HomeMy WebLinkAboutContract 48949-CO1 KE-I" WoR-rH City of Fort Worth CITY8ECRETARY
Change Order Request CONTRACT NO. 1
Project Name:1 Water and Sanitary Sewer Replacement Contract 2011 WSM-A,Part 1 City Sec No.: 1 48949
59601-0600430-CO1928&59607-0700430-001928-C01783
Projectl�s): DOE No. 6867 City Proj.No.: 01928
Project Description:
Water and Sewer Main installation within the Sylvan Heights West, Scenic Bluff,Cookes Meadow and West Meadowbrook
Neighborhoods
Contractor: Stabile&Winn, Inc. Change Order# Date: 1/23/2018
City Project Mgr.J Roberto C. Sauceda, P.E. City Inspector: I Ryan Miller
Phone Number:1 817-392-2387 Phone Number: 817-223-2259
Dept. Water Sewer TPW Totals Contract Time
(Calendar days)
Original Contract Amount $1,833,484.50 $1,421,299.25 $957,108.25 $4,211,892.00 360
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,833,484.50 $1,421,299.25 $957,108.25 $4,211,892.00 360
Amount of Proposed Change Order $1,750.00 $4,772.80 $6,522.80 030
Revised Contract Amount $1,835,234.50 $1,421,299.25 $961,881.05 $4,218,414.80 390
Original Funds Available for Change Orders $55,100.00 $42,700.00 $47,900.00 $145,700.00
Remaining Funds Available for this CO $55,100.00 $42,700.00 $47,900A0 $145,700.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS o OF ORIGINAL CONTRACT 1 0.15%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $5,264,865.00
h� change order will provide for the following:
• Remobilization to replace temporary pavement repair with permanent pavement repair at the
intersection of two busy collector streets.
• Asphalt driveway transition
• The replacement of 3-inch asphalt pavement with 2-inch asphalt pavement Type D on the project
streets
FOFFICIAL RECOR
Staff concurs with the contractor's request for 30 additional calendar days on the change "tlff Y SECRETA
LRI
FT.WORTH,TX
I
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Name Ci�ntractor Narne C S Da
Stabile&Winn, Inc. Jerry Henderson 2 112-01
Construction
Date• __. AssistantCIW
13. - - �1, �/
M&C Number NfA M&C Date Approved !��
FORT WOwr14 City of Fort Worth
Change Order Additions
Project Name Water and Sanitary Sewer Replacement Contract 2011 WSM-A, Part 1 City Sec No.: 48949
Project No.(s): 59601-0600430-CO1928&59607-0700430-CO1928-CO1783 DOE No. 6867 City Proj. No.: 01928
Project Water and Sewer Main installation within the Sylvan Heights West,Scenic Bluff,Cookes Meadow and West
Description Meadowbrook Neighborhoods
Contractor Stabile&Winn, Inc. Change Order:=1 Date: 1/23/2018
City Project Mgr. Roberto C.Sauceda, P.E. City Inspector Ryan Miller
ADDITIONS
IT
- _ > tai# it. _ T
64 Remobilization for permanent pavement repair Water 1.00 LS $1,750.00 $1,750.00
32 2"Type D HMAC TPW 4,816.00 SY $13.80 $66,460.80
33 HMAC Driveway/Transition TPW 100.00 TN $250.00 $25,000.00
Water $1,750.00
Sewer
TPW $91,460.80
Page 2 of 4 Additions Sub Total 1$93,210.80
FORT WORTH City of Fort worth
Change Order Deletions
Project Name Water and Sanitary Sewer Replacement Contract 2011 WSM-A,Part 1 City Sec No.: 48949
Project No.(s): DOE No. 6867 City Proj.No.: 01928
Project Description Water and Sewer Main installation within the Sylvan Heights West,Scenic Bluff,Cookes Meadow and West
Meadowbrook Neighborhoods
Contractor Stabile&Winn, Inc. Change Order: [i] Date 1/23/2018
City Project Mgr. Roberto C.Sauceda,P.E. City Inspector: Ryan Miller
DELETIONS
ITEM ! -10t4 - DEPT QtY Cost
r$86,688.00 9 3 inch Asphalt Pvmt Type D TPW 4,816.00 SY $18.00
Water
Sewer
TPW 1$86,688.00
Page 3 of 4 Deletions Sub Total 1$86,688.00
MMBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 4 of 4
FORTWORTH
Contract Compliance Manager
By signing I acknowledge that I am the person responsible for the monitoring and administration of this
contract, including ensuring all performance and reporting requirements.
Signature
Roberto C. Sauceda,RE
Name of Employee
Water Department-Engineering
Department
Senior Professional En ig neer
Title
817-392-2387 RT
A► �� ..
Phone �•: '�
J. q4r, S
..P�.
�X
Date
WATER MYARTMFMOFFICIAL,RECORD
ENGih'nmc AND FISCAL SERVICES
Twe Crrr of Farr Wom * 1000 TNfto moRTON STREET * Foi r Wowm,Taus 76 10CITY SECRETARY
817-392,8240 * FAx 817-392,8195
FT.WORTH TX
0 P;U on or