Loading...
HomeMy WebLinkAboutContract 48949-CO1 KE-I" WoR-rH City of Fort Worth CITY8ECRETARY Change Order Request CONTRACT NO. 1 Project Name:1 Water and Sanitary Sewer Replacement Contract 2011 WSM-A,Part 1 City Sec No.: 1 48949 59601-0600430-CO1928&59607-0700430-001928-C01783 Projectl�s): DOE No. 6867 City Proj.No.: 01928 Project Description: Water and Sewer Main installation within the Sylvan Heights West, Scenic Bluff,Cookes Meadow and West Meadowbrook Neighborhoods Contractor: Stabile&Winn, Inc. Change Order# Date: 1/23/2018 City Project Mgr.J Roberto C. Sauceda, P.E. City Inspector: I Ryan Miller Phone Number:1 817-392-2387 Phone Number: 817-223-2259 Dept. Water Sewer TPW Totals Contract Time (Calendar days) Original Contract Amount $1,833,484.50 $1,421,299.25 $957,108.25 $4,211,892.00 360 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,833,484.50 $1,421,299.25 $957,108.25 $4,211,892.00 360 Amount of Proposed Change Order $1,750.00 $4,772.80 $6,522.80 030 Revised Contract Amount $1,835,234.50 $1,421,299.25 $961,881.05 $4,218,414.80 390 Original Funds Available for Change Orders $55,100.00 $42,700.00 $47,900.00 $145,700.00 Remaining Funds Available for this CO $55,100.00 $42,700.00 $47,900A0 $145,700.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS o OF ORIGINAL CONTRACT 1 0.15% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $5,264,865.00 h� change order will provide for the following: • Remobilization to replace temporary pavement repair with permanent pavement repair at the intersection of two busy collector streets. • Asphalt driveway transition • The replacement of 3-inch asphalt pavement with 2-inch asphalt pavement Type D on the project streets FOFFICIAL RECOR Staff concurs with the contractor's request for 30 additional calendar days on the change "tlff Y SECRETA LRI FT.WORTH,TX I It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Name Ci�ntractor Narne C S Da Stabile&Winn, Inc. Jerry Henderson 2 112-01 Construction Date• __. AssistantCIW 13. - - �1, �/ M&C Number NfA M&C Date Approved !�� FORT WOwr14 City of Fort Worth Change Order Additions Project Name Water and Sanitary Sewer Replacement Contract 2011 WSM-A, Part 1 City Sec No.: 48949 Project No.(s): 59601-0600430-CO1928&59607-0700430-CO1928-CO1783 DOE No. 6867 City Proj. No.: 01928 Project Water and Sewer Main installation within the Sylvan Heights West,Scenic Bluff,Cookes Meadow and West Description Meadowbrook Neighborhoods Contractor Stabile&Winn, Inc. Change Order:=1 Date: 1/23/2018 City Project Mgr. Roberto C.Sauceda, P.E. City Inspector Ryan Miller ADDITIONS IT - _ > tai# it. _ T 64 Remobilization for permanent pavement repair Water 1.00 LS $1,750.00 $1,750.00 32 2"Type D HMAC TPW 4,816.00 SY $13.80 $66,460.80 33 HMAC Driveway/Transition TPW 100.00 TN $250.00 $25,000.00 Water $1,750.00 Sewer TPW $91,460.80 Page 2 of 4 Additions Sub Total 1$93,210.80 FORT WORTH City of Fort worth Change Order Deletions Project Name Water and Sanitary Sewer Replacement Contract 2011 WSM-A,Part 1 City Sec No.: 48949 Project No.(s): DOE No. 6867 City Proj.No.: 01928 Project Description Water and Sewer Main installation within the Sylvan Heights West,Scenic Bluff,Cookes Meadow and West Meadowbrook Neighborhoods Contractor Stabile&Winn, Inc. Change Order: [i] Date 1/23/2018 City Project Mgr. Roberto C.Sauceda,P.E. City Inspector: Ryan Miller DELETIONS ITEM ! -10t4 - DEPT QtY Cost r$86,688.00 9 3 inch Asphalt Pvmt Type D TPW 4,816.00 SY $18.00 Water Sewer TPW 1$86,688.00 Page 3 of 4 Deletions Sub Total 1$86,688.00 MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 Page 4 of 4 FORTWORTH Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Roberto C. Sauceda,RE Name of Employee Water Department-Engineering Department Senior Professional En ig neer Title 817-392-2387 RT A► �� .. Phone �•: '� J. q4r, S ..P�. �X Date WATER MYARTMFMOFFICIAL,RECORD ENGih'nmc AND FISCAL SERVICES Twe Crrr of Farr Wom * 1000 TNfto moRTON STREET * Foi r Wowm,Taus 76 10CITY SECRETARY 817-392,8240 * FAx 817-392,8195 FT.WORTH TX 0 P;U on or led paper