Loading...
HomeMy WebLinkAboutContract 47193-CO3 FORT WORTH® City of Fort Worth CO' SECRETARY ECR TORY`t7� �✓ W,3 Change Order Request Breakdown Project Name 2015-5 HIR Street Rehabilitation City Sec# 1 47193 Client Project#(s)l 02644 Contractor Cutler Repaving PM Kristian Sugrim I Inspectorl William Mason Change Order Submittal# 0 Date 1/8/2018 Dept. T/PW Contract Time Totals CD Original Contract Amount $3,714,606.65 $3,714,606.65 190 Extras to Date $104.24 $104.24 134 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $3,714,710.89 $3,714,710.89 324 Go to ADD&DEL Tabs to Enter CO Backup $0.00 324 Revised Contract Amount $3,714,710.89 $3,714,710.89 648 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,643,258.31 �.a JU$FIF4GAIONSONSRLtER, , This Change Order is to request an additional 324 Calendar Days to the contract.Two new projects,North Hill Ln.and N.Commerce St.,were added to the contract;also,the limits were extended on NW 21St.The inclusion of these streets segments were authorized by Mayor and Council(C-28281)communication on 6/20/17.Utility clearances for these additions compounded delays.Similarly,delays were encountered with TXDOT R-O-W clearance at SH 183 and Amon Carter Blvd.There were construction delays during the installations of traffic loops at Amon Carter and FAA,Trail Lake Dr., Lackland Rd.and Calmont Ave. Inclement weather conditions was also a drawback. 1b 161 8910 77 \% z �' �w 016 8 L 9� OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX FORT� City of Fort Worth Change Order Additions Project Name 2015-5 HIR Street Rehabilitation City Sec# 47193 Client Project# 02644 Contractor Cutler Repaving PM Kristian Sugnm Inspector William Mason Change Order Submittal# 0 Date 1/8/2018 ADDITIONS Qty Unit UnitCost Total T/PW $0.00 Sub Total Additions Change Order Additions Page 1 of 1 FOR�H City of Fort worth Change Order Deletions Project Name 2015-5 HIR Street Rehabilitation CitySec# 47193 Client Project# 02644 Contractor Cutler Repaving PM Kristian Sugrim Inspector William Mason Change Order Submittal# 0 Date 1/8/2018 DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total T/PW $0.00 Sub Total Deletions Change Order Deletions Page 1 of 1 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 CFW Change Order Approval St-COApp02 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 Fortworthgov/Infrastructure Proiects/02644 - HIR Street Rehabilitation (HMAC 2015-5)/Contractor/Change Orders/Change Order Breakdown # 3 Copy (2) (3) (003).xls Attachments t01 No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/Forms/FomiPrint.aspx?SiteId=51500&ProcessI... 2/20/2018 CFW Change Order Approval St-COApp02 Page 2 of 3 FORT WORM., Ci Change ofFor Worth r Orde Approval pp oval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 3 Change Order No.: St-COApp02 Date Started: 2018-01-16 City Sec. No.: 47193 Date Due: 2018-03-07 Project Name: 02644 - HIR Street Rehabilitation (HMAC 2015-5) Project Numbers: 02644 DOE Numbers: Project Removal and replacement of nonfunctional curb&gutter, Description: driveways and sideawlks; followed by a simultaneous multi-step Cprocess wherein the existing asphaltic pavement is heated, scarified, thoroughly remixed, to a specified depth, and reshaping the old asphaltic surface, applying an asphalt recycling modifier, and then placing an overlay of new asphaltic concrete pavement for the specified thickness. Project Manager: Kristian Sugrim City Inspector: William Mason Contractor: Cutler Repaving COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW 324 Total Cost: $ 0.00 Total Requested Days: 324 Approval Status: https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?Siteld=51500&Processl... 2/20/2018 CFW Change Order Approval St-COApp02 Page 3 of 3 Approved: Yes Comments: User: Bob Veskerna Date: 2018-01-16 4:50 PM Approved: Yes Comments: User: Kristian Sugrim Date: 2018-01-17 8:16 AM Approved: Yes Comments: User: Najib Fares Date: 2018-01-17 11:18 AM Approved: Yes Comments: User: Najib Fares Date: 2018-01-17 11:27 AM Approved: Yes Comments: User: Kim Arnold Date: 2018-01-17 11:42 AM Approved: Yes Comments: User: Doug Wiersig Date: 2018-01-23 2:37 PM Approved: Yes Comments: User: ]ay Chapa Date: 2018-02-20 11:14 AM Action Required: . Mary J. Ka r, ity Secre * f �XAS https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?Siteld=51500&Processl... 2/20/2018 Contract Compliance Manager Re: Change Order No. 3 ($0.00) Contractor: JLB Contracting, LLC. Project Name: HMAC 2015-5 HIR Street rehab. City Secretary No.: 47193 Project No.: CO2644 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract including ensuring all performance and reporting requirements. Name of Employee Project Manager Title