipment, labor and other accessories as 20 defined by law, in the prosecution of the Work as provided for in said Contract and designated as M-339 21 Sewer Main Improvements, City Project No.B45002. 22 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall pay all 23 monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of the Texas 24 Government Code, as amended) in the prosecution of the Work under the Contract, then this obligation 25 shall be and become null and void; otherwise to remain in full force and effect. 26 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas 27 Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the 28 provisions of said statute. 29 30 CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised January 6,2017 0061 14-2 PAYMENT BOND Page 2 of 2 1 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this instrument by 2 duly authorized agents and officers on this sD day of 12018. PRINCIPAL: William J. Schultz, Inc. dba Circle C Construction Company ATTEST: BY: Signature Teresa S. Skelly—President (Principal) Secretary, Michele S. nkford Name and Title Address: P. O. Box 40328 Fort Worth,TX 76140 Witness as to Principal SURETY: Merchants Bo Company(Mutual) ATTEST: BY: _ Signature Sheryl A. Klutts, Attorney-in-Fact (Surety) Secreta;• Name and Title Address: 6700 Westown Parkway Gs • West Des Moines,IA 50266-7754 Witness as to Surety, John .Miller Telephone Number: 1-800-678-8171 3 4 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws 5 showing that this person has authority to sign such obligation. If Surety's physical address is different 6 from its mailing address,both must be provided. 7 8 The date of the bond shall not be prior to the date the Contract is awarded. 9 END OF SECTION CITY OF FORT WORTH M-339 Sewer Main Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.B45002 Revised January 6,2017